SlideShare una empresa de Scribd logo
1 de 30
Descargar para leer sin conexión
BIM ON PROJECT SITE
COFICO Copyright © 2017
PROJECT : ESTELLA HEIGHTS - PHASE 2
LOCATION : AN PHU WARD, DISTRICT 2, HO CHI MINH CITY, VIETNAM.
CLIENT : ESTELLA JOINT VENTURECO.,LTD
Presented by: Hung Lam – BIM Lead
April 2017
CONTENT
COFICO Copyright © 2017
2
1 P R O J E C T B R I E F
2 B I M I M P L E M E N T A T I O N O N S I T E
3 Q & A
April 2017
 PROJECT INFORMATION:
Project: ESTELLA HEIGHTS PHASE 2
Client: ESTELLA JOINT VENTURE CO. LTD.
Location: Ho Chi Minh City, District 2, An Phu Ward
Architectural Consultant: International Construction
& Investment Consultancy Company (ICIC)
Structural Consultant : International Construction
& Investment Consultancy Company (ICIC)
MEP Consultant : International Construction
& Investment Consultancy Company (ICIC)
1| PROJECT BRIEF
COFICO Copyright © 2017 April 2017
Confidential
Total Site Area: 10,643 m2
• Construction Area: 7,592 m2
• Green + Internal Road Area: 2,839 m2
• External Road Area: 212 m2
Nos. of Blocks: 02
Nos. of Basement: 02
Nos. of Storeys: 35
• Podium (Retail) – 06 storeys: 1/F to 6/F
• Tower (Residential) – 29 storeys: 7/F to 35/F
Construction Floor Area (CFA): 130,100 m2
Total GFA (excluding Roof): 91,391 m2
• Residential: 54,101 m2
• Retail: 37,290 m2
Total Population: 1,352
Total Number of Apartment Units: 376
Building Height: 140 m
BASEMENT FLOOR PLAN
TOWER 3 TOWER 4
PODIUM FLOOR PLAN
TYPICAL FLOOR PLAN
1| PROJECT BRIEF
COFICO Copyright © 2017 April 2017
1| PROJECT BRIEF
5
BASEMENT
7.25m
SUPERSTRUCTURE
128m
PODIUM
25.5m
LANDSCAPE DECK
COFICO Copyright © 2017 April 2017
| CONSTRUCTION SITE PLAN
6
Office Toolbox Meeting
Storage
Sub-con Rebar yard Formwork yard
Gate 2
Gate 3
Machine yard
COFICO Copyright © 2017 April 2017
| CONSTRUCTION SITE PLAN
7
Office
Storage
Sub-con
Rebar yard
Formwork yard
Gate 2
Gate 3
COFICO Copyright © 2017 April 2017
|CONSTRUCTION PROGRAMME
8
No Description Start Finish Duration
(Calendar days)
Timeline
TOTAL CONSTRUCTION TIME 20 Jul ‘16 20 Nov'18 854 d 28th month
1 Completion of Foundation of Tower 4 20 Jul ‘16 20 Nov ‘16 124 d 04th month
2 Completion of Foundation of Tower 3 20 Jul ‘16 17 Nov ‘16 121 d 04th month
3 Basement works Completion to L1/ F 20 Jul ‘16 28 Jul ‘17 374 d 12.5th month
4 Podium Frame Completion 13 Jul ’17 03 Dec ’17 144 d 16.5th month
5 Tower 4 Frame Completion 21 Feb’17 12 Mar‘18 385 d 20th month
6 Tower 3 Frame Completion 18 Feb’17 09 Mar ‘18 385 d 20th month
7 Mock-up floors proposed at either L8 or L9 at Tower 4 05 Sep '17 03 Jan '17 121 d 17.5th month
8 MEP works
COFICO Copyright © 2017 April 2017
|CONSTRUCTION PROGRAMME
9
No Description Start Finish Duration
(Calendar days)
Timeline
TOTAL CONSTRUCTION TIME 20 Jul ‘16 20 Nov'18 854 d 28th month
9 Power Turn On 30 Dec '17 13 Jan '18 14 d 18th month
10 Water supply Turn on 30 Dec '17 13 Jan '18 14 d 18th month
11 Fire Fighting Inspection Approvals 30 Jun '18 31 Jul '18 32 d 25th month
12 T & C works for Podium 04 Mar '18 04 May ‘18 60 d 22th month
13 T & C works for Tower 20 Jun '18 03 Aug '18 45 d 25th month
14 Authorities Inspections 22 Oct '18 20 Nov '18 30 d 28th month
15 Podium: Stage 1 Hand-over 20 Jun '18 23rd month
16 Podium: Stage 2 Hand-over 21 Oct '18 27th month
COFICO Copyright © 2017 April 2017
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
Modeling
Clash
Detection
Shop
Drawing
COFICO
Structure Architecture
Temporary
works
Construction
sequence
Sub-cons
(MEP)
MEP FPS LPG Generator
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
Clear objectives
Reduce time for shop drawing & combination
Detect and foresee construction problem
 early find solution
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
SITE TEAM Sub-consCONSULTANT
Modeling
Checking model
Make RFI / RFA
Control model
Create SDW
Modeling
Make RFI / RFA
Modify model
Create SDW
RFI / RFA
Approve SDW
3D data2D data
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
Early coordination
Site team
Sub-cons
Modeling /
Collaborating
Modeling
Coordinated
BIM
Modify
Check Model /
Export data
Share Data
Create SDW
Modify
Check SDW
& ApproveConsultant
2D & 3D data
• BIM Coordination meeting
• RFI / RFA
Time for SDW
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
Modeling
Site team
Sub-cons Sub-cons Sub-cons
COFICO BIM
CENTER
(HQ)
Central
Project
Data
Model by discipline
LOD definition
Sync schedule
Model management
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
Coordination
LPG sub-con
M&E sub-con
FPS sub-con
M&E sub-con C&S sub-con
Site manager
Navisworks Clash Report
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
Coordination
Pipe vs Rebar
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
Coordination
FPS Pipe vs Structure
M&E vs FPS
Finalize pipe / duct layout
Bottom level of pipe / duct
SDW : Penetration sleeve
on structural wall / beam ,
opening on slab
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
Coordination
FPS Pipe vs Structure
M&E vs Architecture Headroom requirement
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
Shop drawing
Beam & Slab level
Visualization the complex
structure
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
Shop drawing
EXPORT
 Concrete body plan & section
add rebar
add formwork & falsework
 3D data for complex
structure
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
Shop drawing
 Model & create SDW by Revit
 Dynamo code to enhance tagging
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
Shop drawing with Dynamo coding
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
Shop drawings Temp. works
 Model & create SDW by Revit
directly
 Parametric object family
 Extract data of item quantity
Sheetpile
Shoring &
Kingpost
Platform
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
Temporary works
 Analyze constructability
Retaining
wall
Sheetpile
Ground floor
slab
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
Temporary works
 Analyze constructability &
sequence
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
Construction sequence
 Revit phasing
 Combine with schedule
 Maximize the planning visualization
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
Make BIM data closer to site than ever…
 Autodesk A360
 3D model viewer
 3D object information
 Revit Sheet viewer
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
Make safety management on site better than ever…
 Autodesk BIM 360 Field
 Safety / Root cause management
 Site issue tracking
 QA/QC management
 Project documents library on iPad
2| BIM IMPLEMENTATION
COFICO Copyright © 2017 April 2017
Q & A
Thank you
COFICO
Building a better future

Más contenido relacionado

La actualidad más candente

DS-17-031 Discuss Impact Fees
DS-17-031 Discuss Impact FeesDS-17-031 Discuss Impact Fees
DS-17-031 Discuss Impact FeesCityofKilleen
 
Patent strategy course 9/10
Patent strategy course 9/10Patent strategy course 9/10
Patent strategy course 9/10Martin Schweiger
 
Learn The Right Way To Apply TCPI Formulas In Project Management
Learn The Right Way To Apply TCPI Formulas In Project ManagementLearn The Right Way To Apply TCPI Formulas In Project Management
Learn The Right Way To Apply TCPI Formulas In Project ManagementPraveen Malik, PMP
 
101 - A Beginner's Guide To Earned Value Management
101 - A Beginner's Guide To Earned Value Management 101 - A Beginner's Guide To Earned Value Management
101 - A Beginner's Guide To Earned Value Management Praveen Malik, PMP
 
4D bim construction scheduling on the 1885 St. James pl. project
4D bim construction scheduling on the 1885 St. James pl. project4D bim construction scheduling on the 1885 St. James pl. project
4D bim construction scheduling on the 1885 St. James pl. projectDat Lien
 
Calculating ETC In 4 Different Scenarios
Calculating ETC In 4 Different ScenariosCalculating ETC In 4 Different Scenarios
Calculating ETC In 4 Different ScenariosPraveen Malik, PMP
 
2nd Qatar BIM User Day Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day Scheduling, QTO and Estimating TechnologyBIM User Day
 
Calculating Estimate At Completion (EAC) Using 5 Different Formulas
Calculating Estimate At Completion (EAC) Using 5 Different FormulasCalculating Estimate At Completion (EAC) Using 5 Different Formulas
Calculating Estimate At Completion (EAC) Using 5 Different FormulasPraveen Malik, PMP
 
A Comprehensive Beginners Guide To Cost Planning
A Comprehensive Beginners Guide To Cost PlanningA Comprehensive Beginners Guide To Cost Planning
A Comprehensive Beginners Guide To Cost PlanningPraveen Malik, PMP
 
News from BRICKER - May 2015
News from BRICKER - May 2015News from BRICKER - May 2015
News from BRICKER - May 2015BRICKERProject
 

La actualidad más candente (11)

Gordon TAFE AcademicRecord
Gordon TAFE AcademicRecordGordon TAFE AcademicRecord
Gordon TAFE AcademicRecord
 
DS-17-031 Discuss Impact Fees
DS-17-031 Discuss Impact FeesDS-17-031 Discuss Impact Fees
DS-17-031 Discuss Impact Fees
 
Patent strategy course 9/10
Patent strategy course 9/10Patent strategy course 9/10
Patent strategy course 9/10
 
Learn The Right Way To Apply TCPI Formulas In Project Management
Learn The Right Way To Apply TCPI Formulas In Project ManagementLearn The Right Way To Apply TCPI Formulas In Project Management
Learn The Right Way To Apply TCPI Formulas In Project Management
 
101 - A Beginner's Guide To Earned Value Management
101 - A Beginner's Guide To Earned Value Management 101 - A Beginner's Guide To Earned Value Management
101 - A Beginner's Guide To Earned Value Management
 
4D bim construction scheduling on the 1885 St. James pl. project
4D bim construction scheduling on the 1885 St. James pl. project4D bim construction scheduling on the 1885 St. James pl. project
4D bim construction scheduling on the 1885 St. James pl. project
 
Calculating ETC In 4 Different Scenarios
Calculating ETC In 4 Different ScenariosCalculating ETC In 4 Different Scenarios
Calculating ETC In 4 Different Scenarios
 
2nd Qatar BIM User Day Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day Scheduling, QTO and Estimating Technology
 
Calculating Estimate At Completion (EAC) Using 5 Different Formulas
Calculating Estimate At Completion (EAC) Using 5 Different FormulasCalculating Estimate At Completion (EAC) Using 5 Different Formulas
Calculating Estimate At Completion (EAC) Using 5 Different Formulas
 
A Comprehensive Beginners Guide To Cost Planning
A Comprehensive Beginners Guide To Cost PlanningA Comprehensive Beginners Guide To Cost Planning
A Comprehensive Beginners Guide To Cost Planning
 
News from BRICKER - May 2015
News from BRICKER - May 2015News from BRICKER - May 2015
News from BRICKER - May 2015
 

Similar a BIM ON PROJECT SITE: COORDINATION, SHOP DRAWINGS AND CONSTRUCTION SEQUENCE

Structural BIM workflows - design-to-fabrication for steel and rebar
Structural BIM workflows - design-to-fabrication for steel and rebarStructural BIM workflows - design-to-fabrication for steel and rebar
Structural BIM workflows - design-to-fabrication for steel and rebarCarl Spalding FISM
 
BULE HORA UNIVERSITY ppdf.pptx
BULE HORA UNIVERSITY ppdf.pptxBULE HORA UNIVERSITY ppdf.pptx
BULE HORA UNIVERSITY ppdf.pptxBossGold
 
OMG BL3 WTF - BIM Show Live 2017 presentation
OMG BL3 WTF - BIM Show Live 2017 presentationOMG BL3 WTF - BIM Show Live 2017 presentation
OMG BL3 WTF - BIM Show Live 2017 presentationLee Mullin
 
CV 2020 - LAM VU NGO HUNG - BIM|VDC Specialist
CV 2020 - LAM VU NGO HUNG - BIM|VDC SpecialistCV 2020 - LAM VU NGO HUNG - BIM|VDC Specialist
CV 2020 - LAM VU NGO HUNG - BIM|VDC SpecialistHung Lam Vu Ngo
 
BIM Project Execution Plans and Open BIM via IFC2x3
BIM Project Execution Plans and Open BIM via IFC2x3BIM Project Execution Plans and Open BIM via IFC2x3
BIM Project Execution Plans and Open BIM via IFC2x3Alfredo Carrato
 
IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...
IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...
IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...IRJET Journal
 
Analysis and Design of a Commercial Building
Analysis and Design of a Commercial BuildingAnalysis and Design of a Commercial Building
Analysis and Design of a Commercial BuildingIRJET Journal
 
Jr. Civil Engineer Portfolio
Jr. Civil Engineer PortfolioJr. Civil Engineer Portfolio
Jr. Civil Engineer PortfolioMahmoud Abubkr
 
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptTemplate-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptJessDazaOsorio
 
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptTemplate-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptssuser3f4412
 
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptTemplate-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptJessDazaOsorio
 
04d_Process_Map_Templates-V2.0_(PowerPiont).ppt
04d_Process_Map_Templates-V2.0_(PowerPiont).ppt04d_Process_Map_Templates-V2.0_(PowerPiont).ppt
04d_Process_Map_Templates-V2.0_(PowerPiont).pptgmundacat
 
IMPRESS BIM Methodology (iBIMm) and Façade Retrofit Methodology using Cloud B...
IMPRESS BIM Methodology (iBIMm) and Façade Retrofit Methodology using Cloud B...IMPRESS BIM Methodology (iBIMm) and Façade Retrofit Methodology using Cloud B...
IMPRESS BIM Methodology (iBIMm) and Façade Retrofit Methodology using Cloud B...IES VE
 
Forge - DevCon 2017, Darmstadt Germany - Introduction and Roadmap
Forge - DevCon 2017, Darmstadt Germany - Introduction and RoadmapForge - DevCon 2017, Darmstadt Germany - Introduction and Roadmap
Forge - DevCon 2017, Darmstadt Germany - Introduction and RoadmapAutodesk
 

Similar a BIM ON PROJECT SITE: COORDINATION, SHOP DRAWINGS AND CONSTRUCTION SEQUENCE (20)

A Holistic BIM Framework for Structural Engineering Practices in Hong Kong - ...
A Holistic BIM Framework for Structural Engineering Practices in Hong Kong - ...A Holistic BIM Framework for Structural Engineering Practices in Hong Kong - ...
A Holistic BIM Framework for Structural Engineering Practices in Hong Kong - ...
 
Structural BIM workflows - design-to-fabrication for steel and rebar
Structural BIM workflows - design-to-fabrication for steel and rebarStructural BIM workflows - design-to-fabrication for steel and rebar
Structural BIM workflows - design-to-fabrication for steel and rebar
 
August 31 - 1139 - Jacob Rischmiller
August 31 - 1139 - Jacob RischmillerAugust 31 - 1139 - Jacob Rischmiller
August 31 - 1139 - Jacob Rischmiller
 
BULE HORA UNIVERSITY ppdf.pptx
BULE HORA UNIVERSITY ppdf.pptxBULE HORA UNIVERSITY ppdf.pptx
BULE HORA UNIVERSITY ppdf.pptx
 
BIM Execution plan
BIM  Execution  planBIM  Execution  plan
BIM Execution plan
 
OMG BL3 WTF - BIM Show Live 2017 presentation
OMG BL3 WTF - BIM Show Live 2017 presentationOMG BL3 WTF - BIM Show Live 2017 presentation
OMG BL3 WTF - BIM Show Live 2017 presentation
 
CV 2020 - LAM VU NGO HUNG - BIM|VDC Specialist
CV 2020 - LAM VU NGO HUNG - BIM|VDC SpecialistCV 2020 - LAM VU NGO HUNG - BIM|VDC Specialist
CV 2020 - LAM VU NGO HUNG - BIM|VDC Specialist
 
BIM Project Execution Plans and Open BIM via IFC2x3
BIM Project Execution Plans and Open BIM via IFC2x3BIM Project Execution Plans and Open BIM via IFC2x3
BIM Project Execution Plans and Open BIM via IFC2x3
 
PLSH PPT
PLSH PPTPLSH PPT
PLSH PPT
 
IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...
IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...
IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...
 
Essential-Guide-Archi.pdf
Essential-Guide-Archi.pdfEssential-Guide-Archi.pdf
Essential-Guide-Archi.pdf
 
Analysis and Design of a Commercial Building
Analysis and Design of a Commercial BuildingAnalysis and Design of a Commercial Building
Analysis and Design of a Commercial Building
 
Jr. Civil Engineer Portfolio
Jr. Civil Engineer PortfolioJr. Civil Engineer Portfolio
Jr. Civil Engineer Portfolio
 
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptTemplate-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
 
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptTemplate-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
 
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptTemplate-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
 
04d_Process_Map_Templates-V2.0_(PowerPiont).ppt
04d_Process_Map_Templates-V2.0_(PowerPiont).ppt04d_Process_Map_Templates-V2.0_(PowerPiont).ppt
04d_Process_Map_Templates-V2.0_(PowerPiont).ppt
 
IMPRESS BIM Methodology (iBIMm) and Façade Retrofit Methodology using Cloud B...
IMPRESS BIM Methodology (iBIMm) and Façade Retrofit Methodology using Cloud B...IMPRESS BIM Methodology (iBIMm) and Façade Retrofit Methodology using Cloud B...
IMPRESS BIM Methodology (iBIMm) and Façade Retrofit Methodology using Cloud B...
 
Forge - DevCon 2017, Darmstadt Germany - Introduction and Roadmap
Forge - DevCon 2017, Darmstadt Germany - Introduction and RoadmapForge - DevCon 2017, Darmstadt Germany - Introduction and Roadmap
Forge - DevCon 2017, Darmstadt Germany - Introduction and Roadmap
 
BIM Workflows: from Products to Practice - Mr. Peter KONCZ Business Developm...
BIM Workflows: from Products to  Practice - Mr. Peter KONCZ Business Developm...BIM Workflows: from Products to  Practice - Mr. Peter KONCZ Business Developm...
BIM Workflows: from Products to Practice - Mr. Peter KONCZ Business Developm...
 

Último

Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringJuanCarlosMorales19600
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 

Último (20)

Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineering
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 

BIM ON PROJECT SITE: COORDINATION, SHOP DRAWINGS AND CONSTRUCTION SEQUENCE

  • 1. BIM ON PROJECT SITE COFICO Copyright © 2017 PROJECT : ESTELLA HEIGHTS - PHASE 2 LOCATION : AN PHU WARD, DISTRICT 2, HO CHI MINH CITY, VIETNAM. CLIENT : ESTELLA JOINT VENTURECO.,LTD Presented by: Hung Lam – BIM Lead April 2017
  • 2. CONTENT COFICO Copyright © 2017 2 1 P R O J E C T B R I E F 2 B I M I M P L E M E N T A T I O N O N S I T E 3 Q & A April 2017
  • 3.  PROJECT INFORMATION: Project: ESTELLA HEIGHTS PHASE 2 Client: ESTELLA JOINT VENTURE CO. LTD. Location: Ho Chi Minh City, District 2, An Phu Ward Architectural Consultant: International Construction & Investment Consultancy Company (ICIC) Structural Consultant : International Construction & Investment Consultancy Company (ICIC) MEP Consultant : International Construction & Investment Consultancy Company (ICIC) 1| PROJECT BRIEF COFICO Copyright © 2017 April 2017
  • 4. Confidential Total Site Area: 10,643 m2 • Construction Area: 7,592 m2 • Green + Internal Road Area: 2,839 m2 • External Road Area: 212 m2 Nos. of Blocks: 02 Nos. of Basement: 02 Nos. of Storeys: 35 • Podium (Retail) – 06 storeys: 1/F to 6/F • Tower (Residential) – 29 storeys: 7/F to 35/F Construction Floor Area (CFA): 130,100 m2 Total GFA (excluding Roof): 91,391 m2 • Residential: 54,101 m2 • Retail: 37,290 m2 Total Population: 1,352 Total Number of Apartment Units: 376 Building Height: 140 m BASEMENT FLOOR PLAN TOWER 3 TOWER 4 PODIUM FLOOR PLAN TYPICAL FLOOR PLAN 1| PROJECT BRIEF COFICO Copyright © 2017 April 2017
  • 6. | CONSTRUCTION SITE PLAN 6 Office Toolbox Meeting Storage Sub-con Rebar yard Formwork yard Gate 2 Gate 3 Machine yard COFICO Copyright © 2017 April 2017
  • 7. | CONSTRUCTION SITE PLAN 7 Office Storage Sub-con Rebar yard Formwork yard Gate 2 Gate 3 COFICO Copyright © 2017 April 2017
  • 8. |CONSTRUCTION PROGRAMME 8 No Description Start Finish Duration (Calendar days) Timeline TOTAL CONSTRUCTION TIME 20 Jul ‘16 20 Nov'18 854 d 28th month 1 Completion of Foundation of Tower 4 20 Jul ‘16 20 Nov ‘16 124 d 04th month 2 Completion of Foundation of Tower 3 20 Jul ‘16 17 Nov ‘16 121 d 04th month 3 Basement works Completion to L1/ F 20 Jul ‘16 28 Jul ‘17 374 d 12.5th month 4 Podium Frame Completion 13 Jul ’17 03 Dec ’17 144 d 16.5th month 5 Tower 4 Frame Completion 21 Feb’17 12 Mar‘18 385 d 20th month 6 Tower 3 Frame Completion 18 Feb’17 09 Mar ‘18 385 d 20th month 7 Mock-up floors proposed at either L8 or L9 at Tower 4 05 Sep '17 03 Jan '17 121 d 17.5th month 8 MEP works COFICO Copyright © 2017 April 2017
  • 9. |CONSTRUCTION PROGRAMME 9 No Description Start Finish Duration (Calendar days) Timeline TOTAL CONSTRUCTION TIME 20 Jul ‘16 20 Nov'18 854 d 28th month 9 Power Turn On 30 Dec '17 13 Jan '18 14 d 18th month 10 Water supply Turn on 30 Dec '17 13 Jan '18 14 d 18th month 11 Fire Fighting Inspection Approvals 30 Jun '18 31 Jul '18 32 d 25th month 12 T & C works for Podium 04 Mar '18 04 May ‘18 60 d 22th month 13 T & C works for Tower 20 Jun '18 03 Aug '18 45 d 25th month 14 Authorities Inspections 22 Oct '18 20 Nov '18 30 d 28th month 15 Podium: Stage 1 Hand-over 20 Jun '18 23rd month 16 Podium: Stage 2 Hand-over 21 Oct '18 27th month COFICO Copyright © 2017 April 2017
  • 10. 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 Modeling Clash Detection Shop Drawing COFICO Structure Architecture Temporary works Construction sequence Sub-cons (MEP) MEP FPS LPG Generator
  • 11. 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 Clear objectives Reduce time for shop drawing & combination Detect and foresee construction problem  early find solution
  • 12. 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 SITE TEAM Sub-consCONSULTANT Modeling Checking model Make RFI / RFA Control model Create SDW Modeling Make RFI / RFA Modify model Create SDW RFI / RFA Approve SDW 3D data2D data
  • 13. 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 Early coordination Site team Sub-cons Modeling / Collaborating Modeling Coordinated BIM Modify Check Model / Export data Share Data Create SDW Modify Check SDW & ApproveConsultant 2D & 3D data • BIM Coordination meeting • RFI / RFA Time for SDW
  • 14. 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 Modeling Site team Sub-cons Sub-cons Sub-cons COFICO BIM CENTER (HQ) Central Project Data Model by discipline LOD definition Sync schedule Model management
  • 15. 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 Coordination LPG sub-con M&E sub-con FPS sub-con M&E sub-con C&S sub-con Site manager Navisworks Clash Report
  • 16. 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 Coordination Pipe vs Rebar
  • 17. 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 Coordination FPS Pipe vs Structure M&E vs FPS Finalize pipe / duct layout Bottom level of pipe / duct SDW : Penetration sleeve on structural wall / beam , opening on slab
  • 18. 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 Coordination FPS Pipe vs Structure M&E vs Architecture Headroom requirement
  • 19. 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 Shop drawing Beam & Slab level Visualization the complex structure
  • 20. 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 Shop drawing EXPORT  Concrete body plan & section add rebar add formwork & falsework  3D data for complex structure
  • 21. 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 Shop drawing  Model & create SDW by Revit  Dynamo code to enhance tagging
  • 22. 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 Shop drawing with Dynamo coding
  • 23. 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 Shop drawings Temp. works  Model & create SDW by Revit directly  Parametric object family  Extract data of item quantity
  • 24. Sheetpile Shoring & Kingpost Platform 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 Temporary works  Analyze constructability Retaining wall Sheetpile Ground floor slab
  • 25. 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 Temporary works  Analyze constructability & sequence
  • 26. 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 Construction sequence  Revit phasing  Combine with schedule  Maximize the planning visualization
  • 27. 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 Make BIM data closer to site than ever…  Autodesk A360  3D model viewer  3D object information  Revit Sheet viewer
  • 28. 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 Make safety management on site better than ever…  Autodesk BIM 360 Field  Safety / Root cause management  Site issue tracking  QA/QC management  Project documents library on iPad
  • 29. 2| BIM IMPLEMENTATION COFICO Copyright © 2017 April 2017 Q & A