1Ā 
USā€23Ā MaintainingĀ TrafficĀ ConceptĀ 
Ā 
TechnicalĀ MemoĀ forĀ EAĀ 
Ā 
Ā 
Ā 
USā€23Ā ActiveĀ TrafficĀ ManagementĀ EAĀ 
Ā 
MDOTĀ JNĀ 122678,Ā 123214Ā 
Ā 
Ā 
Ā 
PreparedĀ byĀ 
Ā 
MDOTĀ UniversityĀ RegionĀ OfficeĀ 
2Ā 
TableĀ ofĀ ContentsĀ 
Ā 
BackgroundĀ ......................................................................................................................................Ā 3Ā 
Ā 
MainlineĀ TrafficĀ ................................................................................................................................Ā 4Ā 
Ā 
BridgeĀ ConstructionĀ ............................................................................................................................Ā 6Ā 
Ā 
PreferredĀ DetourĀ RoutesĀ .......................................................................................................................Ā 7Ā 
Ā 
PedestrianĀ concernsĀ .........................................................................................................................14Ā 
Ā 
ProposedĀ SigningĀ ......................................................................................................................................Ā 14Ā 
Ā 
EconomicĀ impactsĀ ............................................................................................................................14Ā 
Ā 
3Ā 
Ā 
Ā 
BackgroundĀ 
Ā 
Ā 
Ā 
TheĀ  USā€23Ā  corridorĀ  betweenĀ  BrightonĀ  andĀ  AnnĀ  ArborĀ  hasĀ  seenĀ  manyĀ  changesĀ  sinceĀ  itsĀ  originalĀ 
construction.Ā Ā USā€23Ā isĀ theĀ primaryĀ northĀ southĀ routeĀ betweenĀ AnnĀ Arbor,Ā Brighton,Ā Flint,Ā andĀ northernĀ 
Michigan.Ā AsĀ aĀ resultĀ significantĀ amountsĀ ofĀ trafficĀ areĀ generatedĀ onĀ weekĀ daysĀ throughĀ commutingĀ toĀ 
workĀ  andĀ  onĀ  weekendsĀ  forĀ  recreation.Ā  WithĀ  theĀ  evolvingĀ  economyĀ  andĀ  migrationĀ  ofĀ  workforceĀ  theĀ 
currentĀ aspectsĀ ofĀ theĀ roadwayĀ andĀ itsĀ interchangesĀ areĀ inĀ needĀ ofĀ improvements.Ā Ā TheĀ projectĀ areaĀ isĀ 
10.2Ā milesĀ ofĀ fourĀ laneĀ limitedĀ accessĀ freewayĀ withĀ narrowĀ medianĀ locatedĀ inĀ LivingstonĀ andĀ WashtenawĀ 
counties.Ā Ā ThroughĀ pastĀ projectsĀ aĀ singleĀ laneĀ closureĀ duringĀ daytimeĀ hoursĀ resultsĀ inĀ significantĀ backĀ upĀ 
andĀ  asĀ  thereĀ  areĀ  fewĀ  alternativeĀ  routesĀ  diversionĀ  cannotĀ  beĀ  assumed.Ā  Ā  AsĀ  suchĀ  theĀ  maintainĀ  trafficĀ 
conceptĀ  forĀ  mainlineĀ  requiresĀ  thatĀ  allĀ  lanesĀ  beĀ  openĀ  duringĀ  peakĀ  hoursĀ  withĀ  aĀ  singleĀ  laneĀ  allowedĀ  atĀ 
nightĀ andĀ offĀ peak.Ā ThisĀ conceptĀ attemptsĀ toĀ minimizeĀ  theĀ congestionĀ associatedĀ withĀ theĀ constructionĀ 
andĀ  impactsĀ  toĀ  localĀ  stakeholders.Ā  InĀ  orderĀ  toĀ  reconstructĀ  theĀ  bridgesĀ  overĀ  USā€23Ā  detoursĀ  mustĀ  beĀ 
utilizedĀ forĀ rampĀ work.Ā ContinuingĀ theĀ intentĀ toĀ reducedĀ impactsĀ theseĀ detoursĀ willĀ beĀ limitedĀ inĀ scopeĀ 
andĀ potentiallyĀ incentivized.Ā 
Ā 
WithinĀ theĀ projectĀ areaĀ thereĀ areĀ sixĀ interchanges,Ā theseĀ interchangesĀ areĀ asĀ follows:Ā 
Ā 
1.Ā Ā Ā  NorthĀ TerritorialĀ RoadĀ overĀ USā€23.Ā 
2.Ā Ā Ā  SixĀ MileĀ RoadĀ overĀ USā€23.Ā 
3.Ā Ā Ā  BarkerĀ RoadĀ underĀ USā€23Ā 
4.Ā Ā Ā  EightĀ MileĀ RoadĀ overĀ USā€23.Ā 
5.Ā Ā Ā  Mā€36Ā underĀ USā€23.Ā 
6.Ā Ā Ā  SilverĀ LakeĀ RoadĀ underĀ USā€23.Ā 
Ā 
TheĀ  preferredĀ  constructionĀ  alternativesĀ  forĀ  theĀ  projectĀ  willĀ  includeĀ  replacingĀ  theĀ  SixĀ  MileĀ  Road,Ā  NorthĀ 
TerritorialĀ Road,Ā andĀ EightĀ  MileĀ  RoadĀ structures.Ā Ā  AdditionallyĀ  USā€23Ā  willĀ beĀ modifiedĀ  toĀ  accommodateĀ 
theĀ ActiveĀ TrafficĀ ManagementĀ (ATM)Ā improvementsĀ fromĀ NorthĀ TerritorialĀ RoadĀ toĀ Mā€36Ā andĀ aĀ CPMĀ millĀ 
andĀ  resurfacesĀ  fromĀ  Mā€36Ā  toĀ  SilverĀ  LakeĀ  Road.Ā  Ā  InĀ  orderĀ  toĀ  constructĀ  theĀ  freewayĀ  andĀ  interchangeĀ 
upgradesĀ detourĀ routesĀ wereĀ identifiedĀ asĀ theĀ preferredĀ optionsĀ basedĀ onĀ theĀ followingĀ reasons;Ā 
Ā 
1.Ā Ā Ā  AllĀ structuresĀ haveĀ substandardĀ underĀ clearance.Ā AsĀ suchĀ significantĀ gradeĀ raisesĀ willĀ beĀ requiredĀ forĀ 
theĀ proposedĀ structuresĀ andĀ theĀ existingĀ bridgeĀ widthsĀ areĀ unableĀ toĀ accommodateĀ biā€Ā directionalĀ traffic.Ā 
Ā 
2.Ā Ā Ā  DetourĀ routesĀ areĀ readilyĀ availableĀ forĀ theĀ structures.Ā 
4Ā 
Ā 
Ā 
MaintainingĀ trafficĀ forĀ MainlineĀ USā€23Ā 
Ā 
StageĀ 1Ā involvesĀ aĀ nightĀ timeĀ singleĀ laneĀ closureĀ toĀ upgradeĀ theĀ outsideĀ shoulders.Ā DetoursĀ andĀ daytimeĀ 
workĀ  wouldĀ  beĀ  impracticalĀ  forĀ  thisĀ  stageĀ  asĀ  thereĀ  areĀ  noĀ  suitableĀ  detourĀ  routesĀ  forĀ  USā€23.Ā Ā Ā AnyĀ  peakĀ 
hourĀ laneĀ closuresĀ resultĀ inĀ farĀ tooĀ muchĀ delayĀ toĀ localĀ stakeholders.Ā 
Ā 
Ā 
Ā 
StageĀ 1Ā MOTĀ TypicalĀ CrossĀ SectionĀ 
Ā 
Ā 
StageĀ 1Ā MOTĀ PlanĀ 
Ā 
5Ā 
StageĀ  2Ā  consistsĀ  ofĀ  shiftingĀ  trafficĀ  toĀ  theĀ  newlyĀ  upgradedĀ  outsideĀ  shouldersĀ  andĀ  constructingĀ  theĀ  newĀ 
pavementĀ forĀ theĀ ActiveĀ TrafficĀ ManagementĀ system.Ā Ā  NoĀ  peakĀ hourĀ laneĀ closuresĀ orĀ detoursĀ ofĀ USā€23Ā 
willĀ beĀ permitted.Ā 
Ā 
StageĀ 2Ā MOTĀ TypicalĀ CrossĀ SectionĀ 
Ā 
Ā 
Ā 
Ā 
StageĀ 2Ā MOTĀ PlanĀ 
Ā 
6Ā 
BridgeĀ ConstructionĀ 
Ā 
SeveralĀ bridgesĀ overĀ USā€23Ā weĀ beĀ reconstructedĀ asĀ aĀ partĀ ofĀ theĀ project.Ā TheseĀ bridgesĀ willĀ maintainĀ aĀ 
minimumĀ ofĀ oneĀ laneĀ ofĀ trafficĀ atĀ allĀ time.Ā Ā UtilizingĀ directionalĀ detours,Ā accessĀ canĀ beĀ maintainedĀ forĀ allĀ 
roadwayĀ  users.Ā Ā Ā TheĀ  localĀ  bridgesĀ  overĀ  USā€23Ā  whichĀ  willĀ  beĀ  replacedĀ  includeĀ  NorthĀ  TerritorialĀ Road,Ā  6Ā 
MileĀ RoadĀ andĀ 8Ā MileĀ road.Ā Ā  NorthĀ TerritorialĀ RoadĀ andĀ 6Ā MileĀ RoadĀ structuresĀ willĀ beĀ constructedĀ onĀ 
theĀ existingĀ alignment.Ā TheĀ 8Ā MileĀ RoadĀ replacementĀ isĀ anticipatedĀ toĀ beĀ constructedĀ northĀ ofĀ theĀ existingĀ 
bridge.Ā 
Ā 
TheĀ USā€23Ā bridgeĀ overĀ BarkerĀ RoadĀ willĀ beĀ widenedĀ onĀ theĀ medianĀ sideĀ toĀ accommodateĀ theĀ ATM.Ā Ā ThisĀ 
willĀ beĀ coordinatedĀ withĀ theĀ mainlineĀ roadĀ improvementsĀ whileĀ maintainingĀ twoĀ lanesĀ ofĀ trafficĀ inĀ eachĀ 
direction.Ā Ā TheĀ USā€23Ā bridgeĀ overĀ theĀ GreatĀ LakesĀ CentralĀ RailroadĀ isĀ anticipatedĀ toĀ beĀ replacedĀ asĀ partĀ ofĀ 
theĀ project.Ā Ā AĀ bridgeĀ slideĀ ofĀ theĀ NBĀ USā€23Ā trafficĀ ToĀ maintainĀ trafficĀ atĀ thisĀ locationĀ isĀ anticipatedĀ followedĀ 
byĀ shiftingĀ allĀ fourĀ lanesĀ ofĀ mainlineĀ trafficĀ toĀ theĀ newlyĀ constructedĀ USā€23Ā bridge.Ā Ā SouthboundĀ USā€23Ā 
couldĀ beĀ constructedĀ whileĀ trafficĀ isĀ detouredĀ ontoĀ theĀ newĀ NBĀ USā€23Ā bridgeĀ overĀ theĀ Railroad.Ā 
Ā 
MDOTĀ isĀ consideringĀ theĀ useĀ ofĀ AcceleratedĀ BridgeĀ ConstructionĀ (ABC)Ā methodsĀ toĀ minimizeĀ theĀ impactsĀ 
toĀ motoristsĀ atĀ allĀ bridgeĀ replacements.Ā 
Ā 
ThroughoutĀ  allĀ  stagesĀ  messageĀ  boards,Ā  signs,Ā  andĀ  websiteĀ  updatesĀ  willĀ  beĀ  usedĀ  toĀ  notifyĀ  driversĀ  ofĀ 
detours,Ā delay,Ā andĀ alternateĀ routes.Ā 
7Ā 
PreferredĀ detourĀ routes:Ā StructureĀ 
Ā 
NorthĀ TerritorialĀ RoadĀ overĀ USā€23:Ā PartĀ widthĀ constructionĀ ofĀ NorthĀ TerritorialĀ RoadĀ isĀ preferredĀ whileĀ 
maintainingĀ eastboundĀ trafficĀ andĀ detouringĀ westboundĀ traffic.Ā WestboundĀ NorthĀ TerritorialĀ RoadĀ trafficĀ 
willĀ beĀ detouredĀ northĀ onĀ USā€23Ā toĀ theĀ 6Ā MileĀ RoadĀ interchange,Ā southĀ onĀ USā€23Ā andĀ backĀ toĀ NorthĀ 
TerritorialĀ Road.Ā SeeĀ figureĀ 1Ā forĀ locationĀ andĀ appendixĀ A1Ā forĀ signingĀ concept.Ā 
Ā 
Ā 
Ā 
Ā 
6Ā MileĀ RoadĀ overĀ USā€23:Ā PartĀ widthĀ constructionĀ ofĀ 6Ā MileĀ RoadĀ isĀ preferredĀ whileĀ maintainingĀ westboundĀ 
trafficĀ andĀ detouringĀ eastboundĀ traffic.Ā EastboundĀ 6Ā MileĀ RoadĀ trafficĀ willĀ beĀ detouredĀ southĀ onĀ USā€23Ā toĀ 
theĀ NorthĀ TerritorialĀ RoadĀ interchange,Ā northĀ onĀ USā€23Ā andĀ backĀ toĀ 6Ā MileĀ Road.Ā Ā 
Ā 
Ā 
8Ā 
8Ā MileĀ RoadĀ overĀ USā€23:Ā Twoā€wayĀ trafficĀ canĀ beĀ maintainedĀ acrossĀ theĀ existingĀ bridgeĀ atĀ thisĀ locationĀ 
whileĀ theĀ newĀ structureĀ isĀ beingĀ constructedĀ toĀ theĀ north.Ā 
Ā 
PreferredĀ detourĀ routes:Ā RampsĀ 
Ā 
NorthĀ TerritorialĀ RoadĀ NBĀ onĀ Ramp:Ā FullĀ detourĀ ofĀ thisĀ rampĀ isĀ preferredĀ forĀ shortĀ durations.Ā NorthĀ 
TerritorialĀ RoadĀ trafficĀ willĀ beĀ detouredĀ northĀ onĀ WhitmoreĀ LakeĀ RoadĀ toĀ 6Ā MileĀ RoadĀ whereĀ itĀ canĀ enterĀ 
theĀ freeway.Ā 
Ā 
Ā 
Ā 
Ā 
NorthĀ TerritorialĀ RoadĀ SBĀ onĀ Ramp:Ā FullĀ detourĀ ofĀ thisĀ rampĀ isĀ preferredĀ forĀ shortĀ durations.Ā EastboundĀ 
orĀ westboundĀ trafficĀ wantingĀ toĀ enterĀ SBĀ USā€23Ā willĀ beĀ detouredĀ northĀ toĀ 6Ā MileĀ RoadĀ andĀ enterĀ 
southboundĀ USā€23Ā fromĀ theĀ loopĀ ramp.Ā 
Ā 
9Ā 
NorthĀ TerritorialĀ RoadĀ NBĀ exitĀ Ramp:Ā FullĀ detourĀ ofĀ thisĀ rampĀ isĀ preferredĀ forĀ shortĀ durations.Ā 
NorthboundĀ trafficĀ wantingĀ toĀ exitĀ atĀ NorthĀ TerritorialĀ RoadĀ willĀ beĀ detouredĀ northĀ toĀ 6Ā MileĀ RoadĀ andĀ 
southĀ backĀ toĀ NorthĀ TerritorialĀ Road.Ā 
Ā 
Ā 
Ā 
Ā 
NorthĀ TerritorialĀ RoadĀ SBĀ exitĀ Ramp:Ā FullĀ detourĀ ofĀ thisĀ rampĀ isĀ preferredĀ forĀ shortĀ durations.Ā NorthĀ 
TerritorialĀ RoadĀ trafficĀ willĀ beĀ detouredĀ southĀ onĀ WhitmoreĀ LakeĀ RoadĀ toĀ NorthĀ TerritorialĀ Road.Ā 
Ā 
10Ā 
6Ā MileĀ RoadĀ NBĀ onĀ Ramp:Ā FullĀ detourĀ ofĀ thisĀ rampĀ isĀ preferredĀ forĀ shortĀ durations.Ā EastboundĀ andĀ 
westboundĀ 6Ā MileĀ RoadĀ trafficĀ willĀ beĀ detouredĀ southĀ onĀ USā€23Ā andĀ northĀ atĀ NorthĀ TerritorialĀ Road.Ā 
Ā 
Ā 
6Ā MileĀ RoadĀ SBĀ onĀ Ramp:Ā FullĀ detourĀ ofĀ thisĀ rampĀ isĀ preferredĀ forĀ shortĀ durations.Ā EastboundĀ andĀ 
westboundĀ 6Ā MileĀ RoadĀ trafficĀ willĀ beĀ detouredĀ southĀ onĀ WhitmoreĀ LakeĀ RoadĀ andĀ eastĀ toĀ NorthĀ 
TerritorialĀ Road.Ā 
Ā 
11Ā 
6Ā MileĀ RoadĀ NBĀ exitĀ Ramp:Ā FullĀ detourĀ ofĀ thisĀ rampĀ isĀ preferredĀ forĀ shortĀ durations.Ā TrafficĀ wantingĀ toĀ 
exitĀ atĀ 6Ā MileĀ RoadĀ willĀ beĀ detouredĀ northĀ onĀ WhitmoreĀ LakeĀ Road.Ā 
Ā 
Ā 
6Ā MileĀ RoadĀ SBĀ exitĀ Ramp:Ā FullĀ detourĀ ofĀ thisĀ rampĀ isĀ preferredĀ forĀ shortĀ durations.Ā TrafficĀ wantingĀ toĀ 
exitĀ atĀ 6Ā MileĀ RoadĀ willĀ beĀ detouredĀ southĀ onĀ USā€23Ā andĀ northĀ atĀ NorthĀ TerritorialĀ Road.Ā 
Ā 
12Ā 
BarkerĀ RoadĀ SBĀ onĀ Ramp:Ā FullĀ detourĀ ofĀ thisĀ rampĀ isĀ preferredĀ forĀ shortĀ durations.Ā BarkerĀ RoadĀ trafficĀ willĀ 
beĀ detouredĀ southĀ onĀ JenningsĀ RoadĀ toĀ 6Ā MileĀ Road.Ā 
Ā 
Ā 
Ā 
Ā 
Ā 
Ā 
Ā 
Ā 
Ā 
8Ā MileĀ RoadĀ NBĀ onĀ Ramp:Ā FullĀ detourĀ ofĀ thisĀ rampĀ isĀ preferredĀ forĀ shortĀ durations.Ā EastboundĀ andĀ 
westboundĀ 8Ā MileĀ RoadĀ trafficĀ willĀ beĀ detouredĀ southĀ onĀ USā€23Ā toĀ 6Ā MileĀ Road.Ā 
Ā 
13Ā 
8Ā MileĀ RoadĀ SBĀ onĀ Ramp:Ā FullĀ detourĀ ofĀ thisĀ rampĀ isĀ preferredĀ forĀ shortĀ durations.Ā EastboundĀ andĀ 
westboundĀ 8Ā MileĀ RoadĀ willĀ beĀ detouredĀ northĀ onĀ USā€23Ā toĀ theĀ Mā€36Ā interchange.Ā 
Ā 
Ā 
Ā 
Ā 
Ā 
Ā 
Ā 
Ā 
Ā 
8Ā MileĀ RoadĀ NBĀ exitĀ Ramp:Ā FullĀ detourĀ ofĀ thisĀ rampĀ isĀ preferredĀ forĀ shortĀ durations.Ā TrafficĀ wantingĀ toĀ 
exitĀ atĀ 8Ā MileĀ RoadĀ willĀ beĀ detouredĀ NorthĀ onĀ USā€23Ā andĀ southĀ atĀ Mā€36.Ā 
Ā 
14Ā 
8Ā MileĀ RoadĀ SBĀ exitĀ Ramp:Ā FullĀ detourĀ ofĀ thisĀ rampĀ isĀ preferredĀ forĀ shortĀ durations.Ā TrafficĀ wantingĀ toĀ 
exitĀ atĀ 8Ā MileĀ RoadĀ willĀ beĀ detouredĀ southĀ onĀ USā€23Ā andĀ northĀ atĀ 6Ā MileĀ Road.Ā 
Ā 
Ā 
Ā 
Ā 
Ā 
Ā 
Ā 
Ā 
Ā 
Ā 
PedestrianĀ ConcernsĀ 
Ā 
NoneĀ ofĀ theĀ existingĀ structuresĀ haveĀ pedestrianĀ facilities.Ā CombinedĀ withĀ theĀ ruralĀ settingĀ thereĀ isĀ littleĀ 
indicationĀ thatĀ pedestriansĀ willĀ beĀ impactedĀ byĀ theĀ fullĀ orĀ partialĀ closureĀ ofĀ theĀ structures.Ā 
Ā 
ProposedĀ SigningĀ 
Ā 
ProposedĀ signingĀ willĀ beĀ inĀ accordanceĀ withĀ theĀ MMUTCD.Ā 
Ā 
EconomicĀ ImpactsĀ 
Ā 
ThereĀ areĀ severalĀ businesses,Ā homesĀ andĀ developmentsĀ alongĀ theĀ USā€23Ā corridor.Ā TheseĀ interchangesĀ 
areĀ vitalĀ asĀ accessĀ points;Ā asĀ suchĀ itĀ isĀ proposedĀ thatĀ noĀ bridgeĀ beĀ completelyĀ closedĀ duringĀ construction.Ā 
TheĀ directionalĀ trafficĀ willĀ maintainĀ accessĀ toĀ allĀ users.Ā 

More Related Content

What's hot

CODE OF POINTS-GR- 2013 2016 ENGLISH
CODE OF POINTS-GR- 2013 2016 ENGLISHCODE OF POINTS-GR- 2013 2016 ENGLISH
CODE OF POINTS-GR- 2013 2016 ENGLISHLuz Vanegas
Ā 
Montana Videoconferencing Strategic Plan Final Report June 12 ...
Montana Videoconferencing Strategic Plan Final Report June 12 ...Montana Videoconferencing Strategic Plan Final Report June 12 ...
Montana Videoconferencing Strategic Plan Final Report June 12 ...Videoguy
Ā 
Staff Report and Recommendations in Value of DER, 10-27-16
Staff Report and Recommendations in Value of DER, 10-27-16Staff Report and Recommendations in Value of DER, 10-27-16
Staff Report and Recommendations in Value of DER, 10-27-16Dennis Phayre
Ā 
ATR-72 - Karup (Denmark) OY-LHA
ATR-72 - Karup (Denmark) OY-LHAATR-72 - Karup (Denmark) OY-LHA
ATR-72 - Karup (Denmark) OY-LHACiro Esposito
Ā 
Kioti Daedong DK45 Tractor Service Repair Manual
Kioti Daedong DK45 Tractor Service Repair ManualKioti Daedong DK45 Tractor Service Repair Manual
Kioti Daedong DK45 Tractor Service Repair Manualhjsnekmde
Ā 
Workshop gl prt english-introduction
Workshop gl prt english-introductionWorkshop gl prt english-introduction
Workshop gl prt english-introductionhome
Ā 
The bat hat
The bat hatThe bat hat
The bat hatslmnsvn
Ā 
Tourism Sector Review and Masterplan (Final Published Report) 190906
Tourism Sector Review and Masterplan (Final Published Report) 190906Tourism Sector Review and Masterplan (Final Published Report) 190906
Tourism Sector Review and Masterplan (Final Published Report) 190906Ross Hopkins
Ā 
On recent advances in PV output power forecast
On recent advances in PV output power forecastOn recent advances in PV output power forecast
On recent advances in PV output power forecastMuhammad Qamar Raza
Ā 
On recent advances in pv output power forecast
On recent advances in pv output power forecastOn recent advances in pv output power forecast
On recent advances in pv output power forecastMuhammad Qamar Raza
Ā 
Development of Multivariable Control Systems Rev 200
Development of Multivariable Control Systems Rev 200Development of Multivariable Control Systems Rev 200
Development of Multivariable Control Systems Rev 200Maung Maung Latt
Ā 
Job safety analysis jsa
Job safety analysis   jsaJob safety analysis   jsa
Job safety analysis jsamkpq pasha
Ā 
Mnp3810e maintenance part3 board interface & strap
Mnp3810e maintenance part3 board interface & strapMnp3810e maintenance part3 board interface & strap
Mnp3810e maintenance part3 board interface & strapzeu1507
Ā 
Community Based Budget Booklet OMSD
Community Based Budget Booklet OMSDCommunity Based Budget Booklet OMSD
Community Based Budget Booklet OMSDDANIELLE CALISE, MBA
Ā 

What's hot (16)

CODE OF POINTS-GR- 2013 2016 ENGLISH
CODE OF POINTS-GR- 2013 2016 ENGLISHCODE OF POINTS-GR- 2013 2016 ENGLISH
CODE OF POINTS-GR- 2013 2016 ENGLISH
Ā 
Montana Videoconferencing Strategic Plan Final Report June 12 ...
Montana Videoconferencing Strategic Plan Final Report June 12 ...Montana Videoconferencing Strategic Plan Final Report June 12 ...
Montana Videoconferencing Strategic Plan Final Report June 12 ...
Ā 
Staff Report and Recommendations in Value of DER, 10-27-16
Staff Report and Recommendations in Value of DER, 10-27-16Staff Report and Recommendations in Value of DER, 10-27-16
Staff Report and Recommendations in Value of DER, 10-27-16
Ā 
ATR-72 - Karup (Denmark) OY-LHA
ATR-72 - Karup (Denmark) OY-LHAATR-72 - Karup (Denmark) OY-LHA
ATR-72 - Karup (Denmark) OY-LHA
Ā 
Kioti Daedong DK45 Tractor Service Repair Manual
Kioti Daedong DK45 Tractor Service Repair ManualKioti Daedong DK45 Tractor Service Repair Manual
Kioti Daedong DK45 Tractor Service Repair Manual
Ā 
Workshop gl prt english-introduction
Workshop gl prt english-introductionWorkshop gl prt english-introduction
Workshop gl prt english-introduction
Ā 
The bat hat
The bat hatThe bat hat
The bat hat
Ā 
luan van thac si how to use improve debating skills for third year
luan van thac si how to use improve debating skills for third year luan van thac si how to use improve debating skills for third year
luan van thac si how to use improve debating skills for third year
Ā 
Tourism Sector Review and Masterplan (Final Published Report) 190906
Tourism Sector Review and Masterplan (Final Published Report) 190906Tourism Sector Review and Masterplan (Final Published Report) 190906
Tourism Sector Review and Masterplan (Final Published Report) 190906
Ā 
On recent advances in PV output power forecast
On recent advances in PV output power forecastOn recent advances in PV output power forecast
On recent advances in PV output power forecast
Ā 
On recent advances in pv output power forecast
On recent advances in pv output power forecastOn recent advances in pv output power forecast
On recent advances in pv output power forecast
Ā 
Development of Multivariable Control Systems Rev 200
Development of Multivariable Control Systems Rev 200Development of Multivariable Control Systems Rev 200
Development of Multivariable Control Systems Rev 200
Ā 
Job safety analysis jsa
Job safety analysis   jsaJob safety analysis   jsa
Job safety analysis jsa
Ā 
Biomechanics hfe
Biomechanics hfeBiomechanics hfe
Biomechanics hfe
Ā 
Mnp3810e maintenance part3 board interface & strap
Mnp3810e maintenance part3 board interface & strapMnp3810e maintenance part3 board interface & strap
Mnp3810e maintenance part3 board interface & strap
Ā 
Community Based Budget Booklet OMSD
Community Based Budget Booklet OMSDCommunity Based Budget Booklet OMSD
Community Based Budget Booklet OMSD
Ā 

Similar to MDOT US-23 Construction Projects, Planned Detours, January 2015

FCC Interop Board Final Report 05 22 12
FCC Interop Board Final Report 05 22 12FCC Interop Board Final Report 05 22 12
FCC Interop Board Final Report 05 22 12Claudio Lucente
Ā 
Data Center Proposal (System Network Administration)
Data Center Proposal (System Network Administration)Data Center Proposal (System Network Administration)
Data Center Proposal (System Network Administration)Muhammad Ahad
Ā 
The City of Bakersfield, CA GIS Implementation Plan (1997 - 1998)
The City of Bakersfield, CA GIS Implementation Plan (1997 - 1998)The City of Bakersfield, CA GIS Implementation Plan (1997 - 1998)
The City of Bakersfield, CA GIS Implementation Plan (1997 - 1998)Juan Tobar
Ā 
Information Technology Disaster Recovery Guide - ABC Bank (redacted)
Information Technology Disaster Recovery Guide - ABC Bank (redacted)Information Technology Disaster Recovery Guide - ABC Bank (redacted)
Information Technology Disaster Recovery Guide - ABC Bank (redacted)Stephen White
Ā 
41713559 radio-access-network-protocols-and-signalling-analysis
41713559 radio-access-network-protocols-and-signalling-analysis41713559 radio-access-network-protocols-and-signalling-analysis
41713559 radio-access-network-protocols-and-signalling-analysisKevin Kang
Ā 
4 g americas developing integrating high performance het-net october 2012
4 g americas  developing integrating high performance het-net october 20124 g americas  developing integrating high performance het-net october 2012
4 g americas developing integrating high performance het-net october 2012Zoran Kehler
Ā 
E-FREELANCING - MAJOR/FINAL YEAR PROJECT DOCUMENTATION
E-FREELANCING - MAJOR/FINAL YEAR PROJECT DOCUMENTATIONE-FREELANCING - MAJOR/FINAL YEAR PROJECT DOCUMENTATION
E-FREELANCING - MAJOR/FINAL YEAR PROJECT DOCUMENTATIONPIYUSH Dubey
Ā 
Project Implementation Review of the NEPAD Infrastructure Short Term Action P...
Project Implementation Review of the NEPAD Infrastructure Short Term Action P...Project Implementation Review of the NEPAD Infrastructure Short Term Action P...
Project Implementation Review of the NEPAD Infrastructure Short Term Action P...Dr Lendy Spires
Ā 
Mapping of existing RE&EE roadmaps energy efficiency
Mapping of existing RE&EE roadmaps energy efficiencyMapping of existing RE&EE roadmaps energy efficiency
Mapping of existing RE&EE roadmaps energy efficiencyMaghrenov
Ā 
A Study of Traffic Management Detection Methods & Tools
A Study of Traffic Management Detection Methods & ToolsA Study of Traffic Management Detection Methods & Tools
A Study of Traffic Management Detection Methods & ToolsMartin Geddes
Ā 
Manual de servicio serie a1 de baic
Manual de servicio serie a1 de baicManual de servicio serie a1 de baic
Manual de servicio serie a1 de baicGonzalo Martinez
Ā 
ACHIEVING THE VISION OF 80 PERCENT RENEWABLES BY 2030 SRILANKA
ACHIEVING THE VISION OF 80 PERCENT RENEWABLES BY 2030 SRILANKAACHIEVING THE VISION OF 80 PERCENT RENEWABLES BY 2030 SRILANKA
ACHIEVING THE VISION OF 80 PERCENT RENEWABLES BY 2030 SRILANKAPrivate Consultants
Ā 
Central Water Commission Ministry Of Water Resources ,Govt. of India
Central Water Commission Ministry Of Water Resources ,Govt. of IndiaCentral Water Commission Ministry Of Water Resources ,Govt. of India
Central Water Commission Ministry Of Water Resources ,Govt. of IndiaAnshumaan Bhatt
Ā 
Future bnci roadmap
Future bnci roadmapFuture bnci roadmap
Future bnci roadmapKarlos Svoboda
Ā 
Manual GNSS GPS MSJ.pdf
Manual GNSS GPS MSJ.pdfManual GNSS GPS MSJ.pdf
Manual GNSS GPS MSJ.pdfsankal2
Ā 
10201 Executive Summary And Manifesto Event Processing
10201 Executive Summary And Manifesto Event Processing10201 Executive Summary And Manifesto Event Processing
10201 Executive Summary And Manifesto Event ProcessingChristine Maffla
Ā 
Airline Fleet Assignment And Schedule Design Integrated Models And Algorithms
Airline Fleet Assignment And Schedule Design  Integrated Models And AlgorithmsAirline Fleet Assignment And Schedule Design  Integrated Models And Algorithms
Airline Fleet Assignment And Schedule Design Integrated Models And AlgorithmsJennifer Roman
Ā 
Nx 10 for engineering design
Nx 10 for engineering designNx 10 for engineering design
Nx 10 for engineering designSergio Barrios
Ā 

Similar to MDOT US-23 Construction Projects, Planned Detours, January 2015 (20)

FCC Interop Board Final Report 05 22 12
FCC Interop Board Final Report 05 22 12FCC Interop Board Final Report 05 22 12
FCC Interop Board Final Report 05 22 12
Ā 
Data Center Proposal (System Network Administration)
Data Center Proposal (System Network Administration)Data Center Proposal (System Network Administration)
Data Center Proposal (System Network Administration)
Ā 
The City of Bakersfield, CA GIS Implementation Plan (1997 - 1998)
The City of Bakersfield, CA GIS Implementation Plan (1997 - 1998)The City of Bakersfield, CA GIS Implementation Plan (1997 - 1998)
The City of Bakersfield, CA GIS Implementation Plan (1997 - 1998)
Ā 
Information Technology Disaster Recovery Guide - ABC Bank (redacted)
Information Technology Disaster Recovery Guide - ABC Bank (redacted)Information Technology Disaster Recovery Guide - ABC Bank (redacted)
Information Technology Disaster Recovery Guide - ABC Bank (redacted)
Ā 
41713559 radio-access-network-protocols-and-signalling-analysis
41713559 radio-access-network-protocols-and-signalling-analysis41713559 radio-access-network-protocols-and-signalling-analysis
41713559 radio-access-network-protocols-and-signalling-analysis
Ā 
4 g americas developing integrating high performance het-net october 2012
4 g americas  developing integrating high performance het-net october 20124 g americas  developing integrating high performance het-net october 2012
4 g americas developing integrating high performance het-net october 2012
Ā 
E-FREELANCING - MAJOR/FINAL YEAR PROJECT DOCUMENTATION
E-FREELANCING - MAJOR/FINAL YEAR PROJECT DOCUMENTATIONE-FREELANCING - MAJOR/FINAL YEAR PROJECT DOCUMENTATION
E-FREELANCING - MAJOR/FINAL YEAR PROJECT DOCUMENTATION
Ā 
Project Implementation Review of the NEPAD Infrastructure Short Term Action P...
Project Implementation Review of the NEPAD Infrastructure Short Term Action P...Project Implementation Review of the NEPAD Infrastructure Short Term Action P...
Project Implementation Review of the NEPAD Infrastructure Short Term Action P...
Ā 
Mapping of existing RE&EE roadmaps energy efficiency
Mapping of existing RE&EE roadmaps energy efficiencyMapping of existing RE&EE roadmaps energy efficiency
Mapping of existing RE&EE roadmaps energy efficiency
Ā 
A Study of Traffic Management Detection Methods & Tools
A Study of Traffic Management Detection Methods & ToolsA Study of Traffic Management Detection Methods & Tools
A Study of Traffic Management Detection Methods & Tools
Ā 
Manual de servicio serie a1 de baic
Manual de servicio serie a1 de baicManual de servicio serie a1 de baic
Manual de servicio serie a1 de baic
Ā 
ACHIEVING THE VISION OF 80 PERCENT RENEWABLES BY 2030 SRILANKA
ACHIEVING THE VISION OF 80 PERCENT RENEWABLES BY 2030 SRILANKAACHIEVING THE VISION OF 80 PERCENT RENEWABLES BY 2030 SRILANKA
ACHIEVING THE VISION OF 80 PERCENT RENEWABLES BY 2030 SRILANKA
Ā 
Transport Assessment
Transport AssessmentTransport Assessment
Transport Assessment
Ā 
It project development fundamentals
It project development fundamentalsIt project development fundamentals
It project development fundamentals
Ā 
Central Water Commission Ministry Of Water Resources ,Govt. of India
Central Water Commission Ministry Of Water Resources ,Govt. of IndiaCentral Water Commission Ministry Of Water Resources ,Govt. of India
Central Water Commission Ministry Of Water Resources ,Govt. of India
Ā 
Future bnci roadmap
Future bnci roadmapFuture bnci roadmap
Future bnci roadmap
Ā 
Manual GNSS GPS MSJ.pdf
Manual GNSS GPS MSJ.pdfManual GNSS GPS MSJ.pdf
Manual GNSS GPS MSJ.pdf
Ā 
10201 Executive Summary And Manifesto Event Processing
10201 Executive Summary And Manifesto Event Processing10201 Executive Summary And Manifesto Event Processing
10201 Executive Summary And Manifesto Event Processing
Ā 
Airline Fleet Assignment And Schedule Design Integrated Models And Algorithms
Airline Fleet Assignment And Schedule Design  Integrated Models And AlgorithmsAirline Fleet Assignment And Schedule Design  Integrated Models And Algorithms
Airline Fleet Assignment And Schedule Design Integrated Models And Algorithms
Ā 
Nx 10 for engineering design
Nx 10 for engineering designNx 10 for engineering design
Nx 10 for engineering design
Ā 

More from JGNelson

Northfield Township Parks and Recreation Master Plan 2015
Northfield Township Parks and Recreation Master Plan 2015Northfield Township Parks and Recreation Master Plan 2015
Northfield Township Parks and Recreation Master Plan 2015JGNelson
Ā 
Huron River Watershed Council: Green Infrastructure in Northfield Township
Huron River Watershed Council: Green Infrastructure in Northfield TownshipHuron River Watershed Council: Green Infrastructure in Northfield Township
Huron River Watershed Council: Green Infrastructure in Northfield TownshipJGNelson
Ā 
1996 Northfield Township Survey Report, with Joint BOT-PC Letter
1996 Northfield Township Survey Report, with Joint BOT-PC Letter1996 Northfield Township Survey Report, with Joint BOT-PC Letter
1996 Northfield Township Survey Report, with Joint BOT-PC LetterJGNelson
Ā 
2015 Township Survey Proposal 1, from Cobalt Community Research
2015 Township Survey Proposal 1, from Cobalt Community Research2015 Township Survey Proposal 1, from Cobalt Community Research
2015 Township Survey Proposal 1, from Cobalt Community ResearchJGNelson
Ā 
The 2015 Washtenaw County Road Commission Report to Northfield Township, Mich...
The 2015 Washtenaw County Road Commission Report to Northfield Township, Mich...The 2015 Washtenaw County Road Commission Report to Northfield Township, Mich...
The 2015 Washtenaw County Road Commission Report to Northfield Township, Mich...JGNelson
Ā 
Wastewater Treatment Plant Capacity Report 3-18-2015
Wastewater Treatment Plant Capacity Report 3-18-2015Wastewater Treatment Plant Capacity Report 3-18-2015
Wastewater Treatment Plant Capacity Report 3-18-2015JGNelson
Ā 
Territorial Road at Whitmore Lake Road Traffic Study, from Nowatzke Report to...
Territorial Road at Whitmore Lake Road Traffic Study, from Nowatzke Report to...Territorial Road at Whitmore Lake Road Traffic Study, from Nowatzke Report to...
Territorial Road at Whitmore Lake Road Traffic Study, from Nowatzke Report to...JGNelson
Ā 
Ann Arbor Township 1999 Farmland Analysis & Cost of Services Study
Ann Arbor Township 1999 Farmland Analysis & Cost of Services StudyAnn Arbor Township 1999 Farmland Analysis & Cost of Services Study
Ann Arbor Township 1999 Farmland Analysis & Cost of Services StudyJGNelson
Ā 
Dda p14
Dda p14Dda p14
Dda p14JGNelson
Ā 
MDOT US-23 Plans Environmental Assessment Update, Full Document, January 2015
MDOT US-23 Plans Environmental Assessment Update, Full Document, January 2015MDOT US-23 Plans Environmental Assessment Update, Full Document, January 2015
MDOT US-23 Plans Environmental Assessment Update, Full Document, January 2015JGNelson
Ā 
MDOT US-23 Plans Environmental Assessment Update, Appendices, January 2015
MDOT US-23 Plans Environmental Assessment Update, Appendices, January 2015MDOT US-23 Plans Environmental Assessment Update, Appendices, January 2015
MDOT US-23 Plans Environmental Assessment Update, Appendices, January 2015JGNelson
Ā 
MDOT US-23 Plans Environmental Assessment Update, Summary, January 2015
MDOT US-23 Plans Environmental Assessment Update, Summary, January 2015MDOT US-23 Plans Environmental Assessment Update, Summary, January 2015
MDOT US-23 Plans Environmental Assessment Update, Summary, January 2015JGNelson
Ā 
Sewer system legal agreements & lawsuits
Sewer system legal agreements & lawsuitsSewer system legal agreements & lawsuits
Sewer system legal agreements & lawsuitsJGNelson
Ā 
Tetratech sewer system report
Tetratech sewer system reportTetratech sewer system report
Tetratech sewer system reportJGNelson
Ā 
Dda 2003 tax_increment_financing_plan
Dda 2003 tax_increment_financing_planDda 2003 tax_increment_financing_plan
Dda 2003 tax_increment_financing_planJGNelson
Ā 
AFT Cost of Community Services Study
AFT Cost of Community Services StudyAFT Cost of Community Services Study
AFT Cost of Community Services StudyJGNelson
Ā 
Northfield Township Master Plan (final_6_17_13)
Northfield Township Master Plan (final_6_17_13)Northfield Township Master Plan (final_6_17_13)
Northfield Township Master Plan (final_6_17_13)JGNelson
Ā 

More from JGNelson (17)

Northfield Township Parks and Recreation Master Plan 2015
Northfield Township Parks and Recreation Master Plan 2015Northfield Township Parks and Recreation Master Plan 2015
Northfield Township Parks and Recreation Master Plan 2015
Ā 
Huron River Watershed Council: Green Infrastructure in Northfield Township
Huron River Watershed Council: Green Infrastructure in Northfield TownshipHuron River Watershed Council: Green Infrastructure in Northfield Township
Huron River Watershed Council: Green Infrastructure in Northfield Township
Ā 
1996 Northfield Township Survey Report, with Joint BOT-PC Letter
1996 Northfield Township Survey Report, with Joint BOT-PC Letter1996 Northfield Township Survey Report, with Joint BOT-PC Letter
1996 Northfield Township Survey Report, with Joint BOT-PC Letter
Ā 
2015 Township Survey Proposal 1, from Cobalt Community Research
2015 Township Survey Proposal 1, from Cobalt Community Research2015 Township Survey Proposal 1, from Cobalt Community Research
2015 Township Survey Proposal 1, from Cobalt Community Research
Ā 
The 2015 Washtenaw County Road Commission Report to Northfield Township, Mich...
The 2015 Washtenaw County Road Commission Report to Northfield Township, Mich...The 2015 Washtenaw County Road Commission Report to Northfield Township, Mich...
The 2015 Washtenaw County Road Commission Report to Northfield Township, Mich...
Ā 
Wastewater Treatment Plant Capacity Report 3-18-2015
Wastewater Treatment Plant Capacity Report 3-18-2015Wastewater Treatment Plant Capacity Report 3-18-2015
Wastewater Treatment Plant Capacity Report 3-18-2015
Ā 
Territorial Road at Whitmore Lake Road Traffic Study, from Nowatzke Report to...
Territorial Road at Whitmore Lake Road Traffic Study, from Nowatzke Report to...Territorial Road at Whitmore Lake Road Traffic Study, from Nowatzke Report to...
Territorial Road at Whitmore Lake Road Traffic Study, from Nowatzke Report to...
Ā 
Ann Arbor Township 1999 Farmland Analysis & Cost of Services Study
Ann Arbor Township 1999 Farmland Analysis & Cost of Services StudyAnn Arbor Township 1999 Farmland Analysis & Cost of Services Study
Ann Arbor Township 1999 Farmland Analysis & Cost of Services Study
Ā 
Dda p14
Dda p14Dda p14
Dda p14
Ā 
MDOT US-23 Plans Environmental Assessment Update, Full Document, January 2015
MDOT US-23 Plans Environmental Assessment Update, Full Document, January 2015MDOT US-23 Plans Environmental Assessment Update, Full Document, January 2015
MDOT US-23 Plans Environmental Assessment Update, Full Document, January 2015
Ā 
MDOT US-23 Plans Environmental Assessment Update, Appendices, January 2015
MDOT US-23 Plans Environmental Assessment Update, Appendices, January 2015MDOT US-23 Plans Environmental Assessment Update, Appendices, January 2015
MDOT US-23 Plans Environmental Assessment Update, Appendices, January 2015
Ā 
MDOT US-23 Plans Environmental Assessment Update, Summary, January 2015
MDOT US-23 Plans Environmental Assessment Update, Summary, January 2015MDOT US-23 Plans Environmental Assessment Update, Summary, January 2015
MDOT US-23 Plans Environmental Assessment Update, Summary, January 2015
Ā 
Sewer system legal agreements & lawsuits
Sewer system legal agreements & lawsuitsSewer system legal agreements & lawsuits
Sewer system legal agreements & lawsuits
Ā 
Tetratech sewer system report
Tetratech sewer system reportTetratech sewer system report
Tetratech sewer system report
Ā 
Dda 2003 tax_increment_financing_plan
Dda 2003 tax_increment_financing_planDda 2003 tax_increment_financing_plan
Dda 2003 tax_increment_financing_plan
Ā 
AFT Cost of Community Services Study
AFT Cost of Community Services StudyAFT Cost of Community Services Study
AFT Cost of Community Services Study
Ā 
Northfield Township Master Plan (final_6_17_13)
Northfield Township Master Plan (final_6_17_13)Northfield Township Master Plan (final_6_17_13)
Northfield Township Master Plan (final_6_17_13)
Ā 

Recently uploaded

9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai EscortsPooja Nehwal
Ā 
Kolkata Call Girls Halisahar šŸ’ÆCall Us šŸ” 8005736733 šŸ” šŸ’ƒ Top Class Call Girl ...
Kolkata Call Girls Halisahar  šŸ’ÆCall Us šŸ” 8005736733 šŸ” šŸ’ƒ  Top Class Call Girl ...Kolkata Call Girls Halisahar  šŸ’ÆCall Us šŸ” 8005736733 šŸ” šŸ’ƒ  Top Class Call Girl ...
Kolkata Call Girls Halisahar šŸ’ÆCall Us šŸ” 8005736733 šŸ” šŸ’ƒ Top Class Call Girl ...Namrata Singh
Ā 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learningNAP Global Network
Ā 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32JSchaus & Associates
Ā 
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Sareena Khatun
Ā 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfSamirsinh Parmar
Ā 
Cheap Call Girls In Hyderabad Phone No šŸ“ž 9352988975 šŸ“ž Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No šŸ“ž 9352988975 šŸ“ž Elite Escort Service Av...Cheap Call Girls In Hyderabad Phone No šŸ“ž 9352988975 šŸ“ž Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No šŸ“ž 9352988975 šŸ“ž Elite Escort Service Av...kajalverma014
Ā 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCNAP Global Network
Ā 
Just Call VIP Call Girls In Bangalore Kr Puram ā˜Žļø 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ā˜Žļø 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ā˜Žļø 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ā˜Žļø 6378878445 Independent Fem...HyderabadDolls
Ā 
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girlsPakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girlsMonica Sydney
Ā 
Bhubaneswar Call Girls Bhubaneswar šŸ‘‰šŸ‘‰ 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar šŸ‘‰šŸ‘‰ 9777949614 Top Class Call Girl Service ...Bhubaneswar Call Girls Bhubaneswar šŸ‘‰šŸ‘‰ 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar šŸ‘‰šŸ‘‰ 9777949614 Top Class Call Girl Service ...Call Girls Mumbai
Ā 
Unique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfUnique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfScottMeyers35
Ā 
Private Call Girls Bidar 9332606886Call Girls Advance Cash On Delivery Service
Private Call Girls Bidar  9332606886Call Girls Advance Cash On Delivery ServicePrivate Call Girls Bidar  9332606886Call Girls Advance Cash On Delivery Service
Private Call Girls Bidar 9332606886Call Girls Advance Cash On Delivery Servicekumargunjan9515
Ā 
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie WhitehouseTime, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie Whitehousesubs7
Ā 
NAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptxNAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptxNAP Global Network
Ā 
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...kumargunjan9515
Ā 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)NAP Global Network
Ā 
74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptxpiyushsinghrajput913
Ā 
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...gajnagarg
Ā 

Recently uploaded (20)

9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
Ā 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
Ā 
Kolkata Call Girls Halisahar šŸ’ÆCall Us šŸ” 8005736733 šŸ” šŸ’ƒ Top Class Call Girl ...
Kolkata Call Girls Halisahar  šŸ’ÆCall Us šŸ” 8005736733 šŸ” šŸ’ƒ  Top Class Call Girl ...Kolkata Call Girls Halisahar  šŸ’ÆCall Us šŸ” 8005736733 šŸ” šŸ’ƒ  Top Class Call Girl ...
Kolkata Call Girls Halisahar šŸ’ÆCall Us šŸ” 8005736733 šŸ” šŸ’ƒ Top Class Call Girl ...
Ā 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
Ā 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32
Ā 
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Ā 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
Ā 
Cheap Call Girls In Hyderabad Phone No šŸ“ž 9352988975 šŸ“ž Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No šŸ“ž 9352988975 šŸ“ž Elite Escort Service Av...Cheap Call Girls In Hyderabad Phone No šŸ“ž 9352988975 šŸ“ž Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No šŸ“ž 9352988975 šŸ“ž Elite Escort Service Av...
Ā 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
Ā 
Just Call VIP Call Girls In Bangalore Kr Puram ā˜Žļø 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ā˜Žļø 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ā˜Žļø 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ā˜Žļø 6378878445 Independent Fem...
Ā 
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girlsPakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Ā 
Bhubaneswar Call Girls Bhubaneswar šŸ‘‰šŸ‘‰ 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar šŸ‘‰šŸ‘‰ 9777949614 Top Class Call Girl Service ...Bhubaneswar Call Girls Bhubaneswar šŸ‘‰šŸ‘‰ 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar šŸ‘‰šŸ‘‰ 9777949614 Top Class Call Girl Service ...
Ā 
Unique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfUnique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdf
Ā 
Private Call Girls Bidar 9332606886Call Girls Advance Cash On Delivery Service
Private Call Girls Bidar  9332606886Call Girls Advance Cash On Delivery ServicePrivate Call Girls Bidar  9332606886Call Girls Advance Cash On Delivery Service
Private Call Girls Bidar 9332606886Call Girls Advance Cash On Delivery Service
Ā 
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie WhitehouseTime, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Ā 
NAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptxNAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptx
Ā 
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Ā 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
Ā 
74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx
Ā 
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Ā 

MDOT US-23 Construction Projects, Planned Detours, January 2015