Will 66 kV Become the Norm
in Offshore Wind Energy?
The offshore wind industry is poised to grow by leaps and bounds in the coming years as nations seek out
solutions to greenhouse gas emissions using better sources of renewable energy that are cost competitive
with fossil fuels. With the development of mega offshore wind farms like the London Array and more like it to
come, many are looking to alternative voltage levels for the collection of offshore energy. Though a medium
voltage of 33kV is currently the most practical for offshore wind farms, this requires stepping the power up to
high voltage (such as 110kV) at an offshore substation and then transmitting it on land at 132 kV in the UK,
for instance.
But this configuration requires costly offshore substation installation and extensive lengths of expensive ca-
bling. The difficulties of accessing these remote substations further complicate the production of offshore
wind energy. As such, many in the industry are looking for ways to reduce the cost of producing offshore en-
ergy by shifting to higher voltage array technology. The hope is that not only will this reduce capital costs, it
will also preserve more of the generated energy to make wind farms that much more efficient.
Cutting Cable and Substation Costs with 66 kV
Perhaps ones of the greatest benefits of using 66 kV as opposed to a lower voltage is that it reduces the num-
ber of substations required. Further, 66 kV technology can drastically reduce the quantity of cable required,
which will have a substantial cost benefit.
The UK Carbon Trust believes that making the switch to 66 kV could
cut offshore wind power costs by 1.5% on its own. According to an-
other analysis, the capital costs of installing 33 kV cable further off-
shore is lower compared to 66 kV cable in the short term. However,
over the lifetime of the wind farm, depending on distance from shore
and taking load losses into consideration, higher voltage arrays gen-
erate substantial cost reductions.
Acting on this conviction, the Carbon Trust has recently launched a
competition aimed at putting the development of 66 kV cables on
the fast track for offshore wind projects. In particular, they’re hop-
ing to have the technology polished in time for Round 3 offshore
wind power projects in the UK which are to commence 2015. They
estimate that more than 6,000 km of cable and over 6,000 turbine
transformers and switchgear will be required for Round 3 offshore
wind installations in the UK alone, representing a significant market opportunity. The manufacturers that can
perfect 66 kV cable designs will have a distinct competitive advantage.
www.66kv-offshore-wind.com

More Related Content

More from Torben Haagh

More from Torben Haagh (20)

Agenda - Airport Operational Excellence and Automation 2019, Frankfurt Am Ma...
Agenda  - Airport Operational Excellence and Automation 2019, Frankfurt Am Ma...Agenda  - Airport Operational Excellence and Automation 2019, Frankfurt Am Ma...
Agenda - Airport Operational Excellence and Automation 2019, Frankfurt Am Ma...
 
Agenda: Interior Cabin Innovation for Automated Vehicles 2019
Agenda: Interior Cabin Innovation for Automated Vehicles 2019Agenda: Interior Cabin Innovation for Automated Vehicles 2019
Agenda: Interior Cabin Innovation for Automated Vehicles 2019
 
Cognitive Automation 2019, Berlin, Germany
Cognitive Automation 2019, Berlin, GermanyCognitive Automation 2019, Berlin, Germany
Cognitive Automation 2019, Berlin, Germany
 
Präsentation zu Roll-Out Messsysteme Infrastruktur bei EnBW
Präsentation zu Roll-Out Messsysteme Infrastruktur bei EnBWPräsentation zu Roll-Out Messsysteme Infrastruktur bei EnBW
Präsentation zu Roll-Out Messsysteme Infrastruktur bei EnBW
 
Is there potential for robotics in finance and accounting?
Is there potential for robotics in finance and accounting?Is there potential for robotics in finance and accounting?
Is there potential for robotics in finance and accounting?
 
Mythos und Realität des ERF
Mythos und Realität des ERFMythos und Realität des ERF
Mythos und Realität des ERF
 
Expert interview with Nexans - the 66kV cabling technology
Expert interview with Nexans - the 66kV cabling technologyExpert interview with Nexans - the 66kV cabling technology
Expert interview with Nexans - the 66kV cabling technology
 
ENERCON - Energy System Change: Era of Feed-in Tariffs is coming to an end
ENERCON - Energy System Change: Era of Feed-in Tariffs is coming to an endENERCON - Energy System Change: Era of Feed-in Tariffs is coming to an end
ENERCON - Energy System Change: Era of Feed-in Tariffs is coming to an end
 
Innovative Ansätze im Mahn- und Inkassoprozess - Kundenorientiertes Mahnen in...
Innovative Ansätze im Mahn- und Inkassoprozess - Kundenorientiertes Mahnen in...Innovative Ansätze im Mahn- und Inkassoprozess - Kundenorientiertes Mahnen in...
Innovative Ansätze im Mahn- und Inkassoprozess - Kundenorientiertes Mahnen in...
 
Letzte Chance auf Ihr Konferenzticket
Letzte Chance auf Ihr KonferenzticketLetzte Chance auf Ihr Konferenzticket
Letzte Chance auf Ihr Konferenzticket
 
Effizienter mit Kooperationen bei Integra-Partnern
Effizienter mit Kooperationen bei Integra-PartnernEffizienter mit Kooperationen bei Integra-Partnern
Effizienter mit Kooperationen bei Integra-Partnern
 
Digitalisierte bAV
Digitalisierte bAV Digitalisierte bAV
Digitalisierte bAV
 
Die Bank von morgen
Die Bank von morgenDie Bank von morgen
Die Bank von morgen
 
"Die Zeit-Zielscheibe" von Zach Davis
"Die Zeit-Zielscheibe" von Zach Davis"Die Zeit-Zielscheibe" von Zach Davis
"Die Zeit-Zielscheibe" von Zach Davis
 
Onshore Wind 2017
Onshore Wind 2017 Onshore Wind 2017
Onshore Wind 2017
 
ITSiG für KRITIS-Betreiber
ITSiG für KRITIS-BetreiberITSiG für KRITIS-Betreiber
ITSiG für KRITIS-Betreiber
 
"Das Netz war noch nie so wichtig wie heute!"
"Das Netz war noch nie so wichtig wie heute!" "Das Netz war noch nie so wichtig wie heute!"
"Das Netz war noch nie so wichtig wie heute!"
 
EEG Novelle für Onshore Wind
EEG Novelle für Onshore WindEEG Novelle für Onshore Wind
EEG Novelle für Onshore Wind
 
Gesetz zur Digitalisierung der Energiewende – für wen gilt was?
Gesetz zur Digitalisierung der Energiewende – für wen gilt was? Gesetz zur Digitalisierung der Energiewende – für wen gilt was?
Gesetz zur Digitalisierung der Energiewende – für wen gilt was?
 
The Global State of Customer Experience 2016!
The Global State of Customer Experience 2016!The Global State of Customer Experience 2016!
The Global State of Customer Experience 2016!
 

Recently uploaded

Recently uploaded (9)

The Influence and Evolution of Mogul Press in Contemporary Public Relations.docx
The Influence and Evolution of Mogul Press in Contemporary Public Relations.docxThe Influence and Evolution of Mogul Press in Contemporary Public Relations.docx
The Influence and Evolution of Mogul Press in Contemporary Public Relations.docx
 
DAY 0 8 A Revelation 05-19-2024 PPT.pptx
DAY 0 8 A Revelation 05-19-2024 PPT.pptxDAY 0 8 A Revelation 05-19-2024 PPT.pptx
DAY 0 8 A Revelation 05-19-2024 PPT.pptx
 
Microsoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdf
Microsoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdfMicrosoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdf
Microsoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdf
 
ServiceNow CIS-Discovery Exam Dumps 2024
ServiceNow CIS-Discovery Exam Dumps 2024ServiceNow CIS-Discovery Exam Dumps 2024
ServiceNow CIS-Discovery Exam Dumps 2024
 
Deciding The Topic of our Magazine.pptx.
Deciding The Topic of our Magazine.pptx.Deciding The Topic of our Magazine.pptx.
Deciding The Topic of our Magazine.pptx.
 
Understanding Poverty: A Community Questionnaire
Understanding Poverty: A Community QuestionnaireUnderstanding Poverty: A Community Questionnaire
Understanding Poverty: A Community Questionnaire
 
Oracle Database Administration I (1Z0-082) Exam Dumps 2024.pdf
Oracle Database Administration I (1Z0-082) Exam Dumps 2024.pdfOracle Database Administration I (1Z0-082) Exam Dumps 2024.pdf
Oracle Database Administration I (1Z0-082) Exam Dumps 2024.pdf
 
Breathing in New Life_ Part 3 05 22 2024.pptx
Breathing in New Life_ Part 3 05 22 2024.pptxBreathing in New Life_ Part 3 05 22 2024.pptx
Breathing in New Life_ Part 3 05 22 2024.pptx
 
ACM CHT Best Inspection Practices Kinben Innovation MIC Slideshare.pdf
ACM CHT Best Inspection Practices Kinben Innovation MIC Slideshare.pdfACM CHT Best Inspection Practices Kinben Innovation MIC Slideshare.pdf
ACM CHT Best Inspection Practices Kinben Innovation MIC Slideshare.pdf
 

Will 66kv Become the Norm in Offshore Wind Energy?

  • 1. Will 66 kV Become the Norm in Offshore Wind Energy? The offshore wind industry is poised to grow by leaps and bounds in the coming years as nations seek out solutions to greenhouse gas emissions using better sources of renewable energy that are cost competitive with fossil fuels. With the development of mega offshore wind farms like the London Array and more like it to come, many are looking to alternative voltage levels for the collection of offshore energy. Though a medium voltage of 33kV is currently the most practical for offshore wind farms, this requires stepping the power up to high voltage (such as 110kV) at an offshore substation and then transmitting it on land at 132 kV in the UK, for instance. But this configuration requires costly offshore substation installation and extensive lengths of expensive ca- bling. The difficulties of accessing these remote substations further complicate the production of offshore wind energy. As such, many in the industry are looking for ways to reduce the cost of producing offshore en- ergy by shifting to higher voltage array technology. The hope is that not only will this reduce capital costs, it will also preserve more of the generated energy to make wind farms that much more efficient. Cutting Cable and Substation Costs with 66 kV Perhaps ones of the greatest benefits of using 66 kV as opposed to a lower voltage is that it reduces the num- ber of substations required. Further, 66 kV technology can drastically reduce the quantity of cable required, which will have a substantial cost benefit. The UK Carbon Trust believes that making the switch to 66 kV could cut offshore wind power costs by 1.5% on its own. According to an- other analysis, the capital costs of installing 33 kV cable further off- shore is lower compared to 66 kV cable in the short term. However, over the lifetime of the wind farm, depending on distance from shore and taking load losses into consideration, higher voltage arrays gen- erate substantial cost reductions. Acting on this conviction, the Carbon Trust has recently launched a competition aimed at putting the development of 66 kV cables on the fast track for offshore wind projects. In particular, they’re hop- ing to have the technology polished in time for Round 3 offshore wind power projects in the UK which are to commence 2015. They estimate that more than 6,000 km of cable and over 6,000 turbine transformers and switchgear will be required for Round 3 offshore wind installations in the UK alone, representing a significant market opportunity. The manufacturers that can perfect 66 kV cable designs will have a distinct competitive advantage. www.66kv-offshore-wind.com