On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf

PLANT OPERATION IN URDU
CENTRAL POWER GENERATION CO. LTD
GENCO-II
TRAINING CENTER TPS GUDDU
BASICS OF POWER
BY
KHALID AYAZ SOOMRO
INSTRUCTOR OPERATION/ (INTERN ENGINEERS)
TRAINING CENTER TPS, GUDDU
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
SAFETY & HEALTH
GOALS
The following goals have been
established for XYZ Company:
(1) Provide workers with a safe work
environment.
(2) Conduct routine/regular
workplace inspections.
(3) Provide Personal Protective
Equipment.
(4) Develop and implement safe
work procedures and rules.
(5) Provide on-going safety training
(6) Enforce safety rules and
appropriate discipline.
(7) Provide on-going property
conservation practices.
SAFETY RULES
All safety rules must be obeyed. Failure to do so will
result in strict disciplinary action.
All injuries must be reported as soon as
possible.
No horseplay, alcohol, or drugs allowed on
premises.
No alcohol usage allowed during lunch
break.
PPE must be worn as prescribed by
management.
All tools/equipment must be maintained in
All tools/equipment must be maintained in
good condition.
Only appropriate tools shall be used for
specific jobs.
All guards must be kept in place.
No spliced electrical cords/wiring allowed.
Only authorized personnel can operate forklift
vehicles.
Smoking allowed only in lunchroom.
Seat belt use required of all
drivers/passengers.
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
Power Plant
Power Plant
Conventional
Power Plant
Conventional
Power Plant
Hydel Power Plant
Non-Conventional
Power Plant
Non-Conventional
Power Plant
Thermal Power Plant
Thermal Power Plant
Steam Power Plant
Combined Cycle Power Plant
Gas Turbine Power Plant
Diesel Power Plant
Steam Power Plant
Combined Cycle Power Plant
Gas Turbine Power Plant
Diesel Power Plant
Hydel Power Plant
Hydel Power Plant
Low Head Power Plant
Medium Head Power Plant
High Head Power Plant
Run of River Power Plant
Low Head Power Plant
Medium Head Power Plant
High Head Power Plant
Run of River Power Plant
Nuclear Power Plant
Solar Power Plant
Tidal Power Plant
Nuclear Power Plant
Solar Power Plant
Tidal Power Plant
Geo Thermal Power Plant
Wind Power Plant
Bio-mass Power Plant
Geo Thermal Power Plant
Wind Power Plant
Bio-mass Power Plant
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
• GAS TURBINE PREPERATION / CHECKS BEFORE STARTING
• 1- Auxilary power supply 6.6kv ON (internal/external)source for all equepment which are in
servece before strating .
• 2- DC power supplt for control and protection system ON (thrugh Rectifire) and batteries on
stand by position
• 3- No any PTW are in Panding
• 4- Clearence from all maintanence sections
• 5- Check all Mechanical,Instrumentations,and Electrical Equepments are ready for
operation
• 6- Cooling Water circuit are in operation
• 7- Lube oil circuit are in operation and lube oil Temp >35c and turning Gear On
• 7- Lube oil circuit are in operation and lube oil Temp >35c and turning Gear On
• 8-Checke no any Leakage,Vibration,rubbing Noise and over Heating occures
• 9- Filtter house ready for operation
• 10-Anounciator pannel clear no any indication persists
• 11- Fuel (Gas/ Oil) raedy for operation
• 12-H2/Air cooling and sealing system ON
• 13- Gas Turbine Ready For operatoin indication ON.
GAS TURBINE STRARTING PROCEDURE
OF GE WITH RELAYS AND SIEMENS WITH SPEED (STARTING PROCEDURE ALMOST
SAME )
A- GT Ready for operation indication ON
B-Operation mode selector put on Generator and indication must on Generator
C-Master Control selector ON AUTO
D-Synchronizing Selector put on AUTO/Manual
E-Load selector put on BASE LOAD/PEAK LOAD
F- Fuel slector put on GAS/OIL
G-Give strart pulse to master control and starting sequence start
1- starting sequence progress On and ready to start Light OFF
2-14HR relay Light ON and Starting Divice Energize ( it meanse no Zero speed )
3-14HM relay Light On (it meanse speed at 16%)
- speadtronice signal
-for( GCE) for gas and (LCE )for oil , values on for ignition
-IGNITION SEQUENCE ON and Flame detector light ON
-IGNITION SEQUENCE ON and Flame detector light ON
GCE/LCE values decreased up to warm up value for warm up time before
acceleration
4- GCE/LCE values increased for Acceleration speed
5-Accceleration control/speed control light ON
6- 14HA relay light ON (when speed at 50%
-Feild braeker ON for feild flashing
7-14HC relay light ON (when speed at 70%) and Starting Divice Disengage s
8-14HS lrelay light ON -Auxilary Lube oil pump OFF and Axilary Hydrulic pump
OFF
9-Starting Sequence Complet light ON
10-m/c Synchronized through AUTO/Manual
-Spnning Reserve Load On (That is 5 to 8MW)
11- GT Laoding start according to gradient select (normal gradient
11MW/minute and fast gradie
NOTE:- During Inital operation Master Control Switch put on Crank,Fire ,and Auto
to check the Leakages, Rubbing Noise,Overheating.from Lubrication,Automizing
air,fuel gas manifold ,fuel oil, flow devider,cumustion chamber
/combustors,crossfire tube,Liner
check all these things during start up sequence from diffrent comportments.
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
Steam Turbine
Steam turbine is a prime mover that drives its energy of rotation due to
conversion of heat energy of steam into kinetic energy as it expands through a
series of nozzles mounted on the casing or produced by the fixed blades.
That machine converts heat energy into mechanical energy called steam
turbine.
Definition of a steam turbine?
A steam turbine is a prime mover that derives its energy of rotation
due to conversion of the heat energy of steam into kinetic energy as it
due to conversion of the heat energy of steam into kinetic energy as it
expands through a series of nozzles mounted on the casing or
produced by the fixed blades.
1-Neilson defines it: The turbine is a machine in which a rotary motion
is obtained by the gradual change of the momentum of the fluid.
2-Graham's definition: The turbine is a prime mover in which a rotary
motion is obtained by the centrifugal force brought into action by changing
the direction of a jet of a fluid (steam) escaping from the nozzle at high
velocity.
Ts diagram of a typical Rankine cycle operating between pressures of
0.06bar and 50bar
There are four processes in the Rankine cycle. These states are identified by
numbers (in brown) in the above Ts diagram.
 Process 1-2: The working fluid is pumped from low to high pressure. As the fluid
is a liquid at this stage the pump requires little input energy.
 Process 2-3: The high pressure liquid enters a boiler where it is heated at
constant pressure by an external heat source to become a dry saturated
vapor. The input energy required can be easily calculated using mollier
vapor. The input energy required can be easily calculated using mollier
diagram or h-s chart or enthalpy-entropy chart also known as steam tables.
 Process 3-4: The dry saturated vapor expands through a turbine, generating
power. This decreases the temperature and pressure of the vapor, and some
condensation may occur. The output in this process can be easily calculated
using the Enthalpy-entropy chart or the steam tables.
 Process 4-1: The wet vapor then enters a condenser where it is condensed at
a constant temperature to become a saturated liquid.
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
• Synchronization
• When do different electrical systems are coupled together it is called synchronization or to connect the generator with system.
•
• There are three main aspects during synchronization
•
• Generator and system voltage should be same.
• Generator and system frequency should be same.
• Generator and system phase angle should be equal.
•
• Thus, if above three conditions are equal then generator should be synchronized with system
•
• Advantages of A.C Generator
• Field winding on rotor
• Less insulation
• Weight of rotor less
• Easy to retain centrifugal force
• Size of rotor is smaller
• High voltage on rotor
• High voltage on rotor
• Transmission of voltage is easy
• Easy cooling system
•
• Generator protections
• Generator differential protection
• Generator over current protection
• Stator earth fault protection
• Rotor earth fault protection
• Under excitation protection
• Reverse power protection generator motoring
• Negative phase sequence protection… system unbalance
• Over / under frequency protection
• Breaker pole failure protection
• Synchronous check protection “When you system supply is dead and you are the 1st one in the system.. no need of
synchronization”
• Over excitation
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
D.C Supply
As we all know that AC supply can’t be stored. Thus the back systems in power houses are used built on
DC supply system. It is a stand by source of electricity available at every movement in shape of storage
batteries in order to protect our main system to damage.
•Importance of DC supply
All the control and protection system is based on DC supply. Usually the AC supply is converted to DC
through rectifier. Further battery bank is also used which is charge through rectifier. This DC produced by
battery bank is used in emergency when AC is not available. Moreover, during charging the chemical
energy converts into electrical energy.
•Different parts of DC supply
•Rectifier
•Battery charger
•Battery cell 24VDC or 220VDC
•Kinds of batteries
There are so many kinds of batteries; however below mentioned are the one
who have been chosen on their type of material and electrode.
•Lead acid batteries
•Nickel cadmium alkaline batteries
•Nickel cadmium alkaline batteries
Nickel iron alkaline batteries
•Use of battery if power station
•Control of electrical equipment
•Open / close of breakers
•Position indicators
•Emergency lights
•Field flashing
•Control and protection system
•Emergency pumps
Note: The charge battery has 11% water and 89% sulphuric acid and when it
discharged it become 15% sulphric acid and 15% water.
•Thank You for
Your Time and
Attention !!!!
If you Gets Some Points
Please Remember Me
in your Prayers
KHALID AYAZ SOOMRO
INSTRUCTOR OPERATION/ (INTERN ENGINEERS)
TRAINING CENTER TPS, GUDDU
REGARDS:
1 de 106

Recomendados

J D J por
J D JJ D J
J D Jjjinesh
166 vistas25 diapositivas
railway workshop jodhpur por
railway workshop jodhpur railway workshop jodhpur
railway workshop jodhpur kalumutha
2.1K vistas25 diapositivas
railway workshop jodhpur por
railway workshop jodhpurrailway workshop jodhpur
railway workshop jodhpurkalumutha
574 vistas25 diapositivas
Gas Turbine Power Plant.pdf por
Gas Turbine Power Plant.pdfGas Turbine Power Plant.pdf
Gas Turbine Power Plant.pdfKIET Group of Institutions
97 vistas40 diapositivas
LETTER OF AUTHORIZATION por
LETTER OF AUTHORIZATIONLETTER OF AUTHORIZATION
LETTER OF AUTHORIZATIONMoiz Akhter
6.1K vistas48 diapositivas
Bhel training ppt_v[1] at bawana por
Bhel training ppt_v[1] at bawanaBhel training ppt_v[1] at bawana
Bhel training ppt_v[1] at bawanaVisheshKumar55
74 vistas20 diapositivas

Más contenido relacionado

Similar a On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf

PresentationGGSSTP_Atul por
PresentationGGSSTP_AtulPresentationGGSSTP_Atul
PresentationGGSSTP_AtulAtul Kataria
86 vistas22 diapositivas
NTPC DADRI THERMAL PLANT PPT por
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTShivam Sharma
2.9K vistas24 diapositivas
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx por
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptxONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptxTimilehinonalaja
899 vistas42 diapositivas
V.T ppt por
V.T pptV.T ppt
V.T pptAditi Tiwari
590 vistas27 diapositivas
Vocational training at mejia thermal power plant por
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plantNipak Banerjee
3.5K vistas29 diapositivas
Introduction to operation and Control of Thermal Power Plant por
Introduction to operation and Control of Thermal Power PlantIntroduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power PlantSWAPNILTRIVEDI6
169 vistas35 diapositivas

Similar a On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf(20)

PresentationGGSSTP_Atul por Atul Kataria
PresentationGGSSTP_AtulPresentationGGSSTP_Atul
PresentationGGSSTP_Atul
Atul Kataria86 vistas
NTPC DADRI THERMAL PLANT PPT por Shivam Sharma
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPT
Shivam Sharma2.9K vistas
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx por Timilehinonalaja
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptxONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx
Timilehinonalaja899 vistas
Vocational training at mejia thermal power plant por Nipak Banerjee
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
Nipak Banerjee3.5K vistas
Introduction to operation and Control of Thermal Power Plant por SWAPNILTRIVEDI6
Introduction to operation and Control of Thermal Power PlantIntroduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power Plant
SWAPNILTRIVEDI6169 vistas
Ignition System & Engine Electronics por Umar Fayyaz
Ignition System & Engine ElectronicsIgnition System & Engine Electronics
Ignition System & Engine Electronics
Umar Fayyaz3.1K vistas
Bangladesh Power Stations & Power Plants Overview por Ridwanul Hoque
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants Overview
Ridwanul Hoque188 vistas
Motor protection principles por Atiq Sayal
Motor protection principlesMotor protection principles
Motor protection principles
Atiq Sayal2.7K vistas
Power Cycles and power plants por Sarthak Kohli
Power Cycles and power plantsPower Cycles and power plants
Power Cycles and power plants
Sarthak Kohli948 vistas
Hydro Power Plant Auxaleries por Mahajan Saurabh
Hydro Power Plant AuxaleriesHydro Power Plant Auxaleries
Hydro Power Plant Auxaleries
Mahajan Saurabh6.2K vistas
Control Valves for the Power Generation Industry" A Product and Applications ... por Belilove Company-Engineers
Control Valves for the Power Generation Industry" A Product and Applications ...Control Valves for the Power Generation Industry" A Product and Applications ...
Control Valves for the Power Generation Industry" A Product and Applications ...
Operation and maintanance por AnasMirza10
Operation and maintananceOperation and maintanance
Operation and maintanance
AnasMirza10128 vistas
battery-thermal-management-in-evs-and-hevs-issues-and.pdf por CHANDAMAMATV
battery-thermal-management-in-evs-and-hevs-issues-and.pdfbattery-thermal-management-in-evs-and-hevs-issues-and.pdf
battery-thermal-management-in-evs-and-hevs-issues-and.pdf
CHANDAMAMATV77 vistas
Appraisal ppt ankur por Ankur Mishra
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankur
Ankur Mishra126 vistas
Condensate Return Solutions.ppt por ssuser8006c7
Condensate Return Solutions.pptCondensate Return Solutions.ppt
Condensate Return Solutions.ppt
ssuser8006c719 vistas
Wiring diagram krisbow 26 13 por -
Wiring diagram krisbow 26 13Wiring diagram krisbow 26 13
Wiring diagram krisbow 26 13
-7.7K vistas

Más de KhalidAyaz3

Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr... por
Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...
Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...KhalidAyaz3
42 vistas108 diapositivas
FInal Internship Report nust.pdf por
FInal Internship Report nust.pdfFInal Internship Report nust.pdf
FInal Internship Report nust.pdfKhalidAyaz3
11 vistas42 diapositivas
internship Report Print - Copy.pdf por
internship Report Print - Copy.pdfinternship Report Print - Copy.pdf
internship Report Print - Copy.pdfKhalidAyaz3
13 vistas30 diapositivas
Cogeneration Power desalination plant - Copy.pdf por
Cogeneration Power desalination plant - Copy.pdfCogeneration Power desalination plant - Copy.pdf
Cogeneration Power desalination plant - Copy.pdfKhalidAyaz3
4 vistas121 diapositivas
My book on power plant by khalid ayaz soomro.pdf por
My book on power plant by khalid ayaz soomro.pdfMy book on power plant by khalid ayaz soomro.pdf
My book on power plant by khalid ayaz soomro.pdfKhalidAyaz3
8 vistas105 diapositivas
GAS TURBINE OPERATION - Copy.pdf por
GAS TURBINE OPERATION - Copy.pdfGAS TURBINE OPERATION - Copy.pdf
GAS TURBINE OPERATION - Copy.pdfKhalidAyaz3
14 vistas8 diapositivas

Más de KhalidAyaz3(13)

Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr... por KhalidAyaz3
Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...
Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...
KhalidAyaz342 vistas
FInal Internship Report nust.pdf por KhalidAyaz3
FInal Internship Report nust.pdfFInal Internship Report nust.pdf
FInal Internship Report nust.pdf
KhalidAyaz311 vistas
internship Report Print - Copy.pdf por KhalidAyaz3
internship Report Print - Copy.pdfinternship Report Print - Copy.pdf
internship Report Print - Copy.pdf
KhalidAyaz313 vistas
Cogeneration Power desalination plant - Copy.pdf por KhalidAyaz3
Cogeneration Power desalination plant - Copy.pdfCogeneration Power desalination plant - Copy.pdf
Cogeneration Power desalination plant - Copy.pdf
KhalidAyaz34 vistas
My book on power plant by khalid ayaz soomro.pdf por KhalidAyaz3
My book on power plant by khalid ayaz soomro.pdfMy book on power plant by khalid ayaz soomro.pdf
My book on power plant by khalid ayaz soomro.pdf
KhalidAyaz38 vistas
GAS TURBINE OPERATION - Copy.pdf por KhalidAyaz3
GAS TURBINE OPERATION - Copy.pdfGAS TURBINE OPERATION - Copy.pdf
GAS TURBINE OPERATION - Copy.pdf
KhalidAyaz314 vistas
01. Khalid Ayaz 41 Years pdf.pdf por KhalidAyaz3
01. Khalid Ayaz 41 Years pdf.pdf01. Khalid Ayaz 41 Years pdf.pdf
01. Khalid Ayaz 41 Years pdf.pdf
KhalidAyaz37 vistas
Internship report on 747 mw ccpp Guddu.pdf por KhalidAyaz3
Internship report on 747 mw ccpp Guddu.pdfInternship report on 747 mw ccpp Guddu.pdf
Internship report on 747 mw ccpp Guddu.pdf
KhalidAyaz34 vistas
Engr Ahmad raza Internship report on 600mw ccpp giddupdf por KhalidAyaz3
Engr Ahmad raza Internship report on 600mw ccpp giddupdfEngr Ahmad raza Internship report on 600mw ccpp giddupdf
Engr Ahmad raza Internship report on 600mw ccpp giddupdf
KhalidAyaz311 vistas
A BOOK ON BASIC CONCEPT OF MODERN POWER PLANTS by khalid ayaz soomro.pdf por KhalidAyaz3
A BOOK ON BASIC CONCEPT OF MODERN POWER PLANTS by khalid ayaz soomro.pdfA BOOK ON BASIC CONCEPT OF MODERN POWER PLANTS by khalid ayaz soomro.pdf
A BOOK ON BASIC CONCEPT OF MODERN POWER PLANTS by khalid ayaz soomro.pdf
KhalidAyaz331 vistas
A BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdf por KhalidAyaz3
A BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdfA BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdf
A BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdf
KhalidAyaz330 vistas
GOLDEN BOOK ON STEAM TURBINE TTC GUDDU.pdf por KhalidAyaz3
GOLDEN BOOK ON STEAM TURBINE TTC GUDDU.pdfGOLDEN BOOK ON STEAM TURBINE TTC GUDDU.pdf
GOLDEN BOOK ON STEAM TURBINE TTC GUDDU.pdf
KhalidAyaz327 vistas
GOLDEN BOOK ON BOILER TTC GUDDU.pdf por KhalidAyaz3
GOLDEN BOOK ON BOILER TTC GUDDU.pdfGOLDEN BOOK ON BOILER TTC GUDDU.pdf
GOLDEN BOOK ON BOILER TTC GUDDU.pdf
KhalidAyaz37 vistas

Último

MSA Website Slideshow (16).pdf por
MSA Website Slideshow (16).pdfMSA Website Slideshow (16).pdf
MSA Website Slideshow (16).pdfmsaucla
46 vistas8 diapositivas
SPICE PARK DEC2023 (6,625 SPICE Models) por
SPICE PARK DEC2023 (6,625 SPICE Models) SPICE PARK DEC2023 (6,625 SPICE Models)
SPICE PARK DEC2023 (6,625 SPICE Models) Tsuyoshi Horigome
15 vistas218 diapositivas
SWM L1-L14_drhasan (Part 1).pdf por
SWM L1-L14_drhasan (Part 1).pdfSWM L1-L14_drhasan (Part 1).pdf
SWM L1-L14_drhasan (Part 1).pdfMahmudHasan747870
48 vistas150 diapositivas
fakenews_DBDA_Mar23.pptx por
fakenews_DBDA_Mar23.pptxfakenews_DBDA_Mar23.pptx
fakenews_DBDA_Mar23.pptxdeepmitra8
12 vistas34 diapositivas
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L... por
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...Anowar Hossain
12 vistas34 diapositivas
Deutsch Crimping por
Deutsch CrimpingDeutsch Crimping
Deutsch CrimpingIwiss Tools Co.,Ltd
21 vistas7 diapositivas

Último(20)

MSA Website Slideshow (16).pdf por msaucla
MSA Website Slideshow (16).pdfMSA Website Slideshow (16).pdf
MSA Website Slideshow (16).pdf
msaucla46 vistas
SPICE PARK DEC2023 (6,625 SPICE Models) por Tsuyoshi Horigome
SPICE PARK DEC2023 (6,625 SPICE Models) SPICE PARK DEC2023 (6,625 SPICE Models)
SPICE PARK DEC2023 (6,625 SPICE Models)
Tsuyoshi Horigome15 vistas
fakenews_DBDA_Mar23.pptx por deepmitra8
fakenews_DBDA_Mar23.pptxfakenews_DBDA_Mar23.pptx
fakenews_DBDA_Mar23.pptx
deepmitra812 vistas
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L... por Anowar Hossain
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...
Anowar Hossain12 vistas
SUMIT SQL PROJECT SUPERSTORE 1.pptx por Sumit Jadhav
SUMIT SQL PROJECT SUPERSTORE 1.pptxSUMIT SQL PROJECT SUPERSTORE 1.pptx
SUMIT SQL PROJECT SUPERSTORE 1.pptx
Sumit Jadhav 11 vistas
Update 42 models(Diode/General ) in SPICE PARK(DEC2023) por Tsuyoshi Horigome
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Tsuyoshi Horigome19 vistas
What is Whirling Hygrometer.pdf por IIT KHARAGPUR
What is Whirling Hygrometer.pdfWhat is Whirling Hygrometer.pdf
What is Whirling Hygrometer.pdf
IIT KHARAGPUR 11 vistas

On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf

  • 1. PLANT OPERATION IN URDU CENTRAL POWER GENERATION CO. LTD GENCO-II TRAINING CENTER TPS GUDDU BASICS OF POWER BY KHALID AYAZ SOOMRO INSTRUCTOR OPERATION/ (INTERN ENGINEERS) TRAINING CENTER TPS, GUDDU
  • 7. SAFETY & HEALTH GOALS The following goals have been established for XYZ Company: (1) Provide workers with a safe work environment. (2) Conduct routine/regular workplace inspections. (3) Provide Personal Protective Equipment. (4) Develop and implement safe work procedures and rules. (5) Provide on-going safety training (6) Enforce safety rules and appropriate discipline. (7) Provide on-going property conservation practices.
  • 8. SAFETY RULES All safety rules must be obeyed. Failure to do so will result in strict disciplinary action. All injuries must be reported as soon as possible. No horseplay, alcohol, or drugs allowed on premises. No alcohol usage allowed during lunch break. PPE must be worn as prescribed by management. All tools/equipment must be maintained in All tools/equipment must be maintained in good condition. Only appropriate tools shall be used for specific jobs. All guards must be kept in place. No spliced electrical cords/wiring allowed. Only authorized personnel can operate forklift vehicles. Smoking allowed only in lunchroom. Seat belt use required of all drivers/passengers.
  • 25. Power Plant Power Plant Conventional Power Plant Conventional Power Plant Hydel Power Plant Non-Conventional Power Plant Non-Conventional Power Plant Thermal Power Plant Thermal Power Plant Steam Power Plant Combined Cycle Power Plant Gas Turbine Power Plant Diesel Power Plant Steam Power Plant Combined Cycle Power Plant Gas Turbine Power Plant Diesel Power Plant Hydel Power Plant Hydel Power Plant Low Head Power Plant Medium Head Power Plant High Head Power Plant Run of River Power Plant Low Head Power Plant Medium Head Power Plant High Head Power Plant Run of River Power Plant Nuclear Power Plant Solar Power Plant Tidal Power Plant Nuclear Power Plant Solar Power Plant Tidal Power Plant Geo Thermal Power Plant Wind Power Plant Bio-mass Power Plant Geo Thermal Power Plant Wind Power Plant Bio-mass Power Plant
  • 51. • GAS TURBINE PREPERATION / CHECKS BEFORE STARTING • 1- Auxilary power supply 6.6kv ON (internal/external)source for all equepment which are in servece before strating . • 2- DC power supplt for control and protection system ON (thrugh Rectifire) and batteries on stand by position • 3- No any PTW are in Panding • 4- Clearence from all maintanence sections • 5- Check all Mechanical,Instrumentations,and Electrical Equepments are ready for operation • 6- Cooling Water circuit are in operation • 7- Lube oil circuit are in operation and lube oil Temp >35c and turning Gear On • 7- Lube oil circuit are in operation and lube oil Temp >35c and turning Gear On • 8-Checke no any Leakage,Vibration,rubbing Noise and over Heating occures • 9- Filtter house ready for operation • 10-Anounciator pannel clear no any indication persists • 11- Fuel (Gas/ Oil) raedy for operation • 12-H2/Air cooling and sealing system ON • 13- Gas Turbine Ready For operatoin indication ON.
  • 52. GAS TURBINE STRARTING PROCEDURE OF GE WITH RELAYS AND SIEMENS WITH SPEED (STARTING PROCEDURE ALMOST SAME ) A- GT Ready for operation indication ON B-Operation mode selector put on Generator and indication must on Generator C-Master Control selector ON AUTO D-Synchronizing Selector put on AUTO/Manual E-Load selector put on BASE LOAD/PEAK LOAD F- Fuel slector put on GAS/OIL G-Give strart pulse to master control and starting sequence start 1- starting sequence progress On and ready to start Light OFF 2-14HR relay Light ON and Starting Divice Energize ( it meanse no Zero speed ) 3-14HM relay Light On (it meanse speed at 16%) - speadtronice signal -for( GCE) for gas and (LCE )for oil , values on for ignition -IGNITION SEQUENCE ON and Flame detector light ON -IGNITION SEQUENCE ON and Flame detector light ON GCE/LCE values decreased up to warm up value for warm up time before acceleration 4- GCE/LCE values increased for Acceleration speed 5-Accceleration control/speed control light ON 6- 14HA relay light ON (when speed at 50% -Feild braeker ON for feild flashing 7-14HC relay light ON (when speed at 70%) and Starting Divice Disengage s 8-14HS lrelay light ON -Auxilary Lube oil pump OFF and Axilary Hydrulic pump OFF 9-Starting Sequence Complet light ON 10-m/c Synchronized through AUTO/Manual -Spnning Reserve Load On (That is 5 to 8MW) 11- GT Laoding start according to gradient select (normal gradient 11MW/minute and fast gradie
  • 53. NOTE:- During Inital operation Master Control Switch put on Crank,Fire ,and Auto to check the Leakages, Rubbing Noise,Overheating.from Lubrication,Automizing air,fuel gas manifold ,fuel oil, flow devider,cumustion chamber /combustors,crossfire tube,Liner check all these things during start up sequence from diffrent comportments.
  • 58. Steam Turbine Steam turbine is a prime mover that drives its energy of rotation due to conversion of heat energy of steam into kinetic energy as it expands through a series of nozzles mounted on the casing or produced by the fixed blades. That machine converts heat energy into mechanical energy called steam turbine. Definition of a steam turbine? A steam turbine is a prime mover that derives its energy of rotation due to conversion of the heat energy of steam into kinetic energy as it due to conversion of the heat energy of steam into kinetic energy as it expands through a series of nozzles mounted on the casing or produced by the fixed blades. 1-Neilson defines it: The turbine is a machine in which a rotary motion is obtained by the gradual change of the momentum of the fluid. 2-Graham's definition: The turbine is a prime mover in which a rotary motion is obtained by the centrifugal force brought into action by changing the direction of a jet of a fluid (steam) escaping from the nozzle at high velocity.
  • 59. Ts diagram of a typical Rankine cycle operating between pressures of 0.06bar and 50bar There are four processes in the Rankine cycle. These states are identified by numbers (in brown) in the above Ts diagram.  Process 1-2: The working fluid is pumped from low to high pressure. As the fluid is a liquid at this stage the pump requires little input energy.  Process 2-3: The high pressure liquid enters a boiler where it is heated at constant pressure by an external heat source to become a dry saturated vapor. The input energy required can be easily calculated using mollier vapor. The input energy required can be easily calculated using mollier diagram or h-s chart or enthalpy-entropy chart also known as steam tables.  Process 3-4: The dry saturated vapor expands through a turbine, generating power. This decreases the temperature and pressure of the vapor, and some condensation may occur. The output in this process can be easily calculated using the Enthalpy-entropy chart or the steam tables.  Process 4-1: The wet vapor then enters a condenser where it is condensed at a constant temperature to become a saturated liquid.
  • 94. • Synchronization • When do different electrical systems are coupled together it is called synchronization or to connect the generator with system. • • There are three main aspects during synchronization • • Generator and system voltage should be same. • Generator and system frequency should be same. • Generator and system phase angle should be equal. • • Thus, if above three conditions are equal then generator should be synchronized with system • • Advantages of A.C Generator • Field winding on rotor • Less insulation • Weight of rotor less • Easy to retain centrifugal force • Size of rotor is smaller • High voltage on rotor • High voltage on rotor • Transmission of voltage is easy • Easy cooling system • • Generator protections • Generator differential protection • Generator over current protection • Stator earth fault protection • Rotor earth fault protection • Under excitation protection • Reverse power protection generator motoring • Negative phase sequence protection… system unbalance • Over / under frequency protection • Breaker pole failure protection • Synchronous check protection “When you system supply is dead and you are the 1st one in the system.. no need of synchronization” • Over excitation
  • 104. D.C Supply As we all know that AC supply can’t be stored. Thus the back systems in power houses are used built on DC supply system. It is a stand by source of electricity available at every movement in shape of storage batteries in order to protect our main system to damage. •Importance of DC supply All the control and protection system is based on DC supply. Usually the AC supply is converted to DC through rectifier. Further battery bank is also used which is charge through rectifier. This DC produced by battery bank is used in emergency when AC is not available. Moreover, during charging the chemical energy converts into electrical energy. •Different parts of DC supply •Rectifier •Battery charger •Battery cell 24VDC or 220VDC •Kinds of batteries There are so many kinds of batteries; however below mentioned are the one who have been chosen on their type of material and electrode. •Lead acid batteries •Nickel cadmium alkaline batteries •Nickel cadmium alkaline batteries Nickel iron alkaline batteries •Use of battery if power station •Control of electrical equipment •Open / close of breakers •Position indicators •Emergency lights •Field flashing •Control and protection system •Emergency pumps Note: The charge battery has 11% water and 89% sulphuric acid and when it discharged it become 15% sulphric acid and 15% water.
  • 105. •Thank You for Your Time and Attention !!!! If you Gets Some Points Please Remember Me in your Prayers
  • 106. KHALID AYAZ SOOMRO INSTRUCTOR OPERATION/ (INTERN ENGINEERS) TRAINING CENTER TPS, GUDDU REGARDS: