From:    Brandon Valdez                To: David Ficklin - OnGoal
                                                                         Rory O’Connor – OnGoal
                              Office: Kansas City                        Lee Turner – OnGoal
                              Date:    5.26.2010                         Andy Heitmann – Turner
                                                                         Dave Dudzik - Turner
                              Re:      Wizards Stadium Project
                                       Update – Week of
                                       5.24.2010



 Current Activities this Week:

 Mass Excavation:
 Grading is ongoing in Area 3. Backfilling of on-grade
 is ongoing in Area 1 and Area 2.

 Site Utilities:
 Storm Sewer installation (Line 6000) is ongoing on         France Family Drive – Storm Line 6000
 east side of France Family Drive.                          installation is ongoing. Currently at station
                                                            4+00.
 Foundations:
 Area 2 Concourse Level – E-Line footing excavation has
 started and is currently to Column Line 18.

 Area 3 Field Level – Wall Form installation is ongoing
 on A-Line and is currently to Column Line 9.

 Area 3 Field Level – Installation of Drilled Piers
 are ongoing.
                                                            Field Level Area 2 – South East Vomitory
 Area 4 Mezzanine Level – D-Line grade beam excavation      Wall installation is ongoing (Column Lines
 has begun.                                                 11-12).

 Structural Steel Erection:
 Area 1 – Steel Erection in sequence 1-4 is ongoing and
 Is currently to Column Line 31.

 Decking/Detailing/Studs/Edge Angle is ongoing in
 sequence 1-2 on Mezzanine, Concourse and Suite Levels.



                                                            Area 4 – Drilled Pier installation is ongoing
                                                            near Column Line 1.
Building the Future
Underground MEP:
 Deep Sanitary installation has started in Area 2.

 MEP Rough-in:
 Plumbing and Electrical rough-in on Concourse Level has
 started.

 Projected Activities occurring next Week:
                                                                Field Level Area 2 – Deep Sanitary Line
 Mass Excavation:                                               installation has started near Column Line 15.
 Grading at Area 3 will continue.

 Site Utilities:
 Installation of the Storm Line 6000 on the East Side (France
 Family Drive) of the site will continue. Storm Line 5000 and
 4000 will begin.

 Deep Underground Plumbing:
 Deep Sanitary installation in Area 2 will continue.

 Foundations:                                                   Area 1 – Structural Steel Erection at West
 Area 2 Concourse Level – Footing/Grade Beam installation       Building is ongoing in Sequence 1-4 (bays
 will begin.                                                    28-31 shown).

 Area 3 Field Level – A-Line wall placement will begin

 Area 3 Mezzanine Level – Grade beam installation will
 begin.

 Structural Steel Erection:
 Erection of Structural Steel in Sequence 1-4 will continue.
 Decking/Detailing/Studs/Edge Plates will continue in
 Sequence 1-2.
                                                                Field Level Area 1 – Shot looking north from
                                                                Concourse Level.




Building the Future
Additional Photos:




                                               Suite Level Area 1 – Edge plate being
Concourse Level Area 1 – Plumbing rough-in
                                               installed between Column Lines 26 - 27.
has started at north end.




Mezzanine Level Area 4 – Grade Beam
installation has started at Column Line 33     Press Level Area 1 – Steel being set in place
(North Supporter’s Seating Area).              that holds the precast seating tubs.




Field Level Area 1 – Hydrotherapy Pit poured   Field Level Area 1 – Column encasement and
and backfilled.                                backfilling ongoing.




Building the Future

More Related Content

More from Kansas City Wizards (6)

Memo wizards 08-25-2010
Memo wizards 08-25-2010Memo wizards 08-25-2010
Memo wizards 08-25-2010
 
Construction Update 07-28-2010
Construction Update 07-28-2010Construction Update 07-28-2010
Construction Update 07-28-2010
 
Unicorn Wizards Scouting
Unicorn Wizards ScoutingUnicorn Wizards Scouting
Unicorn Wizards Scouting
 
Weekly Construction Update 06-06-2010
Weekly Construction Update 06-06-2010Weekly Construction Update 06-06-2010
Weekly Construction Update 06-06-2010
 
Construction Update 5-5-2010
Construction Update 5-5-2010Construction Update 5-5-2010
Construction Update 5-5-2010
 
Construction Update 4-7-2010
Construction Update 4-7-2010Construction Update 4-7-2010
Construction Update 4-7-2010
 

Recently uploaded

Recently uploaded (20)

Cricket Api Solution.pdfCricket Api Solution.pdf
Cricket Api Solution.pdfCricket Api Solution.pdfCricket Api Solution.pdfCricket Api Solution.pdf
Cricket Api Solution.pdfCricket Api Solution.pdf
 
European Football Icons that Missed Opportunities at UEFA Euro 2024.docx
European Football Icons that Missed Opportunities at UEFA Euro 2024.docxEuropean Football Icons that Missed Opportunities at UEFA Euro 2024.docx
European Football Icons that Missed Opportunities at UEFA Euro 2024.docx
 
Spain Vs Italy Spain to be banned from participating in Euro 2024.docx
Spain Vs Italy Spain to be banned from participating in Euro 2024.docxSpain Vs Italy Spain to be banned from participating in Euro 2024.docx
Spain Vs Italy Spain to be banned from participating in Euro 2024.docx
 
Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...
Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...
Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...
 
Who Is Emmanuel Katto Uganda? His Career, personal life etc.
Who Is Emmanuel Katto Uganda? His Career, personal life etc.Who Is Emmanuel Katto Uganda? His Career, personal life etc.
Who Is Emmanuel Katto Uganda? His Career, personal life etc.
 
Muzaffarpur Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Muzaffarpur Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMuzaffarpur Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Muzaffarpur Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...
 
Personal Brand Exploration - By Bradley Dennis
Personal Brand Exploration - By Bradley DennisPersonal Brand Exploration - By Bradley Dennis
Personal Brand Exploration - By Bradley Dennis
 
Hire 💕 8617697112 Kasauli Call Girls Service Call Girls Agency
Hire 💕 8617697112 Kasauli Call Girls Service Call Girls AgencyHire 💕 8617697112 Kasauli Call Girls Service Call Girls Agency
Hire 💕 8617697112 Kasauli Call Girls Service Call Girls Agency
 
WhatsApp Chat: 📞 8617697112 Birbhum Call Girl available for hotel room package
WhatsApp Chat: 📞 8617697112 Birbhum  Call Girl available for hotel room packageWhatsApp Chat: 📞 8617697112 Birbhum  Call Girl available for hotel room package
WhatsApp Chat: 📞 8617697112 Birbhum Call Girl available for hotel room package
 
Unveiling the Mystery of Main Bazar Chart
Unveiling the Mystery of Main Bazar ChartUnveiling the Mystery of Main Bazar Chart
Unveiling the Mystery of Main Bazar Chart
 
Sector 62, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 62, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Model Escorts | 100% verified
 
Netherlands Players expected to miss UEFA Euro 2024 due to injury.docx
Netherlands Players expected to miss UEFA Euro 2024 due to injury.docxNetherlands Players expected to miss UEFA Euro 2024 due to injury.docx
Netherlands Players expected to miss UEFA Euro 2024 due to injury.docx
 
Italy vs Albania Italy Euro 2024 squad Luciano Spalletti's full team ahead of...
Italy vs Albania Italy Euro 2024 squad Luciano Spalletti's full team ahead of...Italy vs Albania Italy Euro 2024 squad Luciano Spalletti's full team ahead of...
Italy vs Albania Italy Euro 2024 squad Luciano Spalletti's full team ahead of...
 
JORNADA 6 LIGA MURO 2024TUXTEPECOAXACA.pdf
JORNADA 6 LIGA MURO 2024TUXTEPECOAXACA.pdfJORNADA 6 LIGA MURO 2024TUXTEPECOAXACA.pdf
JORNADA 6 LIGA MURO 2024TUXTEPECOAXACA.pdf
 
Albania Vs Spain South American coaches lead Albania to Euro 2024 spot.docx
Albania Vs Spain South American coaches lead Albania to Euro 2024 spot.docxAlbania Vs Spain South American coaches lead Albania to Euro 2024 spot.docx
Albania Vs Spain South American coaches lead Albania to Euro 2024 spot.docx
 
2k Shots ≽ 9205541914 ≼ Call Girls In Sheikh Sarai (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Sheikh Sarai (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Sheikh Sarai (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Sheikh Sarai (Delhi)
 
Slovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docx
Slovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docxSlovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docx
Slovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docx
 
Technical Data | Sig Sauer Easy6 BDX 1-6x24 | Optics Trade
Technical Data | Sig Sauer Easy6 BDX 1-6x24 | Optics TradeTechnical Data | Sig Sauer Easy6 BDX 1-6x24 | Optics Trade
Technical Data | Sig Sauer Easy6 BDX 1-6x24 | Optics Trade
 
UEFA Euro 2024 Squad Check-in Which team is Top favorite.docx
UEFA Euro 2024 Squad Check-in Which team is Top favorite.docxUEFA Euro 2024 Squad Check-in Which team is Top favorite.docx
UEFA Euro 2024 Squad Check-in Which team is Top favorite.docx
 

Weekly Construction Update 06-06-2010

  • 1. From: Brandon Valdez To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 5.26.2010 Andy Heitmann – Turner Dave Dudzik - Turner Re: Wizards Stadium Project Update – Week of 5.24.2010 Current Activities this Week: Mass Excavation: Grading is ongoing in Area 3. Backfilling of on-grade is ongoing in Area 1 and Area 2. Site Utilities: Storm Sewer installation (Line 6000) is ongoing on France Family Drive – Storm Line 6000 east side of France Family Drive. installation is ongoing. Currently at station 4+00. Foundations: Area 2 Concourse Level – E-Line footing excavation has started and is currently to Column Line 18. Area 3 Field Level – Wall Form installation is ongoing on A-Line and is currently to Column Line 9. Area 3 Field Level – Installation of Drilled Piers are ongoing. Field Level Area 2 – South East Vomitory Area 4 Mezzanine Level – D-Line grade beam excavation Wall installation is ongoing (Column Lines has begun. 11-12). Structural Steel Erection: Area 1 – Steel Erection in sequence 1-4 is ongoing and Is currently to Column Line 31. Decking/Detailing/Studs/Edge Angle is ongoing in sequence 1-2 on Mezzanine, Concourse and Suite Levels. Area 4 – Drilled Pier installation is ongoing near Column Line 1. Building the Future
  • 2. Underground MEP: Deep Sanitary installation has started in Area 2. MEP Rough-in: Plumbing and Electrical rough-in on Concourse Level has started. Projected Activities occurring next Week: Field Level Area 2 – Deep Sanitary Line Mass Excavation: installation has started near Column Line 15. Grading at Area 3 will continue. Site Utilities: Installation of the Storm Line 6000 on the East Side (France Family Drive) of the site will continue. Storm Line 5000 and 4000 will begin. Deep Underground Plumbing: Deep Sanitary installation in Area 2 will continue. Foundations: Area 1 – Structural Steel Erection at West Area 2 Concourse Level – Footing/Grade Beam installation Building is ongoing in Sequence 1-4 (bays will begin. 28-31 shown). Area 3 Field Level – A-Line wall placement will begin Area 3 Mezzanine Level – Grade beam installation will begin. Structural Steel Erection: Erection of Structural Steel in Sequence 1-4 will continue. Decking/Detailing/Studs/Edge Plates will continue in Sequence 1-2. Field Level Area 1 – Shot looking north from Concourse Level. Building the Future
  • 3. Additional Photos: Suite Level Area 1 – Edge plate being Concourse Level Area 1 – Plumbing rough-in installed between Column Lines 26 - 27. has started at north end. Mezzanine Level Area 4 – Grade Beam installation has started at Column Line 33 Press Level Area 1 – Steel being set in place (North Supporter’s Seating Area). that holds the precast seating tubs. Field Level Area 1 – Hydrotherapy Pit poured Field Level Area 1 – Column encasement and and backfilled. backfilling ongoing. Building the Future