                          PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management 
                              Presented by:  Karen Yvonne Lucas, PMP 




        P-R-E-C-I-S-I-O-N

                                                 © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org
                          PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management 
                                  Presented by:  Karen Yvonne Lucas, PMP 



                                                                            PRESENTER 
Karen Yvonne Lucas, PMP, has more than 18 years of experience providing senior level guidance, evaluation, analysis and management to clients 
having mission critical programs and projects with enterprise reaching operational, marketing and systems components. Ms. Lucas has been the Senior 
Program  Management  Consultant,  Technical  Auditor  and  Senior  Project  Manager  to  a  number  of  Fortune  500  Companies  (CitiFinancial,  Cable  & 
Wireless, Nextel, Amtrak, UUNet, and  MCI WorldCom) and large government clients (DHS, DOJ, IRS, FDIC, DLA) for major projects. Most recently she 
served in this capacity for CitiFinancial and the National Railroad and Passenger Corporation (AMTRAK) where she oversaw $464 Million of the Capital IT 
Portfolio as the Senior PMO Officer and was responsible for technical analysis, program/project management mentoring, earned value assessment, and 
bringing  projects  into  compliance  toward  success.    Ms.  Lucas  is  the  Sr.  IT  Program  Management  Consultant  for  BAE  Systems  on  the  Department  of 
Homeland Security (DHS), Service Operations Program Directorate Contract. 
 


                                                                             OBJECTIVE 
During this session, Ms. Lucas will present a 9 step process for Project Managers to define and manage project requirements. Known as quot;PRECISIONquot;, this 
process will assist in capturing and controlling requirements throughout the project.  
 


                                                                                 GOALS 
       Present a high level description of the Requirements Gathering and Management Process. 
       Relate Common Requirements Gathering and Management Missteps to Real‐Life Experiences. 
       Explain Requirements Decomposition:  “JAD Sessions”, “1:1 Interview”, “Documentation Review”, “System / Process Walk‐Through”, “Uniqueness”, 
       “Parent‐Child Relationships”, “Tool & Schema Importance” 
       Confirm Requirements and Communicate the Change Process for the same” 
       Investigate and analyze the relationship between other systems, development efforts, projects, etc. and the program / project’s requirements 
       Scope Setting/Adjustment of Requirements after gathering, confirmation, investigation and analysis are complete.  
       Identify “Current Delivery”, “Point Push Delivery”, and “Out of Scope Delivery” from Requirements Investigation & Analysis  
       Organize Requirements using Tools (such as: RequisitePro, Caliber, Doors) and construct relationships & dependencies using “Traceability Matrices”  
       Notify Customer, Team, Developer and Program/Project Management relating to Requirements Gathering and Management, Setting Expectations, 
       and Continued Communications. 


                                                                                                                                                    Page 2 of 11 
                                                     © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org
                          PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management 
                                      Presented by:  Karen Yvonne Lucas, PMP 


                                                                                                                                     • Introduction ‐ 3 min. 




P
                                                                                   GOALS                                             • Expectation 
                                                                                                                                       Management ‐ 3 
                                   Present a high level description of the Requirements Gathering and                                  min. 
                                   Management Process                                                                                • Core Topics ‐ 30 min. 
                                                                                                                                     • Q&A ‐ 10 min. 
. 



               Remember …  
     1. Requirements 
        Gathering & 
        Management occurs 
        only AFTER a project 
        has been authorized 
        by charter.   
      
     2. KEY REQUIREMENTS 
        are found in the IDEA 
        phase artifacts. 
      
     3. Requirements 
        Gathering and 
        Management is an 
        ITERATIVE process 
        that DOES NOT end at 
        the end of the SDLC 
        Requirements Phase. 




                                                                                                                                                 Page 3 of 11 
                                                         © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org
                          PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management 
                                 Presented by:  Karen Yvonne Lucas, PMP 




R
                                                                                                                                • Introduction ‐ 3 min. 
                                                                               GOALS                                            • Expectation 
                                                                                                                                  Management ‐ 3 min. 
                               Relate Common Requirements Gathering and Management Missteps to Real‐                            • Core Topics ‐ 30 min. 
                               Life Experiences. 
                                                                                                                                • Q&A ‐ 10 min. 


                                                                                REQUIREMENTS HUMOR 
           Remember …  
4. Requirements 
   Gathering is an 
   “active receiving” and 
   not an “active 
   dictation or 
   translation”.   
 
5. Sometimes the 
   customer CANNOT 
   CONVEY what is 
   required without 
   elicitation help.  
   Elicitation is you 
   creating questions 
   that will jog their 
   thought process. 
 
6. Requirements 
   Gathering and 
   Management is a 
   “SERVICE” process to 
   the larger solution. 




                                                                                                                                           Page 4 of 11 
                                                    © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org
                          PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management 
                                 Presented by:  Karen Yvonne Lucas, PMP 



                                                                                                                                                                • Introduction ‐ 3 min. 
                                                                                  GOALS 

E
                                                                                                                                                                • Expectation 
                                                                                                                                                                  Management ‐ 3 
                              Explain Requirements Decomposition:  “JAD Sessions”, “1:1 Interview”,                                                               min. 
                              “Documentation Review”, “System / Process Walk‐Through”, “Uniqueness”,                                                            • Core Topics ‐ 30 min. 
                              “Parent‐Child Relationships”, “Tool & Schema Importance”                                                                          • Q&A ‐ 10 min. 

                              Requirements Decomposition: to break down into component parts.  For               System Process Walk‐Through:  The process of using and observing the day‐
                              example, ABCD decomposes to AB and CD.  AB then decomposes to A and B,             to‐day use of the system, process, solution being mapped.  The 
                              and CD decomposes to C and D.                                                      Requirements technician will be able to draw on the hands‐on viewpoint 
                                                                                                                 when crafting relationships and the order of events in requirements. 
           Remember …         JAD:  JAD (Joint Application Development) process where the requirements            
7. In nature, some            team, business team, end‐user and technical teams come together to                 Uniqueness:  requires that no two requirements state the same objective 
   parents have               develop a solution by means of a series of collaborative workshops (called         even if used in two separate functions; there must be a commonality – a 
   children, and some         JAD sessions) progressing into an end‐solution with all team’s buy‐in.   JAD       place where one feature most properly owns the requirement and the other 
   parents do not have        Materials List:   White board; Post‐It Paper (for Parking Lot, Expectation         becomes a user of its results.  Uniqueness also refers to numbering of 
   children – the same        Management, Rolling Action Items); Multiple Colors of dry erase or                 requirements and allows for traceability between requirements without 
   will be true of your       permanent markers; Multiple Pads with Pens (to be given to the                     misunderstanding. 
   requirements.  Where       participants); Conference room with large enough table; Scribe to take              
   a child requirement        notes.                                                                             Parent‐Child Relationships:  The parent is the highest level requirement and 
   exists without a                                                                                              the child is the lowest.  Parent requirements draw from the project 
   parent – an alarm          1:1 Interview:  to meet with a solution user, stakeholder, developer, owner        objectives and are communicated in the Vision and Concept of Operations 
   should raise in the        to derive the system functions, features, abilities, disabilities, and needs in    Documents.   
   requirements               order to form requirements.                                                         
   management team’s                                                                                             Tools & Schema Importance:   Tools in requirements gathering and 
   radar where an             Documentation Review: the process by which a reader in each stakeholder            management can make the Requirements Manager’s job easier or harder 
   appropriate surrogate      groups “actually attends a meeting with other stakeholder representatives          depending on the objective.  As in home improvement, choose the right 
   parent is identified in    to read the document line‐by‐line, section‐by‐section, to ensure that all          tool for the right job without overkill.  If the project does not require tie‐in 
   order that the child       pertinent information is conveyed and related to the parent level                  to large systems and efforts, a full implementation of DOORS, CALIBER or 
   requirement is tested      objectives.  In addition to structure, grammar, etc. – the documentation           REQUISITE PRO may be well out of order.  Similarly, an enterprise 
   in conjunction with        review will show items like (a) conceptual misunderstandings, (b)                  development project should use an enterprise requirements tool such as 
   other features and         incomplete or ambiguous requirements; and/or (c) logical gaps,                     DOORS, CALIBER or REQUISITE PRO for everything from logging 
   services.                  misunderstandings or needs.                                                        requirements, to identifying common attributes to creating test plans, use 
                                                                                                                 cases and scenarios. 
                                                                                                                  


                                                                                                                                                                              Page 5 of 11 
                                                       © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org
                          PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management 
                                   Presented by:  Karen Yvonne Lucas, PMP 




C
                                                                                                                                                         • Introduction ‐ 3 min. 
                                                                                 GOALS                                                                   • Expectation 
                                                                                                                                                           Management ‐ 3 min. 
                                 Confirm Requirements and Communicate the Change Process for the same”                                                   • Core Topics ‐ 30 min. 
                                                                                                                                                         • Q&A ‐ 10 min. 

                                    Perhaps the most important communication plan component is that relating to Requirements Management and the changes that 
                                    may be made to requirements.  The ability to communicate effectively the requirement, its negotiation, its delivery and its use is 
                                    tantamount to gold in successful solution development.  Communicating Requirements and their changes is “gold” because it helps 
          Remember …                to contain the time, money, resources, and expectations.  The Requirements Manager then is responsible for the 2nd most 
8. If the solution is the           important aspect of the project’s delivery – but it comes 1st, making it nearly as important as the solution itself until that solution is 
    heart itself, the               seen and used. 
    requirements are 
    the blood 
    circulating through 
                                      Validation Meetings                    Requirements Documents                    Project Management Information System (PMIS) 
    to make it pump. 
                                                                                                                       &/or Requirements Management System  
 
9. Multiple Methods 
   of Communication 
   can help or hinder                                       
   your success –                                                                                         
   carefully choose                                                                                                                          
                                       Diagram Meetings                              JAD Session                       Requirements Traceability  
   which to use; then, 
                                                                                                                       – Parent / Child Relationships 
   use them with 
   routine, 
   consistently and 
   without change 
   until the solution is 
   complete.                                                                                                                            
                                         Team Meeting                              Project Portal                      E‐Mail 




                                                           
                                                                                                                                              
                                                                                                                                                                    Page 6 of 11 
                                                      © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org
                          PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management 
                                  Presented by:  Karen Yvonne Lucas, PMP 



                                                                                                                                          • Introduction ‐ 3 min. 




I
                                                                               GOALS                                                      • Expectation 
                                                                                                                                            Management ‐ 3 
                               Investigate  and  analyze  the  relationship  between  other  systems,                                       min. 
                               development efforts, projects, etc. and the program / project’s requirements                               • Core Topics ‐ 30 min. 
                                                                                                                                          • Q&A ‐ 10 min. 


                                 The process of “investigation” has six key steps: 
                                                                      1) Review all available material on the desired solution and the solution(s) in 
         Remember …  
10.    Investigation is 
                                                                          place (if any). 
  the process of                                                       
  inquiring into a                                                    2) Determine the current processes, systems, paths, exceptions, data, rules, etc. 
  matter through                                                          for the solution to be developed.  Map these items in written and diagram 
  research, follow‐up, 
                                                                          format so that they can be used in more than one manner toward the 
  study, or formal 
  procedure of                                                            solution. 
  discovery. 
                                                                          3) Determine all systems that will be touched as it “moves forward” – then – 
                                                                             see if there is an impact to how that process, system, path, exception, data, 
                                                                             rule, etc. currently works. 
                                                                          4) Determine all systems that will be touched as it “sends backward” – then – 
                                                                             see if there is an impact to how that process, system, path, exception, data, 
                                                                             rule etc. currently works and/or receives. 
                                                                          5) Identify all ownership parties to each system mapped in steps 1, 2 and 3 
                                                                             above – then – determine if they can see any additional system, process, path, 
                                                                             exception, data, rule etc. impacts. 
                                                                          6) Create a relationship hierarchy, place items on the “risk register” where the 
                                                                             results of the investigation indicate that there is an unresolved matter, and 
                                                                             discovery document. 



                                                                                                                                                      Page 7 of 11 
                                                     © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org
                          PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management 
                                 Presented by:  Karen Yvonne Lucas, PMP 



                                                                                                                                          • Introduction ‐ 3 min. 




S
                                                                               GOALS                                                      • Expectation 
                                                                                                                                            Management ‐ 3 min. 
                               Scope  Setting/Adjustment  of  Requirements  after  gathering,  confirmation,                              • Core Topics ‐ 30 min. 
                               investigation and analysis are complete.                                                                   • Q&A ‐ 10 min. 
                                
                                                                        Once a clear picture is available for the requirements requested, the following must 
                                                                        be occur: 
                                                                         
          Remember …  
11.     Scope creep 
                                                                            • Determine which requirements are most logical to include together,  
  (also called                                                              • Advise the Program/Project Manager, Development Manager, and other 
  requirement creep,                                                            persons on the Communications Plan of the same.   
  feature creep, and                                                         
  sometimes kitchen 
                                  
  sink syndrome) in 
  project management             NOTE:   A more senior Requirements Manager may also be able to also identify functional releases and negotiate their 
  refers to uncontrolled         schedule with the business owner / stakeholders to the benefit of the project and the solution. 
  changes in a project's          
  scope.                         The Program / Project Manager is to be keenly aware and vigilant re: 
 
12.     The most                     • “new requirements”  
  dangerous portion of               • “changing requirements” 
  requirements for a                 • “clarified requirements” 
  program/project 
                                     • “gold plating”  
  manager is “scope 
  creep” that comes               
  from poorly defined,           Inevitably, the requirements come to a point when they should stop evolving.  However, requirements and solutions 
  communicated, and              based upon supply‐and‐demand do not often have this luxury.  While requirements elicitation and management are 
  managed                        “iterative” and “continuous” – the program / project manager must communicate a drop date for requirements coming 
  requirements. 
                                 into consideration for the solution.  At the same time, the program / project manager must constantly keep the new 
                                 requirement door open to listen to needs and potential solutions.  If the end solution is completed on‐time, within 
                                 budget, and with adequate resources – yet does not satisfy the need of the intended client any longer due to growth in 
                                 a new direction – she or he has done a disservice to the solution by not maintaining an open ear to the issues.

                                                                                                                                                     Page 8 of 11 
                                                    © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org
                          PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management 
                                  Presented by:  Karen Yvonne Lucas, PMP 




                                                                                                                                        • Introduction ‐ 3 min. 




I
                                                                               GOALS                                                    • Expectation 
                                                                                                                                          Management ‐ 3 
                               Identify “Current Delivery”, “Point Push Delivery”, and “Out of Scope Delivery”                            min. 
                               from Requirements Investigation & Analysis                                                               • Core Topics ‐ 30 min. 
                                                                                                                                        • Q&A ‐ 10 min. 


                                 The next natural phase to move to in requirements is the identification of deliveries associated with the gathered and 
                                 validated requirements.  Customarily there are more requirements that the current budget, time or resource 
          Remember …  
                                 allocation will allow.  When this occurs, the Program/Project Manager should make full use of the information found 
13.      Current 
  Delivery and Point             in the Requirements Investigation and Analysis to determine if a requirement can be one of the following: 
  Push Delivery                   
  assumes that strong                                                         Achieved in a Point Push Delivery 
  Release Management               Achieved in the Current Delivery                                                        Is Out of Scope for Delivery 
                                                                                 After the Current Delivery 
  is in place as well as 
  “flexible                      These requirements are those                These requirements are those               These requirements are those 
  development” which             that were planned, are properly             that were:                                 that were: 
  lend itself to having          documented and decomposed,                  (1) Planned but experienced                    (1) Not originally requested. 
  room for both                  relate to existing &/or planned                 issues during test so that they            (2) Belong to another entity 
  Waterfall and 
  Iterative XP. 
                                 systems in development, and for                 could not be integrated in the                 or agency not under 
                                 which no outstanding functional                 final solution “on time” but                   current authority. 
                                 or non‐functional, system                       with further remedy they can               (3) Not properly 
                                 interface, and data questions                   be pushed out shortly after                    documented in diagram, 
                                 exist.                                          the delivery date.                             design, work artifact or 
                                                                             (2) Not planned but necessary to                   any other reasons – for 
                                                                                 the proper function of                         which the solution could 
                                                                                 planned requirements.                          not have included each. 




                                                                                                                                                    Page 9 of 11 
                                                     © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org
                          PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management 
                                 Presented by:  Karen Yvonne Lucas, PMP 


                                                                                                                                      • Introduction ‐ 3 min. 




O
                                                                               GOALS                                                  • Expectation 
                                                                                                                                        Management ‐ 3 min. 
                               Organize Requirements using Tools (such as: RequisitePro, Caliber, Doors) and                          • Core Topics ‐ 30 min. 
                               construct relationships & dependencies using “Traceability Matrices””.                                 • Q&A ‐ 10 min. 
                                
                                  Organization of requirements, change management for the same, and speed to reference is central to Requirements 
                                  management.  Enterprise tools are available which allow for the entry, categorization, relationship and extensibility to 
                                  requirements so that the solution’s success is almost guaranteed by any team who uses and develops to the consistent 
         Remember …               and repeatable methods.  Leading tools include:  RequisitePro, DOORS and Caliber.  Each is equally useful in 
14.     Get your 
  requirements                    knowledgeable hands. 
  manager trained on               
  the tool chosen to be           Program and Project Managers should insist on the following in the setup of requirements using these tools: 
  used.  It can be                 
  leveraged when more 
  or larger 
                                  (1) Common Attributes 
  programs/projects               (2) Unique Numbering 
  come aboard.                    (3) Upload of Supplemental / Clarifying Documents as attachments to the requirement. 
                                  (4) Parent & Child Relationship for all requirements. 
                                  (5) Requirements Traceability Matrix  
                                  (6) Tie‐In from Requirements Analysis & Diagramming Tool 
                                  (7) Tie‐In from Requirements Tool to Testing Tool 
                                  (8) Tie‐In from Requirements Tool to Release Tool 




                                                                                                                                                Page 10 of 11 
                                                    © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org
                          PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management 
                                     Presented by:  Karen Yvonne Lucas, PMP 


                                                                                                                                           • Introduction ‐ 3 min. 
                                                                                  GOALS 

N
                                                                                                                                           • Expectation 
                                                                                                                                             Management ‐ 3 
                                  Notify  Customer,  Team,  Developer  and  Program/Project  Management  relating                            min. 
                                  to  Requirements  Gathering  and  Management,  Setting  Expectations,  and                               • Core Topics ‐ 30 min. 
                                  Continued Communications.                                                                                • Q&A ‐ 10 min. 



                                                                                              n(n‐1)/2 
              Remember …  
    15.     The Program           When making changes to your requirements and setting expectation for the same – continued communications is 
      and Project Manager         critical.  Slide 6 speaks to choosing a method and being consistent with the methods chosen.  Slide 12 speaks to 
      SHOULD CONTROL              identifying where communication is needed based on the size of the project team.  The below table represents the 
      the communications          number project team members and illustrates communication paths needed to properly manage expectorations. 
      that are going out of 
      the team.  That is, 
      they should craft or                                                            Potential Communication Paths for Program/ Project Managers when 
      approve what is said                                                            changes occur to requirements: 
      prior to it being said                                                          Roles In Program = 5            N(N‐1)/2       (1) PM   REQ 
      so that a consistent 
      message is spread re:                                                               • Project Manager           5 (5‐1)/2      (2) PM   DEV 
      the project                                                                         • Requirements Analyst  5(4)/2             (3) PM   BUS 
      achievements,                                                                       • Developer                 20/2           (4) PM   MKTG 
      obstacles, timelines, 
                                                                                          • Business Stakeholder      = 10           (5) MKTG   DEV 
      scope and 
                                                                                          • Marketing Person                         (6) MKTG   REQ 
      expectations.  Advice 
      – anticipate the                                                                                                               (7) MKTG   BUS 
      surprise channels like                                                                                                         (8) REQ   DEV 
      DEVELOPER to                                                                                                                   (9) REQ   BUS 
      BUSINESS                                                                                                                       (10) DEV   BUS 
      STAKEHOLDER and 
      plan your response. 
 




                                                                                                                                                      Page 11 of 11 
                                                        © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org

More Related Content

Viewers also liked (7)

How to Best Gather Requirements for SharePoint Projects
How to Best Gather Requirements for SharePoint ProjectsHow to Best Gather Requirements for SharePoint Projects
How to Best Gather Requirements for SharePoint Projects
 
Sample - Data Warehouse Requirements
Sample -  Data Warehouse RequirementsSample -  Data Warehouse Requirements
Sample - Data Warehouse Requirements
 
Gathering Business Requirements for Data Warehouses
Gathering Business Requirements for Data WarehousesGathering Business Requirements for Data Warehouses
Gathering Business Requirements for Data Warehouses
 
Requirements Gathering for Project Management Success
Requirements Gathering for Project Management SuccessRequirements Gathering for Project Management Success
Requirements Gathering for Project Management Success
 
Sample Business Requirement Document
Sample Business Requirement DocumentSample Business Requirement Document
Sample Business Requirement Document
 
Requirements Gathering Best Practice Pack
Requirements Gathering Best Practice PackRequirements Gathering Best Practice Pack
Requirements Gathering Best Practice Pack
 
Business requirements gathering and analysis
Business requirements gathering and analysisBusiness requirements gathering and analysis
Business requirements gathering and analysis
 

Similar to Precision Kylucas (C) 2008 All Rights Reserved

Organizational Structure Options
Organizational Structure OptionsOrganizational Structure Options
Organizational Structure Options
MABSIV
 
Training Report - Evyap
Training Report - EvyapTraining Report - Evyap
Training Report - Evyap
ercumentsonmez
 
OCCMS Brochure
OCCMS BrochureOCCMS Brochure
OCCMS Brochure
BenHolden
 
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...Strategic Advancement in Turbulent Environment thru Organizational Project Ma...
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...
IEEEP Karachi
 
Tech Ed 2009 Practical Tips To Manage Projects Productively
Tech Ed 2009   Practical Tips To Manage Projects ProductivelyTech Ed 2009   Practical Tips To Manage Projects Productively
Tech Ed 2009 Practical Tips To Manage Projects Productively
rsnarayanan
 
Sapo BUS Hands-On
Sapo BUS Hands-OnSapo BUS Hands-On
Sapo BUS Hands-On
codebits
 

Similar to Precision Kylucas (C) 2008 All Rights Reserved (20)

Organizational Structure Options
Organizational Structure OptionsOrganizational Structure Options
Organizational Structure Options
 
A Practical Guide For Implementing Web 2 0 Learning
A Practical Guide For Implementing Web 2 0 LearningA Practical Guide For Implementing Web 2 0 Learning
A Practical Guide For Implementing Web 2 0 Learning
 
Training Report - Evyap
Training Report - EvyapTraining Report - Evyap
Training Report - Evyap
 
Spring of Scrum
Spring of ScrumSpring of Scrum
Spring of Scrum
 
OCCMS Brochure
OCCMS BrochureOCCMS Brochure
OCCMS Brochure
 
SE Course Presentation - Infy SPE
SE Course Presentation - Infy SPESE Course Presentation - Infy SPE
SE Course Presentation - Infy SPE
 
Halcrow Major Developments
Halcrow Major DevelopmentsHalcrow Major Developments
Halcrow Major Developments
 
Synergize Course Brochure Unleash Personal And Professional Effectiveness
Synergize Course Brochure   Unleash Personal And Professional EffectivenessSynergize Course Brochure   Unleash Personal And Professional Effectiveness
Synergize Course Brochure Unleash Personal And Professional Effectiveness
 
Bcm Best Practise & Local Challenges
Bcm Best Practise & Local ChallengesBcm Best Practise & Local Challenges
Bcm Best Practise & Local Challenges
 
Equable Lean Six Sigma Boe English Presentation
Equable Lean Six Sigma Boe English PresentationEquable Lean Six Sigma Boe English Presentation
Equable Lean Six Sigma Boe English Presentation
 
Worldwide Consulting
Worldwide ConsultingWorldwide Consulting
Worldwide Consulting
 
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...Strategic Advancement in Turbulent Environment thru Organizational Project Ma...
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...
 
Tech Ed 2009 Practical Tips To Manage Projects Productively
Tech Ed 2009   Practical Tips To Manage Projects ProductivelyTech Ed 2009   Practical Tips To Manage Projects Productively
Tech Ed 2009 Practical Tips To Manage Projects Productively
 
Sugsa Event3 Implementscrum
Sugsa Event3 ImplementscrumSugsa Event3 Implementscrum
Sugsa Event3 Implementscrum
 
From Work To Word
From Work To WordFrom Work To Word
From Work To Word
 
Project management at a glance
Project management at a glanceProject management at a glance
Project management at a glance
 
Sapo BUS Hands-On
Sapo BUS Hands-OnSapo BUS Hands-On
Sapo BUS Hands-On
 
Perfect Fit Erp Selection Approach
Perfect Fit Erp Selection ApproachPerfect Fit Erp Selection Approach
Perfect Fit Erp Selection Approach
 
Planning Workshop Materials
Planning Workshop MaterialsPlanning Workshop Materials
Planning Workshop Materials
 
Best Practice In A Recession Styled Ck
Best Practice In A Recession   Styled CkBest Practice In A Recession   Styled Ck
Best Practice In A Recession Styled Ck
 

Recently uploaded

unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 

Recently uploaded (20)

Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 

Precision Kylucas (C) 2008 All Rights Reserved

  • 2.                           PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management                                Presented by:  Karen Yvonne Lucas, PMP  PRESENTER  Karen Yvonne Lucas, PMP, has more than 18 years of experience providing senior level guidance, evaluation, analysis and management to clients  having mission critical programs and projects with enterprise reaching operational, marketing and systems components. Ms. Lucas has been the Senior  Program  Management  Consultant,  Technical  Auditor  and  Senior  Project  Manager  to  a  number  of  Fortune  500  Companies  (CitiFinancial,  Cable  &  Wireless, Nextel, Amtrak, UUNet, and  MCI WorldCom) and large government clients (DHS, DOJ, IRS, FDIC, DLA) for major projects. Most recently she  served in this capacity for CitiFinancial and the National Railroad and Passenger Corporation (AMTRAK) where she oversaw $464 Million of the Capital IT  Portfolio as the Senior PMO Officer and was responsible for technical analysis, program/project management mentoring, earned value assessment, and  bringing  projects  into  compliance  toward  success.    Ms.  Lucas  is  the  Sr.  IT  Program  Management  Consultant  for  BAE  Systems  on  the  Department  of  Homeland Security (DHS), Service Operations Program Directorate Contract.    OBJECTIVE  During this session, Ms. Lucas will present a 9 step process for Project Managers to define and manage project requirements. Known as quot;PRECISIONquot;, this  process will assist in capturing and controlling requirements throughout the project.     GOALS  Present a high level description of the Requirements Gathering and Management Process.  Relate Common Requirements Gathering and Management Missteps to Real‐Life Experiences.  Explain Requirements Decomposition:  “JAD Sessions”, “1:1 Interview”, “Documentation Review”, “System / Process Walk‐Through”, “Uniqueness”,  “Parent‐Child Relationships”, “Tool & Schema Importance”  Confirm Requirements and Communicate the Change Process for the same”  Investigate and analyze the relationship between other systems, development efforts, projects, etc. and the program / project’s requirements  Scope Setting/Adjustment of Requirements after gathering, confirmation, investigation and analysis are complete.   Identify “Current Delivery”, “Point Push Delivery”, and “Out of Scope Delivery” from Requirements Investigation & Analysis   Organize Requirements using Tools (such as: RequisitePro, Caliber, Doors) and construct relationships & dependencies using “Traceability Matrices”   Notify Customer, Team, Developer and Program/Project Management relating to Requirements Gathering and Management, Setting Expectations,  and Continued Communications.  Page 2 of 11  © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org
  • 3.                           PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management                                Presented by:  Karen Yvonne Lucas, PMP  • Introduction ‐ 3 min.  P GOALS  • Expectation  Management ‐ 3  Present a high level description of the Requirements Gathering and  min.  Management Process • Core Topics ‐ 30 min.  • Q&A ‐ 10 min.  .   Remember …   1. Requirements  Gathering &  Management occurs  only AFTER a project  has been authorized  by charter.      2. KEY REQUIREMENTS  are found in the IDEA  phase artifacts.    3. Requirements  Gathering and  Management is an  ITERATIVE process  that DOES NOT end at  the end of the SDLC    Requirements Phase.  Page 3 of 11  © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org
  • 4.                           PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management                                Presented by:  Karen Yvonne Lucas, PMP  R • Introduction ‐ 3 min.  GOALS  • Expectation  Management ‐ 3 min.  Relate Common Requirements Gathering and Management Missteps to Real‐ • Core Topics ‐ 30 min.  Life Experiences.    • Q&A ‐ 10 min.  REQUIREMENTS HUMOR   Remember …   4. Requirements  Gathering is an  “active receiving” and  not an “active  dictation or  translation”.      5. Sometimes the  customer CANNOT  CONVEY what is  required without  elicitation help.   Elicitation is you  creating questions  that will jog their  thought process.    6. Requirements  Gathering and  Management is a  “SERVICE” process to  the larger solution.  Page 4 of 11  © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org
  • 5.                           PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management                                Presented by:  Karen Yvonne Lucas, PMP  • Introduction ‐ 3 min.  GOALS  E • Expectation  Management ‐ 3  Explain Requirements Decomposition:  “JAD Sessions”, “1:1 Interview”,  min.  “Documentation Review”, “System / Process Walk‐Through”, “Uniqueness”,  • Core Topics ‐ 30 min.  “Parent‐Child Relationships”, “Tool & Schema Importance”  • Q&A ‐ 10 min.  Requirements Decomposition: to break down into component parts.  For  System Process Walk‐Through:  The process of using and observing the day‐ example, ABCD decomposes to AB and CD.  AB then decomposes to A and B,  to‐day use of the system, process, solution being mapped.  The  and CD decomposes to C and D.  Requirements technician will be able to draw on the hands‐on viewpoint    when crafting relationships and the order of events in requirements.   Remember …   JAD:  JAD (Joint Application Development) process where the requirements    7. In nature, some  team, business team, end‐user and technical teams come together to  Uniqueness:  requires that no two requirements state the same objective  parents have  develop a solution by means of a series of collaborative workshops (called  even if used in two separate functions; there must be a commonality – a  children, and some  JAD sessions) progressing into an end‐solution with all team’s buy‐in.   JAD  place where one feature most properly owns the requirement and the other  parents do not have  Materials List:   White board; Post‐It Paper (for Parking Lot, Expectation  becomes a user of its results.  Uniqueness also refers to numbering of  children – the same  Management, Rolling Action Items); Multiple Colors of dry erase or  requirements and allows for traceability between requirements without  will be true of your  permanent markers; Multiple Pads with Pens (to be given to the  misunderstanding.  requirements.  Where  participants); Conference room with large enough table; Scribe to take    a child requirement  notes.  Parent‐Child Relationships:  The parent is the highest level requirement and  exists without a    the child is the lowest.  Parent requirements draw from the project  parent – an alarm  1:1 Interview:  to meet with a solution user, stakeholder, developer, owner  objectives and are communicated in the Vision and Concept of Operations  should raise in the  to derive the system functions, features, abilities, disabilities, and needs in  Documents.    requirements  order to form requirements.      management team’s    Tools & Schema Importance:   Tools in requirements gathering and  radar where an  Documentation Review: the process by which a reader in each stakeholder  management can make the Requirements Manager’s job easier or harder  appropriate surrogate  groups “actually attends a meeting with other stakeholder representatives  depending on the objective.  As in home improvement, choose the right  parent is identified in  to read the document line‐by‐line, section‐by‐section, to ensure that all  tool for the right job without overkill.  If the project does not require tie‐in  order that the child  pertinent information is conveyed and related to the parent level  to large systems and efforts, a full implementation of DOORS, CALIBER or  requirement is tested  objectives.  In addition to structure, grammar, etc. – the documentation  REQUISITE PRO may be well out of order.  Similarly, an enterprise  in conjunction with  review will show items like (a) conceptual misunderstandings, (b)  development project should use an enterprise requirements tool such as  other features and  incomplete or ambiguous requirements; and/or (c) logical gaps,  DOORS, CALIBER or REQUISITE PRO for everything from logging  services.  misunderstandings or needs.  requirements, to identifying common attributes to creating test plans, use      cases and scenarios.      Page 5 of 11  © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org
  • 6.                           PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management                                Presented by:  Karen Yvonne Lucas, PMP  C • Introduction ‐ 3 min.  GOALS  • Expectation  Management ‐ 3 min.  Confirm Requirements and Communicate the Change Process for the same”  • Core Topics ‐ 30 min.    • Q&A ‐ 10 min.  Perhaps the most important communication plan component is that relating to Requirements Management and the changes that  may be made to requirements.  The ability to communicate effectively the requirement, its negotiation, its delivery and its use is  tantamount to gold in successful solution development.  Communicating Requirements and their changes is “gold” because it helps   Remember …   to contain the time, money, resources, and expectations.  The Requirements Manager then is responsible for the 2nd most  8. If the solution is the  important aspect of the project’s delivery – but it comes 1st, making it nearly as important as the solution itself until that solution is  heart itself, the  seen and used.  requirements are  the blood  circulating through  Validation Meetings  Requirements Documents  Project Management Information System (PMIS)  to make it pump.  &/or Requirements Management System     9. Multiple Methods  of Communication  can help or hinder    your success –    carefully choose    Diagram Meetings  JAD Session  Requirements Traceability   which to use; then,  – Parent / Child Relationships  use them with  routine,  consistently and  without change  until the solution is  complete.        Team Meeting  Project Portal  E‐Mail        Page 6 of 11  © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org
  • 7.                           PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management                                Presented by:  Karen Yvonne Lucas, PMP  • Introduction ‐ 3 min.  I GOALS  • Expectation  Management ‐ 3  Investigate  and  analyze  the  relationship  between  other  systems,  min.  development efforts, projects, etc. and the program / project’s requirements  • Core Topics ‐ 30 min.  • Q&A ‐ 10 min.  The process of “investigation” has six key steps:  1) Review all available material on the desired solution and the solution(s) in   Remember …   10. Investigation is  place (if any).  the process of    inquiring into a  2) Determine the current processes, systems, paths, exceptions, data, rules, etc.  matter through  for the solution to be developed.  Map these items in written and diagram  research, follow‐up,  format so that they can be used in more than one manner toward the  study, or formal  procedure of  solution.  discovery.    3) Determine all systems that will be touched as it “moves forward” – then –  see if there is an impact to how that process, system, path, exception, data,  rule, etc. currently works.  4) Determine all systems that will be touched as it “sends backward” – then –  see if there is an impact to how that process, system, path, exception, data,  rule etc. currently works and/or receives.  5) Identify all ownership parties to each system mapped in steps 1, 2 and 3  above – then – determine if they can see any additional system, process, path,  exception, data, rule etc. impacts.  6) Create a relationship hierarchy, place items on the “risk register” where the  results of the investigation indicate that there is an unresolved matter, and  discovery document.  Page 7 of 11  © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org
  • 8.                           PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management                                Presented by:  Karen Yvonne Lucas, PMP  • Introduction ‐ 3 min.  S GOALS  • Expectation  Management ‐ 3 min.  Scope  Setting/Adjustment  of  Requirements  after  gathering,  confirmation,  • Core Topics ‐ 30 min.  investigation and analysis are complete.   • Q&A ‐ 10 min.    Once a clear picture is available for the requirements requested, the following must  be occur:     Remember …   11. Scope creep  • Determine which requirements are most logical to include together,   (also called  • Advise the Program/Project Manager, Development Manager, and other  requirement creep,    persons on the Communications Plan of the same.    feature creep, and    sometimes kitchen    sink syndrome) in  project management  NOTE:   A more senior Requirements Manager may also be able to also identify functional releases and negotiate their  refers to uncontrolled  schedule with the business owner / stakeholders to the benefit of the project and the solution.  changes in a project's    scope.  The Program / Project Manager is to be keenly aware and vigilant re:    12. The most  • “new requirements”   dangerous portion of  • “changing requirements”  requirements for a  • “clarified requirements”  program/project  • “gold plating”   manager is “scope  creep” that comes    from poorly defined,  Inevitably, the requirements come to a point when they should stop evolving.  However, requirements and solutions  communicated, and  based upon supply‐and‐demand do not often have this luxury.  While requirements elicitation and management are  managed  “iterative” and “continuous” – the program / project manager must communicate a drop date for requirements coming  requirements.  into consideration for the solution.  At the same time, the program / project manager must constantly keep the new  requirement door open to listen to needs and potential solutions.  If the end solution is completed on‐time, within  budget, and with adequate resources – yet does not satisfy the need of the intended client any longer due to growth in  a new direction – she or he has done a disservice to the solution by not maintaining an open ear to the issues. Page 8 of 11  © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org
  • 9.                           PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management                                Presented by:  Karen Yvonne Lucas, PMP  • Introduction ‐ 3 min.  I GOALS  • Expectation  Management ‐ 3  Identify “Current Delivery”, “Point Push Delivery”, and “Out of Scope Delivery”  min.  from Requirements Investigation & Analysis   • Core Topics ‐ 30 min.  • Q&A ‐ 10 min.  The next natural phase to move to in requirements is the identification of deliveries associated with the gathered and  validated requirements.  Customarily there are more requirements that the current budget, time or resource   Remember …   allocation will allow.  When this occurs, the Program/Project Manager should make full use of the information found  13. Current  Delivery and Point  in the Requirements Investigation and Analysis to determine if a requirement can be one of the following:  Push Delivery    assumes that strong  Achieved in a Point Push Delivery  Release Management  Achieved in the Current Delivery  Is Out of Scope for Delivery  After the Current Delivery  is in place as well as  “flexible  These requirements are those  These requirements are those  These requirements are those  development” which  that were planned, are properly  that were:  that were:  lend itself to having  documented and decomposed,  (1) Planned but experienced  (1) Not originally requested.  room for both  relate to existing &/or planned  issues during test so that they  (2) Belong to another entity  Waterfall and  Iterative XP.  systems in development, and for  could not be integrated in the  or agency not under    which no outstanding functional  final solution “on time” but  current authority.  or non‐functional, system  with further remedy they can  (3) Not properly  interface, and data questions  be pushed out shortly after  documented in diagram,  exist.  the delivery date.  design, work artifact or  (2) Not planned but necessary to  any other reasons – for  the proper function of  which the solution could  planned requirements.  not have included each.  Page 9 of 11  © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org
  • 10.                           PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management                                Presented by:  Karen Yvonne Lucas, PMP  • Introduction ‐ 3 min.  O GOALS  • Expectation  Management ‐ 3 min.  Organize Requirements using Tools (such as: RequisitePro, Caliber, Doors) and  • Core Topics ‐ 30 min.  construct relationships & dependencies using “Traceability Matrices””.  • Q&A ‐ 10 min.    Organization of requirements, change management for the same, and speed to reference is central to Requirements  management.  Enterprise tools are available which allow for the entry, categorization, relationship and extensibility to  requirements so that the solution’s success is almost guaranteed by any team who uses and develops to the consistent   Remember …   and repeatable methods.  Leading tools include:  RequisitePro, DOORS and Caliber.  Each is equally useful in  14. Get your  requirements  knowledgeable hands.  manager trained on    the tool chosen to be  Program and Project Managers should insist on the following in the setup of requirements using these tools:  used.  It can be    leveraged when more  or larger  (1) Common Attributes  programs/projects  (2) Unique Numbering  come aboard.  (3) Upload of Supplemental / Clarifying Documents as attachments to the requirement.    (4) Parent & Child Relationship for all requirements.  (5) Requirements Traceability Matrix   (6) Tie‐In from Requirements Analysis & Diagramming Tool  (7) Tie‐In from Requirements Tool to Testing Tool  (8) Tie‐In from Requirements Tool to Release Tool  Page 10 of 11  © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org
  • 11.                           PROGRAM / PROJECT MANAGEMENT:  Effective Requirements Gathering and Management                                Presented by:  Karen Yvonne Lucas, PMP  • Introduction ‐ 3 min.  GOALS  N • Expectation  Management ‐ 3  Notify  Customer,  Team,  Developer  and  Program/Project  Management  relating  min.  to  Requirements  Gathering  and  Management,  Setting  Expectations,  and  • Core Topics ‐ 30 min.  Continued Communications.  • Q&A ‐ 10 min.  n(n‐1)/2   Remember …   15. The Program  When making changes to your requirements and setting expectation for the same – continued communications is  and Project Manager  critical.  Slide 6 speaks to choosing a method and being consistent with the methods chosen.  Slide 12 speaks to  SHOULD CONTROL  identifying where communication is needed based on the size of the project team.  The below table represents the  the communications  number project team members and illustrates communication paths needed to properly manage expectorations.  that are going out of  the team.  That is,  they should craft or  Potential Communication Paths for Program/ Project Managers when  approve what is said  changes occur to requirements:  prior to it being said  Roles In Program = 5  N(N‐1)/2  (1) PM   REQ  so that a consistent  message is spread re:  • Project Manager  5 (5‐1)/2  (2) PM   DEV  the project  • Requirements Analyst  5(4)/2  (3) PM   BUS  achievements,  • Developer  20/2  (4) PM   MKTG  obstacles, timelines,  • Business Stakeholder  = 10  (5) MKTG   DEV  scope and  • Marketing Person    (6) MKTG   REQ  expectations.  Advice  – anticipate the    (7) MKTG   BUS  surprise channels like  (8) REQ   DEV  DEVELOPER to  (9) REQ   BUS  BUSINESS  (10) DEV   BUS  STAKEHOLDER and  plan your response.    Page 11 of 11  © 2008, Karen Yvonne Lucas, PMP All Rights Reserved. www.agape‐circle.org