SlideShare a Scribd company logo
1 of 1
Success Stories
 The client steel companyneeded to convert from IBM DOS/VS to MVS. This was a fixed time and
budgetproject. I was responsible for the conversion of 600+ programs and an equivalentnumber ofJCL
members from IBM DOS/VSE to MVS, testing and implementation. As a ProjectManager, I managed 9
team members.This difficultprojectwas completed within tighttime and budgetconstraints,even
though 3 weeks of converted software was lostby the client company.Received an “employee of the
month award” and a “fully paid-for weekend” at Sun City from the consulting company
management.
 The specific governmentdepartmentneeded additional computerized systems and theydid not have
the additional IT resources or expertise.I was given the task to develop and implementthe contractor
administration- and paymentsystem.Iperformed business analysis:eliciting,defining business,
functional and technical requirementspecifications,designed/specified,developed,tested and
implemented the contractor administration- and paymentsystem. The response of the system users
was overwhelmingly positive such that it resulted in a larger project. As a Project Manager, I
managed a projectof 8 people,implementing budgetplanning & control,cash flow, and general
financial systems (e.g.GL).
 Apart from many shortcomings,the current International Banking / Foreign Exchange system costthe
bank an extra $200,000 per year. The scope of the new project consisted ofthe Stock Control and
Financial Trading System for Foreign Travelers Checks / Bank Drafts / Bank Notes,for all commercial
branches (800+),and interfacing with SWIFT / Thomas Cook for financial inter-bank settlement. As a
Business Analyst,I conducted business analysis,inclusive ofall duties/functions, artifacts,and delivery.
I led a team of 6 people.Commended by bank management for “a very good design and long
hours worked”.I received an informal rewardfrom management.
 The current Bank’s CreditBureau Inquiry System was identified for a redesign.The proposed new
system would provide on-line connectivity via EDI for all commercial branches,all vehicle finance
branches and the CreditCard Division,to two major CreditBureaus.It would also provide interfaces to
other bank products,e.g. housing and personal loans,etc., which would include the application credit
scoring technique (FICO), as well as bank/bureau financial reconciliation.I was responsible for the
business analysis,the technical design, data gap analysis and data mapping between the credit
bureaus and the bank, writing technical specifications,hands-on programming,testing,implementation,
and production support.I led a team of 5 people. Personally thanked for this complicated design by
the VP BSD/IT: “This re-design had a profound financial impact and improvement of the bank's
credit application processes”.
I was nominated by the consulting company’s management for the yearly: "Walk an extra mile
award".
 The current CreditBureau’s Connectivity System link to external vendors was performing twice as slow
as the opposition creditbureau.After researching and identifying the cause ofthe technical problem,
and elicited additional business requirements,Igenerated the functional and technical specifications for
a software conversion.I led a team of 9 people. The improved data extraction/transmit turnaround
time via EDI improved by 90% after the implementation of this software conversion.
 The newly implemented SupportEnforcementand Tracking System’s (SETS) monthly batch-processing
took 3 to 4 days to complete.This resulted in system unavailabilityfor 2 to 3 business days,impacting
the payments for claimants and system users directly.I played a major role in the process
reengineering,redesign,development,testing and implementation supportofthe SETS monthlybatch
processing,with particular emphases on improved throughputand quality. The enhanced efficiency
resulted in the monthly batch-processing window to shrink by 80%,resulting in eventual
downtime of 1 business day.
 During my 6 year assignmentata health care company,I was invited to investigate and create new and
more efficientprocesses to provide quality testdata from production for the developmentteams,testing
environment,users and external partners.I analyzed, designed and developed (programmed) process
improvements,reengineering software and processes for extract, transform and load (ETL) of claim test
data to CICS test regions. Most of these processes I createdon my own initiative to complement
the already developed ones. I designed and performed performance measurements,metrics and
benchmarking to determine a costanalysis per claim for top management (BI). My efforts resulted in
improving the performance of processes for claim test data mining by 90%, resulting in shorter
test data ETL turnaround times.

More Related Content

Featured

Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 

Featured (20)

Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 

Success Stories - 03-11-2015

  • 1. Success Stories  The client steel companyneeded to convert from IBM DOS/VS to MVS. This was a fixed time and budgetproject. I was responsible for the conversion of 600+ programs and an equivalentnumber ofJCL members from IBM DOS/VSE to MVS, testing and implementation. As a ProjectManager, I managed 9 team members.This difficultprojectwas completed within tighttime and budgetconstraints,even though 3 weeks of converted software was lostby the client company.Received an “employee of the month award” and a “fully paid-for weekend” at Sun City from the consulting company management.  The specific governmentdepartmentneeded additional computerized systems and theydid not have the additional IT resources or expertise.I was given the task to develop and implementthe contractor administration- and paymentsystem.Iperformed business analysis:eliciting,defining business, functional and technical requirementspecifications,designed/specified,developed,tested and implemented the contractor administration- and paymentsystem. The response of the system users was overwhelmingly positive such that it resulted in a larger project. As a Project Manager, I managed a projectof 8 people,implementing budgetplanning & control,cash flow, and general financial systems (e.g.GL).  Apart from many shortcomings,the current International Banking / Foreign Exchange system costthe bank an extra $200,000 per year. The scope of the new project consisted ofthe Stock Control and Financial Trading System for Foreign Travelers Checks / Bank Drafts / Bank Notes,for all commercial branches (800+),and interfacing with SWIFT / Thomas Cook for financial inter-bank settlement. As a Business Analyst,I conducted business analysis,inclusive ofall duties/functions, artifacts,and delivery. I led a team of 6 people.Commended by bank management for “a very good design and long hours worked”.I received an informal rewardfrom management.  The current Bank’s CreditBureau Inquiry System was identified for a redesign.The proposed new system would provide on-line connectivity via EDI for all commercial branches,all vehicle finance branches and the CreditCard Division,to two major CreditBureaus.It would also provide interfaces to other bank products,e.g. housing and personal loans,etc., which would include the application credit scoring technique (FICO), as well as bank/bureau financial reconciliation.I was responsible for the business analysis,the technical design, data gap analysis and data mapping between the credit bureaus and the bank, writing technical specifications,hands-on programming,testing,implementation, and production support.I led a team of 5 people. Personally thanked for this complicated design by the VP BSD/IT: “This re-design had a profound financial impact and improvement of the bank's credit application processes”. I was nominated by the consulting company’s management for the yearly: "Walk an extra mile award".  The current CreditBureau’s Connectivity System link to external vendors was performing twice as slow as the opposition creditbureau.After researching and identifying the cause ofthe technical problem, and elicited additional business requirements,Igenerated the functional and technical specifications for a software conversion.I led a team of 9 people. The improved data extraction/transmit turnaround time via EDI improved by 90% after the implementation of this software conversion.  The newly implemented SupportEnforcementand Tracking System’s (SETS) monthly batch-processing took 3 to 4 days to complete.This resulted in system unavailabilityfor 2 to 3 business days,impacting the payments for claimants and system users directly.I played a major role in the process reengineering,redesign,development,testing and implementation supportofthe SETS monthlybatch processing,with particular emphases on improved throughputand quality. The enhanced efficiency resulted in the monthly batch-processing window to shrink by 80%,resulting in eventual downtime of 1 business day.  During my 6 year assignmentata health care company,I was invited to investigate and create new and more efficientprocesses to provide quality testdata from production for the developmentteams,testing environment,users and external partners.I analyzed, designed and developed (programmed) process improvements,reengineering software and processes for extract, transform and load (ETL) of claim test data to CICS test regions. Most of these processes I createdon my own initiative to complement the already developed ones. I designed and performed performance measurements,metrics and benchmarking to determine a costanalysis per claim for top management (BI). My efforts resulted in improving the performance of processes for claim test data mining by 90%, resulting in shorter test data ETL turnaround times.