SlideShare a Scribd company logo
1 of 13
Download to read offline
Proppant Management
CONEXPLO 2014
Presented by: Juan Carlos Bonapace
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 2
2010-11
• 1st Los Molles Shale Completion
• 1st Los Molles Shale Hztal Well Completion
• 1st Cacheuta Shale Completion (Cuyo Basin)
2012
• 1st Vaca Muerta Shale Completion & Dual Micro-Seismic
• 1st Vaca Muerta Shale Hztal Well Completion & Micro-Seismic
2013
• 1st Vaca Muerta Shale Integrated Project
• 1st Vaca Muerta Continous Multistate Completion (AccesFrac)
• 1st Vaca Muerta Hztal Gas Well Completion
• 1st Vaca Muerta PinPoint Completion (CobraMax)
2014
• 1st D-129 Shale Completion (GSJ Basin)
• 1st Vaca Muerta MultiPAD Completion
• 1st Agrio Shale Completion
• 1st Vaca Muerta Hztal Completion 100% Bulk proppant transportation
• 1st Vaca Muerta Hztal Completion 100% Proppant Managment
SHELL
TOTAL
CAPEX
YPF
G&P
HALLIBURTON Experiences
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 3
Unconventional Resources
• Type of Treatment in Unconventional
– Hybrid Frac – (Slickwater, Linear Gel and Crosslinked Fluid)
– 50 to 75% Low Visc (Slickwater, Linear Gel)
– Multiple mesh proppant
• Tight Gas Wells
– Vertical / Horizontal
• Stages-Thickness: 7 (500m) / 7 (700m)
• Water: 3,200m3 / 2,500m3
• Proppant: 15,000 sks / 8,500 sks
• Shale Oil & Gas Wells
– Vertical / Horizontal
• Stages-Thickness: 4 to 6 (170 to 250m) / 6 to 14 (1000m)
• Water: 5,000 to 10,000m3 / 10,000 to 15,000m3
• Proppant: 13,000 to 23,000 sks / 25,000 to 55,000 sks
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 4
ARGENTINA Shale Plays
** Halliburton Data Base
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 5
Vaca Muerta Shale Plays
** Halliburton Data Base
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 6
Proppant Importation
• Vessel transport
• BsAs port
• Ocean Containers
Proppant Transport
• Road (truck)
• BsAs to Nqn
Proppant Storage
• Large storage sites
• Excessive manipulation
• Big Bag
Manual loading
• Handling on location
• Additional personnel
• Unsafety
Transport from Storage to
Wellsite
• High traffic of materials
• Overcrowding
Storage at Wellsite
• Space at wellsite
• Additional resources
• Forklifts, cranes
Current Proppant Logistic – Manual Loading
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 7
Proppant Importation
• Break Bulk Vessel
• Bahia Blanca port
• Up to 10,000 Ton
Proppant Transport
• Multiple Options
• Rail / Road (truck)
• B.Blanca to VMuerta
Big Bag to Bulk
• Improve load velocity
• Option to load
Truck (bulk) or Plant
Plant – Big Storage
• High Sotrage capacity
• 1,800 to 3,600 Ton
• Multiple mesh
Bulk Transport to Wellsite
• Truck (30 Ton each)
• Improve velocity (time)
Bulk Loading
• Efficient discharge
• Reduce spaces and additional
resources
• Safety
Future Proppant Logistic - Bulk Loading
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 8
• New Proppant Storage Plant - (1st Plant outside USA)
– Increase Proppant Storage
– Improve Proppant delivery
– Total Surface: 3,500m2
• Warehouse 650m2
• Capacity: 1,200 Ton (2,650,000 lb)
– 1st phase: 3 silos
• Capacity: 1,800 Ton (3,900,000 lb)
– 2nd phase – Expansion / Q1-2016
• Capacity: 3,600 Ton (7,800,000 lb)
Proppant Management - Storage
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 9
Proppant Management - Transloading
• Transloading Option
– Satellital Storage Center
• Relocable
• Near to well site
• Mesh (lower percentages)
• Improve logistic time and cost
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 10
• Bulk Transport & Loading
– Improve Proppant Transport and Loading
• Reduction time and cost
• safety and efficiency
– 1st phase: 8 Truck
• Capacity: 240Ton (530,000 lb)
– 2nd phase: 6 Truck / Q2-2015
• Capacity: 180Ton (400,000 lb)
Proppant Management - Bulk Transport, Loading and Wellsite
• Wellsite Storage
– Increase storage capacity (wellsite)
• Efficiency
– 4 Storage Unit (M.Mover) / Q2-2015
• Capacity: 1,000,000 lb
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 11
Case Histories - Proppant Management
• 2 Hztal well: 13 Frac Stages
• Total Proppant. 56,500 sks
• 3 Proppant Mesh
• 14 bulk transport (> 90 trips)
• Plant and Satellital Storage Center
• Hztal well: 10 Frac Stages
• Total Proppant. 55,000 sks
• 3 Proppant Mesh
• 14 bulk transport (> 85 trips)
• Central and Satellital Storage Center
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 12
2011/2013 Logistic
Proppant Management
2014 Logistic
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 13
www.halliburton.com/
juancarlos.bonapace@halliburton.com
Juan Carlos Bonapace
Technology Manager
Neuquén District
(Unconventional Tech Team)
Phone: +(54-299) (449 1100)
Ext 1127
Fax: +(54-299) (449 1145)
Cell: +(54-9-299) (4515952)
For more information

More Related Content

What's hot

Building a haul road tor T282B Dump truck with GVM 600t same as A380 jumbo
Building a haul road tor T282B Dump truck with GVM 600t same as A380 jumboBuilding a haul road tor T282B Dump truck with GVM 600t same as A380 jumbo
Building a haul road tor T282B Dump truck with GVM 600t same as A380 jumboAndrew Wachtel
 
Permian Basin Frac Design & New Completions Technologies 2017 - frac sand sup...
Permian Basin Frac Design & New Completions Technologies 2017 - frac sand sup...Permian Basin Frac Design & New Completions Technologies 2017 - frac sand sup...
Permian Basin Frac Design & New Completions Technologies 2017 - frac sand sup...Taylor Robinson
 
Modularization the-key-to-success
Modularization the-key-to-successModularization the-key-to-success
Modularization the-key-to-successMerrylyn Yeo
 
Modes of transportation.ppp.[1]
Modes of transportation.ppp.[1]Modes of transportation.ppp.[1]
Modes of transportation.ppp.[1]k_ari130
 
Savannah cruise ship study phase i report presentaion 06-24-13
Savannah cruise ship study phase i report presentaion  06-24-13Savannah cruise ship study phase i report presentaion  06-24-13
Savannah cruise ship study phase i report presentaion 06-24-13jhayman09
 
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaStephen McKnight
 
Modes of Transport in Logistics
Modes of Transport in LogisticsModes of Transport in Logistics
Modes of Transport in LogisticsYoussef Serroukh
 
Canadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 PresentationCanadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 PresentationRebecca Barton
 
Team 8_2M(Final)
Team 8_2M(Final)Team 8_2M(Final)
Team 8_2M(Final)Jenny Hoang
 
Geotechnical Engineering Services
Geotechnical Engineering ServicesGeotechnical Engineering Services
Geotechnical Engineering ServicesVictor Panlilio
 
Royal Canadian Mounted Police: Mari-Tech 2017 Presentation
Royal Canadian Mounted Police: Mari-Tech 2017 PresentationRoyal Canadian Mounted Police: Mari-Tech 2017 Presentation
Royal Canadian Mounted Police: Mari-Tech 2017 PresentationRebecca Barton
 
LNG as fuel for shipping - dynamics & growth
LNG as fuel for shipping - dynamics & growthLNG as fuel for shipping - dynamics & growth
LNG as fuel for shipping - dynamics & growthFrank Harteveld
 
Kpct presentation
Kpct presentation Kpct presentation
Kpct presentation Kiran K.V.S.
 
The Possible Effects of the Panama Canal Expansion on Ports in the Western He...
The Possible Effects of the Panama Canal Expansion on Ports in the Western He...The Possible Effects of the Panama Canal Expansion on Ports in the Western He...
The Possible Effects of the Panama Canal Expansion on Ports in the Western He...Portek International Pte Ltd
 
The increasing role of ship repair in southern African Ports - Part 1 of 2
The increasing role of ship repair in southern African Ports - Part 1 of 2The increasing role of ship repair in southern African Ports - Part 1 of 2
The increasing role of ship repair in southern African Ports - Part 1 of 2Railways and Harbours
 

What's hot (20)

Building a haul road tor T282B Dump truck with GVM 600t same as A380 jumbo
Building a haul road tor T282B Dump truck with GVM 600t same as A380 jumboBuilding a haul road tor T282B Dump truck with GVM 600t same as A380 jumbo
Building a haul road tor T282B Dump truck with GVM 600t same as A380 jumbo
 
Permian Basin Frac Design & New Completions Technologies 2017 - frac sand sup...
Permian Basin Frac Design & New Completions Technologies 2017 - frac sand sup...Permian Basin Frac Design & New Completions Technologies 2017 - frac sand sup...
Permian Basin Frac Design & New Completions Technologies 2017 - frac sand sup...
 
Modularization the-key-to-success
Modularization the-key-to-successModularization the-key-to-success
Modularization the-key-to-success
 
Modes of transportation.ppp.[1]
Modes of transportation.ppp.[1]Modes of transportation.ppp.[1]
Modes of transportation.ppp.[1]
 
2015 STS - Port Upgrades Will Change Your Operations
2015 STS - Port Upgrades Will Change Your Operations 2015 STS - Port Upgrades Will Change Your Operations
2015 STS - Port Upgrades Will Change Your Operations
 
Natural Gas Basics Webinar
Natural Gas Basics WebinarNatural Gas Basics Webinar
Natural Gas Basics Webinar
 
Savannah cruise ship study phase i report presentaion 06-24-13
Savannah cruise ship study phase i report presentaion  06-24-13Savannah cruise ship study phase i report presentaion  06-24-13
Savannah cruise ship study phase i report presentaion 06-24-13
 
PNI - 2016
PNI - 2016PNI - 2016
PNI - 2016
 
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
 
Modes of Transport in Logistics
Modes of Transport in LogisticsModes of Transport in Logistics
Modes of Transport in Logistics
 
Canadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 PresentationCanadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 Presentation
 
Team 8_2M(Final)
Team 8_2M(Final)Team 8_2M(Final)
Team 8_2M(Final)
 
Geotechnical Engineering Services
Geotechnical Engineering ServicesGeotechnical Engineering Services
Geotechnical Engineering Services
 
Freight 2011
Freight 2011Freight 2011
Freight 2011
 
Royal Canadian Mounted Police: Mari-Tech 2017 Presentation
Royal Canadian Mounted Police: Mari-Tech 2017 PresentationRoyal Canadian Mounted Police: Mari-Tech 2017 Presentation
Royal Canadian Mounted Police: Mari-Tech 2017 Presentation
 
LNG as fuel for shipping - dynamics & growth
LNG as fuel for shipping - dynamics & growthLNG as fuel for shipping - dynamics & growth
LNG as fuel for shipping - dynamics & growth
 
Kpct presentation
Kpct presentation Kpct presentation
Kpct presentation
 
The Possible Effects of the Panama Canal Expansion on Ports in the Western He...
The Possible Effects of the Panama Canal Expansion on Ports in the Western He...The Possible Effects of the Panama Canal Expansion on Ports in the Western He...
The Possible Effects of the Panama Canal Expansion on Ports in the Western He...
 
D mfor lng
D mfor lngD mfor lng
D mfor lng
 
The increasing role of ship repair in southern African Ports - Part 1 of 2
The increasing role of ship repair in southern African Ports - Part 1 of 2The increasing role of ship repair in southern African Ports - Part 1 of 2
The increasing role of ship repair in southern African Ports - Part 1 of 2
 

Viewers also liked (12)

SPE-172724
SPE-172724SPE-172724
SPE-172724
 
SPE-164580
SPE-164580SPE-164580
SPE-164580
 
SPE-174119
SPE-174119SPE-174119
SPE-174119
 
Expl 2-jb-57-e INGEPET VII 2011
Expl 2-jb-57-e INGEPET VII 2011Expl 2-jb-57-e INGEPET VII 2011
Expl 2-jb-57-e INGEPET VII 2011
 
14 aneu applications of technological & engineering solutions edit
14 aneu applications of technological & engineering solutions edit 14 aneu applications of technological & engineering solutions edit
14 aneu applications of technological & engineering solutions edit
 
SPE-165174
SPE-165174SPE-165174
SPE-165174
 
SPE WVS-593.
SPE WVS-593. SPE WVS-593.
SPE WVS-593.
 
Spe 180818-ms ttec 2016
Spe 180818-ms ttec 2016Spe 180818-ms ttec 2016
Spe 180818-ms ttec 2016
 
SPE-151819
SPE-151819SPE-151819
SPE-151819
 
Iapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquén
Iapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquénIapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquén
Iapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquén
 
Iapg jornadas shale neuquén vm completion in existing wells- 2013 neuquén
Iapg jornadas shale neuquén vm completion in existing wells- 2013 neuquénIapg jornadas shale neuquén vm completion in existing wells- 2013 neuquén
Iapg jornadas shale neuquén vm completion in existing wells- 2013 neuquén
 
SPE-119460
SPE-119460SPE-119460
SPE-119460
 

Similar to Conexplo proppant management 2014 mendoza

Development at Port Louis Harbour
Development at Port Louis HarbourDevelopment at Port Louis Harbour
Development at Port Louis HarbourTristan Wiggill
 
The port of Walvis Bay and Namport
The port of Walvis Bay and Namport The port of Walvis Bay and Namport
The port of Walvis Bay and Namport Tristan Wiggill
 
Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Fred Davidson
 
Port Development Summit 2013 (PAC-ATLANTIC)
Port Development Summit 2013 (PAC-ATLANTIC)Port Development Summit 2013 (PAC-ATLANTIC)
Port Development Summit 2013 (PAC-ATLANTIC)Joel Muyrong
 
Bangkok river port case study
Bangkok river port case studyBangkok river port case study
Bangkok river port case studySem9AD
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webNora Kohlhase
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webPaul Heinrich
 
10 090.public consultation
10 090.public consultation10 090.public consultation
10 090.public consultationafloat
 
[3] ptk 2014 2015 ship types
[3] ptk 2014 2015 ship types[3] ptk 2014 2015 ship types
[3] ptk 2014 2015 ship typesSyaifullah Hamim
 
Margaret Lake Diamonds Inc. - Corporate Presentation (April 2015) - Defining ...
Margaret Lake Diamonds Inc. - Corporate Presentation (April 2015) - Defining ...Margaret Lake Diamonds Inc. - Corporate Presentation (April 2015) - Defining ...
Margaret Lake Diamonds Inc. - Corporate Presentation (April 2015) - Defining ...margaretlakediamonds
 
Delivering a Cruise/Ferry Port at Preston Links
Delivering a Cruise/Ferry Port at Preston LinksDelivering a Cruise/Ferry Port at Preston Links
Delivering a Cruise/Ferry Port at Preston LinksCalum Miller
 
120420 Aph Cv
120420 Aph Cv120420 Aph Cv
120420 Aph Cveboroil
 
Takraf ipcc 2014_compressed
Takraf ipcc 2014_compressedTakraf ipcc 2014_compressed
Takraf ipcc 2014_compressedNorbert Neumann
 
[2] ship classification and types
[2] ship classification and types[2] ship classification and types
[2] ship classification and typesikhulsys
 
[2] ship classification and types
[2] ship classification and types[2] ship classification and types
[2] ship classification and typesikhulsys
 
lee walker cv 05.10.16
lee walker cv 05.10.16lee walker cv 05.10.16
lee walker cv 05.10.16lee walker
 
Allcargo Logistic Limited
Allcargo Logistic LimitedAllcargo Logistic Limited
Allcargo Logistic Limitedsaurabh kumar
 

Similar to Conexplo proppant management 2014 mendoza (20)

Namport overview
Namport overviewNamport overview
Namport overview
 
Development at Port Louis Harbour
Development at Port Louis HarbourDevelopment at Port Louis Harbour
Development at Port Louis Harbour
 
The port of Walvis Bay and Namport
The port of Walvis Bay and Namport The port of Walvis Bay and Namport
The port of Walvis Bay and Namport
 
Session 11 – site visits port of maputo
Session 11  – site visits  port of maputoSession 11  – site visits  port of maputo
Session 11 – site visits port of maputo
 
Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012
 
Port Development Summit 2013 (PAC-ATLANTIC)
Port Development Summit 2013 (PAC-ATLANTIC)Port Development Summit 2013 (PAC-ATLANTIC)
Port Development Summit 2013 (PAC-ATLANTIC)
 
Bangkok river port case study
Bangkok river port case studyBangkok river port case study
Bangkok river port case study
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
10 090.public consultation
10 090.public consultation10 090.public consultation
10 090.public consultation
 
[3] ptk 2014 2015 ship types
[3] ptk 2014 2015 ship types[3] ptk 2014 2015 ship types
[3] ptk 2014 2015 ship types
 
Margaret Lake Diamonds Inc. - Corporate Presentation (April 2015) - Defining ...
Margaret Lake Diamonds Inc. - Corporate Presentation (April 2015) - Defining ...Margaret Lake Diamonds Inc. - Corporate Presentation (April 2015) - Defining ...
Margaret Lake Diamonds Inc. - Corporate Presentation (April 2015) - Defining ...
 
Delivering a Cruise/Ferry Port at Preston Links
Delivering a Cruise/Ferry Port at Preston LinksDelivering a Cruise/Ferry Port at Preston Links
Delivering a Cruise/Ferry Port at Preston Links
 
120420 Aph Cv
120420 Aph Cv120420 Aph Cv
120420 Aph Cv
 
2016 STS - Parto Mazdeyasni: Partnering with Ports
2016 STS - Parto Mazdeyasni: Partnering with Ports 2016 STS - Parto Mazdeyasni: Partnering with Ports
2016 STS - Parto Mazdeyasni: Partnering with Ports
 
Takraf ipcc 2014_compressed
Takraf ipcc 2014_compressedTakraf ipcc 2014_compressed
Takraf ipcc 2014_compressed
 
[2] ship classification and types
[2] ship classification and types[2] ship classification and types
[2] ship classification and types
 
[2] ship classification and types
[2] ship classification and types[2] ship classification and types
[2] ship classification and types
 
lee walker cv 05.10.16
lee walker cv 05.10.16lee walker cv 05.10.16
lee walker cv 05.10.16
 
Allcargo Logistic Limited
Allcargo Logistic LimitedAllcargo Logistic Limited
Allcargo Logistic Limited
 

More from Juan Carlos Bonapace (20)

SPE-212574-MS.pdf
SPE-212574-MS.pdfSPE-212574-MS.pdf
SPE-212574-MS.pdf
 
SPE-212571-MS.pdf
SPE-212571-MS.pdfSPE-212571-MS.pdf
SPE-212571-MS.pdf
 
Presentation_SPE-212571-MS.pptx
Presentation_SPE-212571-MS.pptxPresentation_SPE-212571-MS.pptx
Presentation_SPE-212571-MS.pptx
 
Presentation_SPE-212574-MS.pptx
Presentation_SPE-212574-MS.pptxPresentation_SPE-212574-MS.pptx
Presentation_SPE-212574-MS.pptx
 
Multipay Well Completion in Argentina: A Versatile Pinpoint Completion Techno...
Multipay Well Completion in Argentina: A Versatile Pinpoint Completion Techno...Multipay Well Completion in Argentina: A Versatile Pinpoint Completion Techno...
Multipay Well Completion in Argentina: A Versatile Pinpoint Completion Techno...
 
Technological Aadvances Hydraulic Fracture
Technological Aadvances Hydraulic FractureTechnological Aadvances Hydraulic Fracture
Technological Aadvances Hydraulic Fracture
 
Logistica proppant no convencional v1
Logistica proppant no convencional v1Logistica proppant no convencional v1
Logistica proppant no convencional v1
 
Spe 185478-ms
Spe 185478-msSpe 185478-ms
Spe 185478-ms
 
Spe 180818-ms
Spe 180818-msSpe 180818-ms
Spe 180818-ms
 
Spe 174119-ms
Spe 174119-msSpe 174119-ms
Spe 174119-ms
 
Spe 174118-ms
Spe 174118-msSpe 174118-ms
Spe 174118-ms
 
Spe 172724-ms
Spe 172724-msSpe 172724-ms
Spe 172724-ms
 
Spe 168666-ms
Spe 168666-msSpe 168666-ms
Spe 168666-ms
 
Spe 165174-ms
Spe 165174-msSpe 165174-ms
Spe 165174-ms
 
Spe 164580-ms
Spe 164580-msSpe 164580-ms
Spe 164580-ms
 
Spe 151819-ms
Spe 151819-msSpe 151819-ms
Spe 151819-ms
 
Spe 123010-ms
Spe 123010-msSpe 123010-ms
Spe 123010-ms
 
Spe 121557-ms
Spe 121557-msSpe 121557-ms
Spe 121557-ms
 
Spe 119460-ms
Spe 119460-msSpe 119460-ms
Spe 119460-ms
 
Expl 2-jb-57-e
Expl 2-jb-57-eExpl 2-jb-57-e
Expl 2-jb-57-e
 

Recently uploaded

Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsDILIPKUMARMONDAL6
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 

Recently uploaded (20)

Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teams
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 

Conexplo proppant management 2014 mendoza

  • 2. © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 2 2010-11 • 1st Los Molles Shale Completion • 1st Los Molles Shale Hztal Well Completion • 1st Cacheuta Shale Completion (Cuyo Basin) 2012 • 1st Vaca Muerta Shale Completion & Dual Micro-Seismic • 1st Vaca Muerta Shale Hztal Well Completion & Micro-Seismic 2013 • 1st Vaca Muerta Shale Integrated Project • 1st Vaca Muerta Continous Multistate Completion (AccesFrac) • 1st Vaca Muerta Hztal Gas Well Completion • 1st Vaca Muerta PinPoint Completion (CobraMax) 2014 • 1st D-129 Shale Completion (GSJ Basin) • 1st Vaca Muerta MultiPAD Completion • 1st Agrio Shale Completion • 1st Vaca Muerta Hztal Completion 100% Bulk proppant transportation • 1st Vaca Muerta Hztal Completion 100% Proppant Managment SHELL TOTAL CAPEX YPF G&P HALLIBURTON Experiences
  • 3. © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 3 Unconventional Resources • Type of Treatment in Unconventional – Hybrid Frac – (Slickwater, Linear Gel and Crosslinked Fluid) – 50 to 75% Low Visc (Slickwater, Linear Gel) – Multiple mesh proppant • Tight Gas Wells – Vertical / Horizontal • Stages-Thickness: 7 (500m) / 7 (700m) • Water: 3,200m3 / 2,500m3 • Proppant: 15,000 sks / 8,500 sks • Shale Oil & Gas Wells – Vertical / Horizontal • Stages-Thickness: 4 to 6 (170 to 250m) / 6 to 14 (1000m) • Water: 5,000 to 10,000m3 / 10,000 to 15,000m3 • Proppant: 13,000 to 23,000 sks / 25,000 to 55,000 sks
  • 4. © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 4 ARGENTINA Shale Plays ** Halliburton Data Base
  • 5. © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 5 Vaca Muerta Shale Plays ** Halliburton Data Base
  • 6. © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 6 Proppant Importation • Vessel transport • BsAs port • Ocean Containers Proppant Transport • Road (truck) • BsAs to Nqn Proppant Storage • Large storage sites • Excessive manipulation • Big Bag Manual loading • Handling on location • Additional personnel • Unsafety Transport from Storage to Wellsite • High traffic of materials • Overcrowding Storage at Wellsite • Space at wellsite • Additional resources • Forklifts, cranes Current Proppant Logistic – Manual Loading
  • 7. © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 7 Proppant Importation • Break Bulk Vessel • Bahia Blanca port • Up to 10,000 Ton Proppant Transport • Multiple Options • Rail / Road (truck) • B.Blanca to VMuerta Big Bag to Bulk • Improve load velocity • Option to load Truck (bulk) or Plant Plant – Big Storage • High Sotrage capacity • 1,800 to 3,600 Ton • Multiple mesh Bulk Transport to Wellsite • Truck (30 Ton each) • Improve velocity (time) Bulk Loading • Efficient discharge • Reduce spaces and additional resources • Safety Future Proppant Logistic - Bulk Loading
  • 8. © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 8 • New Proppant Storage Plant - (1st Plant outside USA) – Increase Proppant Storage – Improve Proppant delivery – Total Surface: 3,500m2 • Warehouse 650m2 • Capacity: 1,200 Ton (2,650,000 lb) – 1st phase: 3 silos • Capacity: 1,800 Ton (3,900,000 lb) – 2nd phase – Expansion / Q1-2016 • Capacity: 3,600 Ton (7,800,000 lb) Proppant Management - Storage
  • 9. © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 9 Proppant Management - Transloading • Transloading Option – Satellital Storage Center • Relocable • Near to well site • Mesh (lower percentages) • Improve logistic time and cost
  • 10. © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 10 • Bulk Transport & Loading – Improve Proppant Transport and Loading • Reduction time and cost • safety and efficiency – 1st phase: 8 Truck • Capacity: 240Ton (530,000 lb) – 2nd phase: 6 Truck / Q2-2015 • Capacity: 180Ton (400,000 lb) Proppant Management - Bulk Transport, Loading and Wellsite • Wellsite Storage – Increase storage capacity (wellsite) • Efficiency – 4 Storage Unit (M.Mover) / Q2-2015 • Capacity: 1,000,000 lb
  • 11. © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 11 Case Histories - Proppant Management • 2 Hztal well: 13 Frac Stages • Total Proppant. 56,500 sks • 3 Proppant Mesh • 14 bulk transport (> 90 trips) • Plant and Satellital Storage Center • Hztal well: 10 Frac Stages • Total Proppant. 55,000 sks • 3 Proppant Mesh • 14 bulk transport (> 85 trips) • Central and Satellital Storage Center
  • 12. © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 12 2011/2013 Logistic Proppant Management 2014 Logistic
  • 13. © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 13 www.halliburton.com/ juancarlos.bonapace@halliburton.com Juan Carlos Bonapace Technology Manager Neuquén District (Unconventional Tech Team) Phone: +(54-299) (449 1100) Ext 1127 Fax: +(54-299) (449 1145) Cell: +(54-9-299) (4515952) For more information