 Modern day people use more than 65 million
plastic water bottles per year. These bottle are
made of petroleum product (PET) polyethylene
terephthalate.
 The disintegration process of plastic will take
more than 1650 years.
 By using eco friendly plastic houses the
amount of harmful plastics can be reduced up
to a admirable level.
• These walls are highly thermal insulated
and flexible.
Other alternative techniques
• Small scale boundary walls construction
technique using and empty bottle walls
• For small scale building
structures composite stiffener
columns can be used (Empty
bottle and Structural
concrete)
 Soil cement is a construction material, a mix of
pulverized natural soil with small amount of Portland
cement and water, usually processed in a tumble,
compacted to high density. Hard, semi-rigid durable
material is formed by hydration of the cement
particles.
• The in-situ construction with soil-cement shall be limited to single-story
with a wall height not exceeding 3.2 m and a minimum wall thickness of
300 mm for load-bearing, and 200 mm for non-load bearing walls.
• For the construction of walls above the plinth level, the suitable soil shall
have a density of 2.5-3.5% by mass. For construction of walls below plinth
level, the soil shall have a density of 5-7.5% by mass, so that the crushing
strength of blocks made of soil-cement shall not be less than 1.4
N/mm2 for the dry condition. The unit weight of dry soil shall be
considered as 1300 kg/m3 for calculations
 Form work for soil – cement walls
• The planks shall not be less than
200 mm in width and 50 mm in
thickness.
• The shuttering can be lifted to the
second stage immediately after the
first stage of soil-cement walls are
well-compacted.
 Preparation of Soil
Once the shuttering is erected, the moist stabilized soil shall be
poured into the shuttering in layers of 75 mm. The layer shall be
uniform in depth and templates should be used to control the depth
of the wall
 Compaction
The compaction shall be carried out using iron rammers by starting
the process from the sides and working towards the center. Ramming
of the sides shall be evenly distributed to avoid tilting of the
shuttering. Verticality of the shuttering shall be checked as
compaction proceeds
 Curing
The walls must be cured for 15 days after the removal of shuttering. A
slight sprinkling of water shall be done at regular intervals.
 Plastering
The cement plaster of mix not leaner than 1:5 shall be used for
plastering of soil-cement walls. It shall be applied after drying
the wall for at least four weeks. The wall surface shall be given
a neat cement wash before applying plaster
Group – 01
CTRM/19/B1/04
CTRM/19/B1/14
CTRM/19/B1/22
CTRM/19/B1/30

Más contenido relacionado

Similar a Advanced construction technologies.pptx

Buiding construction (part ii)
Buiding construction (part ii)Buiding construction (part ii)
Buiding construction (part ii)Waqas Aslam
 
Sample copy of IT PPT.pptx
Sample copy of IT PPT.pptxSample copy of IT PPT.pptx
Sample copy of IT PPT.pptxHimanshumangal12
 
Waterproffing.pptx
Waterproffing.pptxWaterproffing.pptx
Waterproffing.pptxPrituJadhav1
 
RAMMED EARTH WALL sem 5 sem 5 sem 6 .pptx
RAMMED EARTH WALL sem 5 sem 5 sem 6 .pptxRAMMED EARTH WALL sem 5 sem 5 sem 6 .pptx
RAMMED EARTH WALL sem 5 sem 5 sem 6 .pptxNehaAlbert
 
Special Concrete And Concreting Method
Special Concrete And Concreting MethodSpecial Concrete And Concreting Method
Special Concrete And Concreting MethodRutvij Patel
 
alternate wall technologies.pdf
alternate wall technologies.pdfalternate wall technologies.pdf
alternate wall technologies.pdfNithyashree594058
 
diaphragm and basement construction.pptx
diaphragm and basement construction.pptxdiaphragm and basement construction.pptx
diaphragm and basement construction.pptxChinnuNinan
 
cf_Special Concrete SHOTCRETE PRESENTATION_124_CE60021543644600-1.pptx
cf_Special Concrete SHOTCRETE PRESENTATION_124_CE60021543644600-1.pptxcf_Special Concrete SHOTCRETE PRESENTATION_124_CE60021543644600-1.pptx
cf_Special Concrete SHOTCRETE PRESENTATION_124_CE60021543644600-1.pptxKavithaSuresh31
 
CASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil worksCASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil worksKumarS250747
 
CASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitationCASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitationKumarS250747
 
Late Shri Sanat Mehta's low cost house at gandhinagar, india
Late Shri Sanat Mehta's low cost house at gandhinagar, indiaLate Shri Sanat Mehta's low cost house at gandhinagar, india
Late Shri Sanat Mehta's low cost house at gandhinagar, indiaShirish Avrani
 
02 FLOORING 08.06.2022.pptx
02 FLOORING 08.06.2022.pptx02 FLOORING 08.06.2022.pptx
02 FLOORING 08.06.2022.pptxPAVITRA GOYAL
 
7 building construction part 2 flooring,roofs,staircase and maintance - edit
7 building construction part 2   flooring,roofs,staircase and maintance - edit7 building construction part 2   flooring,roofs,staircase and maintance - edit
7 building construction part 2 flooring,roofs,staircase and maintance - editmuhammadumairallahdi
 

Similar a Advanced construction technologies.pptx (20)

Plastering ppt
Plastering pptPlastering ppt
Plastering ppt
 
Buiding construction (part ii)
Buiding construction (part ii)Buiding construction (part ii)
Buiding construction (part ii)
 
Damp proof course
Damp proof courseDamp proof course
Damp proof course
 
Sample copy of IT PPT.pptx
Sample copy of IT PPT.pptxSample copy of IT PPT.pptx
Sample copy of IT PPT.pptx
 
Waterproffing.pptx
Waterproffing.pptxWaterproffing.pptx
Waterproffing.pptx
 
RAMMED EARTH WALL sem 5 sem 5 sem 6 .pptx
RAMMED EARTH WALL sem 5 sem 5 sem 6 .pptxRAMMED EARTH WALL sem 5 sem 5 sem 6 .pptx
RAMMED EARTH WALL sem 5 sem 5 sem 6 .pptx
 
Special Concrete And Concreting Method
Special Concrete And Concreting MethodSpecial Concrete And Concreting Method
Special Concrete And Concreting Method
 
QSCM.pptx
QSCM.pptxQSCM.pptx
QSCM.pptx
 
alternate wall technologies.pdf
alternate wall technologies.pdfalternate wall technologies.pdf
alternate wall technologies.pdf
 
diaphragm and basement construction.pptx
diaphragm and basement construction.pptxdiaphragm and basement construction.pptx
diaphragm and basement construction.pptx
 
specification of Rcc
specification of Rccspecification of Rcc
specification of Rcc
 
cf_Special Concrete SHOTCRETE PRESENTATION_124_CE60021543644600-1.pptx
cf_Special Concrete SHOTCRETE PRESENTATION_124_CE60021543644600-1.pptxcf_Special Concrete SHOTCRETE PRESENTATION_124_CE60021543644600-1.pptx
cf_Special Concrete SHOTCRETE PRESENTATION_124_CE60021543644600-1.pptx
 
CASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil worksCASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil works
 
CASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitationCASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitation
 
Late Shri Sanat Mehta's low cost house at gandhinagar, india
Late Shri Sanat Mehta's low cost house at gandhinagar, indiaLate Shri Sanat Mehta's low cost house at gandhinagar, india
Late Shri Sanat Mehta's low cost house at gandhinagar, india
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
 
material ppt
material pptmaterial ppt
material ppt
 
02 FLOORING 08.06.2022.pptx
02 FLOORING 08.06.2022.pptx02 FLOORING 08.06.2022.pptx
02 FLOORING 08.06.2022.pptx
 
construction study project sjce ctm
construction study project sjce ctmconstruction study project sjce ctm
construction study project sjce ctm
 
7 building construction part 2 flooring,roofs,staircase and maintance - edit
7 building construction part 2   flooring,roofs,staircase and maintance - edit7 building construction part 2   flooring,roofs,staircase and maintance - edit
7 building construction part 2 flooring,roofs,staircase and maintance - edit
 

Último

Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptJohnWilliam111370
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solidnamansinghjarodiya
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 

Último (20)

Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solid
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 

Advanced construction technologies.pptx

  • 1. University of Vocational Technology Faculty of Engineering Technology B.Tech in Construction Technology & Resource Management Construction Technology II (CT 40607)
  • 2.  Modern day people use more than 65 million plastic water bottles per year. These bottle are made of petroleum product (PET) polyethylene terephthalate.
  • 3.  The disintegration process of plastic will take more than 1650 years.
  • 4.  By using eco friendly plastic houses the amount of harmful plastics can be reduced up to a admirable level. • These walls are highly thermal insulated and flexible.
  • 5. Other alternative techniques • Small scale boundary walls construction technique using and empty bottle walls • For small scale building structures composite stiffener columns can be used (Empty bottle and Structural concrete)
  • 6.  Soil cement is a construction material, a mix of pulverized natural soil with small amount of Portland cement and water, usually processed in a tumble, compacted to high density. Hard, semi-rigid durable material is formed by hydration of the cement particles.
  • 7. • The in-situ construction with soil-cement shall be limited to single-story with a wall height not exceeding 3.2 m and a minimum wall thickness of 300 mm for load-bearing, and 200 mm for non-load bearing walls. • For the construction of walls above the plinth level, the suitable soil shall have a density of 2.5-3.5% by mass. For construction of walls below plinth level, the soil shall have a density of 5-7.5% by mass, so that the crushing strength of blocks made of soil-cement shall not be less than 1.4 N/mm2 for the dry condition. The unit weight of dry soil shall be considered as 1300 kg/m3 for calculations
  • 8.  Form work for soil – cement walls • The planks shall not be less than 200 mm in width and 50 mm in thickness. • The shuttering can be lifted to the second stage immediately after the first stage of soil-cement walls are well-compacted.
  • 9.  Preparation of Soil Once the shuttering is erected, the moist stabilized soil shall be poured into the shuttering in layers of 75 mm. The layer shall be uniform in depth and templates should be used to control the depth of the wall  Compaction The compaction shall be carried out using iron rammers by starting the process from the sides and working towards the center. Ramming of the sides shall be evenly distributed to avoid tilting of the shuttering. Verticality of the shuttering shall be checked as compaction proceeds  Curing The walls must be cured for 15 days after the removal of shuttering. A slight sprinkling of water shall be done at regular intervals.  Plastering The cement plaster of mix not leaner than 1:5 shall be used for plastering of soil-cement walls. It shall be applied after drying the wall for at least four weeks. The wall surface shall be given a neat cement wash before applying plaster