ANALISA INDUSTRI :
POTENSI BOOKING LEASING UNIT EXCAVATOR
PADA GALIAN C “TANAH URUG”
PROVINSI JAWA TIMUR
Jurnas
MCE OJT – ...
TREND BOOKING BFI JAWA TIMUR
1. Manufacturing 26,31%
2. Konstruksi 22,67%
3. Perhutanan 16,81%
4. Pertambangan 13,84%
5. P...
PORTFOLIO CABANG SIDOARJO
CORPORATE
CUT OFF 30 APRIL 2016
Manufacturing
36%
Pertambangan /
"Galian C"
27%
Percetakan/
Printing
20%
Expedisi
9%
Konstruksi
8%
PersentaseTop 5 Booking...
Nama
Debitur
Jenis
Pembiayaan
Jenis Unit Nilai OSP
Yusuf Andy
(januari)
Sale &
Leaseback
2 pcs – Doosan
Excavator DX-225 t...
Peningkatan
Area Untuk
Lahan Galian
Terbesar
PROYEK JALAN TOL DAN FLY OVER
JATIM (PROYEK STRATEGIS
NASIONAL)
 Solo – Ngawi (90 Km)
 Ngawi – Kertosono (87 Km)
 Kerto...
ESTIMASI KEBUTUHAN UNIT
EXCAVATOR
PC 200 GALIAN “C” TANAH URUG
PROYEK JALAN TOL DAN FLY OVER
JATIM (PROYEK STRATEGIS
NASIONAL)
 Solo – Ngawi (90 Km)
 Ngawi – Kertosono (87 Km)
 Kerto...
BASED ON KERJA SAMA FLASH DENGAN WASKITA
MAKA ESTIMASI SETIAP 60 KM MEMBUTUHKAN
2.000.000 KUBIK TANAH URUG
Disesuaikan den...
CONCERN TAMBANG GALIAN
C TANAH URUG
1. Masih cukup banyak penambangan Liar
2. Term Of Payment BUMN >=90 Hari
3. Usia Unit ...
ANALISA KOMPETITOR
•Proses cepat dan fleksibel
•Dapat melakukan transaksi
Sale and Leaseback
•Pembiayaan segala merk
•Belum banyak aplikasi
m...
KESIMPULAN
 Kebutuhan galian c untuk penyelesaian proyek Tol Trans Jawa
menjadi potensi bangkitnya tambang galian C terut...
GALIAN C
GALIAN C
GALIAN C
Próxima SlideShare
Cargando en…5
×

GALIAN C

81 visualizaciones

Publicado el

  • Sé el primero en comentar

  • Sé el primero en recomendar esto

GALIAN C

  1. 1. ANALISA INDUSTRI : POTENSI BOOKING LEASING UNIT EXCAVATOR PADA GALIAN C “TANAH URUG” PROVINSI JAWA TIMUR Jurnas MCE OJT – HETO MT Batch 1 / 2016
  2. 2. TREND BOOKING BFI JAWA TIMUR 1. Manufacturing 26,31% 2. Konstruksi 22,67% 3. Perhutanan 16,81% 4. Pertambangan 13,84% 5. Perdagangan dan distribusi 7,63% 6. Perkebunan 4,32% Sektor Ekonomi Dengan OSP Tertinggi :
  3. 3. PORTFOLIO CABANG SIDOARJO CORPORATE CUT OFF 30 APRIL 2016
  4. 4. Manufacturing 36% Pertambangan / "Galian C" 27% Percetakan/ Printing 20% Expedisi 9% Konstruksi 8% PersentaseTop 5 Booking MCE Sidoarjo2 Galian “C”
  5. 5. Nama Debitur Jenis Pembiayaan Jenis Unit Nilai OSP Yusuf Andy (januari) Sale & Leaseback 2 pcs – Doosan Excavator DX-225 th 2010 Rp 480.000.000,- PT Flash Entertainment (april) Sale & Leaseback Excavator PC200-6 th 2012 & Excavator PC210-LC7 th 2011 Rp 550.000.000,- Samsul (april) Sale & Leaseback Kobelco Excavator SK 200-8 th 2011 Rp 300.000.000,- BOOKING HETO CABANG SIDOARJO2 PERTAMBANGAN 2016
  6. 6. Peningkatan Area Untuk Lahan Galian Terbesar
  7. 7. PROYEK JALAN TOL DAN FLY OVER JATIM (PROYEK STRATEGIS NASIONAL)  Solo – Ngawi (90 Km)  Ngawi – Kertosono (87 Km)  Kertosono – Mojokerto (41 Km)  Mojokerto – Surabaya (36 Km)  Gempol – Pasuruan (34,15 Km)  Gempol – Pandaan (14 Km)  Pandaan – Malang (37,62 Km) Total (339,77 Km)  Fly Over Terminal Teluk Lamongan Source : Peraturan Presiden Republik Indonesia Nomor 3 Tahun 2016 Tentang Percepatan Pelaksanaan Proyek Strategis Nasional GOVERNMENT NEEDS
  8. 8. ESTIMASI KEBUTUHAN UNIT EXCAVATOR PC 200 GALIAN “C” TANAH URUG
  9. 9. PROYEK JALAN TOL DAN FLY OVER JATIM (PROYEK STRATEGIS NASIONAL)  Solo – Ngawi (90 Km)  Ngawi – Kertosono (87 Km)  Kertosono – Mojokerto (41 Km)  Mojokerto – Surabaya (36 Km)  Gempol – Pasuruan (34,15 Km)  Gempol – Pandaan (14 Km)  Pandaan – Malang (37,62 Km) Total (339,77 Km)  Fly Over Terminal Teluk Lamongan Source : Peraturan Presiden Republik Indonesia Nomor 3 Tahun 2016 Tentang Percepatan Pelaksanaan Proyek Strategis Nasional GOVERNMENT NEEDS
  10. 10. BASED ON KERJA SAMA FLASH DENGAN WASKITA MAKA ESTIMASI SETIAP 60 KM MEMBUTUHKAN 2.000.000 KUBIK TANAH URUG Disesuaikan dengan Target Pemerintah agar Tol ini selesai pada 2018 Maka untuk 340 Km proyek jalan Tol Trans Jawa dibutuhkan 53 Unit Excavator, Guna Memenuhi kebutuhan 3.143.362. kubik Tanah Urug / Tahun
  11. 11. CONCERN TAMBANG GALIAN C TANAH URUG 1. Masih cukup banyak penambangan Liar 2. Term Of Payment BUMN >=90 Hari 3. Usia Unit Yang Kebanyakan Cukup Tua 4. Keserasian Pengusaha dengan Masyarakat Sekitar 5. Keberlangsungan Proyek Debitur Jika Tenor Melebihi Masa Kerja Proyek Yang Sedang Berjalan
  12. 12. ANALISA KOMPETITOR
  13. 13. •Proses cepat dan fleksibel •Dapat melakukan transaksi Sale and Leaseback •Pembiayaan segala merk •Belum banyak aplikasi masuk dari supplier •Bunga kalah jauh dibanding bank • Pengembangan lahan tambang berkembang pesat • Banyak proyek Tol yang membutuhkan bahan galian C (tanah urug) •Tambang pasir mulai stabil dengan pengawasan ketat • Masih ada penambangan tanpa ijin walau persentasenya terbilang kecil • kondisi industri ini sedang terganggu akibat kasus pertambangan pasir Lumajang yang menewaskan 2 orang
  14. 14. KESIMPULAN  Kebutuhan galian c untuk penyelesaian proyek Tol Trans Jawa menjadi potensi bangkitnya tambang galian C terutama tanah urug di Jawa Timur, dan memunculkan opportunity booking HETO untuk unit excavator.  Perbanyak database debitur dengan kanvasing satu areal industri / proyek.  Melakukan koordinasi dengan GAPENSI.  Review kerjasama debitur RO seperti PT. Flash Entertainment Indonesia ( Penyedia lahan tambang)  Memastikan keberlangsungan kerja debitur di luar proyek Tol, dan memastikan legalitas calon debitur. LANGKAH YANG DAPAT DILAKUKAN BFI SIDOARJO2 :

×