China–Pakistan Economic Corridor
[CPEC] will be a strategic game changer
in the region, which would go a long
way in making Pakistan a richer and
stronger entity than ever before.
Firstpost (India) April 22, 2015
The China–Pakistan Economic Corridor
(Chinese: 中国-巴基斯坦经济走廊; Urdu:
‫پاكستان‬-‫راہداری‬ ‫اقتصادی‬ ‫چین‬ ), often referred to
by the acronym CPEC, is a collection of
projects currently under construction at a
cost of $51 billion intended to rapidly
expand and upgrade Pakistani
infrastructure as well as deepen and
broaden economic links between Pakistan
and the People's Republic of China.
The corridor is considered to be an
extension of China's ambitious One Belt,
One Road initiative and the importance of
CPEC to China is reflected by its inclusion
as part of China's 13th five-year
development plan.
Pakistani officials predict that the project
will result in the creation of upwards of
700,000 direct jobs between 2015–2030,
and add 2 to 2.5 percentage points to the
country's annual economic growth.
Were all the planned projects to be
implemented, the value of those
projects would be equal to all foreign
direct investment in Pakistan since
1970, and would be equivalent to 17%
of Pakistan's 2015 gross domestic
product.
Infrastructure projects under the aegis of CPEC
will span the length and breadth of Pakistan,
and will eventually link the city of Gwadar in
southwestern Pakistan to China's northwestern
autonomous region of Xinjiang via a vast
network of highways and railways. Proposed
infrastructure projects are worth approximately
$11 billion, and will be financed by heavily-
subsidized concessionary loans that will be
dispersed to the Government of Pakistan by the
Exim Bank of China, China Development Bank,
and the Industrial and Commercial Bank of
As part of the broad package of infrastructure projects under
CPEC, a 1,100 kilometre long motorway will be constructed
between the cities of Karachi and Lahore, while the
Karakoram Highway between Rawalpindi and the Chinese
border will be completely reconstructed and overhauled.
The Karachi–Peshawar main railway line will also be upgraded
to allow for train travel at up to 160 kilometres per hour by
December 2019. Pakistan's railway network will also be
extended to eventually connect to China's Southern Xinjiang
Railway in Kashgar. A network of pipelines to transport
liquefied natural gas and oil will also be laid as part of the
project, including a $2.5 billion pipeline between Gwadar and
Nawabshah to eventually transport gas from Iran
Over $33 billion worth of energy infrastructure are to
be constructed by private consortia to help alleviate
Pakistan's chronic energy shortages, which regularly
amount to over 4,500MW, and have shed an
estimated 2-2.5% off Pakistan's annual gross domestic
product. Over 10,400MW of energy generating
capacity is to be developed between 2018 and 2020
as part of the corridor's fast-tracked "Early Harvest"
projects in conjunction with four projects under
construction prior to the announcement of
CPEC.Electricity from these projects will primarily be
generated by coal, though wind projects are included
under CPEC, as is the construction of one of the
world's largest solar energy plants.
Plans for a corridor stretching from the Chinese
border to Pakistan's deep water ports on the Arabian
Sea date back to the 1950s, and motivated
construction of the Karakoram Highway beginning in
1959.
Chinese interest in Pakistan's deep-water harbour at
Gwadar had been rekindled by 1998 and in 2002
China began construction at Gwadar port which was
completed in 2006. Expansion of Gwadar Port then
ceased thereafter owing to political instability in
Pakistan following the fall of General Pervez
Musharraf and subsequent conflict between the
Pakistani state and Islamist militants.
The current form of the project was
first proposed by General Pervez
Musharraf, however it was postponed
owing to the political instability in the
country that followed Musharraf's step
down. The subsequent government of
the Pakistan Peoples Party proposed it
again but it was formally launched
during the Pakistan Muslim League-N’s
current tenure.
In February 2014, Pakistani President Mamnoon
Hussain visited China to discuss the plans for an
economic corridor in Pakistan.
Two months later, Pakistan Prime Minister Nawaz
Sharif met with Premier Li Kequiang in China to
discuss further plans, resulting in the full scope of the
project to be devised under Sharif's tenure.
In November 2014, Chinese government announced
its intention to finance Chinese companies as part of
its $45.6 billion energy and infrastructure projects in
Pakistan as part of CPEC.
During the state visit of Xi Jinping to
Pakistan in April 2015, he wrote in an open
editorial stating: "This will be my first trip
to Pakistan, but I feel as if I am going to
visit the home of my own brother." On 20
April 2015, Pakistan and China signed an
agreement to commence work on the $46
billion agreement, which is roughly 20% of
Pakistan's annual GDP, with approximately
$28 billion worth of fast-tracked "Early
Harvest" projects to be developed by the
As a gesture of friendship, the Pakistani
capital at that time was dotted with
slogans and signboards such as
"Pakistan-China friendship is higher
than the mountains, deeper than the
oceans, sweeter than honey, and
stronger than steel" an often repeated
phrase coined by the Chinese to
describe their deep ties to Pakistan.
On 12 August 2015 in the city of Karamay,
China and Pakistan signed 20 more
agreements worth $1.6 billion to further
augment the scale and scope of CPEC.
Details of the plan are opaque, but are said
to mainly focus on increasing energy
generation capacity. As part of the
agreement, Pakistan and China have
agreed to co-operate in the field of space
research.
In September and October 2015, the
government of the United Kingdom
announced two separate grants to the
Government of Pakistan for
construction of roadways that are
complementary to CPEC.
In November 2015, China included the
CPEC into its 13th five-year
development plan, while in December
2015,
China and Pakistan agreed on a further
$1.5 billion investment to set up an
information and technology park as part of
the CPEC project. On 8 April 2016, during
the visit of Xinjiang's Communist Party
chief Zhang Chunxian companies from
Xinjiang with their Pakistan counterparts
signed $2 billion of additional agreements
covering infrastructure, solar power and
logistics.
Promises for Pakistan:
Gwadar Port complex
Initial infrastructure works at Gwadar Port
commenced in 2002 and were completed
in 2007, however plans to upgrade and
expand Gwadar's port stalled. Under CPEC
agreement, Gwadar Port will initially be
expanded and upgraded to allow for
docking of larger ships with deadweight
tonnage of up to 70,000.
Improvement plans also include
construction of a $130 million
breakwater around the port, as well as
the construction of a floating liquefied
natural gas facility that will have a
capacity of 500 million cubic feet of
liquified natural gas per day and will be
connected to the Gwadar-Nawabshah
segment of the Iran–Pakistan gas
pipeline
Projects in Gwadar city
China will grant Pakistan $230 million to
construct a new international airport in Gwadar
which is to be operational by December
2017.The provincial government of Balochistan
has set aside 4000 acres for the construction of
the new $230 million Gwadar International
Airport which will require an estimated 30
months for construction, the costs of which are
to be fully funded by grants from the Chinese
government which Pakistan will not be obliged
to repay.
The city of Gwadar is further being developed
by the construction of a 300MW coal power
plant, a desalinisation plant, and a new 300 bed
hospital.[53] Plans for Gwadar city also include
construction of the East Bay Expressway – a 19
kilometre controlled-access road that will
connect Gwadar Port to the Makran Coastal
Highway. These additional projects are
estimated to cost $800 million, and are to be
financed by 0% interest loans extended by the
Exim Bank of China to Pakistan.
In addition to the aforementioned
infrastructure works, the Pakistani
government announced in September
2015 its intention to establish a training
institute named Pak-China Technical and
Vocational Institute at Gwadar, which is to
be developed by the Gwadar Port
Authority.The institute is to be completed
by March 2016 at the cost of 943 million
rupees, and is designed to impart to local
residents the skills required to operate and
Roadway projects:
The CPEC project envisages major upgrades and
overhauls to Pakistan's transportation
infrastructure. Under the CPEC project, China
has announced financing for $10.63 billion
worth of transportation infrastructure so far;
$6.1 billion have been allocated for construction
"Early Harvest" roadway projects at an interest
rate of 1.6 percent. The remainder of funds will
be allocated when the Pakistani government
awards contracts for construction of road
segments which are still in the planning phase.
Three corridors have been identified for
cargo transport: the Eastern Alignment
though the heavily populated provinces of
Sindh and Punjab where most industries
are located, the Western Alignment
through the less developed and more
sparsely populated provinces of Khyber
Pakhtunkhwa and Balochistan, and the
future Central Alignment which will pass
through Khyber Pakhtunkhwa, Punjab, and
Balochistan.
Railway projects
The CPEC project emphasises major
upgrades to Pakistan's ageing railway
system, including rebuilding of the entire
Main Line 1 railway between Karachi and
Peshawar by 2020; this single railway
currently handles 70% of Pakistan Railways
traffic. In addition to the Main Line 1
railway, upgrades and expansions are
slated for the Main Line 2 railway, Main
Line 3 railway.
The CPEC plan also calls for completion
of a rail link over the 4,693-meter high
Khunjerab Pass. The railway will
provide direct access for Chinese and
East Asian goods to Pakistani seaports
at Karachi and Gwadar by 203
Procurement of an initial 250 new passenger
coaches, and reconstruction of 21 train stations
are also planned as part of the first phase of the
project – bringing the total investment in
Pakistan's railway system to approximately
$5 billion by the end of 2019, 180 of the
coaches are to be built at the Pakistan Railways
Carriage Factory near Islamabad, while the
Government of Pakistan intends to procure an
additional 800 coaches at a later date, with the
intention of building 595 of those coaches in
Pakistan
Energy sector projects
Pakistan's current energy generating
capacity is 24,830 MW, though the country
currently faces energy shortfalls of over
4,500MW on a regular basis with routine
power cuts of up to 5 hours per day, which
has shed an estimated 2–2.5% off its
annual GDP. Energy generation will be a
major focus of the CPEC project, with
approximately $33 billion expected to be
invested in this sector.
As part of the "Early Harvest" scheme of the
CPEC, an estimated 10,400 MW of electricity
are slated for generation by March 2018 as part
of CPEC's "Early Harvest" projects The energy
projects under CPEC will be constructed by
private Independent Power Producers, rather
than by the governments of either China or
Pakistan. The Exim Bank of China will finance
these private investments at 5–6% interest
rates, while the government of Pakistan will be
contractually obliged to purchase electricity
from those firms at pre-negotiated rates
Other areas of cooperation
Agriculture
The long-term plan for the period 2025-30 during the
CPEC summit held in Islamabad on August 30, 2016.
The plan includes cooperation over livelihood, water
resources, livestock, people-to-people
communications and financial matters.
Under the plan, agricultural information project,
storage and distribution of agricultural equipment
and construction project, agricultural mechanisation,
demonstration and machinery leasing project and
fertilizer production project for producing 800,000
tons of fertilizer and 100,000 tons of bio-organic
fertilizer will be implemented.
Science and technology cooperation
As part of CPEC, the two countries signed an
Economic and Technical Cooperation
Agreement, as well as pledged to "China-
Pakistan Joint Cotton Bio-Tech Laboratory" The
two countries also pledged to establish the
"China-Pakistan Joint Marine Research Center"
with State Oceanic Administration and
Pakistan's Ministry of Science and Technology
Also as part of the CPEC agreement, Pakistan
and China have agreed to co-operate in the field
of space research
In February 2016, the two countries agreed
to establish the "Pak-China Science,
Technology, Commerce and Logistic Park"
near Islamabad at an estimated cost of
$1.5 billion. The park will be situated on
500 hectares, which will be provided by
Pakistan to China's Xinjiang Production and
Construction Corps, with all investments
expected to come from the Chinese side
over the course of ten years.
In May 2016, construction began on
the $44 million 820 kilometer long
Pakistan-China Fiber Optic Project, an
optical fiber cable that will enhance
telecommunication in the Gilgit-
Baltistan region, while offering Pakistan
a fifth route by which to transmit
telecommunication traffic.
Government-to-government cooperation
The two nations also pledged co-operation
in field ranging from anti-narcotic efforts,
to co-operation in an effort to reduce
climate change. The two nations also
agreed to increase co-operating between
the banking sectors of the two countries,
as well as to establish closer ties between
China Central Television and the Pakistan
Television Corporation.
Project financing
Loans to the Pakistani Government:
Approximately $11 billion worth of
infrastructure projects being developed by the
Pakistani government will be financed by
concessionary loans, with composite interest
rates of 1.6%, after Pakistan successfully lobbied
the Chinese government to reduce interest
rates from an initial 3%. The loans are
subsidised by the government of China, and are
to be dispersed by the Exim Bank of China and
the China Development Bank.
For comparison, loans for previous
Pakistani infrastructure projects
financed by the World Bank carried an
interest rate between 5% and 8.5%,
while interest rates on market loans
approach 12%
Interest-free loans for Gwadar projects
The government of China in August 2015
announced that concessionary loans for several
projects in Gwadar totalling $757 million would
be converted 0% interest loans. The projects
which are now to financed by the 0% interest
loans include: the construction of the $140
million East Bay Expressway project, installation
of breakwaters in Gwadar which will cost
$130 million, a $360 million coal power plant in
Gwadar, a $27 million project to dredge berths
in Gwadar harbour, and a $100 million 300-bed
Pakistan will only repay the principle
on these loans.
In September 2015, the government of
China also announced that the
$230 million Gwadar International
Airport project would no longer be
financed by loans, but would instead
be constructed by grants which the
government of Pakistan will not be
required to repay.
Geostrategic impact:
A stimulus for economic growth in Pakistan:
CPEC is considered economically vital to
Pakistan in helping it drive economic growth.
The Pakistani media and government have
called CPEC investments a "game and fate
changer" for the region, while both China and
Pakistan intend that the massive investment
plan will transform Pakistan into a regional
economic hub and further boost the deepening
ties between the two countries.
Approximately 1 year after the
announcement of CPEC, Zhang Baozhong,
chairman of China Overseas Port Holding
Company told The Washington Post that
his company planned to spend an
additional $4.5 billion on roads, power,
hotels and other infrastructure for
Gwadar's industrial zone,[6] which would
be one of the largest ever sums of foreign
direct investment into Pakistan
1 de 39

Más contenido relacionado

La actualidad más candente(20)

 pak china relations slides pak china relations slides
pak china relations slides
Muhammad Abdur Rehman19.7K vistas
Pak Iran Relations Pak Iran Relations
Pak Iran Relations
IRFAN UR REHMAN2.2K vistas
Pakistan’s foreign policyPakistan’s foreign policy
Pakistan’s foreign policy
Mohummad Arsalan22.5K vistas
PAK CHINA ECONOMIC CORRIDOR PAK CHINA ECONOMIC CORRIDOR
PAK CHINA ECONOMIC CORRIDOR
Tanweer Sudhan80.7K vistas
Pak US relations ReportPak US relations Report
Pak US relations Report
Areej Fatima4.6K vistas
Relation of Pakistan and afghanistanRelation of Pakistan and afghanistan
Relation of Pakistan and afghanistan
Freelanced3.6K vistas
China Pakistan Economic CorridorChina Pakistan Economic Corridor
China Pakistan Economic Corridor
Malik Younis1K vistas
Cpec challenges and opportunitiesCpec challenges and opportunities
Cpec challenges and opportunities
Haider Sabir5.1K vistas
Cpec newCpec new
Cpec new
Ashish Kumar Gouda 11.6K vistas
CHINA-PAKISTAN ECONOMIC CORRIDORCHINA-PAKISTAN ECONOMIC CORRIDOR
CHINA-PAKISTAN ECONOMIC CORRIDOR
NIZAM UL HAK2.4K vistas
CpecCpec
Cpec
Abbas Najam4.2K vistas
Pak China RelationPak China Relation
Pak China Relation
shahroz alam14.4K vistas
Relations between pakistan and indiaRelations between pakistan and india
Relations between pakistan and india
Rida Syed21.7K vistas
Cpec( m.ehsan)Cpec( m.ehsan)
Cpec( m.ehsan)
Ahsan Rao4.4K vistas
Cpac presentationCpac presentation
Cpac presentation
Abid Aqeel2.1K vistas
Pak russia relationsPak russia relations
Pak russia relations
Muhammad Yaseen6.1K vistas
pak afghann relationpak afghann relation
pak afghann relation
fahadraza7865K vistas

Similar a CPEC, A game changer

CpecCpec
Cpecliberty00
224 vistas12 diapositivas
What is cpec (pak.st)What is cpec (pak.st)
What is cpec (pak.st)MuhammadUmar496
802 vistas9 diapositivas
CPEC   deloitte overviewCPEC   deloitte overview
CPEC deloitte overviewFarhan Munir
374 vistas5 diapositivas

Similar a CPEC, A game changer(20)

CpecCpec
Cpec
liberty00224 vistas
What is cpec (pak.st)What is cpec (pak.st)
What is cpec (pak.st)
MuhammadUmar496802 vistas
CPEC   deloitte overviewCPEC   deloitte overview
CPEC deloitte overview
Farhan Munir374 vistas
CpecCpec
Cpec
𝓕𝓮𝓻𝓸𝔃 𝓗𝓪𝓷𝓲𝓯1.5K vistas
China Pakistan Economic CorridorChina Pakistan Economic Corridor
China Pakistan Economic Corridor
Mubshir Hussain379 vistas
China-Pakistan economic CorridorChina-Pakistan economic Corridor
China-Pakistan economic Corridor
Saad Naseem338 vistas
Pak china economic corridorPak china economic corridor
Pak china economic corridor
shamroz kakar1K vistas
China pakistan economic corridor (CPEC)China pakistan economic corridor (CPEC)
China pakistan economic corridor (CPEC)
ShahzaibSohail8448 vistas
Pak china economic corridor (pcec)Pak china economic corridor (pcec)
Pak china economic corridor (pcec)
Umar Saeed12.2K vistas
Pakistan China Economic CorridorPakistan China Economic Corridor
Pakistan China Economic Corridor
Muhammad Saad Virk780 vistas
CPECCPEC
CPEC
Shahzaib Mahesar676 vistas
cpeccpec
cpec
awaisq2601 vistas
China pakistan economic corriddorChina pakistan economic corriddor
China pakistan economic corriddor
Siddhartha Singh167 vistas
CPEC - The Game ChangerCPEC - The Game Changer
CPEC - The Game Changer
Aamer Mumtaz989 vistas
project.pptxproject.pptx
project.pptx
AyeshaHassan918 vistas
Economic outcomes through cpecEconomic outcomes through cpec
Economic outcomes through cpec
Iqbal Naqvi63 vistas

Más de Kinza Irshad(20)

PROJECT MANAGEMENT PROJECT MANAGEMENT
PROJECT MANAGEMENT
Kinza Irshad126 vistas
Memorizing techniquessMemorizing techniquess
Memorizing techniquess
Kinza Irshad873 vistas
Lbm degradationLbm degradation
Lbm degradation
Kinza Irshad2.6K vistas
Hospital waste incineration Hospital waste incineration
Hospital waste incineration
Kinza Irshad156 vistas
Strategic Environmental Assessment Strategic Environmental Assessment
Strategic Environmental Assessment
Kinza Irshad793 vistas
Attractions and DistractionAttractions and Distraction
Attractions and Distraction
Kinza Irshad196 vistas
Halqa e asar final pptHalqa e asar final ppt
Halqa e asar final ppt
Kinza Irshad127 vistas
Leadership editedLeadership edited
Leadership edited
Kinza Irshad39 vistas
Leadership influenceLeadership influence
Leadership influence
Kinza Irshad46 vistas
Management Management
Management
Kinza Irshad24 vistas
Protein computational analysisProtein computational analysis
Protein computational analysis
Kinza Irshad1.2K vistas
Protein computational analysisProtein computational analysis
Protein computational analysis
Kinza Irshad679 vistas
R studio R studio
R studio
Kinza Irshad557 vistas
Beat plasticBeat plastic
Beat plastic
Kinza Irshad385 vistas

Último(20)

Economic Capsule - November 2023Economic Capsule - November 2023
Economic Capsule - November 2023
Commercial Bank of Ceylon PLC39 vistas
DDKT-SAET.pdfDDKT-SAET.pdf
DDKT-SAET.pdf
GRAPE27 vistas
Presentation.pdfPresentation.pdf
Presentation.pdf
GRAPE12 vistas
Lion One Presentation MIF November 2023Lion One Presentation MIF November 2023
Lion One Presentation MIF November 2023
Adnet Communications629 vistas
score 10000.pdfscore 10000.pdf
score 10000.pdf
sadimd0076 vistas
Lundin Gold Corporate Presentation Nov 2023.pdfLundin Gold Corporate Presentation Nov 2023.pdf
Lundin Gold Corporate Presentation Nov 2023.pdf
Adnet Communications192 vistas
DDKT-Munich.pdfDDKT-Munich.pdf
DDKT-Munich.pdf
GRAPE7 vistas
Stock Market Brief Deck 1121.pdfStock Market Brief Deck 1121.pdf
Stock Market Brief Deck 1121.pdf
Michael Silva68 vistas
Slides.pdfSlides.pdf
Slides.pdf
GRAPE12 vistas
Motivation TheoryMotivation Theory
Motivation Theory
lamluanvan.net Viết thuê luận văn6 vistas
DDKT-Praga.pdfDDKT-Praga.pdf
DDKT-Praga.pdf
GRAPE10 vistas

CPEC, A game changer

  • 2. [CPEC] will be a strategic game changer in the region, which would go a long way in making Pakistan a richer and stronger entity than ever before. Firstpost (India) April 22, 2015
  • 3. The China–Pakistan Economic Corridor (Chinese: 中国-巴基斯坦经济走廊; Urdu: ‫پاكستان‬-‫راہداری‬ ‫اقتصادی‬ ‫چین‬ ), often referred to by the acronym CPEC, is a collection of projects currently under construction at a cost of $51 billion intended to rapidly expand and upgrade Pakistani infrastructure as well as deepen and broaden economic links between Pakistan and the People's Republic of China.
  • 4. The corridor is considered to be an extension of China's ambitious One Belt, One Road initiative and the importance of CPEC to China is reflected by its inclusion as part of China's 13th five-year development plan. Pakistani officials predict that the project will result in the creation of upwards of 700,000 direct jobs between 2015–2030, and add 2 to 2.5 percentage points to the country's annual economic growth.
  • 5. Were all the planned projects to be implemented, the value of those projects would be equal to all foreign direct investment in Pakistan since 1970, and would be equivalent to 17% of Pakistan's 2015 gross domestic product.
  • 6. Infrastructure projects under the aegis of CPEC will span the length and breadth of Pakistan, and will eventually link the city of Gwadar in southwestern Pakistan to China's northwestern autonomous region of Xinjiang via a vast network of highways and railways. Proposed infrastructure projects are worth approximately $11 billion, and will be financed by heavily- subsidized concessionary loans that will be dispersed to the Government of Pakistan by the Exim Bank of China, China Development Bank, and the Industrial and Commercial Bank of
  • 7. As part of the broad package of infrastructure projects under CPEC, a 1,100 kilometre long motorway will be constructed between the cities of Karachi and Lahore, while the Karakoram Highway between Rawalpindi and the Chinese border will be completely reconstructed and overhauled. The Karachi–Peshawar main railway line will also be upgraded to allow for train travel at up to 160 kilometres per hour by December 2019. Pakistan's railway network will also be extended to eventually connect to China's Southern Xinjiang Railway in Kashgar. A network of pipelines to transport liquefied natural gas and oil will also be laid as part of the project, including a $2.5 billion pipeline between Gwadar and Nawabshah to eventually transport gas from Iran
  • 8. Over $33 billion worth of energy infrastructure are to be constructed by private consortia to help alleviate Pakistan's chronic energy shortages, which regularly amount to over 4,500MW, and have shed an estimated 2-2.5% off Pakistan's annual gross domestic product. Over 10,400MW of energy generating capacity is to be developed between 2018 and 2020 as part of the corridor's fast-tracked "Early Harvest" projects in conjunction with four projects under construction prior to the announcement of CPEC.Electricity from these projects will primarily be generated by coal, though wind projects are included under CPEC, as is the construction of one of the world's largest solar energy plants.
  • 9. Plans for a corridor stretching from the Chinese border to Pakistan's deep water ports on the Arabian Sea date back to the 1950s, and motivated construction of the Karakoram Highway beginning in 1959. Chinese interest in Pakistan's deep-water harbour at Gwadar had been rekindled by 1998 and in 2002 China began construction at Gwadar port which was completed in 2006. Expansion of Gwadar Port then ceased thereafter owing to political instability in Pakistan following the fall of General Pervez Musharraf and subsequent conflict between the Pakistani state and Islamist militants.
  • 10. The current form of the project was first proposed by General Pervez Musharraf, however it was postponed owing to the political instability in the country that followed Musharraf's step down. The subsequent government of the Pakistan Peoples Party proposed it again but it was formally launched during the Pakistan Muslim League-N’s current tenure.
  • 11. In February 2014, Pakistani President Mamnoon Hussain visited China to discuss the plans for an economic corridor in Pakistan. Two months later, Pakistan Prime Minister Nawaz Sharif met with Premier Li Kequiang in China to discuss further plans, resulting in the full scope of the project to be devised under Sharif's tenure. In November 2014, Chinese government announced its intention to finance Chinese companies as part of its $45.6 billion energy and infrastructure projects in Pakistan as part of CPEC.
  • 12. During the state visit of Xi Jinping to Pakistan in April 2015, he wrote in an open editorial stating: "This will be my first trip to Pakistan, but I feel as if I am going to visit the home of my own brother." On 20 April 2015, Pakistan and China signed an agreement to commence work on the $46 billion agreement, which is roughly 20% of Pakistan's annual GDP, with approximately $28 billion worth of fast-tracked "Early Harvest" projects to be developed by the
  • 13. As a gesture of friendship, the Pakistani capital at that time was dotted with slogans and signboards such as "Pakistan-China friendship is higher than the mountains, deeper than the oceans, sweeter than honey, and stronger than steel" an often repeated phrase coined by the Chinese to describe their deep ties to Pakistan.
  • 14. On 12 August 2015 in the city of Karamay, China and Pakistan signed 20 more agreements worth $1.6 billion to further augment the scale and scope of CPEC. Details of the plan are opaque, but are said to mainly focus on increasing energy generation capacity. As part of the agreement, Pakistan and China have agreed to co-operate in the field of space research.
  • 15. In September and October 2015, the government of the United Kingdom announced two separate grants to the Government of Pakistan for construction of roadways that are complementary to CPEC. In November 2015, China included the CPEC into its 13th five-year development plan, while in December 2015,
  • 16. China and Pakistan agreed on a further $1.5 billion investment to set up an information and technology park as part of the CPEC project. On 8 April 2016, during the visit of Xinjiang's Communist Party chief Zhang Chunxian companies from Xinjiang with their Pakistan counterparts signed $2 billion of additional agreements covering infrastructure, solar power and logistics.
  • 17. Promises for Pakistan: Gwadar Port complex Initial infrastructure works at Gwadar Port commenced in 2002 and were completed in 2007, however plans to upgrade and expand Gwadar's port stalled. Under CPEC agreement, Gwadar Port will initially be expanded and upgraded to allow for docking of larger ships with deadweight tonnage of up to 70,000.
  • 18. Improvement plans also include construction of a $130 million breakwater around the port, as well as the construction of a floating liquefied natural gas facility that will have a capacity of 500 million cubic feet of liquified natural gas per day and will be connected to the Gwadar-Nawabshah segment of the Iran–Pakistan gas pipeline
  • 19. Projects in Gwadar city China will grant Pakistan $230 million to construct a new international airport in Gwadar which is to be operational by December 2017.The provincial government of Balochistan has set aside 4000 acres for the construction of the new $230 million Gwadar International Airport which will require an estimated 30 months for construction, the costs of which are to be fully funded by grants from the Chinese government which Pakistan will not be obliged to repay.
  • 20. The city of Gwadar is further being developed by the construction of a 300MW coal power plant, a desalinisation plant, and a new 300 bed hospital.[53] Plans for Gwadar city also include construction of the East Bay Expressway – a 19 kilometre controlled-access road that will connect Gwadar Port to the Makran Coastal Highway. These additional projects are estimated to cost $800 million, and are to be financed by 0% interest loans extended by the Exim Bank of China to Pakistan.
  • 21. In addition to the aforementioned infrastructure works, the Pakistani government announced in September 2015 its intention to establish a training institute named Pak-China Technical and Vocational Institute at Gwadar, which is to be developed by the Gwadar Port Authority.The institute is to be completed by March 2016 at the cost of 943 million rupees, and is designed to impart to local residents the skills required to operate and
  • 22. Roadway projects: The CPEC project envisages major upgrades and overhauls to Pakistan's transportation infrastructure. Under the CPEC project, China has announced financing for $10.63 billion worth of transportation infrastructure so far; $6.1 billion have been allocated for construction "Early Harvest" roadway projects at an interest rate of 1.6 percent. The remainder of funds will be allocated when the Pakistani government awards contracts for construction of road segments which are still in the planning phase.
  • 23. Three corridors have been identified for cargo transport: the Eastern Alignment though the heavily populated provinces of Sindh and Punjab where most industries are located, the Western Alignment through the less developed and more sparsely populated provinces of Khyber Pakhtunkhwa and Balochistan, and the future Central Alignment which will pass through Khyber Pakhtunkhwa, Punjab, and Balochistan.
  • 24. Railway projects The CPEC project emphasises major upgrades to Pakistan's ageing railway system, including rebuilding of the entire Main Line 1 railway between Karachi and Peshawar by 2020; this single railway currently handles 70% of Pakistan Railways traffic. In addition to the Main Line 1 railway, upgrades and expansions are slated for the Main Line 2 railway, Main Line 3 railway.
  • 25. The CPEC plan also calls for completion of a rail link over the 4,693-meter high Khunjerab Pass. The railway will provide direct access for Chinese and East Asian goods to Pakistani seaports at Karachi and Gwadar by 203
  • 26. Procurement of an initial 250 new passenger coaches, and reconstruction of 21 train stations are also planned as part of the first phase of the project – bringing the total investment in Pakistan's railway system to approximately $5 billion by the end of 2019, 180 of the coaches are to be built at the Pakistan Railways Carriage Factory near Islamabad, while the Government of Pakistan intends to procure an additional 800 coaches at a later date, with the intention of building 595 of those coaches in Pakistan
  • 27. Energy sector projects Pakistan's current energy generating capacity is 24,830 MW, though the country currently faces energy shortfalls of over 4,500MW on a regular basis with routine power cuts of up to 5 hours per day, which has shed an estimated 2–2.5% off its annual GDP. Energy generation will be a major focus of the CPEC project, with approximately $33 billion expected to be invested in this sector.
  • 28. As part of the "Early Harvest" scheme of the CPEC, an estimated 10,400 MW of electricity are slated for generation by March 2018 as part of CPEC's "Early Harvest" projects The energy projects under CPEC will be constructed by private Independent Power Producers, rather than by the governments of either China or Pakistan. The Exim Bank of China will finance these private investments at 5–6% interest rates, while the government of Pakistan will be contractually obliged to purchase electricity from those firms at pre-negotiated rates
  • 29. Other areas of cooperation Agriculture The long-term plan for the period 2025-30 during the CPEC summit held in Islamabad on August 30, 2016. The plan includes cooperation over livelihood, water resources, livestock, people-to-people communications and financial matters. Under the plan, agricultural information project, storage and distribution of agricultural equipment and construction project, agricultural mechanisation, demonstration and machinery leasing project and fertilizer production project for producing 800,000 tons of fertilizer and 100,000 tons of bio-organic fertilizer will be implemented.
  • 30. Science and technology cooperation As part of CPEC, the two countries signed an Economic and Technical Cooperation Agreement, as well as pledged to "China- Pakistan Joint Cotton Bio-Tech Laboratory" The two countries also pledged to establish the "China-Pakistan Joint Marine Research Center" with State Oceanic Administration and Pakistan's Ministry of Science and Technology Also as part of the CPEC agreement, Pakistan and China have agreed to co-operate in the field of space research
  • 31. In February 2016, the two countries agreed to establish the "Pak-China Science, Technology, Commerce and Logistic Park" near Islamabad at an estimated cost of $1.5 billion. The park will be situated on 500 hectares, which will be provided by Pakistan to China's Xinjiang Production and Construction Corps, with all investments expected to come from the Chinese side over the course of ten years.
  • 32. In May 2016, construction began on the $44 million 820 kilometer long Pakistan-China Fiber Optic Project, an optical fiber cable that will enhance telecommunication in the Gilgit- Baltistan region, while offering Pakistan a fifth route by which to transmit telecommunication traffic.
  • 33. Government-to-government cooperation The two nations also pledged co-operation in field ranging from anti-narcotic efforts, to co-operation in an effort to reduce climate change. The two nations also agreed to increase co-operating between the banking sectors of the two countries, as well as to establish closer ties between China Central Television and the Pakistan Television Corporation.
  • 34. Project financing Loans to the Pakistani Government: Approximately $11 billion worth of infrastructure projects being developed by the Pakistani government will be financed by concessionary loans, with composite interest rates of 1.6%, after Pakistan successfully lobbied the Chinese government to reduce interest rates from an initial 3%. The loans are subsidised by the government of China, and are to be dispersed by the Exim Bank of China and the China Development Bank.
  • 35. For comparison, loans for previous Pakistani infrastructure projects financed by the World Bank carried an interest rate between 5% and 8.5%, while interest rates on market loans approach 12%
  • 36. Interest-free loans for Gwadar projects The government of China in August 2015 announced that concessionary loans for several projects in Gwadar totalling $757 million would be converted 0% interest loans. The projects which are now to financed by the 0% interest loans include: the construction of the $140 million East Bay Expressway project, installation of breakwaters in Gwadar which will cost $130 million, a $360 million coal power plant in Gwadar, a $27 million project to dredge berths in Gwadar harbour, and a $100 million 300-bed
  • 37. Pakistan will only repay the principle on these loans. In September 2015, the government of China also announced that the $230 million Gwadar International Airport project would no longer be financed by loans, but would instead be constructed by grants which the government of Pakistan will not be required to repay.
  • 38. Geostrategic impact: A stimulus for economic growth in Pakistan: CPEC is considered economically vital to Pakistan in helping it drive economic growth. The Pakistani media and government have called CPEC investments a "game and fate changer" for the region, while both China and Pakistan intend that the massive investment plan will transform Pakistan into a regional economic hub and further boost the deepening ties between the two countries.
  • 39. Approximately 1 year after the announcement of CPEC, Zhang Baozhong, chairman of China Overseas Port Holding Company told The Washington Post that his company planned to spend an additional $4.5 billion on roads, power, hotels and other infrastructure for Gwadar's industrial zone,[6] which would be one of the largest ever sums of foreign direct investment into Pakistan