Second Meeting of the Air Navigation
System Implementation Group (ANSIG/2)
Cairo, Egypt, 6-8 December 2016
EGYPT
ASBU Block 0 modules
Implementation Status
Outline
 Brief on the Egypt National ASBU Implementation Plan
 Status of ASBU Implementation
 Outlook 2020
 Challenges
 Recommendations
ANSIG/2, Cairo, Egypt, 6‐8 December 2016
2
3
Egypt National ASBU Implementation Plan
 Develop Egypt strategic plan with a goal of global aviation
system interoperability.
 Implement priority 1 ASBU Block 0 modules according to
Egypt operational requirements and the MID region air
navigation strategy to be in line with global air navigation
objectives.
ANSIG/2, Cairo, Egypt, 6‐8 December 2016
4
Status of ASBU Implementation
ANSIG/2, Cairo, Egypt, 6‐8 December 2016
5ANSIG/2, Cairo, Egypt, 6‐8 December 2016
B0 – APTA: Optimization of Approach Procedures including vertical guidance
Elements Applicability Status
Action
Plan/Timelines
Remarks
States’ PBN
Implementation
Plans Egypt Implemented
Updated Version
Edition 1.5 by
August 2016
LNAV All RWYs
Ends at
International
Aerodromes
86 % of RWY Ends
(19 THR) with RNAV
(GNSS)
100% by 2016
LNAV/VNAV All RWYs
Ends at
International
Aerodromes
18 % of RWY Ends
(4 THR) provided with
Baro-VNAV APP
procedure
55% by 2016
100% by 2018
Timelines will be
modified at the
next PBN version
Status of ASBU Implementation
6ANSIG/2, Cairo, Egypt, 6‐8 December 2016
B0-SURF: Safety and Efficiency of Surface Operations (A-SMGCS Level 1-2)
Elements Applicability Status
Action
Plan/Timelines
Remarks
A-SMGCS
Level 1
As per the
MID Air
Navigation
Strategy
Implemented
A-SMGCS
Level 2
As per the
MID Air
Navigation
Strategy
Implemented Completed since 2013
Status of ASBU Implementation
7ANSIG/2, Cairo, Egypt, 6‐8 December 2016
B0 – ACDM: Improved Airport Operations through Airport-CDM
Elements Applicability Status
Action
Plan/Timelines
Remarks
A-CDM
As per the
MID Air
Navigation
Strategy
Not
Implemented
TBD
Timeline will be determined after
completion of the gap analysis by
the designated committee (High
level).
Status of ASBU Implementation
8ANSIG/2, Cairo, Egypt, 6‐8 December 2016
B0 – FICE: Increased Interoperability, Efficiency and Capacity through Ground‐Ground Integration
Elements Applicability Status
Action
Plan/Timelines
Remarks
AMHS
capability
Egypt Implemented
AMHS Impl.
/interconnection
Egypt Implemented
Impl. of
AIDC/OLDI
between
adjacent ACCs
Cairo ACC Implemented • Currently connected to
Athens ACC
• Stopped with Jeddah
due to Compatibility
issue
Status of ASBU Implementation
9ANSIG/2, Cairo, Egypt, 6‐8 December 2016
B0 – DATM: Service Improvement through Digital Aeronautical Information Management
Elements Applicability Status
Action
Plan/Timelines
Remarks
National AIM
Roadmap
Egypt Implemented
Updated Version
by Nov 2016
AIXM Egypt Implemented
eAIP Egypt
Partially
Compliant
Fully Implemented
by Dec 2018
QMS Egypt Fully Compliant
WGS-84
ENR
AD
TMA
GUND
Fully Compliant
eTOD
Area 1 Terrain
Area 1 Obstacle
Area 4 Terrain
Area 4 Obstacle
Fully Compliant
Not Compliant
Fully Compliant
Not Compliant
Fully Implemented
by Dec 2018
Status of ASBU Implementation
10ANSIG/2, Cairo, Egypt, 6‐8 December 2016
B0 – AMET: Meteorological information supporting enhanced operational efficiency
and safety
Elements Applicability Status
Action
Plan/Timelines
Remarks
SADIS 2G
or Secure
SADIS FTP
Egypt Implemented
QMS Egypt Implemented
Renewal ISO 9001
Certified at May 2015
Status of ASBU Implementation
11ANSIG/2, Cairo, Egypt, 6‐8 December 2016
B0 – FRTO: Improved Operations through Enhanced En‐Route Trajectories
Elements Applicability Status Action
Plan/Timelines
Remarks
Flexible use
of airspace
(FUA)
Egypt Not Implemented TBD
Timeline will be defined
after completing
the establishment of
civilMilitary coordination
center
Flexible
routing
Egypt Not Implemented TBD
Status of ASBU Implementation
12ANSIG/2, Cairo, Egypt, 6‐8 December 2016
B0 – ACAS: ACAS Improvements
Elements Applicability Status
Action
Plan/Timelines
Remarks
State
Regulation
on carriage
of ACAS
(TCAS v7.1)
Egypt Implemented
ECAR Part 121.356 &
ECAR Part 91.221
ECAA ensure the
conformity through its
oversight program
Status of ASBU Implementation
13ANSIG/2, Cairo, Egypt, 6‐8 December 2016
B0 – CDO: Improved Flexibility and Efficiency in Descent Profiles (CDO)
Elements Applicability Status
Action
Plan/Timelines
Remarks
PBN STARs As per the
MID Air
Navigation
Strategy
55 % of International
Aerodromes/TMAs with
PBN STAR implemented
64% by Dec 2016
100% by Dec 2018
International
aerodromes/
TMAs with
CDO
As per the
MID Air
Navigation
Strategy
Not Implemented TBD
Status of ASBU Implementation
14ANSIG/2, Cairo, Egypt, 6‐8 December 2016
B0 – CCO: Improved Flexibility and Efficiency Departure Profiles ‐ Continuous
Climb Operations (CCO)
Elements Applicability Status
Action
Plan/Timelines
Remarks
PBN SIDs As per the
MID Air
Navigation
Strategy
59 % of International
Aerodromes/TMAs with
PBN SID implemented
68% by Dec 2016
100% by Dec 2018
International
aerodromes/
TMAs with
CCO
As per the
MID Air
Navigation
Strategy
Not Implemented TBD
Status of ASBU Implementation
15ANSIG/2, Cairo, Egypt, 6‐8 December 2016
Other ASBU Block 0 Modules (priority 2)
Implemented by the State
Module Module Title
Status
Remarks
Yes No
B0-WAKE
Increased Runway Throughput
through Optimized Wake
Turbulence Separation
Yes
B0-RSEQ
Improve Traffic flow through
Runway Sequencing
(AMAN/DMAN)
No
B0-SNET
Increased Effectiveness of Ground-
Based Safety Nets
No
B0-ASUR
Initial capability for ground
surveillance No
B0-ASEP
Air Traffic Situational Awareness
(ATSA) No
B0-OPFL
Improved access to optimum flight
levels through climb/descent
procedures using ADS-B
No
B0-TBO
Improved Safety and Efficiency
through the initial application of
Data Link En-Route
No
16ANSIG/2, Cairo, Egypt, 6‐8 December 2016
Outlook 2020
(Status of ASBU Block 0 Modules by 2020)
Module Module Title
Status by 2020
Remarks
FI PI NI N/A
B0-APTA
Optimization of Approach Procedures
including vertical guidance FI
B0-WAKE
Increased Runway Throughput through
Optimized Wake Turbulence Separation FI
B0-RSEQ
Improve Traffic flow through Runway
Sequencing (AMAN/DMAN) N/A
B0-SURF
Safety and Efficiency of Surface
Operations (A-SMGCS Level 1-2) FI
B0-ACDM
Improved Airport Operations through
Airport-CDM TBD
Reported after
completing Gap Analysis
B0-FICE
Increased Interoperability, Efficiency
and Capacity through Ground-Ground
Integration
FI
17ANSIG/2, Cairo, Egypt, 6‐8 December 2016
Outlook 2020
(Status of ASBU Block 0 Modules by 2020)
Module Module Title
Status by 2020
RemarksFI PI NI N/A
B0-DATM
Service Improvement through Digital
Aeronautical Information Management
FI
B0-AMET
Meteorological information supporting
enhanced operational efficiency and
safety
FI
B0-FRTO
Improved Operations through Enhanced
En-Route Trajectories
FI
B0-NOPS
Improved Flow Performance through
Planning based on a Network-Wide view
FI
B0-ASUR Initial capability for ground surveillance FI
18ANSIG/2, Cairo, Egypt, 6‐8 December 2016
Outlook 2020
(Status of ASBU Block 0 Modules by 2020)
Module Module Title
Status by 2020
Remarks
FI PI NI N/A
B0-OPFL
Improved access to optimum flight levels
through climb/descent procedures using
ADS-B
N/A
B0-ACAS ACAS Improvements FI
B0-SNET
Increased Effectiveness of Ground-
Based Safety Nets
FI
B0-CDO
Improved Flexibility and Efficiency in
Descent Profiles (CDO)
TBD
B0-TBO
Improved Safety and Efficiency through
the initial application of Data Link En-
Route
N/A
B0-CCO
Improved Flexibility and Efficiency
Departure Profiles - Continuous Climb
Operations (CCO)
TBD
19
Challenges
ANSIG/2, Cairo, Egypt, 6‐8 December 2016
Challenge Mitigation Measures
B0-APTA
GNSS
Vulnerabilities
GNSS RAIM
Outage
 The low power signal
received from GNSS core
satellite constellations can be
easily interfered by low power
transmitters (Unintentional
interference) or spoofed by
Intentional Interference.
 Unpredicted outages of GNSS
services can cause undesired
interruptions on aircraft
operations. Safety impacts may
become more severe during
approach phase of flights.
 Retaining terrestrial aids as
part of a mitigation strategy
during GNSS Interference
events, Through reliance on
stand alone systems such as
Instrument landing system till
at least the end of Block 1
interval (2024).
20
Challenges
ANSIG/2, Cairo, Egypt, 6‐8 December 2016
Challenge Mitigation Measures
B0-APTA
 Training and lack of qualified
Personnel (Procedure Designers).
 Perfecting Technical training for
procedure designers (LNAVVNAV APP
Procedures).
B0-FICE
 Difficulty of coordination with the remaining neighboring ACCs by
establishing AIDC/OLDI connection with these ACCs due to
compatibility issues of their systems.
21
Challenges
ANSIG/2, Cairo, Egypt, 6‐8 December 2016
Challenge Mitigation Measures
B0-FRTO
 Complicated Egyptian Airspace
Structure (Segregated Airspaces
aren’t exist).
Establishing Civil/Military Coordination
center by 2019.
B0-CCO & B0-CDO
 Training and lack of qualified
Personnel.
 Complicated Egyptian Airspace
structure.
Establishing Civil/Military Coordination
center by 2019.
B0-DATM
 Interoperability with meteorological products.
22
Recommendations
 B0-APTA
• A common, regional RAIM prediction service for MID region can
prove to be effective solution to unpredicted outages of GNSS
services, since RAIM prediction results are needed daily by pilots,
flight dispatchers, ATC….etc.
 B0-ACDM
• The ICAO MID office consider organizing seminars/workshops on
ACDM implementation.
ANSIG/2, Cairo, Egypt, 6‐8 December 2016
23ANSIG/2, Cairo, Egypt, 6‐8 December 2016
Thank You !

Más contenido relacionado

La actualidad más candente

EGYPT PBN Implementation Status
EGYPT PBN Implementation StatusEGYPT PBN Implementation Status
EGYPT PBN Implementation StatusKhaled Eltanany
 
Mlat ads-b-reference-guide
Mlat ads-b-reference-guideMlat ads-b-reference-guide
Mlat ads-b-reference-guideSergio Llugdar
 
ADS-B Update: equipping for 2020 (August 2015 edition)
ADS-B Update: equipping for 2020 (August 2015 edition)ADS-B Update: equipping for 2020 (August 2015 edition)
ADS-B Update: equipping for 2020 (August 2015 edition)sportyspilotshop
 
ADS-B & The 2020 FAA Final Rule
ADS-B & The 2020 FAA Final RuleADS-B & The 2020 FAA Final Rule
ADS-B & The 2020 FAA Final RuleTodd Shellnutt
 
eMOTION! REPORTS.com Archives: (Boeing) Air Traffic Management: Revolutionary...
eMOTION! REPORTS.com Archives: (Boeing) Air Traffic Management: Revolutionary...eMOTION! REPORTS.com Archives: (Boeing) Air Traffic Management: Revolutionary...
eMOTION! REPORTS.com Archives: (Boeing) Air Traffic Management: Revolutionary...GLOBAL HEAVYLIFT HOLDINGS
 
SESAR at World ATM Congress 2016 - SESAR Awards
SESAR at World ATM Congress 2016 - SESAR AwardsSESAR at World ATM Congress 2016 - SESAR Awards
SESAR at World ATM Congress 2016 - SESAR AwardsSESAR Joint Undertaking
 
Wgs 84 Ref Rnav
Wgs 84 Ref RnavWgs 84 Ref Rnav
Wgs 84 Ref Rnavcochez
 
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92SESAR Joint Undertaking
 
SESAR at World ATM Congress 2016 - High Performing Aviation for Europe
SESAR at World ATM Congress 2016 - High Performing Aviation for EuropeSESAR at World ATM Congress 2016 - High Performing Aviation for Europe
SESAR at World ATM Congress 2016 - High Performing Aviation for EuropeSESAR Joint Undertaking
 
Smartpath SLS-4000 Ground Based Augmentation System By Brian Davis,Air Traffi...
Smartpath SLS-4000 Ground Based Augmentation System By Brian Davis,Air Traffi...Smartpath SLS-4000 Ground Based Augmentation System By Brian Davis,Air Traffi...
Smartpath SLS-4000 Ground Based Augmentation System By Brian Davis,Air Traffi...IPPAI
 
FOSTER ITS _ a trusted GNSS module to secure ITS application
FOSTER ITS _ a trusted GNSS module to secure ITS applicationFOSTER ITS _ a trusted GNSS module to secure ITS application
FOSTER ITS _ a trusted GNSS module to secure ITS applicationThe European GNSS Agency (GSA)
 

La actualidad más candente (20)

EGYPT PBN Implementation Status
EGYPT PBN Implementation StatusEGYPT PBN Implementation Status
EGYPT PBN Implementation Status
 
ADS-B: A Special Report
ADS-B: A Special ReportADS-B: A Special Report
ADS-B: A Special Report
 
Mlat ads-b-reference-guide
Mlat ads-b-reference-guideMlat ads-b-reference-guide
Mlat ads-b-reference-guide
 
ADS-B Update: equipping for 2020 (August 2015 edition)
ADS-B Update: equipping for 2020 (August 2015 edition)ADS-B Update: equipping for 2020 (August 2015 edition)
ADS-B Update: equipping for 2020 (August 2015 edition)
 
ADS-B & The 2020 FAA Final Rule
ADS-B & The 2020 FAA Final RuleADS-B & The 2020 FAA Final Rule
ADS-B & The 2020 FAA Final Rule
 
eMOTION! REPORTS.com Archives: (Boeing) Air Traffic Management: Revolutionary...
eMOTION! REPORTS.com Archives: (Boeing) Air Traffic Management: Revolutionary...eMOTION! REPORTS.com Archives: (Boeing) Air Traffic Management: Revolutionary...
eMOTION! REPORTS.com Archives: (Boeing) Air Traffic Management: Revolutionary...
 
UMS Company Presentation 03062014
UMS Company Presentation 03062014UMS Company Presentation 03062014
UMS Company Presentation 03062014
 
SESAR at World ATM Congress 2016 - SESAR Awards
SESAR at World ATM Congress 2016 - SESAR AwardsSESAR at World ATM Congress 2016 - SESAR Awards
SESAR at World ATM Congress 2016 - SESAR Awards
 
RADAR, Mlat, ADS, Bird RADAR, Weather RADAR Guide
RADAR, Mlat, ADS, Bird RADAR, Weather RADAR GuideRADAR, Mlat, ADS, Bird RADAR, Weather RADAR Guide
RADAR, Mlat, ADS, Bird RADAR, Weather RADAR Guide
 
News on Satnav for GA
News on Satnav for GANews on Satnav for GA
News on Satnav for GA
 
Wgs 84 Ref Rnav
Wgs 84 Ref RnavWgs 84 Ref Rnav
Wgs 84 Ref Rnav
 
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92
 
PBN RNAV
PBN RNAVPBN RNAV
PBN RNAV
 
SESAR at World ATM Congress 2016 - High Performing Aviation for Europe
SESAR at World ATM Congress 2016 - High Performing Aviation for EuropeSESAR at World ATM Congress 2016 - High Performing Aviation for Europe
SESAR at World ATM Congress 2016 - High Performing Aviation for Europe
 
EGNOS benefits for General Aviation
EGNOS benefits for General AviationEGNOS benefits for General Aviation
EGNOS benefits for General Aviation
 
Status of Galileo
Status of Galileo Status of Galileo
Status of Galileo
 
Smartpath SLS-4000 Ground Based Augmentation System By Brian Davis,Air Traffi...
Smartpath SLS-4000 Ground Based Augmentation System By Brian Davis,Air Traffi...Smartpath SLS-4000 Ground Based Augmentation System By Brian Davis,Air Traffi...
Smartpath SLS-4000 Ground Based Augmentation System By Brian Davis,Air Traffi...
 
Galileo differentiators for mass market
Galileo differentiators for mass marketGalileo differentiators for mass market
Galileo differentiators for mass market
 
FOSTER ITS _ a trusted GNSS module to secure ITS application
FOSTER ITS _ a trusted GNSS module to secure ITS applicationFOSTER ITS _ a trusted GNSS module to secure ITS application
FOSTER ITS _ a trusted GNSS module to secure ITS application
 
Sesar General presentation
Sesar  General presentationSesar  General presentation
Sesar General presentation
 

Similar a Egypt ASBU B0

Global Global Air Traffic Management
Global Global Air Traffic ManagementGlobal Global Air Traffic Management
Global Global Air Traffic ManagementARVIND KUMAR SINGH
 
Improved Safety and Efficiency through the initial application of Data Link E...
Improved Safety and Efficiency through the initial application of Data Link E...Improved Safety and Efficiency through the initial application of Data Link E...
Improved Safety and Efficiency through the initial application of Data Link E...rsanAkbaba
 
Iaetsd ads-b technology with gps aided geo
Iaetsd ads-b technology with gps aided geoIaetsd ads-b technology with gps aided geo
Iaetsd ads-b technology with gps aided geoIaetsd Iaetsd
 
13. Development of an advanced raim multi-constellation receiver
13. Development of an advanced raim multi-constellation receiver 13. Development of an advanced raim multi-constellation receiver
13. Development of an advanced raim multi-constellation receiver The European GNSS Agency (GSA)
 
Optimizing precision final approach through gbas
Optimizing precision final approach through gbasOptimizing precision final approach through gbas
Optimizing precision final approach through gbasIrfan iftekhar
 
The larger picture – an icao update
The larger picture – an icao updateThe larger picture – an icao update
The larger picture – an icao updatealban_sylaj
 
The PROuD project - Flying into the future with the PBN flight procedures
The PROuD project - Flying into the future with the PBN flight procedures The PROuD project - Flying into the future with the PBN flight procedures
The PROuD project - Flying into the future with the PBN flight procedures PROuD Project
 
The future of EGNOS beyond aviation: standardizing SBAS in intermodal freight...
The future of EGNOS beyond aviation: standardizing SBAS in intermodal freight...The future of EGNOS beyond aviation: standardizing SBAS in intermodal freight...
The future of EGNOS beyond aviation: standardizing SBAS in intermodal freight...Finmeccanica
 
Air Traffic System Technologies
Air Traffic System TechnologiesAir Traffic System Technologies
Air Traffic System TechnologiesÜlger Ahmet
 
EffectiveAirportManagement-Diffs-Sols-191213.ppt
EffectiveAirportManagement-Diffs-Sols-191213.pptEffectiveAirportManagement-Diffs-Sols-191213.ppt
EffectiveAirportManagement-Diffs-Sols-191213.pptSURAJ SINGH SAINI
 

Similar a Egypt ASBU B0 (20)

CNS SG7 -PPT5
CNS SG7 -PPT5CNS SG7 -PPT5
CNS SG7 -PPT5
 
Global Global Air Traffic Management
Global Global Air Traffic ManagementGlobal Global Air Traffic Management
Global Global Air Traffic Management
 
Improved Safety and Efficiency through the initial application of Data Link E...
Improved Safety and Efficiency through the initial application of Data Link E...Improved Safety and Efficiency through the initial application of Data Link E...
Improved Safety and Efficiency through the initial application of Data Link E...
 
Iaetsd ads-b technology with gps aided geo
Iaetsd ads-b technology with gps aided geoIaetsd ads-b technology with gps aided geo
Iaetsd ads-b technology with gps aided geo
 
Secretaria de Aviação Civil - SESAR Experience and Deployment
Secretaria de Aviação Civil - SESAR Experience and DeploymentSecretaria de Aviação Civil - SESAR Experience and Deployment
Secretaria de Aviação Civil - SESAR Experience and Deployment
 
GSA EGNOS and Galileo for Aviation
GSA EGNOS and Galileo for AviationGSA EGNOS and Galileo for Aviation
GSA EGNOS and Galileo for Aviation
 
Gbas
GbasGbas
Gbas
 
13. Development of an advanced raim multi-constellation receiver
13. Development of an advanced raim multi-constellation receiver 13. Development of an advanced raim multi-constellation receiver
13. Development of an advanced raim multi-constellation receiver
 
Optimizing precision final approach through gbas
Optimizing precision final approach through gbasOptimizing precision final approach through gbas
Optimizing precision final approach through gbas
 
The larger picture – an icao update
The larger picture – an icao updateThe larger picture – an icao update
The larger picture – an icao update
 
GNSS Opportunities in Aviation
GNSS Opportunities in AviationGNSS Opportunities in Aviation
GNSS Opportunities in Aviation
 
The PROuD project - Flying into the future with the PBN flight procedures
The PROuD project - Flying into the future with the PBN flight procedures The PROuD project - Flying into the future with the PBN flight procedures
The PROuD project - Flying into the future with the PBN flight procedures
 
10. Enhanced gnss user terminal
10. Enhanced gnss user terminal10. Enhanced gnss user terminal
10. Enhanced gnss user terminal
 
The future of EGNOS beyond aviation: standardizing SBAS in intermodal freight...
The future of EGNOS beyond aviation: standardizing SBAS in intermodal freight...The future of EGNOS beyond aviation: standardizing SBAS in intermodal freight...
The future of EGNOS beyond aviation: standardizing SBAS in intermodal freight...
 
European GNSS & rail market
European GNSS & rail marketEuropean GNSS & rail market
European GNSS & rail market
 
houstonIS13.pptx
houstonIS13.pptxhoustonIS13.pptx
houstonIS13.pptx
 
EGNSS for robots - GSA special prize
EGNSS for robots - GSA special prizeEGNSS for robots - GSA special prize
EGNSS for robots - GSA special prize
 
Airport Surface Surveillance
Airport Surface SurveillanceAirport Surface Surveillance
Airport Surface Surveillance
 
Air Traffic System Technologies
Air Traffic System TechnologiesAir Traffic System Technologies
Air Traffic System Technologies
 
EffectiveAirportManagement-Diffs-Sols-191213.ppt
EffectiveAirportManagement-Diffs-Sols-191213.pptEffectiveAirportManagement-Diffs-Sols-191213.ppt
EffectiveAirportManagement-Diffs-Sols-191213.ppt
 

Egypt ASBU B0

  • 1. Second Meeting of the Air Navigation System Implementation Group (ANSIG/2) Cairo, Egypt, 6-8 December 2016 EGYPT ASBU Block 0 modules Implementation Status
  • 2. Outline  Brief on the Egypt National ASBU Implementation Plan  Status of ASBU Implementation  Outlook 2020  Challenges  Recommendations ANSIG/2, Cairo, Egypt, 6‐8 December 2016 2
  • 3. 3 Egypt National ASBU Implementation Plan  Develop Egypt strategic plan with a goal of global aviation system interoperability.  Implement priority 1 ASBU Block 0 modules according to Egypt operational requirements and the MID region air navigation strategy to be in line with global air navigation objectives. ANSIG/2, Cairo, Egypt, 6‐8 December 2016
  • 4. 4 Status of ASBU Implementation ANSIG/2, Cairo, Egypt, 6‐8 December 2016
  • 5. 5ANSIG/2, Cairo, Egypt, 6‐8 December 2016 B0 – APTA: Optimization of Approach Procedures including vertical guidance Elements Applicability Status Action Plan/Timelines Remarks States’ PBN Implementation Plans Egypt Implemented Updated Version Edition 1.5 by August 2016 LNAV All RWYs Ends at International Aerodromes 86 % of RWY Ends (19 THR) with RNAV (GNSS) 100% by 2016 LNAV/VNAV All RWYs Ends at International Aerodromes 18 % of RWY Ends (4 THR) provided with Baro-VNAV APP procedure 55% by 2016 100% by 2018 Timelines will be modified at the next PBN version Status of ASBU Implementation
  • 6. 6ANSIG/2, Cairo, Egypt, 6‐8 December 2016 B0-SURF: Safety and Efficiency of Surface Operations (A-SMGCS Level 1-2) Elements Applicability Status Action Plan/Timelines Remarks A-SMGCS Level 1 As per the MID Air Navigation Strategy Implemented A-SMGCS Level 2 As per the MID Air Navigation Strategy Implemented Completed since 2013 Status of ASBU Implementation
  • 7. 7ANSIG/2, Cairo, Egypt, 6‐8 December 2016 B0 – ACDM: Improved Airport Operations through Airport-CDM Elements Applicability Status Action Plan/Timelines Remarks A-CDM As per the MID Air Navigation Strategy Not Implemented TBD Timeline will be determined after completion of the gap analysis by the designated committee (High level). Status of ASBU Implementation
  • 8. 8ANSIG/2, Cairo, Egypt, 6‐8 December 2016 B0 – FICE: Increased Interoperability, Efficiency and Capacity through Ground‐Ground Integration Elements Applicability Status Action Plan/Timelines Remarks AMHS capability Egypt Implemented AMHS Impl. /interconnection Egypt Implemented Impl. of AIDC/OLDI between adjacent ACCs Cairo ACC Implemented • Currently connected to Athens ACC • Stopped with Jeddah due to Compatibility issue Status of ASBU Implementation
  • 9. 9ANSIG/2, Cairo, Egypt, 6‐8 December 2016 B0 – DATM: Service Improvement through Digital Aeronautical Information Management Elements Applicability Status Action Plan/Timelines Remarks National AIM Roadmap Egypt Implemented Updated Version by Nov 2016 AIXM Egypt Implemented eAIP Egypt Partially Compliant Fully Implemented by Dec 2018 QMS Egypt Fully Compliant WGS-84 ENR AD TMA GUND Fully Compliant eTOD Area 1 Terrain Area 1 Obstacle Area 4 Terrain Area 4 Obstacle Fully Compliant Not Compliant Fully Compliant Not Compliant Fully Implemented by Dec 2018 Status of ASBU Implementation
  • 10. 10ANSIG/2, Cairo, Egypt, 6‐8 December 2016 B0 – AMET: Meteorological information supporting enhanced operational efficiency and safety Elements Applicability Status Action Plan/Timelines Remarks SADIS 2G or Secure SADIS FTP Egypt Implemented QMS Egypt Implemented Renewal ISO 9001 Certified at May 2015 Status of ASBU Implementation
  • 11. 11ANSIG/2, Cairo, Egypt, 6‐8 December 2016 B0 – FRTO: Improved Operations through Enhanced En‐Route Trajectories Elements Applicability Status Action Plan/Timelines Remarks Flexible use of airspace (FUA) Egypt Not Implemented TBD Timeline will be defined after completing the establishment of civilMilitary coordination center Flexible routing Egypt Not Implemented TBD Status of ASBU Implementation
  • 12. 12ANSIG/2, Cairo, Egypt, 6‐8 December 2016 B0 – ACAS: ACAS Improvements Elements Applicability Status Action Plan/Timelines Remarks State Regulation on carriage of ACAS (TCAS v7.1) Egypt Implemented ECAR Part 121.356 & ECAR Part 91.221 ECAA ensure the conformity through its oversight program Status of ASBU Implementation
  • 13. 13ANSIG/2, Cairo, Egypt, 6‐8 December 2016 B0 – CDO: Improved Flexibility and Efficiency in Descent Profiles (CDO) Elements Applicability Status Action Plan/Timelines Remarks PBN STARs As per the MID Air Navigation Strategy 55 % of International Aerodromes/TMAs with PBN STAR implemented 64% by Dec 2016 100% by Dec 2018 International aerodromes/ TMAs with CDO As per the MID Air Navigation Strategy Not Implemented TBD Status of ASBU Implementation
  • 14. 14ANSIG/2, Cairo, Egypt, 6‐8 December 2016 B0 – CCO: Improved Flexibility and Efficiency Departure Profiles ‐ Continuous Climb Operations (CCO) Elements Applicability Status Action Plan/Timelines Remarks PBN SIDs As per the MID Air Navigation Strategy 59 % of International Aerodromes/TMAs with PBN SID implemented 68% by Dec 2016 100% by Dec 2018 International aerodromes/ TMAs with CCO As per the MID Air Navigation Strategy Not Implemented TBD Status of ASBU Implementation
  • 15. 15ANSIG/2, Cairo, Egypt, 6‐8 December 2016 Other ASBU Block 0 Modules (priority 2) Implemented by the State Module Module Title Status Remarks Yes No B0-WAKE Increased Runway Throughput through Optimized Wake Turbulence Separation Yes B0-RSEQ Improve Traffic flow through Runway Sequencing (AMAN/DMAN) No B0-SNET Increased Effectiveness of Ground- Based Safety Nets No B0-ASUR Initial capability for ground surveillance No B0-ASEP Air Traffic Situational Awareness (ATSA) No B0-OPFL Improved access to optimum flight levels through climb/descent procedures using ADS-B No B0-TBO Improved Safety and Efficiency through the initial application of Data Link En-Route No
  • 16. 16ANSIG/2, Cairo, Egypt, 6‐8 December 2016 Outlook 2020 (Status of ASBU Block 0 Modules by 2020) Module Module Title Status by 2020 Remarks FI PI NI N/A B0-APTA Optimization of Approach Procedures including vertical guidance FI B0-WAKE Increased Runway Throughput through Optimized Wake Turbulence Separation FI B0-RSEQ Improve Traffic flow through Runway Sequencing (AMAN/DMAN) N/A B0-SURF Safety and Efficiency of Surface Operations (A-SMGCS Level 1-2) FI B0-ACDM Improved Airport Operations through Airport-CDM TBD Reported after completing Gap Analysis B0-FICE Increased Interoperability, Efficiency and Capacity through Ground-Ground Integration FI
  • 17. 17ANSIG/2, Cairo, Egypt, 6‐8 December 2016 Outlook 2020 (Status of ASBU Block 0 Modules by 2020) Module Module Title Status by 2020 RemarksFI PI NI N/A B0-DATM Service Improvement through Digital Aeronautical Information Management FI B0-AMET Meteorological information supporting enhanced operational efficiency and safety FI B0-FRTO Improved Operations through Enhanced En-Route Trajectories FI B0-NOPS Improved Flow Performance through Planning based on a Network-Wide view FI B0-ASUR Initial capability for ground surveillance FI
  • 18. 18ANSIG/2, Cairo, Egypt, 6‐8 December 2016 Outlook 2020 (Status of ASBU Block 0 Modules by 2020) Module Module Title Status by 2020 Remarks FI PI NI N/A B0-OPFL Improved access to optimum flight levels through climb/descent procedures using ADS-B N/A B0-ACAS ACAS Improvements FI B0-SNET Increased Effectiveness of Ground- Based Safety Nets FI B0-CDO Improved Flexibility and Efficiency in Descent Profiles (CDO) TBD B0-TBO Improved Safety and Efficiency through the initial application of Data Link En- Route N/A B0-CCO Improved Flexibility and Efficiency Departure Profiles - Continuous Climb Operations (CCO) TBD
  • 19. 19 Challenges ANSIG/2, Cairo, Egypt, 6‐8 December 2016 Challenge Mitigation Measures B0-APTA GNSS Vulnerabilities GNSS RAIM Outage  The low power signal received from GNSS core satellite constellations can be easily interfered by low power transmitters (Unintentional interference) or spoofed by Intentional Interference.  Unpredicted outages of GNSS services can cause undesired interruptions on aircraft operations. Safety impacts may become more severe during approach phase of flights.  Retaining terrestrial aids as part of a mitigation strategy during GNSS Interference events, Through reliance on stand alone systems such as Instrument landing system till at least the end of Block 1 interval (2024).
  • 20. 20 Challenges ANSIG/2, Cairo, Egypt, 6‐8 December 2016 Challenge Mitigation Measures B0-APTA  Training and lack of qualified Personnel (Procedure Designers).  Perfecting Technical training for procedure designers (LNAVVNAV APP Procedures). B0-FICE  Difficulty of coordination with the remaining neighboring ACCs by establishing AIDC/OLDI connection with these ACCs due to compatibility issues of their systems.
  • 21. 21 Challenges ANSIG/2, Cairo, Egypt, 6‐8 December 2016 Challenge Mitigation Measures B0-FRTO  Complicated Egyptian Airspace Structure (Segregated Airspaces aren’t exist). Establishing Civil/Military Coordination center by 2019. B0-CCO & B0-CDO  Training and lack of qualified Personnel.  Complicated Egyptian Airspace structure. Establishing Civil/Military Coordination center by 2019. B0-DATM  Interoperability with meteorological products.
  • 22. 22 Recommendations  B0-APTA • A common, regional RAIM prediction service for MID region can prove to be effective solution to unpredicted outages of GNSS services, since RAIM prediction results are needed daily by pilots, flight dispatchers, ATC….etc.  B0-ACDM • The ICAO MID office consider organizing seminars/workshops on ACDM implementation. ANSIG/2, Cairo, Egypt, 6‐8 December 2016