SlideShare una empresa de Scribd logo
1 de 7
PROJECT HANDOVER REPORT TEMPLATE
GENERAL PROJECT INFORMATION
PROJECT NAME PROJECT MANAGER PROJECT SPONSOR
EMAIL PHONE ORGANIZATIONAL UNIT
GREEN BELTS ASSIGNED EXPECTED START DATE EXPECTED COMPLETION DATE
BLACK BELTS ASSIGNED EXPECTED SAVINGS ESTIMATED COSTS
PROJECT OVERVIEW
PROBLEM
OR ISSUE
PURPOSE
OF PROJECT
BUSINESS
CASE
GOALS /
METRICS
EXPECTED
DELIVERABLES
PROJECT SCOPE
WITHIN
SCOPE
OUTSIDE
OF SCOPE
TENTATIVE SCHEDULE
KEY MILESTONE START FINISH
Form Project Team / Preliminary Review / Scope
Finalize Project Plan / Charter / Kick Off
Define Phase
Measurement Phase
Analysis Phase
Improvement Phase
Control Phase
Project Summary Report and Close Out
3
RESOURCES
PROJECT
TEAM
SUPPORT
RESOURCES
SPECIAL
NEEDS
COSTS
COST TYPE VENDOR / LABOR NAMES RATE QTY AMOUNT
Labor
Labor
Labor
Labor
Labor
Supplies
Miscellaneous
TOTAL COSTS
BENEFITS AND CUSTOMERS
PROCESS
OWNER
KEY
STAKEHOLDERS
FINAL
CUSTOMER
EXPECTED
BENEFITS
TYPE OF BENEFIT BASIS OF ESTIMATE ESTIMATED BENEFIT AMOUNT
Specific Cost Savings
Enhanced Revenues
Higher Productivity (Soft)
Improved Compliance
Better Decision Making
Less Maintenance
Other Costs Avoided
TOTAL BENEFIT
RISKS, CONSTRAINTS, AND ASSUMPTIONS
RISKS
CONSTRAINTS
ASSUMPTIONS
PREPARED BY TITLE DATE
DISCLAIMER
Any articles, templates, or information provided by Smartsheet on the website are for reference only.
While we strive to keep the information up to date and correct, we make no representations or
warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability, or
availability with respect to the website or the information, articles, templates, or related graphics
contained on the website. Any reliance you place on such information is therefore strictly at your own
risk.

Más contenido relacionado

Similar a Project Handover Report

Essential Project Documents
Essential Project DocumentsEssential Project Documents
Essential Project DocumentsMike Pepelea
 
BABoK V2 Business Analysis Planning and Monitoring (BAPM)
BABoK V2 Business Analysis Planning and Monitoring (BAPM)BABoK V2 Business Analysis Planning and Monitoring (BAPM)
BABoK V2 Business Analysis Planning and Monitoring (BAPM)AMJAD SHAIKH
 
Linkedin Selling Services
Linkedin Selling ServicesLinkedin Selling Services
Linkedin Selling Servicesdewilkin
 
Project management
Project managementProject management
Project managementNitin KR
 
Top task presentation fuzzy protection
Top task presentation fuzzy protectionTop task presentation fuzzy protection
Top task presentation fuzzy protectionRute Xu
 
Project Management Toolkit - Presentation
Project Management Toolkit - PresentationProject Management Toolkit - Presentation
Project Management Toolkit - PresentationHassan Rizwan
 
Due Diligence Report Template
Due Diligence Report TemplateDue Diligence Report Template
Due Diligence Report TemplateWINGFUNOLIVERKONG
 
Job costing
Job costingJob costing
Job costingcdcsys
 
Moldova ICT Summit 2011 - Pentalog's presentation in Project Management section.
Moldova ICT Summit 2011 - Pentalog's presentation in Project Management section.Moldova ICT Summit 2011 - Pentalog's presentation in Project Management section.
Moldova ICT Summit 2011 - Pentalog's presentation in Project Management section.gserghei
 
Estimating & Control - Reliable Estimates for Realistic Projects - PMI NL cha...
Estimating & Control - Reliable Estimates for Realistic Projects - PMI NL cha...Estimating & Control - Reliable Estimates for Realistic Projects - PMI NL cha...
Estimating & Control - Reliable Estimates for Realistic Projects - PMI NL cha...Frank Vogelezang
 
Source Selection Practicum: What You Need to Know About Source Selection Stra...
Source Selection Practicum: What You Need to Know About Source Selection Stra...Source Selection Practicum: What You Need to Know About Source Selection Stra...
Source Selection Practicum: What You Need to Know About Source Selection Stra...Government Contract Pricing Summit
 
Pmp doc data_as per pmp - copy
Pmp doc data_as per pmp - copyPmp doc data_as per pmp - copy
Pmp doc data_as per pmp - copysandeep sonkusale
 
Project Management 101 Briefing
Project Management 101 BriefingProject Management 101 Briefing
Project Management 101 BriefingBen Blanquera
 
Training ppt for control plan
Training ppt for control plan   Training ppt for control plan
Training ppt for control plan Jitesh Gaurav
 
PM Notebook - Appendix E - Estimating Techniques
PM Notebook - Appendix E - Estimating TechniquesPM Notebook - Appendix E - Estimating Techniques
PM Notebook - Appendix E - Estimating TechniquesMohammad Elsheimy
 

Similar a Project Handover Report (20)

Detailed project report
Detailed project reportDetailed project report
Detailed project report
 
Roofs
RoofsRoofs
Roofs
 
Essential Project Documents
Essential Project DocumentsEssential Project Documents
Essential Project Documents
 
BABoK V2 Business Analysis Planning and Monitoring (BAPM)
BABoK V2 Business Analysis Planning and Monitoring (BAPM)BABoK V2 Business Analysis Planning and Monitoring (BAPM)
BABoK V2 Business Analysis Planning and Monitoring (BAPM)
 
Linkedin Selling Services
Linkedin Selling ServicesLinkedin Selling Services
Linkedin Selling Services
 
Project management
Project managementProject management
Project management
 
Top task presentation fuzzy protection
Top task presentation fuzzy protectionTop task presentation fuzzy protection
Top task presentation fuzzy protection
 
Project Management Toolkit - Presentation
Project Management Toolkit - PresentationProject Management Toolkit - Presentation
Project Management Toolkit - Presentation
 
Due Diligence Report Template
Due Diligence Report TemplateDue Diligence Report Template
Due Diligence Report Template
 
Job costing
Job costingJob costing
Job costing
 
PMP-Cost Management area
PMP-Cost Management areaPMP-Cost Management area
PMP-Cost Management area
 
Moldova ICT Summit 2011 - Pentalog's presentation in Project Management section.
Moldova ICT Summit 2011 - Pentalog's presentation in Project Management section.Moldova ICT Summit 2011 - Pentalog's presentation in Project Management section.
Moldova ICT Summit 2011 - Pentalog's presentation in Project Management section.
 
Estimating & Control - Reliable Estimates for Realistic Projects - PMI NL cha...
Estimating & Control - Reliable Estimates for Realistic Projects - PMI NL cha...Estimating & Control - Reliable Estimates for Realistic Projects - PMI NL cha...
Estimating & Control - Reliable Estimates for Realistic Projects - PMI NL cha...
 
Source Selection Practicum: What You Need to Know About Source Selection Stra...
Source Selection Practicum: What You Need to Know About Source Selection Stra...Source Selection Practicum: What You Need to Know About Source Selection Stra...
Source Selection Practicum: What You Need to Know About Source Selection Stra...
 
Proposal Management Process
Proposal  Management  ProcessProposal  Management  Process
Proposal Management Process
 
Pmp doc data_as per pmp - copy
Pmp doc data_as per pmp - copyPmp doc data_as per pmp - copy
Pmp doc data_as per pmp - copy
 
Project Management 101 Briefing
Project Management 101 BriefingProject Management 101 Briefing
Project Management 101 Briefing
 
Training ppt for control plan
Training ppt for control plan   Training ppt for control plan
Training ppt for control plan
 
Proposal Writing
Proposal WritingProposal Writing
Proposal Writing
 
PM Notebook - Appendix E - Estimating Techniques
PM Notebook - Appendix E - Estimating TechniquesPM Notebook - Appendix E - Estimating Techniques
PM Notebook - Appendix E - Estimating Techniques
 

Último

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptxNikhil Raut
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 

Último (20)

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 

Project Handover Report

  • 1. PROJECT HANDOVER REPORT TEMPLATE GENERAL PROJECT INFORMATION PROJECT NAME PROJECT MANAGER PROJECT SPONSOR EMAIL PHONE ORGANIZATIONAL UNIT GREEN BELTS ASSIGNED EXPECTED START DATE EXPECTED COMPLETION DATE BLACK BELTS ASSIGNED EXPECTED SAVINGS ESTIMATED COSTS PROJECT OVERVIEW PROBLEM OR ISSUE PURPOSE OF PROJECT BUSINESS CASE GOALS / METRICS EXPECTED DELIVERABLES
  • 2. PROJECT SCOPE WITHIN SCOPE OUTSIDE OF SCOPE TENTATIVE SCHEDULE KEY MILESTONE START FINISH Form Project Team / Preliminary Review / Scope Finalize Project Plan / Charter / Kick Off Define Phase Measurement Phase Analysis Phase Improvement Phase Control Phase Project Summary Report and Close Out
  • 3. 3
  • 4. RESOURCES PROJECT TEAM SUPPORT RESOURCES SPECIAL NEEDS COSTS COST TYPE VENDOR / LABOR NAMES RATE QTY AMOUNT Labor Labor Labor Labor Labor Supplies Miscellaneous TOTAL COSTS
  • 5. BENEFITS AND CUSTOMERS PROCESS OWNER KEY STAKEHOLDERS FINAL CUSTOMER EXPECTED BENEFITS TYPE OF BENEFIT BASIS OF ESTIMATE ESTIMATED BENEFIT AMOUNT Specific Cost Savings Enhanced Revenues Higher Productivity (Soft) Improved Compliance Better Decision Making Less Maintenance Other Costs Avoided TOTAL BENEFIT
  • 6. RISKS, CONSTRAINTS, AND ASSUMPTIONS RISKS CONSTRAINTS ASSUMPTIONS PREPARED BY TITLE DATE
  • 7. DISCLAIMER Any articles, templates, or information provided by Smartsheet on the website are for reference only. While we strive to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability, or availability with respect to the website or the information, articles, templates, or related graphics contained on the website. Any reliance you place on such information is therefore strictly at your own risk.