Microsoft Visual Studio 2012 brings a number of new features into the integrated ALM toolset. With new features like PowerPoint Storyboarding, Integrated Code Review Features, Stakeholder Feedback, and a newly integrated Developer / Operations Workflow, you will quickly find many reasons to upgrade to Visual Studio and Team Foundation Server 2012! In this webinar, we’ll briefly discuss the breadth of new ALM features. Come join us for this free Webinar!
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
Upgrading to Team Foundation Server (TFS) 2012 – What You Need to Know! (07-25-2013)
1. Agenda
• Overview:
– “ALM” in 2012
– Visual Studio 2012
• New ALM Features
– Agile Management
– Developer Productivity
– Feedback and testing
– DevOps
– Features by Edition
• Planning Your Upgrade
– Client-side Upgrade
– Server-side Upgrade
– Migration Options
– Next Steps
• Summary
2. FEEDBACK
Project
Portfolio
• Ideas
• Business
Priorities
• Funding
• Project
Selection
Definition
• Elicitation
• Requirements
• Validation
• Planning
Development
• Design
• Develop
• Test
Operate
• Release
• Monitor
• Support
Retire
Yesterday‟s View of the Application Lifecycle
3. Initial Project Portfolio Retire
Recognizing the Iterative Nature of Applications
Define
•Requirements
•Validation
•Prioritization
•Release Plan
Develop
•Iteration Plan
•Develop
•Test
Operate
•Monitor
•Support
•Upgrade
Plan
WorkDone
Plan
WorkDone
Plan
WorkDone
Plan
WorkDone
Plan
WorkDone
4. ALM Capabilities in Visual Studio 2010
Define
•Requirements
•Validation
•Prioritization
•Release Plan
Develop
•Iteration Plan
•Develop
•Test
Operate
•Monitor
•Support
•Upgrade
5. Opportunities from Visual Studio 2010 ALM
Define
•Requirements
•Validation
•Prioritization
•Release Plan
Develop
•Iteration Plan
•Develop
•Test
Operate
•Monitor
•Support
•Upgrade
6. New ALM Capabilities in Visual Studio 2012
Define
•Requirements
•Validation
•Prioritization
•Release Plan
Develop
•Iteration Plan
•Develop
•Test
Operate
•Monitor
•Support
•Upgrade
8. Agenda
• Overview:
– “ALM” in 2012
– Visual Studio 2012
• New ALM Features
– Agile Management
– Developer Productivity
– Feedback and testing
– DevOps
– Features by Edition
• Planning Your Upgrade
– Client-side Upgrade
– Server-side Upgrade
– Migration Options
– Next Steps
• Summary
9. Managing the Product Backlog
• Accessed from the
Team Project Web
Access
• Shows a single view
of the current backlog
of work
• Dynamically re-
ordered and group
• Enable Product Owner
to quickly prioritize
work and outline
dependencies and
relationships
Velocity progress
Easily drag ’n drop to
prioritize tasks
10. StoryBoard Assistant Tool
• Tighter loop between the
Business Stakeholders and
Development Team
• Graphical design tools built in
PowerPoint
• Embed other content including
context slides
• Capture screen shots and create
lightweight animations
• Store common elements within a
shape library
• Create master templates to
simplify multiple similar views
• Get feedback to others
– Email, print and version control
the document
– leverage collaborative tools
– leverage web viewing tools
11. Sprint Planning Tool Capacity & Sprint Burndown
• The enhanced work
item management
tools in Team Web
Access
• Tool pre-populates
required data
• Streamlines the
association and
update process.
• Effectively allocate
work balancing load
with available capacity
• Real-time feedback on
the updates to the
plan
Burndown progress
Team capacity at a glance
12. Task Board in Team Web Access
Burndown progress
Easily move tasks around
• Updates the status of work items visually
15. Agenda
• Overview:
– “ALM” in 2012
– Visual Studio 2012
• New ALM Features
– Agile Management
– Developer Productivity
– Feedback and testing
– DevOps
– Features by Edition
• Planning Your Upgrade
– Client-side Upgrade
– Server-side Upgrade
– Migration Options
– Next Steps
• Summary
16. Team Explorer: My Work
• Associate work packages
– Associate work items
with activities
– All changes are
automatically associated
with those work items
• Easily suspend/resume
– Suspend active work
– Perform other work
– Resume work when
ready
• Easily request / respond
to code reviews
• Other Team Explorer
efficiency changes…
17. Unit Testing Runner
New Test Runner:
• Tests run in background
• Run automatically on build
• Support for multiple unit
testing frameworks:
– MS Test
– xUnit
– nUnit
– And More!
• Deep integration in the
IDE
• Supports native C++ code
• Multiple run options
– Failed Tests
– Not-run Tests
– All Tests
• Easy code coverage access
18. Integrated Code Review
• Provides
feedback from
other team
members
• Shared
knowledge
across team
• Code reviews
can be set as a
quality gate
• Source changes
highlighted and
comments about
the changes.
19. Code Clone Detection
• Reviews common code
blocks exposing
refactoring
opportunities
• Detect code blocks with
common structure and
approach
• Search is semantic, not
just literal
• Detects „copy and
paste‟ errors
• Detects code fragments
with a common logical
structure
• Review common code
and decide how to
proceed
21. Agenda
• Overview:
– “ALM” in 2012
– Visual Studio 2012
• New ALM Features
– Agile Management
– Developer Productivity
– Feedback and testing
– DevOps
– Features by Edition
• Planning Your Upgrade
– Client-side Upgrade
– Server-side Upgrade
– Migration Options
– Next Steps
• Summary
22. Request Feedback
• Requested via team web
access
• Specify who will receive the
email request
• Specify how to access the
target application:
– Web application
– Remote machine
– Client application
• Provide one or more focus
areas for the feedback
29. IntelliTrace In Production
• PowerShell
commands
• Historical
Debugger
• Full collection
options
• View requests and
exceptions
• Shows all events
and calls
30. System Center & TFS Integration
• Capture application
issues in production
• Actionable workflow
between development
and operations
• Operations leveraging
System Center to pass
data to the
development team
• Integrated IntelliTrace
infrastructure used for
historical debugging
• Fully integrated with
TFS work items
31. Visual Studio 2012 Editions
Feature Professional Premium Ultimate Test Pro
IntelliTrace™ X
Profiling X X X
Graphics Debugging X X X
Code Coverage X X
Code Clone X X
Blend for VS X X X
Code Review X X
Architecture Tools X
Storyboarding X X X
Feedback Manager X X X
Backlog Mgmt. X X X
Sprint Planning X X X
Manual Testing X X X
Load Testing X
Coded UI Tests X X
Lab Management X X X
Unit Testing X X X
Fakes * *
32. Agenda
• Overview:
– “ALM” in 2012
– Visual Studio 2012
• New ALM Features
– Agile Management
– Developer Productivity
– Feedback and testing
– DevOps
– Features by Edition
• Planning Your Upgrade
– Client-side Upgrade
– Server-side Upgrade
– Migration Options
– Next Steps
• Summary
33. How do you get there?
• Upgrade?
• Migration?
• Coexistence?
• Iterative adoption?
• Instantaneous
adoption?
• Education?
• Pilots? Testing?
34. • Servers
– O/S?
• 2003? 2008? R2?
• 32-bit? 64-bit?
– SQL Server
• 2005? 2008? R2?
– SharePoint
• WSS? SF? MOSS? 2010?
– TFS
• 2005? 2008? 2010?
• Lab Management?
– Project Server?
– Customizations?
Where are you today?
• Client Tools
– O/S?
– Visual Studio
• VB6 and other legacy?
• VS .NET, 2003?
• VS 2005, 2008?
• VS 2010?
• MTM?
– Eclipse?
– Other IDEs?
– Third-Party Tools?
– Customizations?
35. Compatibility
• SxS Client Tools?
• File compatibility?
• Additional tools?
• Process Templates?
• Reports?
• How you work?
36. Agenda
• Overview:
– “ALM” in 2012
– Visual Studio 2012
• New ALM Features
– Agile Management
– Developer Productivity
– Feedback and testing
– DevOps
– Features by Edition
• Planning Your Upgrade
– Client-side Upgrade
– Server-side Upgrade
– Migration Options
– Next Steps
• Summary
37. Requirements for Visual Studio 2012
• Supported operating systems:
– Windows 7 (x86 and x64)
– Windows 8 (x86 and x64)
– Windows Server 2008 R2 (x64)
– Windows Server 2012 (x64)
• Supported architectures:
– 32-bit (x86)
– 64-bit (x64)
• Hardware requirements:
– 1.6 GHz or faster processor
– 1 GB of RAM (1.5 GB if running on a virtual machine)
– 10 GB (NTFS) of available hard disk space
– 5400 RPM hard drive
– DirectX 9-capable video card running at 1024 x 768 or higher
display resolution
38. Visual Studio SxS
• Visual Studio 2012:
– Install along side older Visual Studio
versions
– General project compatibilityA with Visual
Studio 2010 SP1
– Platform targeting
• Managed code can target Windows XP and
Windows Server 2003 with Visual Studio
2010 SxS, targeting .NET 4.0 or earlier
• Team Explorer 2012 can…
– Connect to TFS 2012
– Connect to TFS 2010B
A Solutions and projects can generally be opened in VS 2012 without breaking compatibility
with VS 2010. There are some exceptions (e.g., Database projects).
B Reduced functionality when connecting to earlier versions of TFS.
39. Project Compatibility
• Compatible with 2010 SP1:
– Blend
– C#/VB Silverlight 4 or 5
– C#/VB Webforms
– C#/VB Winforms
– Coded UI test
– Modeling
– SharePoint 2010
– Unit tests
– Visual Studio 2010 web
– VS 2010 SSDT
– WCF
– WPF
– MPI/Cluster Debugging
– SSRS
• Upgrade required
– SharePoint 2007
– MVC 2
– Rich Internet Applications
Based on October 2012 MSDN Documentation
• Yes, With Limitations:
– Visual Studio 2010
Database (.dbproj)
– SQL Server 2008 R2
Express
– SQL Server Report Project
– Visual C++
– Visual Studio Lab
Management
• Other:
– SQL Server CE 3.5 (After
upgrade to SQL Server CE
4.0)
– Office 2007 VSTO (Upgrade
to Office 2010 /.NET 4)
– MVC framework (For
compatible MVC versions)
– MPI/Cluster Debugging (For
compatible versions)
– Office 2010 VSTO (.NET 4)
• No (Deprecated):
– MSI setup (.vdproj)
– Visual Studio macros
– Windows Mobile
– Windows Phone
– SharePoint 2007
• No:
– BizTalk 2010 R2
– Cloud tools
– F#
– LightSwitch
– Rich Internet
Applications
– Visual Studio SDK/VSIX
– SQL Server Express
LocalDB
40. Visual Studio and TFS 2012
• Connectivity to TFS 2012:
• Visual Studio 2012 (Native support)
• Visual Studio 2010
– Requires SP1 and TFS 2012 Compatibility GDR
• Visual Studio 2008
– Requires SP1 and TFS 2012 Compatibility GDR
• Visual Studio 2005 and earlier
– No support expected
– Consider the MSSCCI provider
41. Microsoft Test Manager
• Compatible across MTM and TFS versions:
– Test Plans
– Test Case work items
– Test Runs
– Work item queries
• Incompatible:
– MTM 2012 and TFS 2010
• Lab Management
• Test Results (additional tab)
• Exploratory Testing
• Windows Store app testing
– MTM 2010 and TFS 2012
• Lab Management (environments and templates)
42. Cross Platform
• Team Explorer Everywhere (TEE) 2012:
– Connect to TFS 2012
– Connect to TFS 2010*
– Connect to TFS 2008*
– Connect to TFS 2005*
• TEE 2012 supports 3.4 - 3.8
• TEE 2010 SP1 supports 3.2 - 3.6
• TEE 2010 supports Eclipse 3.0 - 3.5
* Reduced functionality when connecting to earlier versions of TFS.
43. Beyond Visual Studio
• Third party tools and integration…
– Some VS/TFS 2010 tools will work as is.
– Some VS/TFS 2010 must be upgraded.
– Some VS/TFS 2010 will not work.
• New versions of some common tools are available:
– Team Foundation Power Tools
– MSSCCI Provider
• Not using Visual Studio or Eclipse?
– Team Explorer on Windows or TEE cross-platform
– Some compatibility via bridges: TFS/SVN or TFS/GIT
– Web access
44. Agenda
• Overview:
– “ALM” in 2012
– Visual Studio 2012
• New ALM Features
– Agile Management
– Developer Productivity
– Feedback and testing
– DevOps
– Features by Edition
• Planning Your Upgrade
– Client-side Upgrade
– Server-side Upgrade
– Migration Options
– Next Steps
• Summary
45. TFS 2012 Prerequisites
Operating System:
• 64-Bit server
– Windows Server 2008 SP2
– Windows Server 2008 R2 SP1
– Windows Server 2012
• 32-bit or 64-bit client
– Windows 7 SP1
– Windows 8
Database Requirements:
• SQL Server 2008 R2
• SQL Server 2012
• Express (basic installation)
• Standard or Enterprise Edition
for Reporting
SharePoint Requirements:
• SharePoint Foundation 2010
• SharePoint Server 2010 (Enterprise
or Standard)
• MOSS 2007 (Enterprise or
Standard)
• Windows SharePoint Services 3.0
Project Server Requirements:
• Project Server 2010 SP1
• Project Server 2007 SP2 with SQL
Server 2005 or 2008
TFS Requirements (Upgrade):
• TFS 2008 SP1
• TFS 2010 RTM or SP1
46. General Upgrade Process
• In-Place Upgrade:
• Verify the upgrade before the upgrade.
• Take care of prerequisites!
• Make sure you have backups!
• Uninstall TFS 2010
• Install TFS 2012
• Configure TFS 2012 as an “Upgrade”
• Post-Installation cleanup
• Verify and release the upgrade into production!
Alternatively, you can migrate to a new server!
48. Enabling Web Features
• Browse to Web Access
• Access your project
• View Backlog
• Configure Upgrades
• Move forward with TFS 2012!
49. Agenda
• Overview:
– “ALM” in 2012
– Visual Studio 2012
• New ALM Features
– Agile Management
– Developer Productivity
– Feedback and testing
– DevOps
– Features by Edition
• Planning Your Upgrade
– Client-side Upgrade
– Server-side Upgrade
– Migration Options
– Next Steps
• Summary
50. Migration from where?
• ALM:
– TFS (older versions)
– Rational Team Concert
– Other…
• Version Control:
– Visual Source Safe
– IBM ClearCase
– CVS
– MKS
– Subversion
– Perforce
– StarTeam
– Vault
– Other…
• Work Tracking:
– HP ALM (Quality Center)
– IBM ClearQuest
– Other…
• Automated Build:
– CC.NET
– FinalBuild
– Bamboo
– Hudson
– NAnt
– Ant
– Other…
• Testing:
– HP ALM (Quality Center)
– Other…
51. Migration Options for ALM
• TFS Hardware Migration
– Upgrade to 2008 SP1 or later
– Restore backups of TFS databases on new servers
– Perform aforementioned upgrade steps
– Retire original server
• Non-TFS ALM Migration
– Migrate per individual subsystems
52. Version Control Migration
• “Tips” Migration
– Low fidelity
– Works with everything
– Opportunity to clean up
• Timely Migration™
– High fidelity
– Subversion
– StarTeam
– CVS
– TFS
• TFS Integration Platform
– Subversion
– ClearCase
– Custom
• VSS Converter
• Bridges
– SVN Bridge
– GIT TFS
• Roll-your-own
53. Work Tracking and Test Case Migration
• Manual
– Retype
– Excel
• Scrat
– Quality Center to TFS
– Support Requirements, Bugs, Test Cases and Attachments
• Test Case Migrator Plus
– Supports link type: Parent/Child, Related, Tests/Tested By
– Supports Requirements, Test Cases, and Bugs
– Frequently used with Excel as an intermediary
• HP Quality Center Synchronizer
– Bugs only – not currently support TFS 2012
• Scripting / Roll-your-own
54. Test Runs, Automated Builds, Reports, …
• Rebuild from scratch
• Roll-your own
:-(
55. Agenda
• Overview:
– “ALM” in 2012
– Visual Studio 2012
• New ALM Features
– Agile Management
– Developer Productivity
– Feedback and testing
– DevOps
– Features by Edition
• Planning Your Upgrade
– Client-side Upgrade
– Server-side Upgrade
– Migration Options
– Next Steps
• Summary
56. What next?
• Plan
– Understand your environment
– Understand timing and risks
– Define your destination
• Leverage Experience
– Build it internally
• Read / Study
• Practice
• Verify
– Hire/buy experience
• Execute!
57. Summary
Answering some questions…
• What is Visual Studio 2012
“ALM”?
• What are some of the
compelling new features?
• What should you consider
when planning for Visual
Studio 2012?
• What about for TFS 2012?
• What approach will you use
when you upgrade?
60. Imaginet‟s New Blog Keeps You In The Know
http://blog.imaginet.com
Stay up to speed on the latest news from Imaginet, Microsoft,
Visual Studio, and the entire software development world.
61. More Webcasts on ALM / TFS / Visual Studio 2012
• Upgrading to TFS 2012: What You
Need to Know!
• February 21 (1:00-2:30pm CT)
• Getting Started With Coded UI
testing: Building Your First
Automated Test
• February 28 (1:00-2:30pm CT)
Upcoming ALM Workshops & Webcasts:
• Lean, Kanban, and TFS
• March 7 (1:00-2:30pm CT)
• March 21 (1:00-2:30pm CT)
• Using Lean and Kanban to
Revolutionize Your Organization
• March 11 (1:00-2:00pm CT)
• The newest of the new with Visual
Studio and TFS 2012
• March 14 (1:00-2:30pm CT)
• March 28 (1:00-2:30pm CT)
62. For attendees of today‟s session that fill out the survey
FREE Imaginet On Demand
Web Training Subscription Offer
Complete our Post-Webcast survey, and receive 1
free Imaginet On Demand web training
subscription, good for 1 person for 1 month!! The
survey will be emailed to you immediately after this
webcast is over.
What is Imaginet On Demand? Imaginet is proud to announce our newest
web-based training program called Imaginet On Demand, your source for the
best Application Lifecycle Management (ALM) training on the internet.
Imaginet On Demand is a subscription-based training program centric to the
Visual Studio ALM tools, including Visual Studio, Team Foundation Server
(TFS), Microsoft Test Manager, and Microsoft Visual Studio Lab Management.
Learn the new tools of Visual Studio at your pace, from wherever you want.
It's that simple!
63. Free Services from Imaginet & Microsoft
There are a number of different Microsoft Programs that you
might be able to leverage to get some free services from
Imaginet:
• Deployment Planning Services (DPS) – You can trade in your
Microsoft Software Assurance credits to receive some free
TFS/ALM Deployment Planning Services days with Imaginet
• Partner Services Credit (PSC) – Have you or are you about to
spend money with Microsoft on Visual Studio 2012 products? If
so, Microsoft may kick in some funding to help you successfully
adopt.
• Virtual Technical Specialist (VTS) hours –You may be eligible
to receive some free remote consulting/training hours with
Imaginet through the Microsoft Virtual Technical Specialist
program.
For more information, email bmadison@imaginet.com.
64. Email us at:
ALM Planning & Implementation Services
ALM Planning
• ALM Assessment & Envisioning Workshops
(3 or 5 days)
• VS & TFS Migration Planning Workshop (5
days)
• TFS Deployment Planning* (5 days)
• Visual SourceSafe to TFS Migration
Planning* (3 Days)
• Visual Studio Quality Tools Deployment
Planning* (5 days)
Upgrade
• TFS 2010 Adoption Quick Start (5 or 10
days)
• TFS 2012 Adoption Quick Start (5 or 10
days)
• TFS 2010 Upgrade Quick Start (10 days)
• TFS 2012 Upgrade Quick Start (10 days)
Remote Support
• Remote Support for TFS & Visual Studio
Lab
• Visual Studio Lab Management Quick Start
(10 days)
Testing
• Manual Testing with Test Manager Quick
Start (5 days)
• Visual Studio Testing Tools Quick Start (10
days)
• Visual Studio Automated Testing Quick Start
(5 days)
• Visual Studio Load Testing Quick Start (5 or
10 Days)
Builds
• Automated Build & Release Management
Quick Start (5 days)
• Automated Build Center of Excellence (CoE)
Database
• Visual Studio Database Tools Quick Start
(10 days)
Integrations
• Team Foundation Server (TFS) & Project
Server Integration Quick Start (10 days)
• TFS & Quality Center Integration/Migration
Quick Start (10 days)
65. Top Gun Academy Training Classes
• Other Imaginet Training Classes
– ALM
• Microsoft Visual Studio & TFS 2012 – Skills Upgrade (2 days)
• Overview Training with Microsoft Visual Studio 2012 ALM Tools (4 days)
• Overview Training with Microsoft Visual Studio 2010 ALM Tools (4 days)
• Testers Training with Microsoft Visual Studio 2012 ALM Tools (4 days)
• Testers Training with Microsoft Visual Studio 2010 ALM Tools (4 days)
• Developers Training with Microsoft Visual Studio 2012 ALM Tools (4 days)
• Developers Training with Microsoft Visual Studio 2010 ALM Tools (4 days)
• Imaginet On Demand Online Web Training
– Scrum/Kanban
• Professional Scrum Foundations (PSF) (2 days)
• Professional Scrum Master (PSM) (2 days)
• Professional Scrum Developer (PSD) (5 days)
• Professional Scrum Master (PSM) Using Microsoft ALM (3 days)
• Accredited Core Kanban Using Microsoft ALM (3 days)
To register or for more information, please visit our website here:
http://www.imaginet.com/ or contact us: info@imaginet.com
66. Upcoming Class – Tester Training with VS 2012
This four-day instructor-led course provides students with the
knowledge and skills to use the latest testing tools provided by Visual
Studio 2012 to support a variety of different testing needs (manual
and automated).
Date: March 11-15, 2013
Location: Dallas (Irving, TX)
Price: $2375/student
Registration link will be included in our follow-up email later today!
Testers Training Using
Visual Studio 2012 ALM Tools
(4 Days Class)
67. For questions or more information,
please contact us at:
info@imaginet.com or (972)607-4830
Remember to add http://blog.imaginet.com to your favorite reader!
Microsoft Visual Studio 2012 brings a number of new features into the integrated ALM toolset. With new features like PowerPoint Storyboarding, Integrated Code Review Features, Stakeholder Feedback, and a newly integrated Developer / Operations Workflow, you will quickly find many reasons to upgrade to Visual Studio and Team Foundation Server 2012! In this webinar, we'll briefly discuss the breadth of new ALM features. Come join us for this free Webinar!
Agile project management to TFS
UI Updates to make it more appealing
What makes Ultimate? IntelliTrace (including in production), Web/Load testing and the Architecture tools.New features? Graphics Debugging, Code Clone, Code Review, Storyboarding, Feedback Manager, agile management tools.Features moved to Premium from Ultimate? MTM, including: Manual testing and Lab Management
Take inventory and evaluate what an upgrade will impact.
Understand how TFS supports your work today. Adopting 2012 will help in many ways. But understand pieces in your existing implementation that might break if you don’t plan appropriately.
VS 2012 & 2010 us supportedSxSMost common projects and file types are supported (defer to the next slide)
Local workspaces and the execute bit are examples of things that need TEE 2012 AND TFS 2012
Note – this is important and likely to be a kicker… SQL 2008 is NOT supported.Also – no SP requirements for SharePoint, but many O/Ses will require SPs.
#1 is one biggie#6 can take time if you have a big database#7 can be the other biggie, depending upon your process and any customizations or tooling
Make sure they know this is an “if you’re luck” situation, especially for customized process templates.