When the humanitarian response
requires urban development policies:
THE RESPONSE TO
THE IDP CRISIS IN BANGUI
Presentation by Anne Burlat aburlat@urd.org
When IIED published its call for proposal for research grants (Oct. 2016),
Groupe URD was working on the response to the IDP crisis in Bangui and there were
28 000 estimated IDPs in the M’Poko (airport) site that had to be closed
Sept. 2016 - Peer exchange in Port-au-Prince: an official urban development
delegation from Bangui travelled to Haiti
 Field visits to informal settlements
 Discussions with government representatives about the different response
processes to the Earthquake crisis
 Lessons in the process of being learned
- Aug. 2016 - iNGOs & Governmental institutions: we are doing more than our
mandate requires - they need to make more effort to establish dialogue
 A stand off situation, where both sides are convinced that they are right
 Neither side makes an effort to understand the other’s mandate
- Mar. 2016 - iNGOs: no “forced” IDP displacement according to Kampala convention
 Tensions between CAR Govt. & Int. Humanitarians / Sectorial response
 No knowledge of the Bangui urban context and the impacts of the urban crisis
Research context - initial observations
Linking humanitarian response and development in urban contexts
Impacts of the crisis on Bangui
Neighbourhoods completely destroyed …
14 juin 2011 26 mai 2016
… around the commercial area which became an enclave: known as the Muslim enclave
 The conflict is not a religious one: this oversimplification led to misunderstandings
…there has been almost continuous conflict in the Central Africa Republic since 2002
 Bangui: a crisis within the crisis, where stakeholders did not take the
urban context into account
Crisis impacts
- Field impact: Neighbourhoods completely destroyed around the enclave
- Human impact: million IDPs, 100 000 in M’Poko site
- Political impact: M. Djotodja resigned
Crisis response
- Political response  restore stability
Accord de cessation des hostilités (23rd July 2014)
Temporary Government (Jan. 2015)
Accord DDR (10th May 2015) Forum de Bangui
Presidential election (Feb. 2016)
- Humanitarian response  supporting vulnerable people, mainly IDPs
MIRA (Jan. 2014)
- Structural support  aiming to restart: HRP 2017-2020 (approval Nov. 2016)
RCPCA 2017-2020
 stakeholders did not take the urban context into account
A crisis within the crisis
Which response to which crisis ?
The enclave & its neighbourhoods
by google earth
mid-Dec. 2016 - The site had been closed by the government (MASRN):
 operation Noël à la maison
mid-Feb. 2017 - Tensions between Gvt institutions and iNGOs
- Different positions within different UN agencies
April 2017 : field mission - Meetings, discussions, visits with all types of stakeholders
 Understanding the issues at stake
- Piece together stakeholders’ actions and choices
 with a focus on the relations between these
- First difficulty
 inability to have a clear picture of the past
- Validation of the global hypothesis
 No awareness of the change from a humanitarian crisis with an urban
component to an urban crisis with a humanitarian component.
 The response targets individual vulnerable people without responding to
structural urban issues, which can be seen as a part of the crisis.
The IDP crisis in Bangui
The challenge of responding to a humanitarian crisis
that became an urban crisis
M’Poko IDP site - Internal airport area
Became a part of the city puzzle
19th November 2015
M’Poko was the largest IDP site in Bangui, estimated IDPs: early January 2014 - 100 000
stabilized - 28 000
- M’Poko localisation inside airport area:
along the runway, which people and vehicles frequently cross
 Its closure is a priority for the government: high institutional pressure
and the airport management not accepted by iNGOs
- Dissension about its closure process:
Government proposed relocation to a site without facilities: AVICOM
 Its closure brought humanitarian stakeholders together against the gvt.
 Who can support the recovery ? UN agencies, temporary gvt., iNGOs …
- The first closure process was impeded:
a new explosion of violence (manipulation ?)
 Its closure has obscured other dimensions of the crisis
- Confrontation between two complementary positions
 The government wants to close the IDP site
 Humanitarians want to implement sustainable solutions for the IDPs
M’poko site: emblematic of the crisis in Bangui
What happened after the closure of the largest IDP site?
The 3 sustainable solutions: return, resettlement & local integration:
an interpretation of refugee policies:
- return to the home country,
- resettlement in another country (ideally chosen) or
- integration in the current country (often initially seen as temporary).
 For IDPs:
- return to the former house
- resettlement somewhere else in CAR (return to the village)
- local integration in areas where IDPs take refuge
 Humanitarian programs in Bangui emphasized return
- return to the former house: chosen by more than 90% of the IDPs
but: what question was asked during the profiling?
- resettlement in Bangui = individual choice
resettlement in rural areas: rare in CAR where the tendancy is towards urban
migration and the crisis is national
- local integration: all sites are private (mainly owned by churches) = impossible
local integration: AVICOM gathered the lowest profiling intention.
IDPs & the 3 Sustainable solutions
The framework of all humanitarian activities
7-8 months after the crisis Return was chosen by 87% of IDPs (profiling July
2014)
- It is very common for resettled refugees to express the wish to go home even
though they do nothing to achieve this: could this be similar for IDPs?
- What are the other options in the questionnaire?
Return: what is the essential condition for IDPs?
 Security (and a job, and free access to water, and …)
When security is the objective, only armed solutions are considered: but
where would armed forces be deployed? (cf. profiling, July 2014)
 Along roads and public spaces
- No surveys of the completely destroyed neighbourhoods
- The urban fabric in these neighbourhoods is informal, without road networks
and the government is hostile to their existence.
Related issues: access to water (well issues) and previously non-existent
services (schools, health, etc.)
 iNGOs wanted to oversee the IDPs’ return in good conditions and … inertia
IDPs: the "over-promoted" return solution (1/3)
The security issue - without recognition of the urban context
under-integrated neighbourhoods destroyed
The strength
against informality
8 décembre 2013
26 mai 2016
South of the enclave
under-integrated neighbourhoods destroyed
The strenght
against informality
8 décembre 2013
26 mai 2016
North of the enclave
The majority of IDPs declared former informal activity, whereas the formal
market is the property of the enclave inhabitants
 Good knowledge about former situation and current wishes
(DRC, profiling, etc.)
- When 90% of IDPs declared that they would restart the same activity (profiling,
July 2014) this was seen as a sign that economic recovery was possible
 No questions about the recovery process
- What could have been done to prevent those who had developed a commercial
activity from losing this resilience behaviour?
- What about urban agriculture activities? When there are no local products,
when there are no jobs, and when the economic network has collapsed
Urban migration is due to job opportunities
 Urban contexts are made up of interconnected networks.
- Developing economic activities implies creating links and developing networks
- Having a home is more about having neighbours than having a roof
IDPs: the "over-promoted" return solution (2/3)
The economic issue - the city as a source of opportunities:
What is the situation “after” the crisis?
8th December 2013
M’Poko international airport area
Urban agriculture
29th Decemeber 2016
A former issue
with its own agenda
What about the NUA
paragraphe
considering urban
agriculture inside
urban planification ?
Even though residential migration can reflect growing vulnerability
 Residential migration is a way of urban life
 The Return process only concerns owners
- 39% of M’Poko IDPs declared that they rented a flat/house
- The market is pushing vulnerable renters further and further from the city center
No one approached the MHLSU, which owns land for the city expansion
 MHLSU is the institution responsible for housing and urban issues
- MHLSU declared 35m2 as the minimum suitable size for a house
- MHLSU was involved in the first governmental commitee working on the
response, but did not come back to the next one.
Shelter programs not approved by the government (MHLSU or MASRN)
 Does this imply an indirect responsibility for the destructions?
- Certain government representatives were very vocal in their opposition
- The completly destroyed neighbourhoods were the least integrated areas near
the economic center in Bangui.
- No shared analysis or discussion between iNGOs & MHLSU
IDPs: the " over-promoted return solution (3/3)
The shelter issue - without taking into consideration
the impact on the urban fabric
 Crises in cities - a crisis taking place within a city
- Partial: flooding of a neighbourhood, etc.
- One-off / short-term: a strike, poorly managed waste, etc.
- One-off / mid-term: urban refugees (Amman), etc.
 Crises of cities - a crisis of the urban form …
- Shrinking cities: Industrial towns from former East-Germany, etc.
- Urban misery, slums (Daravi), shantytowns, informal settlements, etc.
- Socio-spatial segregation : gated communities, etc.
… Which often strongly impact the urban system Urban crisis
The crisis has become systemic and counteracts the (proper) operation
of the system
- Major (natural) disaster : Port-au-Prince, New Orleans
- Conflict, Civil war: Beirut, Aleppo, Bangui
- War outside the territory: assisting refugees (Lebanon), Tripoli (Leb.)
- Social crises (initially economic) caused by shrinking cities: Detroit
Recognition of the urban system
Identifying the right crisis scale
Humanitarian lens to characterize a crisis
Objectives of humanitarian response process
02 septembre 2016
How many and where : beneficiaries / vulnerable people in need
How much money : needed budget / gap with available funds
… The humanitarian view of the enclave
Situation de l’enclave et des quartiers abandonnés du PK5
BANGUI (25/11/2015) - OCHA
14 avril 2015
- Human environment
Population density, but more specifically diversity, charactarizes cities
 Importance of regulatory structures
- Built environment
Infrastructures are fragile, and their fragility increases in proportion to their
complexity and the size of the city
 The services delivered in an area reflect its level of formality
- Artificial environment
Supply dependency
 Security as a condition of exchange
 Exchange is the « raison d’être » of cities, including economic
exchange and mobility
 Urban life depends on properly functioning networks
 Once it has been recognised that this is an urban crisis, recovery will
depend on improved dialogue with the regulatory structures
Adressing an urban crisis
Cities as a human artefact: exchanges and diversity reinforce networks
It is the presence of humans, an economy or an environment, and their
vulnerability, that transforms a hazard into a risk.
 Preventing risk implies decreasing vulnerability
 Preventing its impact implies increasing resilience
 Resilience and vulnerability are not two sides of the same coin:
The most resilient city fabric is the slum …
A crisis reveals or highlights existing fragilities, making institutions doubly
powerless.
Weakened by the crisis, the institutions find themselves faced with a
problem amplified by the crisis which they had been unable to address
before.
 Should aid organisations support regulatory structures?
Can national institutions accept that fragilities exist and address them?
Adressing an urban crisis
Weakness of regulatory structures - lack of public spaces
 Who is responsible to prepare territories for the IDP’s return ?
UN Agencies Work on 2 levels : structural & emergency
- Structural action imply a long term agenda, defined by an approved plan, written
which targets development issues and written with national representatives.
 This process allow cross-cutting project, but depending the good
willing of the representatives.
- In Emergency, the cluster system is activated: each cluster work under
the (co)lead of a UN agency, includind the willing (i)NGOs :
- Gathering informations, structuring de mapping
- Checking the possible overlaps, Informing about the lack, etc.
 This process is sectorial, but depending the good willing of the
representatives.
 Integrated project is not the addition or the juxtaposition of topics
Humanitarian system
A sectorial structuration which handicaps the transversality
The lead issue  is another relationship suitable?
 Platform of humanitarian organisations to promote sustainable solutions
adopted the same sector-based approach: 7 pillars under the lead of iNGOs
The government was invited  but did not attend
The government created its own technical and strategic committees, based on the
same approach: ministries under a lead appointed by the Prime Minister, with
invitations to humanitarian partners.
 Which legitimacy does the lead structure have? No specific budget
 The government system is resilient: practices are still the same, but how could
this be different?
M’Poko closure: supported by UNHCR
"power relationship" with NGOs and some UN agencies
Stakeholders mandates
"We let the government take the lead, but maybe we were wrong"
Access to water – strengths and weaknesses of a well organised sector

Shelter reconstruction projects - major stakes

Humanitarian mediation

In the field

More Related Content

Similar to The challenges for a humanitarian response in an urbanising crisis: the IDPs in Bangui, Central African Republic

Moving Manila Public Lecture Documentation
Moving Manila Public Lecture DocumentationMoving Manila Public Lecture Documentation
Moving Manila Public Lecture Documentation
iBoP Asia
 
161010_acaps_haiti_lessons_learned_hurricane_matthew_0
161010_acaps_haiti_lessons_learned_hurricane_matthew_0161010_acaps_haiti_lessons_learned_hurricane_matthew_0
161010_acaps_haiti_lessons_learned_hurricane_matthew_0
Claudia Grigore
 
Global Forum on Financial Inclusion for Development
Global Forum on Financial Inclusion for DevelopmentGlobal Forum on Financial Inclusion for Development
Global Forum on Financial Inclusion for Development
Dr Lendy Spires
 

Similar to The challenges for a humanitarian response in an urbanising crisis: the IDPs in Bangui, Central African Republic (20)

Moving Manila Public Lecture Documentation
Moving Manila Public Lecture DocumentationMoving Manila Public Lecture Documentation
Moving Manila Public Lecture Documentation
 
Presentation city of barcelona
Presentation city of barcelonaPresentation city of barcelona
Presentation city of barcelona
 
Challenges faced in emergency response phase in urban areas
Challenges faced in  emergency response phase in urban areasChallenges faced in  emergency response phase in urban areas
Challenges faced in emergency response phase in urban areas
 
Challenges faced in emergency response phase in urban areas
Challenges faced in  emergency response phase in urban areasChallenges faced in  emergency response phase in urban areas
Challenges faced in emergency response phase in urban areas
 
Global migration's impact and oppertunity
Global migration's impact and oppertunityGlobal migration's impact and oppertunity
Global migration's impact and oppertunity
 
CSI.SP: Informal Sao Paulo by Jaap Klaarenbeek (18 Feb 2009)
CSI.SP: Informal Sao Paulo by Jaap Klaarenbeek (18 Feb 2009)CSI.SP: Informal Sao Paulo by Jaap Klaarenbeek (18 Feb 2009)
CSI.SP: Informal Sao Paulo by Jaap Klaarenbeek (18 Feb 2009)
 
The Future of Urbanism is Democratic: Africa Edition
The Future of Urbanism is Democratic: Africa EditionThe Future of Urbanism is Democratic: Africa Edition
The Future of Urbanism is Democratic: Africa Edition
 
Collective construction of scenarios to apprehend the aftermath of a disaster
Collective construction of scenarios to apprehend the aftermath of a disasterCollective construction of scenarios to apprehend the aftermath of a disaster
Collective construction of scenarios to apprehend the aftermath of a disaster
 
161010_acaps_haiti_lessons_learned_hurricane_matthew_0
161010_acaps_haiti_lessons_learned_hurricane_matthew_0161010_acaps_haiti_lessons_learned_hurricane_matthew_0
161010_acaps_haiti_lessons_learned_hurricane_matthew_0
 
Rural Urban Migration
Rural Urban MigrationRural Urban Migration
Rural Urban Migration
 
African migration
African migrationAfrican migration
African migration
 
2017 Terms in GIS Town Planning
2017 Terms in GIS Town Planning2017 Terms in GIS Town Planning
2017 Terms in GIS Town Planning
 
La be project how to overcome stereotypes - background research spain
La be project    how to overcome stereotypes - background research spainLa be project    how to overcome stereotypes - background research spain
La be project how to overcome stereotypes - background research spain
 
17 sm land-use-planning_ws2015
17 sm land-use-planning_ws201517 sm land-use-planning_ws2015
17 sm land-use-planning_ws2015
 
Global Forum on Financial Inclusion for Development
Global Forum on Financial Inclusion for DevelopmentGlobal Forum on Financial Inclusion for Development
Global Forum on Financial Inclusion for Development
 
Urban Water Planning
Urban Water PlanningUrban Water Planning
Urban Water Planning
 
Geography gcse year 11 examination preparation booklet
Geography gcse year 11 examination preparation bookletGeography gcse year 11 examination preparation booklet
Geography gcse year 11 examination preparation booklet
 
What Was The Industrial Revolution
What Was The Industrial RevolutionWhat Was The Industrial Revolution
What Was The Industrial Revolution
 
Spatial Planning from a Global Trend, (MMDA) Traffic Mgt and Metro Governance...
Spatial Planning from a Global Trend, (MMDA) Traffic Mgt and Metro Governance...Spatial Planning from a Global Trend, (MMDA) Traffic Mgt and Metro Governance...
Spatial Planning from a Global Trend, (MMDA) Traffic Mgt and Metro Governance...
 
Migration and Development with African Countries.
Migration and Development with African Countries.Migration and Development with African Countries.
Migration and Development with African Countries.
 

More from IIED

Adaptability of peri-urban agricultural workers towards resilience
Adaptability of peri-urban agricultural workers towards resilienceAdaptability of peri-urban agricultural workers towards resilience
Adaptability of peri-urban agricultural workers towards resilience
IIED
 
Sociétés Coopératives de cacao et Différentiel du revenu Décent : Leçons de l...
Sociétés Coopératives de cacao et Différentiel du revenu Décent : Leçons de l...Sociétés Coopératives de cacao et Différentiel du revenu Décent : Leçons de l...
Sociétés Coopératives de cacao et Différentiel du revenu Décent : Leçons de l...
IIED
 

More from IIED (20)

Women paying the health cost of the climate crisis
Women paying the health cost of the climate crisisWomen paying the health cost of the climate crisis
Women paying the health cost of the climate crisis
 
IIED's environmental sustainability impact report 2022/23
IIED's environmental sustainability impact report 2022/23IIED's environmental sustainability impact report 2022/23
IIED's environmental sustainability impact report 2022/23
 
Summary presentation on the case study on approaches for supporting pastorali...
Summary presentation on the case study on approaches for supporting pastorali...Summary presentation on the case study on approaches for supporting pastorali...
Summary presentation on the case study on approaches for supporting pastorali...
 
Cities for refugees: places of economic productivity, participation and wellb...
Cities for refugees: places of economic productivity, participation and wellb...Cities for refugees: places of economic productivity, participation and wellb...
Cities for refugees: places of economic productivity, participation and wellb...
 
Collectif por la defense des terres malgaces
Collectif por la defense des terres malgacesCollectif por la defense des terres malgaces
Collectif por la defense des terres malgaces
 
Special economic zones in Senegal: characteristics, land ans socio-economic i...
Special economic zones in Senegal: characteristics, land ans socio-economic i...Special economic zones in Senegal: characteristics, land ans socio-economic i...
Special economic zones in Senegal: characteristics, land ans socio-economic i...
 
Investment zones in Madagascar: characteristics and land implications
Investment zones in Madagascar: characteristics and land implicationsInvestment zones in Madagascar: characteristics and land implications
Investment zones in Madagascar: characteristics and land implications
 
Special economic zones and land tenure: global trends and local impacts in Se...
Special economic zones and land tenure: global trends and local impacts in Se...Special economic zones and land tenure: global trends and local impacts in Se...
Special economic zones and land tenure: global trends and local impacts in Se...
 
Adaptability of peri-urban agricultural workers towards resilience
Adaptability of peri-urban agricultural workers towards resilienceAdaptability of peri-urban agricultural workers towards resilience
Adaptability of peri-urban agricultural workers towards resilience
 
Stitching their trajectories with determination: stories from Indore, India
Stitching their trajectories with determination: stories from Indore, IndiaStitching their trajectories with determination: stories from Indore, India
Stitching their trajectories with determination: stories from Indore, India
 
Improving strategy and uptake of cleaner cooking in Kitui, Kenya
Improving strategy and uptake of cleaner cooking in Kitui, KenyaImproving strategy and uptake of cleaner cooking in Kitui, Kenya
Improving strategy and uptake of cleaner cooking in Kitui, Kenya
 
Placing COVID-19 and the wildlife trade within the bigger picture
Placing COVID-19 and the wildlife trade within the bigger picturePlacing COVID-19 and the wildlife trade within the bigger picture
Placing COVID-19 and the wildlife trade within the bigger picture
 
Impacts of the COVID-19 pandemic on wild meat use and perception in communiti...
Impacts of the COVID-19 pandemic on wild meat use and perception in communiti...Impacts of the COVID-19 pandemic on wild meat use and perception in communiti...
Impacts of the COVID-19 pandemic on wild meat use and perception in communiti...
 
Drivers of wild meat consumption steph brittain
Drivers of wild meat consumption steph brittainDrivers of wild meat consumption steph brittain
Drivers of wild meat consumption steph brittain
 
Designing wild meat alternative projects
Designing wild meat alternative projectsDesigning wild meat alternative projects
Designing wild meat alternative projects
 
Multifaceted approach to transition from emergency aid and rehabilitation to ...
Multifaceted approach to transition from emergency aid and rehabilitation to ...Multifaceted approach to transition from emergency aid and rehabilitation to ...
Multifaceted approach to transition from emergency aid and rehabilitation to ...
 
Sociétés Coopératives de cacao et Différentiel du revenu Décent : Leçons de l...
Sociétés Coopératives de cacao et Différentiel du revenu Décent : Leçons de l...Sociétés Coopératives de cacao et Différentiel du revenu Décent : Leçons de l...
Sociétés Coopératives de cacao et Différentiel du revenu Décent : Leçons de l...
 
Innovating to improve the ownership, sustainability and multi-actor nature of...
Innovating to improve the ownership, sustainability and multi-actor nature of...Innovating to improve the ownership, sustainability and multi-actor nature of...
Innovating to improve the ownership, sustainability and multi-actor nature of...
 
Communities Combating Illegal Wildlife Trade session seven
Communities Combating Illegal Wildlife Trade session sevenCommunities Combating Illegal Wildlife Trade session seven
Communities Combating Illegal Wildlife Trade session seven
 
Organisational innovations that make community forestry prosperous
Organisational innovations that make community forestry prosperousOrganisational innovations that make community forestry prosperous
Organisational innovations that make community forestry prosperous
 

Recently uploaded

Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
ZAPPAC1
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
arnab132
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
HyderabadDolls
 

Recently uploaded (20)

Your Budget Call Girls in Hassan 9332606886Call Girls Advance Cash On Delive...
Your Budget Call Girls in Hassan  9332606886Call Girls Advance Cash On Delive...Your Budget Call Girls in Hassan  9332606886Call Girls Advance Cash On Delive...
Your Budget Call Girls in Hassan 9332606886Call Girls Advance Cash On Delive...
 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...
 
Call Girls in Banswara { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Call Girls in Banswara { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelCall Girls in Banswara { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Call Girls in Banswara { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
 
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServiceMira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
 
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
 
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelTop Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
Fuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionFuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An Introduction
 
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
 
Mira Road Comfortable Call Girls ,09167354423,Mira Road Model Call Girls .
Mira Road  Comfortable Call Girls ,09167354423,Mira Road Model Call Girls .Mira Road  Comfortable Call Girls ,09167354423,Mira Road Model Call Girls .
Mira Road Comfortable Call Girls ,09167354423,Mira Road Model Call Girls .
 
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
Call Girls in Tiruppur  9332606886  ust Genuine Escort Model SeviceCall Girls in Tiruppur  9332606886  ust Genuine Escort Model Sevice
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
 
Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...
Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...
Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
 
Deforestation
DeforestationDeforestation
Deforestation
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
Call Girls Pimpri Chinchwad / 8250092165 Genuine Call girls with real Photos ...
Call Girls Pimpri Chinchwad / 8250092165 Genuine Call girls with real Photos ...Call Girls Pimpri Chinchwad / 8250092165 Genuine Call girls with real Photos ...
Call Girls Pimpri Chinchwad / 8250092165 Genuine Call girls with real Photos ...
 
Call girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesCall girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl services
 
Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...
Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...
Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...
 

The challenges for a humanitarian response in an urbanising crisis: the IDPs in Bangui, Central African Republic

  • 1. IIED 28th June 2017 When the humanitarian response requires urban development policies: THE RESPONSE TO THE IDP CRISIS IN BANGUI Presentation by Anne Burlat aburlat@urd.org
  • 2. When IIED published its call for proposal for research grants (Oct. 2016), Groupe URD was working on the response to the IDP crisis in Bangui and there were 28 000 estimated IDPs in the M’Poko (airport) site that had to be closed Sept. 2016 - Peer exchange in Port-au-Prince: an official urban development delegation from Bangui travelled to Haiti  Field visits to informal settlements  Discussions with government representatives about the different response processes to the Earthquake crisis  Lessons in the process of being learned - Aug. 2016 - iNGOs & Governmental institutions: we are doing more than our mandate requires - they need to make more effort to establish dialogue  A stand off situation, where both sides are convinced that they are right  Neither side makes an effort to understand the other’s mandate - Mar. 2016 - iNGOs: no “forced” IDP displacement according to Kampala convention  Tensions between CAR Govt. & Int. Humanitarians / Sectorial response  No knowledge of the Bangui urban context and the impacts of the urban crisis Research context - initial observations Linking humanitarian response and development in urban contexts
  • 3. Impacts of the crisis on Bangui Neighbourhoods completely destroyed … 14 juin 2011 26 mai 2016 … around the commercial area which became an enclave: known as the Muslim enclave  The conflict is not a religious one: this oversimplification led to misunderstandings …there has been almost continuous conflict in the Central Africa Republic since 2002  Bangui: a crisis within the crisis, where stakeholders did not take the urban context into account
  • 4. Crisis impacts - Field impact: Neighbourhoods completely destroyed around the enclave - Human impact: million IDPs, 100 000 in M’Poko site - Political impact: M. Djotodja resigned Crisis response - Political response  restore stability Accord de cessation des hostilités (23rd July 2014) Temporary Government (Jan. 2015) Accord DDR (10th May 2015) Forum de Bangui Presidential election (Feb. 2016) - Humanitarian response  supporting vulnerable people, mainly IDPs MIRA (Jan. 2014) - Structural support  aiming to restart: HRP 2017-2020 (approval Nov. 2016) RCPCA 2017-2020  stakeholders did not take the urban context into account A crisis within the crisis Which response to which crisis ?
  • 5. The enclave & its neighbourhoods by google earth
  • 6. mid-Dec. 2016 - The site had been closed by the government (MASRN):  operation Noël à la maison mid-Feb. 2017 - Tensions between Gvt institutions and iNGOs - Different positions within different UN agencies April 2017 : field mission - Meetings, discussions, visits with all types of stakeholders  Understanding the issues at stake - Piece together stakeholders’ actions and choices  with a focus on the relations between these - First difficulty  inability to have a clear picture of the past - Validation of the global hypothesis  No awareness of the change from a humanitarian crisis with an urban component to an urban crisis with a humanitarian component.  The response targets individual vulnerable people without responding to structural urban issues, which can be seen as a part of the crisis. The IDP crisis in Bangui The challenge of responding to a humanitarian crisis that became an urban crisis
  • 7. M’Poko IDP site - Internal airport area Became a part of the city puzzle 19th November 2015 M’Poko was the largest IDP site in Bangui, estimated IDPs: early January 2014 - 100 000 stabilized - 28 000
  • 8. - M’Poko localisation inside airport area: along the runway, which people and vehicles frequently cross  Its closure is a priority for the government: high institutional pressure and the airport management not accepted by iNGOs - Dissension about its closure process: Government proposed relocation to a site without facilities: AVICOM  Its closure brought humanitarian stakeholders together against the gvt.  Who can support the recovery ? UN agencies, temporary gvt., iNGOs … - The first closure process was impeded: a new explosion of violence (manipulation ?)  Its closure has obscured other dimensions of the crisis - Confrontation between two complementary positions  The government wants to close the IDP site  Humanitarians want to implement sustainable solutions for the IDPs M’poko site: emblematic of the crisis in Bangui What happened after the closure of the largest IDP site?
  • 9. The 3 sustainable solutions: return, resettlement & local integration: an interpretation of refugee policies: - return to the home country, - resettlement in another country (ideally chosen) or - integration in the current country (often initially seen as temporary).  For IDPs: - return to the former house - resettlement somewhere else in CAR (return to the village) - local integration in areas where IDPs take refuge  Humanitarian programs in Bangui emphasized return - return to the former house: chosen by more than 90% of the IDPs but: what question was asked during the profiling? - resettlement in Bangui = individual choice resettlement in rural areas: rare in CAR where the tendancy is towards urban migration and the crisis is national - local integration: all sites are private (mainly owned by churches) = impossible local integration: AVICOM gathered the lowest profiling intention. IDPs & the 3 Sustainable solutions The framework of all humanitarian activities
  • 10. 7-8 months after the crisis Return was chosen by 87% of IDPs (profiling July 2014) - It is very common for resettled refugees to express the wish to go home even though they do nothing to achieve this: could this be similar for IDPs? - What are the other options in the questionnaire? Return: what is the essential condition for IDPs?  Security (and a job, and free access to water, and …) When security is the objective, only armed solutions are considered: but where would armed forces be deployed? (cf. profiling, July 2014)  Along roads and public spaces - No surveys of the completely destroyed neighbourhoods - The urban fabric in these neighbourhoods is informal, without road networks and the government is hostile to their existence. Related issues: access to water (well issues) and previously non-existent services (schools, health, etc.)  iNGOs wanted to oversee the IDPs’ return in good conditions and … inertia IDPs: the "over-promoted" return solution (1/3) The security issue - without recognition of the urban context
  • 11. under-integrated neighbourhoods destroyed The strength against informality 8 décembre 2013 26 mai 2016 South of the enclave
  • 12. under-integrated neighbourhoods destroyed The strenght against informality 8 décembre 2013 26 mai 2016 North of the enclave
  • 13. The majority of IDPs declared former informal activity, whereas the formal market is the property of the enclave inhabitants  Good knowledge about former situation and current wishes (DRC, profiling, etc.) - When 90% of IDPs declared that they would restart the same activity (profiling, July 2014) this was seen as a sign that economic recovery was possible  No questions about the recovery process - What could have been done to prevent those who had developed a commercial activity from losing this resilience behaviour? - What about urban agriculture activities? When there are no local products, when there are no jobs, and when the economic network has collapsed Urban migration is due to job opportunities  Urban contexts are made up of interconnected networks. - Developing economic activities implies creating links and developing networks - Having a home is more about having neighbours than having a roof IDPs: the "over-promoted" return solution (2/3) The economic issue - the city as a source of opportunities: What is the situation “after” the crisis?
  • 14. 8th December 2013 M’Poko international airport area Urban agriculture 29th Decemeber 2016 A former issue with its own agenda What about the NUA paragraphe considering urban agriculture inside urban planification ?
  • 15. Even though residential migration can reflect growing vulnerability  Residential migration is a way of urban life  The Return process only concerns owners - 39% of M’Poko IDPs declared that they rented a flat/house - The market is pushing vulnerable renters further and further from the city center No one approached the MHLSU, which owns land for the city expansion  MHLSU is the institution responsible for housing and urban issues - MHLSU declared 35m2 as the minimum suitable size for a house - MHLSU was involved in the first governmental commitee working on the response, but did not come back to the next one. Shelter programs not approved by the government (MHLSU or MASRN)  Does this imply an indirect responsibility for the destructions? - Certain government representatives were very vocal in their opposition - The completly destroyed neighbourhoods were the least integrated areas near the economic center in Bangui. - No shared analysis or discussion between iNGOs & MHLSU IDPs: the " over-promoted return solution (3/3) The shelter issue - without taking into consideration the impact on the urban fabric
  • 16.  Crises in cities - a crisis taking place within a city - Partial: flooding of a neighbourhood, etc. - One-off / short-term: a strike, poorly managed waste, etc. - One-off / mid-term: urban refugees (Amman), etc.  Crises of cities - a crisis of the urban form … - Shrinking cities: Industrial towns from former East-Germany, etc. - Urban misery, slums (Daravi), shantytowns, informal settlements, etc. - Socio-spatial segregation : gated communities, etc. … Which often strongly impact the urban system Urban crisis The crisis has become systemic and counteracts the (proper) operation of the system - Major (natural) disaster : Port-au-Prince, New Orleans - Conflict, Civil war: Beirut, Aleppo, Bangui - War outside the territory: assisting refugees (Lebanon), Tripoli (Leb.) - Social crises (initially economic) caused by shrinking cities: Detroit Recognition of the urban system Identifying the right crisis scale
  • 17. Humanitarian lens to characterize a crisis Objectives of humanitarian response process 02 septembre 2016 How many and where : beneficiaries / vulnerable people in need How much money : needed budget / gap with available funds
  • 18. … The humanitarian view of the enclave Situation de l’enclave et des quartiers abandonnés du PK5 BANGUI (25/11/2015) - OCHA 14 avril 2015
  • 19. - Human environment Population density, but more specifically diversity, charactarizes cities  Importance of regulatory structures - Built environment Infrastructures are fragile, and their fragility increases in proportion to their complexity and the size of the city  The services delivered in an area reflect its level of formality - Artificial environment Supply dependency  Security as a condition of exchange  Exchange is the « raison d’être » of cities, including economic exchange and mobility  Urban life depends on properly functioning networks  Once it has been recognised that this is an urban crisis, recovery will depend on improved dialogue with the regulatory structures Adressing an urban crisis Cities as a human artefact: exchanges and diversity reinforce networks
  • 20. It is the presence of humans, an economy or an environment, and their vulnerability, that transforms a hazard into a risk.  Preventing risk implies decreasing vulnerability  Preventing its impact implies increasing resilience  Resilience and vulnerability are not two sides of the same coin: The most resilient city fabric is the slum … A crisis reveals or highlights existing fragilities, making institutions doubly powerless. Weakened by the crisis, the institutions find themselves faced with a problem amplified by the crisis which they had been unable to address before.  Should aid organisations support regulatory structures? Can national institutions accept that fragilities exist and address them? Adressing an urban crisis Weakness of regulatory structures - lack of public spaces
  • 21.  Who is responsible to prepare territories for the IDP’s return ? UN Agencies Work on 2 levels : structural & emergency - Structural action imply a long term agenda, defined by an approved plan, written which targets development issues and written with national representatives.  This process allow cross-cutting project, but depending the good willing of the representatives. - In Emergency, the cluster system is activated: each cluster work under the (co)lead of a UN agency, includind the willing (i)NGOs : - Gathering informations, structuring de mapping - Checking the possible overlaps, Informing about the lack, etc.  This process is sectorial, but depending the good willing of the representatives.  Integrated project is not the addition or the juxtaposition of topics Humanitarian system A sectorial structuration which handicaps the transversality
  • 22. The lead issue  is another relationship suitable?  Platform of humanitarian organisations to promote sustainable solutions adopted the same sector-based approach: 7 pillars under the lead of iNGOs The government was invited  but did not attend The government created its own technical and strategic committees, based on the same approach: ministries under a lead appointed by the Prime Minister, with invitations to humanitarian partners.  Which legitimacy does the lead structure have? No specific budget  The government system is resilient: practices are still the same, but how could this be different? M’Poko closure: supported by UNHCR "power relationship" with NGOs and some UN agencies Stakeholders mandates "We let the government take the lead, but maybe we were wrong"
  • 23. Access to water – strengths and weaknesses of a well organised sector  Shelter reconstruction projects - major stakes  Humanitarian mediation  In the field