ELEMENTAL COST ANALYSIS - FORM 1
Project Details and Site Condition :
Agreement and conditions of PAM Contract 2006 Edition
(With Quantities)
Market Conditions : COMPETITIVE
Contract particulars : Competitive Tender List
Type of Contract : Agreement and conditions of PAM Yes
Basis of Tender : No /
Bills of Quantities / /
/
RM
RM
Contract Period Stipulated by Client: 10 months RM
Contract Period Offered by Builders: 10 months RM
Numbers of Tenders Issued : N/A RM
Numbers of Tenders Received : N/A
ANALYSIS OF SINGLE BUILDING
Accomodation and Design Features:
Areas :
Functional unit: m² Design / Shapes
Lower Ground Floor m² Percentage of Gross Floor Area
Ground floor 1402 m²
Upper Floors m² External Wall Area = (a) %
Gross Floor Area m² Gross Floor Area
(b) 9
Usable Area m² = (409 m²)
Circulation Area m²
Ancillary Area m² (c)
Internal Division m² Storey Heights:
Gross Floor Area m²
Av. Below Ground Floor m (d)
Floor Spaces NOT Enclosed: m²
At Ground Floor m
Roof Area : m² (e) 91 %
(Structural and Plant Rooms) Above Ground Floor m
(average)
Brief Cost
Contract sum RM Functional Unit Costs :
excluding external works RM 1,998.52 per m2
Provisional Sums RM
Prime Cost Sums RM
Preliminaries RM
Contigencies RM
RM
Contract 2006 Edition (With Quantities)
Int (JV)/L
N/A
Open / Selected
Competition
Negotiated
1,091,800.00
7 - Educational, Cultural, Scientific Buildings
A - 4 - 4717
Project and Contract Information
(4308 m²)
Bills of Appr. Quant.
Spec. & Drawings
Schedule of rates / Serials
Preliminaries
Prime Cost Sums
Private
Provisional Sums
2950
5426
%
%
%
Below Ground Floor
2872
6,949,424.43
1,091,800.00
7,249,424.43Contract Sum
300,000.00
Single-Storey
Construction
Two-storey Construction
3 - storey Construction
4 - storey Construction
360,000.00
7,249,424.43
194
4717
3401
4.51
3.21
-
3.51
Design/Shape Information
being
being298,000.00
4717 4717
2950 1.150
Contract Sum less Contingencies
507
1067
% of remainder
% Contract Sum
4.29
300,000.00
The primary school is a 4 storey building comprising with 36 unit of classrooms, offices, library, labs, store and others facilities and 1 storey building of canteen. The building
is generally rectangular in shape.
Contigencies
-
3315
N/A
298,000.00
360,000.00
RM
Contract :
Proposed a primary school of 4 storey building comprising with 36 unit of classrooms, offices,
library, labs, store and others facilities and 1 storey building of canteen.
INSTITUTION OF SURVEYORS MALAYSIA
BUILDING COST INFORMATION CENTRE
Cost Fluctuation:
Government
JOB TITLE :
LOCATION :
INFORMATION TOTAL PROJECT
Government
15th March 2013
Accessibility to site is good
Overall site is generally flat.
CADANGAN MEMBINA SEBUAH SEKOLAH JENIS KEBANGSAAN (C) BUKIT
SERDANG YANG MENGANDUNGI BLOK BANGUNAN 36 UNIT BILIK
DARJAT,PEJABAT, PERPUSTAKAAN, BILIK GURU, MAKMAL, STOR DAN LAIN-
LAIN KEMUDAHAN 4 TINGKAT DAN 1 BLOK BANGUNAN KANTIN 1 TINGKAT.
DAERAH PETALING, SELANGOR. TENDER DATE :
CLIENT :
7 - Educational, Cultural, Scientific Buildings
GROSS FLOOR AREA : 4,717 m² TENDER DATE : 15th March 2013
Total Cost Cost per m2 Element Element Reinforced Rein- Formwork
of Element GFA unit rate Ratio per Concrete forcement
RM RM RM m2 GFA m3 kg m2
Piling 131,922.60 27.97 2,286 m 57.71 0.485 - - -
Work Below Lowest Floor 560,986.85 118.93 1,402 m² 400.13 0.297 327 24,238 1,380
Finish
692,909.45 146.89 - - 327.00 24,238.00 1,380.00
883,940.85 187.39 4,717 m² 187.39 1.000 677 110,167 1,163
573,542.79 121.59 3,315 m² 173.01 0.703 563 45,422 5,333
451,534.18 95.72 3,411 m² 132.38 0.723 22 990 223
67,892.06 14.39 - - 39 4,518 320
176,586.00 37.44 3,931 m² 44.92 0.833 - - -
216,355.70 45.87 1,495 m² 144.72 0.317 - - -
62,774.00 13.31 1,646 m² 38.14 0.349 - - -
31,140.05 6.60 136 m² 228.97 0.029 - - -
2,463,765.63 522.31 - - 1,301.00 161,097.00 7,039.00
3. Finishes
299,237.00 63.44 6,733 m² 44.44 1.427
112,050.50 23.75 5,555 m² 20.17 1.178
175,402.50 37.18 7,258 m² 24.17 1.539
309,467.00 65.61
896,157.00 124.38 - -
10,000.00 2.12 - -
5. Services
93,425.00 19.81 450 Nos 207.61 -
360,000.00 76.32 - -
- - - -
- - - -
600,000.00 127.20 - -
100,000.00 21.20 - -
- - - -
- - - -
- - - -
31,800.00 6.74
- -
- - - -
1,185,225.00 244.52 - - -
5,248,057.08 1,040.22
6. External Works
674,141.85 142.92 - -
572,299.50 121.33 - -
129,926.00 27.54 - -
27,000.00 5.72 - -
- -
1,403,367.35 297.51
Preliminaries 298,000.00 63.17
TOTAL ( less Contigencies ) 6,949,424.43 1,400.90
6E Recreational Facilities
6B Drainage
6C External Services
6D Ancillary Buildings
Sub-total excluding External Works,
Preliminaries and Contingencies
6A Site Work
5K Builder's Profit & Attendance
on Services
Group Element Total :
5L Builder's Work in Connection
With Services
-
100,000.00
-
31,800.00
-
-
-
-
5F Fire Protection Installation
5E Electrical Installation
5J Special Installation
5G Lift & Conveyor Installation
5H Communication Installation
-
5C Refuse Disposal
5D Air-conditioning & Ventilation
System
-
P.C.Sums Allowed (RM)
Group Element Total :
3D External Finishes
Group Element Total :
Tendered
Sums (RM)
5A Sanitary Appliances
5B Plumbing Installation
2E
3C
Internal Wall Finishes
Internal Floor Finishes
Internal Ceiling Finishes
Internal Doors
3A
3B
2F
Quantity
4. Fittings and Furnishing
360,000.00
600,000.00
2H
Stairs
Roof
Upper Floor
1A
1B
2G
2 Superstructure
2D
Frame
External Wall
Windows & External Doors
Internal Walls & Partitions
2A
2B
2C
-
1,091,800.00
INSTITUTION OF SURVEYORS MALAYSIA
BUILDING COST INFORMATION CENTRE
Unit
Preliminaries Shown Separately
Element
SUMMARY OF ELEMENT COSTS
1. Substructure
Group Element Total :
Group Element Total :
-
-
-
-
-
-
-
-
-
-
A - 4 - 4717
ELEMENTAL COST ANALYSIS - Form 2
-
-
-
-
-
-
-
-
INSTITUTION OF SURVEYOR MALAYSIA
BUILDING COST INFORMATION CENTRE
ELEMENTAL COST ANALYSIS - Form 3 7 - Educational, Cultural, Scientific Buildings
GROSS FLOOR AREA : 4717 m² TENDER DATE : 15th March 2013
1 Substructure
1A Piling
1B Work Below Lowest Floor Finish
2 Superstructure
2A Frame
2B Upper Floors
2C Roof
2D Staircase
2E External Walls
2F Windows & External Doors
2G Internal Walls & Partition
2H Internal Doors
3 Finishes
3A Internal Wall finishes
3B Internal Floor Finishes
3C Internal Ceiling Finishes
3D External Finishes
4 Fittings and Furnishings
5 Services
5A Sanitary Appliances
5B Plumbing Installation
5C Refuse disposal
5D Air-Conditioning & Ventilation
System
5E Electrical Installation
5F Fire Protection Installation
5G Lift & Conveyor Installation
5H Communication Installation
5J Special Installation
5K Builders's Profit & Attendance on
Services
5L Builders's Work in Connection With
Services
6 External Works
6A Site Works
6B Drainage
6C External Services
6D Ancillary Building
6E Recreation Facilities
A - 4 - 4717
Nil
Prime Cost Sum allowance
Nil
Nil
Prime Cost Sum allowance including telephone services (including ELV system)
EZYFLIK, CAM, KRISTO, ATGET range of fittings and sundries
Signages
Road works, fencing and gates and landscaping works.
External water reticulation
Nil
Nil
Builder’s profit and attendance to all Prime Cost Sums.
Nil
Surface water drainage comprising surface water drains, pipe culverts and sumps. Sewer
drainage comprising sewer pipes and manholes.
Prime Cost Sum allowance.
Nil
115mm thick common clay brickwalls
Metal frame plywood flush door with cylindrical entrance lockset and cylindrical privarcy lockset.
300 x300mm MML homogenous tiles and approved flexible polymer cementitious waterproofing
system
Cement and sand plastering with one coat of "SEAMASTER" Arcryseal Alkali Fungus resistant
and two coats of platinum luxury matt, 300x300mm MML glazed homogeneous, 300 x 300mm
MML glazed ceramic wall tiles
"Superflex" Asbestos free ceiling board to 3rd floor. Resisting primer sealer and two coats of
emulsion paint
BRIEF SPECIFICATION
SPECIFICATION
Reinforced concrete pilecaps, pad footing, column stumps, ground beams, aprons, ramps and
ground slabs.
Reinforced concrete columns, stiffener, beams and roof beams.
115mm thick common clay brickwalls
ELEMENT
200mm x 200mm Precast reinforced concrete piles drive in average 15.0m depth
Metal frame plywood flush door, adjustable lovered window, fixed glass lovered, mild steel roller
shutter and ironmongeries.
Reinforced concrete suspended floor slabs.
Steel truss with 'Monier' concrete roofing tile with double sided aluminium foil laid on fribre glass
insulation and rockwool insulation. Reinforced concrete roof slab with waterproofing membrane
system. G.I. gutter and UPVC rainwater goods.
Reinforced concrete staircase with cement and sand paving trowelled smooth. 900mm High mild
steel balustrades and handrailing.
Guardhouse and Refuse Chamber
Cement and sand plastering with one coat of "SEAMASTER" Arcryseal Alkali Fungus resistant
and two coats of weathershieen Arcrylic, 300x300mm MML glazed homogeneous wall tiles to
canteen; 100mm Thick conceret pavers to assembly hall and drop off; "Superflex" Asbestos free
ceiling board to 3rd floor. Resisting primer sealer and two coats of weather resistant paint.

More Related Content

What's hot

Eca presentation
Eca presentationEca presentation
Eca presentationKailyn Lee
 
Elemental Cost Analysis
Elemental Cost AnalysisElemental Cost Analysis
Elemental Cost AnalysisPang Khai Shuen
 
Eca presentation
Eca presentationEca presentation
Eca presentationwendyteosy
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - BriefKai Yun Pang
 
ECA Presentation
ECA PresentationECA Presentation
ECA PresentationLee Pei Gie
 
element
elementelement
elementLai Vlyn
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQashleyyeap
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalKai Yun Pang
 
ECA: Elemental Cost Analysis (Measurement Workshop)
ECA: Elemental Cost Analysis (Measurement Workshop)ECA: Elemental Cost Analysis (Measurement Workshop)
ECA: Elemental Cost Analysis (Measurement Workshop)Yee Len Wan
 
Construction Law Final Report
Construction Law Final ReportConstruction Law Final Report
Construction Law Final ReportArissa Loh
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof coveringEst
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Measurement 4 Tender Document
Measurement 4 Tender Document Measurement 4 Tender Document
Measurement 4 Tender Document xingxin_GOh
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1Sow Wei Henn
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in MalaysiaDayat Mohamad
 
MEASUREMENT 4 SLIDES
MEASUREMENT 4 SLIDESMEASUREMENT 4 SLIDES
MEASUREMENT 4 SLIDESwendyteosy
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second editionBt Lee
 

What's hot (20)

Eca presentation
Eca presentationEca presentation
Eca presentation
 
Elemental Cost Analysis
Elemental Cost AnalysisElemental Cost Analysis
Elemental Cost Analysis
 
Eca presentation
Eca presentationEca presentation
Eca presentation
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
ECA Presentation
ECA PresentationECA Presentation
ECA Presentation
 
element
elementelement
element
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQ
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost Appraisal
 
ECA: Elemental Cost Analysis (Measurement Workshop)
ECA: Elemental Cost Analysis (Measurement Workshop)ECA: Elemental Cost Analysis (Measurement Workshop)
ECA: Elemental Cost Analysis (Measurement Workshop)
 
Earthwork support
Earthwork supportEarthwork support
Earthwork support
 
SMM2 Explained
SMM2 ExplainedSMM2 Explained
SMM2 Explained
 
Construction Law Final Report
Construction Law Final ReportConstruction Law Final Report
Construction Law Final Report
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
 
Bq floor
Bq floorBq floor
Bq floor
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Measurement 4 Tender Document
Measurement 4 Tender Document Measurement 4 Tender Document
Measurement 4 Tender Document
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
MEASUREMENT 4 SLIDES
MEASUREMENT 4 SLIDESMEASUREMENT 4 SLIDES
MEASUREMENT 4 SLIDES
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second edition
 

Similar to ECA Workshop - ECA Form

Building technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationBuilding technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationTan Jaden
 
Building Economics Group Presentation Slides
Building Economics Group Presentation SlidesBuilding Economics Group Presentation Slides
Building Economics Group Presentation SlidesMelvin Lim
 
Menara PjH Handout
Menara PjH HandoutMenara PjH Handout
Menara PjH Handoutaadzla
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportkiransuresh7
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportkiransuresh7
 
Building economics presentation 3 2
Building economics presentation 3 2Building economics presentation 3 2
Building economics presentation 3 2Syafiq Zariful
 
PRESENTATION.pptxA EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF FINE AGGREGA...
PRESENTATION.pptxA EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF FINE  AGGREGA...PRESENTATION.pptxA EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF FINE  AGGREGA...
PRESENTATION.pptxA EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF FINE AGGREGA...pakkurathikailashpav
 
Be presentation slides
Be presentation slidesBe presentation slides
Be presentation slideslohwenjun
 
practical training ppt
practical training pptpractical training ppt
practical training pptSagar Shah
 
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHAIT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHAalwayslogo
 
Case study prestige tech park and select city walk
Case study   prestige tech park and select city walkCase study   prestige tech park and select city walk
Case study prestige tech park and select city walkMadhu Sagar
 
BE presentation slides
BE presentation slidesBE presentation slides
BE presentation slidesDoreen Yeo
 
Be presentation rev
Be presentation revBe presentation rev
Be presentation revYong Sy
 
Measurement 4
Measurement 4 Measurement 4
Measurement 4 Enoch Wong
 

Similar to ECA Workshop - ECA Form (20)

Building technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationBuilding technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilation
 
Building Economics Group Presentation Slides
Building Economics Group Presentation SlidesBuilding Economics Group Presentation Slides
Building Economics Group Presentation Slides
 
Menara PjH Handout
Menara PjH HandoutMenara PjH Handout
Menara PjH Handout
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
SPM.pptx
SPM.pptxSPM.pptx
SPM.pptx
 
Presentation.pptx
Presentation.pptxPresentation.pptx
Presentation.pptx
 
Building economics presentation 3 2
Building economics presentation 3 2Building economics presentation 3 2
Building economics presentation 3 2
 
PRESENTATION.pptxA EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF FINE AGGREGA...
PRESENTATION.pptxA EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF FINE  AGGREGA...PRESENTATION.pptxA EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF FINE  AGGREGA...
PRESENTATION.pptxA EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF FINE AGGREGA...
 
Be presentation slides
Be presentation slidesBe presentation slides
Be presentation slides
 
A PPT.pptx
A PPT.pptxA PPT.pptx
A PPT.pptx
 
8 months work
8 months work8 months work
8 months work
 
Lisans portfolyo
Lisans portfolyoLisans portfolyo
Lisans portfolyo
 
5th batch.pptx
5th batch.pptx5th batch.pptx
5th batch.pptx
 
practical training ppt
practical training pptpractical training ppt
practical training ppt
 
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHAIT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
 
Case study prestige tech park and select city walk
Case study   prestige tech park and select city walkCase study   prestige tech park and select city walk
Case study prestige tech park and select city walk
 
BE presentation slides
BE presentation slidesBE presentation slides
BE presentation slides
 
Be presentation rev
Be presentation revBe presentation rev
Be presentation rev
 
Measurement 4
Measurement 4 Measurement 4
Measurement 4
 

More from Kai Yun Pang

Assignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiAssignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiKai Yun Pang
 
Assignment 2 - Report
Assignment 2 - ReportAssignment 2 - Report
Assignment 2 - ReportKai Yun Pang
 
Assignment 1 - Water Pump Station
Assignment 1 - Water Pump StationAssignment 1 - Water Pump Station
Assignment 1 - Water Pump StationKai Yun Pang
 
Assignment 1 - Microsoft Project
Assignment 1 - Microsoft ProjectAssignment 1 - Microsoft Project
Assignment 1 - Microsoft ProjectKai Yun Pang
 
Assignment - Financial Appraisal
Assignment - Financial AppraisalAssignment - Financial Appraisal
Assignment - Financial AppraisalKai Yun Pang
 
Assignment - Financial Appraisal
Assignment - Financial Appraisal Assignment - Financial Appraisal
Assignment - Financial Appraisal Kai Yun Pang
 
Assignment - FIDIC Contract
Assignment - FIDIC ContractAssignment - FIDIC Contract
Assignment - FIDIC ContractKai Yun Pang
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - ReportKai Yun Pang
 
Seminar - CIPAA 2012
Seminar - CIPAA 2012Seminar - CIPAA 2012
Seminar - CIPAA 2012Kai Yun Pang
 
Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Kai Yun Pang
 
Assignment - S Hotel
Assignment - S HotelAssignment - S Hotel
Assignment - S HotelKai Yun Pang
 
Assignment - Case Study Report
Assignment - Case Study ReportAssignment - Case Study Report
Assignment - Case Study ReportKai Yun Pang
 
Assignment - Journal
Assignment - JournalAssignment - Journal
Assignment - JournalKai Yun Pang
 
Assignment - Community Service
Assignment - Community Service Assignment - Community Service
Assignment - Community Service Kai Yun Pang
 
Assignment - Final Account
Assignment - Final AccountAssignment - Final Account
Assignment - Final AccountKai Yun Pang
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - ReportKai Yun Pang
 
Seminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerSeminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerKai Yun Pang
 
Seminar - Question
Seminar - QuestionSeminar - Question
Seminar - QuestionKai Yun Pang
 
Assignment - MK Land
Assignment - MK LandAssignment - MK Land
Assignment - MK LandKai Yun Pang
 
Assignment - Financial Analysis
Assignment - Financial AnalysisAssignment - Financial Analysis
Assignment - Financial AnalysisKai Yun Pang
 

More from Kai Yun Pang (20)

Assignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiAssignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau Langkawi
 
Assignment 2 - Report
Assignment 2 - ReportAssignment 2 - Report
Assignment 2 - Report
 
Assignment 1 - Water Pump Station
Assignment 1 - Water Pump StationAssignment 1 - Water Pump Station
Assignment 1 - Water Pump Station
 
Assignment 1 - Microsoft Project
Assignment 1 - Microsoft ProjectAssignment 1 - Microsoft Project
Assignment 1 - Microsoft Project
 
Assignment - Financial Appraisal
Assignment - Financial AppraisalAssignment - Financial Appraisal
Assignment - Financial Appraisal
 
Assignment - Financial Appraisal
Assignment - Financial Appraisal Assignment - Financial Appraisal
Assignment - Financial Appraisal
 
Assignment - FIDIC Contract
Assignment - FIDIC ContractAssignment - FIDIC Contract
Assignment - FIDIC Contract
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
Seminar - CIPAA 2012
Seminar - CIPAA 2012Seminar - CIPAA 2012
Seminar - CIPAA 2012
 
Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)
 
Assignment - S Hotel
Assignment - S HotelAssignment - S Hotel
Assignment - S Hotel
 
Assignment - Case Study Report
Assignment - Case Study ReportAssignment - Case Study Report
Assignment - Case Study Report
 
Assignment - Journal
Assignment - JournalAssignment - Journal
Assignment - Journal
 
Assignment - Community Service
Assignment - Community Service Assignment - Community Service
Assignment - Community Service
 
Assignment - Final Account
Assignment - Final AccountAssignment - Final Account
Assignment - Final Account
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
Seminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerSeminar - Partial Possession by Employer
Seminar - Partial Possession by Employer
 
Seminar - Question
Seminar - QuestionSeminar - Question
Seminar - Question
 
Assignment - MK Land
Assignment - MK LandAssignment - MK Land
Assignment - MK Land
 
Assignment - Financial Analysis
Assignment - Financial AnalysisAssignment - Financial Analysis
Assignment - Financial Analysis
 

Recently uploaded

A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 đź’ž Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 đź’ž Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 đź’ž Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 đź’ž Full Nigh...Pooja Nehwal
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Dr. Mazin Mohamed alkathiri
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 

Recently uploaded (20)

A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 đź’ž Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 đź’ž Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 đź’ž Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 đź’ž Full Nigh...
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
CĂłdigo Creativo y Arte de Software | Unidad 1
CĂłdigo Creativo y Arte de Software | Unidad 1CĂłdigo Creativo y Arte de Software | Unidad 1
CĂłdigo Creativo y Arte de Software | Unidad 1
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 

ECA Workshop - ECA Form

  • 1. ELEMENTAL COST ANALYSIS - FORM 1 Project Details and Site Condition : Agreement and conditions of PAM Contract 2006 Edition (With Quantities) Market Conditions : COMPETITIVE Contract particulars : Competitive Tender List Type of Contract : Agreement and conditions of PAM Yes Basis of Tender : No / Bills of Quantities / / / RM RM Contract Period Stipulated by Client: 10 months RM Contract Period Offered by Builders: 10 months RM Numbers of Tenders Issued : N/A RM Numbers of Tenders Received : N/A ANALYSIS OF SINGLE BUILDING Accomodation and Design Features: Areas : Functional unit: m² Design / Shapes Lower Ground Floor m² Percentage of Gross Floor Area Ground floor 1402 m² Upper Floors m² External Wall Area = (a) % Gross Floor Area m² Gross Floor Area (b) 9 Usable Area m² = (409 m²) Circulation Area m² Ancillary Area m² (c) Internal Division m² Storey Heights: Gross Floor Area m² Av. Below Ground Floor m (d) Floor Spaces NOT Enclosed: m² At Ground Floor m Roof Area : m² (e) 91 % (Structural and Plant Rooms) Above Ground Floor m (average) Brief Cost Contract sum RM Functional Unit Costs : excluding external works RM 1,998.52 per m2 Provisional Sums RM Prime Cost Sums RM Preliminaries RM Contigencies RM RM Contract 2006 Edition (With Quantities) Int (JV)/L N/A Open / Selected Competition Negotiated 1,091,800.00 7 - Educational, Cultural, Scientific Buildings A - 4 - 4717 Project and Contract Information (4308 m²) Bills of Appr. Quant. Spec. & Drawings Schedule of rates / Serials Preliminaries Prime Cost Sums Private Provisional Sums 2950 5426 % % % Below Ground Floor 2872 6,949,424.43 1,091,800.00 7,249,424.43Contract Sum 300,000.00 Single-Storey Construction Two-storey Construction 3 - storey Construction 4 - storey Construction 360,000.00 7,249,424.43 194 4717 3401 4.51 3.21 - 3.51 Design/Shape Information being being298,000.00 4717 4717 2950 1.150 Contract Sum less Contingencies 507 1067 % of remainder % Contract Sum 4.29 300,000.00 The primary school is a 4 storey building comprising with 36 unit of classrooms, offices, library, labs, store and others facilities and 1 storey building of canteen. The building is generally rectangular in shape. Contigencies - 3315 N/A 298,000.00 360,000.00 RM Contract : Proposed a primary school of 4 storey building comprising with 36 unit of classrooms, offices, library, labs, store and others facilities and 1 storey building of canteen. INSTITUTION OF SURVEYORS MALAYSIA BUILDING COST INFORMATION CENTRE Cost Fluctuation: Government JOB TITLE : LOCATION : INFORMATION TOTAL PROJECT Government 15th March 2013 Accessibility to site is good Overall site is generally flat. CADANGAN MEMBINA SEBUAH SEKOLAH JENIS KEBANGSAAN (C) BUKIT SERDANG YANG MENGANDUNGI BLOK BANGUNAN 36 UNIT BILIK DARJAT,PEJABAT, PERPUSTAKAAN, BILIK GURU, MAKMAL, STOR DAN LAIN- LAIN KEMUDAHAN 4 TINGKAT DAN 1 BLOK BANGUNAN KANTIN 1 TINGKAT. DAERAH PETALING, SELANGOR. TENDER DATE : CLIENT :
  • 2. 7 - Educational, Cultural, Scientific Buildings GROSS FLOOR AREA : 4,717 m² TENDER DATE : 15th March 2013 Total Cost Cost per m2 Element Element Reinforced Rein- Formwork of Element GFA unit rate Ratio per Concrete forcement RM RM RM m2 GFA m3 kg m2 Piling 131,922.60 27.97 2,286 m 57.71 0.485 - - - Work Below Lowest Floor 560,986.85 118.93 1,402 m² 400.13 0.297 327 24,238 1,380 Finish 692,909.45 146.89 - - 327.00 24,238.00 1,380.00 883,940.85 187.39 4,717 m² 187.39 1.000 677 110,167 1,163 573,542.79 121.59 3,315 m² 173.01 0.703 563 45,422 5,333 451,534.18 95.72 3,411 m² 132.38 0.723 22 990 223 67,892.06 14.39 - - 39 4,518 320 176,586.00 37.44 3,931 m² 44.92 0.833 - - - 216,355.70 45.87 1,495 m² 144.72 0.317 - - - 62,774.00 13.31 1,646 m² 38.14 0.349 - - - 31,140.05 6.60 136 m² 228.97 0.029 - - - 2,463,765.63 522.31 - - 1,301.00 161,097.00 7,039.00 3. Finishes 299,237.00 63.44 6,733 m² 44.44 1.427 112,050.50 23.75 5,555 m² 20.17 1.178 175,402.50 37.18 7,258 m² 24.17 1.539 309,467.00 65.61 896,157.00 124.38 - - 10,000.00 2.12 - - 5. Services 93,425.00 19.81 450 Nos 207.61 - 360,000.00 76.32 - - - - - - - - - - 600,000.00 127.20 - - 100,000.00 21.20 - - - - - - - - - - - - - - 31,800.00 6.74 - - - - - - 1,185,225.00 244.52 - - - 5,248,057.08 1,040.22 6. External Works 674,141.85 142.92 - - 572,299.50 121.33 - - 129,926.00 27.54 - - 27,000.00 5.72 - - - - 1,403,367.35 297.51 Preliminaries 298,000.00 63.17 TOTAL ( less Contigencies ) 6,949,424.43 1,400.90 6E Recreational Facilities 6B Drainage 6C External Services 6D Ancillary Buildings Sub-total excluding External Works, Preliminaries and Contingencies 6A Site Work 5K Builder's Profit & Attendance on Services Group Element Total : 5L Builder's Work in Connection With Services - 100,000.00 - 31,800.00 - - - - 5F Fire Protection Installation 5E Electrical Installation 5J Special Installation 5G Lift & Conveyor Installation 5H Communication Installation - 5C Refuse Disposal 5D Air-conditioning & Ventilation System - P.C.Sums Allowed (RM) Group Element Total : 3D External Finishes Group Element Total : Tendered Sums (RM) 5A Sanitary Appliances 5B Plumbing Installation 2E 3C Internal Wall Finishes Internal Floor Finishes Internal Ceiling Finishes Internal Doors 3A 3B 2F Quantity 4. Fittings and Furnishing 360,000.00 600,000.00 2H Stairs Roof Upper Floor 1A 1B 2G 2 Superstructure 2D Frame External Wall Windows & External Doors Internal Walls & Partitions 2A 2B 2C - 1,091,800.00 INSTITUTION OF SURVEYORS MALAYSIA BUILDING COST INFORMATION CENTRE Unit Preliminaries Shown Separately Element SUMMARY OF ELEMENT COSTS 1. Substructure Group Element Total : Group Element Total : - - - - - - - - - - A - 4 - 4717 ELEMENTAL COST ANALYSIS - Form 2 - - - - - - - -
  • 3. INSTITUTION OF SURVEYOR MALAYSIA BUILDING COST INFORMATION CENTRE ELEMENTAL COST ANALYSIS - Form 3 7 - Educational, Cultural, Scientific Buildings GROSS FLOOR AREA : 4717 m² TENDER DATE : 15th March 2013 1 Substructure 1A Piling 1B Work Below Lowest Floor Finish 2 Superstructure 2A Frame 2B Upper Floors 2C Roof 2D Staircase 2E External Walls 2F Windows & External Doors 2G Internal Walls & Partition 2H Internal Doors 3 Finishes 3A Internal Wall finishes 3B Internal Floor Finishes 3C Internal Ceiling Finishes 3D External Finishes 4 Fittings and Furnishings 5 Services 5A Sanitary Appliances 5B Plumbing Installation 5C Refuse disposal 5D Air-Conditioning & Ventilation System 5E Electrical Installation 5F Fire Protection Installation 5G Lift & Conveyor Installation 5H Communication Installation 5J Special Installation 5K Builders's Profit & Attendance on Services 5L Builders's Work in Connection With Services 6 External Works 6A Site Works 6B Drainage 6C External Services 6D Ancillary Building 6E Recreation Facilities A - 4 - 4717 Nil Prime Cost Sum allowance Nil Nil Prime Cost Sum allowance including telephone services (including ELV system) EZYFLIK, CAM, KRISTO, ATGET range of fittings and sundries Signages Road works, fencing and gates and landscaping works. External water reticulation Nil Nil Builder’s profit and attendance to all Prime Cost Sums. Nil Surface water drainage comprising surface water drains, pipe culverts and sumps. Sewer drainage comprising sewer pipes and manholes. Prime Cost Sum allowance. Nil 115mm thick common clay brickwalls Metal frame plywood flush door with cylindrical entrance lockset and cylindrical privarcy lockset. 300 x300mm MML homogenous tiles and approved flexible polymer cementitious waterproofing system Cement and sand plastering with one coat of "SEAMASTER" Arcryseal Alkali Fungus resistant and two coats of platinum luxury matt, 300x300mm MML glazed homogeneous, 300 x 300mm MML glazed ceramic wall tiles "Superflex" Asbestos free ceiling board to 3rd floor. Resisting primer sealer and two coats of emulsion paint BRIEF SPECIFICATION SPECIFICATION Reinforced concrete pilecaps, pad footing, column stumps, ground beams, aprons, ramps and ground slabs. Reinforced concrete columns, stiffener, beams and roof beams. 115mm thick common clay brickwalls ELEMENT 200mm x 200mm Precast reinforced concrete piles drive in average 15.0m depth Metal frame plywood flush door, adjustable lovered window, fixed glass lovered, mild steel roller shutter and ironmongeries. Reinforced concrete suspended floor slabs. Steel truss with 'Monier' concrete roofing tile with double sided aluminium foil laid on fribre glass insulation and rockwool insulation. Reinforced concrete roof slab with waterproofing membrane system. G.I. gutter and UPVC rainwater goods. Reinforced concrete staircase with cement and sand paving trowelled smooth. 900mm High mild steel balustrades and handrailing. Guardhouse and Refuse Chamber Cement and sand plastering with one coat of "SEAMASTER" Arcryseal Alkali Fungus resistant and two coats of weathershieen Arcrylic, 300x300mm MML glazed homogeneous wall tiles to canteen; 100mm Thick conceret pavers to assembly hall and drop off; "Superflex" Asbestos free ceiling board to 3rd floor. Resisting primer sealer and two coats of weather resistant paint.