This is a story of Lean Manufacturing Plant Manager Shari, seeking
plant value stream level continuous improvement. Shari intends to
improve plant level visibility on SLAs, batch sizes (volumes) and
WIP. Here are some pictures from this Lean Manufacturing plant.
3
Plant Manager Shari is trained
by Lean Enterprise Institute.
She has read Taiichi Ohno’s
“TPS”, Eli Goldratt’s “Goal”,
Gene Kim’s “Phoenix Project”!
You can say that Shari is big
on Lean, in just 10 pictures!
4
Shari implemented Lean manufacturing at this
Plant she manages, influencing other 5 plants.
She implemented Lean, starting with Lean House
for tracking continuous improvement!
5
Shari
implemented
accountability
board to drive
continuous
improvement
at her plant.
6
Shari implemented
manufacturing kanban in all
“cells” to visualize work
related to continuous
improvement.
7
Here Shari shows an
example of kanban
card that is attached
to a product across
workstations in a cell.
She says plant has JIT
(Just-In-Time)
inventory almost, with
at most 2 days of raw
materials!
8
Shari implemented
visual controls to
visualize front-end
work for products.
9
Shari
implemented
Lean tool 5S to
complement
other Lean tools
used in all plant
cells.
10
Shari implemented
“Wall of Appreciation”
in cells. Jurgen Apello
talks about it in
Management 3.0!
11
This is the
latest cell
Shari proudly
shows during
a plant tour.
She intends
to improve
visibility of
plant level
value stream
specific to
monitoring
SLAs, batch
sizes and WIP.
We saw some pictures from this Lean Manufacturing plant.
We will see how DevOps can be implemented to seek plant level
continuous improvements with Lean and Agile.
Upstream Kanban:
Downstream Kanban:
13
• Begin with the end in mind: create “Stop Starting, Start Finishing“ Kanban mindset
• Visualize flow between Portfolio (“Upstream”) with Release Engineering (“Downstream”)
• Visualize bottlenecks to flow at both upstream and downstream levels!
• Use Portfolio Kanban board across Org Design (Team of Teams)
• Use a simple Kanban board with a “Plan->Build->Run” or similar workflow
Run
F
E
I
Idea Deploy to Prod
G
D
GY
PB
MN
2
∞
AB
Biz Design
Plan Build (Dev & QA)
Architecture,
resource plan
Core team OMS …
3 3
DE
Explicit policy:
Feature is “done”
only when last
team working on
it has completed
“Deploy to Prod” Lead time ends at
1st infinite queue!
There could be
additional queues
with no WIP limit.
Lead time “clock”
starts at 1st queue
i.e. WIP limited
input queue!
3 3
Deployed
(Note touch time)
NPD
(New Prod
Dev) (60%)
Defect&
Tech Debt
(30%)
Innovation
(10%)
5
2
1
Expedite 1
3
Fixed
Date
Standard
Intangible
2
2
3
WIP Limits
based on
classes of service
(Release Engineering)
WIP Limits
based on
work types
(feature teams)
Upstream (Portfolio) and Downstream (Release Engineering) Kanban Systems
“As-Is” Value Stream Map – Illustrating Kaizen Lightening Bursts
Customer
Plan (Idea / Discovery) Build (Delivery) Run (Operations)
Business
Case
PlanningPrioritization
- Ideation
- Biz & Tech
Assessment
- Go/No-go/Defer
- Capacity
Planning
- Project
Planning
- Prioritization
- Project Selection
- RFE Approval
Design
(Arch)
Build
(Dev)
Test
(QA)
- Technical
Design
- WBS
- Integrate
- Test Planning
- Ops Planning
- Get Approval
- Deploy to QA
- Configure Tests
- Manual Testing
- User Acceptance
Production
Go-Live
Business-As-Usual
Change Mgmt
(ITIL)
Environment
Provisioning- Ops Planning
- Config&Deploy
- Wait for DBA
- Get Approval
Prod Support &
Monitoring
Ops Mgmt
(DB, Network)
3 to 5 m 4 to 6 m
2 to 3 m Sustenance mode
Business
Portfolio:
Governance &
Oversight
Environments & Tools
Time
Ladder
(approx.)
Lead Time ?
Value Add Time ?
Non-VA Time ?
Electronic Information Flow
Offshoring
Teams
0.5 m 1 m
1 m 1 m
1-3 m
0.5 m 2 m 0.5 m
0.5 m 0.5 m
1-2 m
1-2 m
1-2 m
1 m
WIP (Inventory)PUSH- scheduled before neededExternal source
LEGEND
Eliminate Waste
Time Analysis
Non-Value Add vs. Total
45%
Value Add vs. Total
55%
Value Add vs. Non-VA
?
Sustenance
14
“To-Be” Value Stream Map – Seek “Build” Process Improvements
Customer
Plan(A “Release”) Build(Deployables) Run (Operations)
TDAD
Multi-
Sprint Plan
Backlog Prep
<Story Map>
- Technical Design - Multi-team
- At cadence
- Ops work
- 1 story map
- per team
- per epic
Design
(Artifacts)
Sprint Plan +
Sprint Retro
Iterate
(Dev & QA)
- MVD (wiki)
- Test Plans
- UX artifact
- 2 mtgs, 4hr each
- Ops work included
- Build w/ Unit Tests
- Execute test cases
- Expedite bug-fixes
- Dev & Test NFRs
Demo
Business-As-Usual
Change Mgmt
(ITIL)
Environment
Provisioning- Env on demand
- PO Acceptance
- Production bugs
- Proactive DBAs
Prod Support &
Monitoring
Ops Mgmt
(DB, Network)
3m 3m (4 sprints) 1m Sustenance mode
Business
Portfolio:
Governance &
Oversight
Environments & Tools
Time
Ladder
(approx.)
Lead Time ~4m
Value Add Time ~2m
Non-VA Time ~2m
Time Analysis
Non-Value Add vs. Total
50%
Value Add vs. Total
50%
Value Add vs. Non-VA
1
Electronic Information Flow
Offshoring
Teams
2m 1w
1w .5 w
NVA:1d
1m
0.5 w 1w.5 w 2w
NVA:1d
1w
WIP (Inventory)PUSH- scheduled before neededExternal source
LEGEND
Eliminate Waste
1w
3m (4 sprints)
Sustenance
15
16
Begin with end in mind:
visualize work on a
“Plan->Build->Run”
value stream of
Enterprise Kanban
Enterprise Kanban System with "Plan->Build->Run" value stream
17
In the beginning:
A workflow automation solution requires starting
with an end-to-end process simulation.
Shari started solutioning by organizing use-case
scenarios for process simulation of plant level
process improvements.
Process Simulation for Planning a workflow automation initiative
round1: Discussion
about sharing your
experiences on
implementing
Process Simulation
18
Shari participated in solutioning by
role playing as Plant Manager during
User Story Mapping for plant
simulations about improving Lean
Manufacturing value stream with
visibility on SLAs, batch sizes and WIP.
Note how her persona shows up on a
slide in this picture showing this user
story map as well
Story Map: Driver for Lean Portfolio Management
round2: Discussion
about sharing your
experiences on
implementing Story
Mapping
19
Like Lean manufacturing plant, for continuous improvements, IT
uses Kaizen events e.g. open spaces in corporate setting:
Using Open Spaces to build communities of practice for “Kaizen”
20
Like Lean manufacturing plant, for continuous improvements, IT
uses TQM’s PDCA loop on a Kanban board like this:
Example of
continuous
improvement
about
introducing
DevOps via
feature toggle
Example of Continuous Improvement Kanban Board with PDCA-loop
round3: Discussion
about sharing your
experiences on
implementing Kaizen
for continuous
21
In summary: Workflow Automation Solutioning is an
end-to-end process, starting with process simulation,
to visualize epics on Enterprise Kanban, to big room
planning, to implementing user stories based on DoD,
to visualizing deployable artifacts on DevOps Kanban!
Summary of visualizations used in Plan-Build-Run Value Stream
During planning, create org alignment to improve flow (1st way of DevOps), using Portfolio Kanban system.
22
Role of Manager: Leading from the front, Applying 3 ways of DevOps
Enable managers in shaping various communities of practice: create culture of continual experimentation & learning (3rd way of DevOps).
• Begin with succinctly defined portfolio hierarchy or swim lanes that consist
of strategic (CAPEX) and tactical (OPEX) investments:
• Themes
• Initiatives
• Features
• Create single-piece flow of portfolio items with Portfolio Kanban board.
Apply lean metrics for continuous improvement.
• Apply first way of DevOps: emphasize on performance of entire system by
analyzing value streams, WIP, lead times & due date performance.
During execution, enable continuous feedback loops (2nd
way of DevOps) with obstacle boards to act on
impediments & dysfunctions.
• This requires low-fidelity obstacle escalation process.
This can be a 2-level (team->management) process, or
a 3-level (team->program>portfolio) process.
• Example of obstacle board and related workflow:
FYI: Swift-Kanban & Atlassian Tool Chains Integrated for DevOps with SAFe
Development Tools
Atlassian BitBucket (GIT)
Developer writes code and
check-in
Associate JIRA Issue Types
(Tasks / Bugs)
Build gets triggered
 Microsoft Visual Studio (For .NET)
 Eclipse (For JAVA)
Atlassian BAMBOO for CI
Build Definitions for:
 Database
 .NET
 Java
Atlassian BAMBOO for Continuous Deployment (CD)
Approve / Reject
Build
DIT1
Functional
Testing
• Continuous Integration
• Scheduled Build
Approve / Reject
Build
DIT2
Approve / Reject
Build
SIT
Regression
Testing
Selenium
Approve / Reject
Build
UAT
UAT Testing
Approve / Reject
Build
PROD
Functional
Testing
DEVELOPMENT Branch
QA Branch
MASTER Branch
FEATURE Branch
Service & Data Mock
Epics
e.g. Ship to Home Pre-pay
(JIRA Issue Type)
User Stories
(JIRA Issue Type)
Monitoring
Ngaios
Initiatives
e.g. Sports on Spectrum
(JIRA Issue Type)
Release Stream aka Agile Release Train (ART)
Themes
(Strategic Goals)
 prevent defects related to
Requirements problems
 Test Planning
 Test Execution
 Traceability & Reporting
 Defect Creation in JIRA
 Track Coverage & Quality Metrics
UX Team DB Team ART Engineer Product Managers
Note: Integrate Atlassian Bamboo with “Chef” for non-windows deployments
DevelopmentTasks
Visualize Portfolio Timeline by Releases
Swift-Kanban Metrics
and/or
EasyBI plugin
(Reporting & Charting)
On top of existing JQL queries
Visualize Investment by Themes
PMO-level
Status Reporting
Testing Tasks
23
Kanplan: backlog
for Kanban and
Scrumban teams
23
In Summary:
24
That’s Lean Manufacturing workflow automation related continuous improvement case study.
Implementing DevOps means creating DevOps mindset & culture. That requires lots of Lean,
Six Sigma, TQM, Lean Startup, and yes, Bit of Agile with Lots of “Respect for People”:
Top down approach:
30-60-90 strategic plan for
continuous improvement
with baseline assessment of
DevOps capability maturity
Bottom up approach:
Crowd sourcing tactical plan
for continuous improvement
with assessment based open
space events
Inside out approach:
PDCA Kanban board for
feedback driven visibility
with Lean Startup method
(build-measure-learn loop)
and TQM (PDCA loop)
Implementing DevOps requires mindset & culture open to all approaches
Appendix
Approach, Details and Samples of various process artifacts
Operations wide Proposal for Management Review
How can Modern Agile & ESP work in Operations?
• Operations currently has a plan driven management approach to align an
ecosystem of interconnected and interdependent services.
• For Operations , Modern Agile based transformation will enrich the
management approach to be more value-driven, for faster “flow” of work.
• Model Agile approach supports ESP (Enterprise Services Planning).
• ESP is a Kanban based management system of cadences to coordinate and align
across multiple interconnected services or domains, to create customer value
• ESP enables business agility without loss of management control.
• EPS enables speedier value delivery, improved optionality and business agility.
• ESP will also make Operations leadership focus on flow efficiencies in addition
to resource efficiencies, to achieve V2MOM level goals.
Step 1:
Intake & Planning
(1- 2 weeks)
•Define V2MOM level Goal(s)
- e.g. Tech Refresh initiative for
1. on-time engineering wide provisioning
(rack & loose gear on/off boarding)
2. Planning new compute capacity
•Reduce Scope for incremental value
(~1 quarter to 6 months)- leveled by
capacity to do work-
early adopter programs/products
- e.g. rack onboarding process workflow
•Identify key stakeholders:
from Business, Dev/Engg, SQA/Test,
Release Engg and/or Operations
• Identify landscape:
Value chain, initiatives, priorities,
expectations, impediments, and known
constraints
•Create initial Lean change plan using
canvasses such as:
“Lean change canvases” for both
initiatives, and
“Strategy canvas” for tracking strategy
through execution
Step 2:
Discovery phase
(2-3 weeks)
•Apply "learning to see” approach to
Create value by finding sources of non-
value-adding wastes, whether
necessary or unnecessary; and to
reduce or eliminate those.
•Narrow down and validate current
state value stream map (VSM)–
identify current process workflows,
analyze timings and identify NVA
wastes (impediments) causing delays
in flow.
•Visualize future state VSM- “single
piece flow” in ideal world.
•Gap Analysis Workshops- to identify
gaps between “as is” and “to be” VSMs
in terms of key tenets related to
people, process, tools, governance &
metrics
•Assessment of process maturity
•Formal Report- Submit assessment
worksheet highlighting gaps
Step 3:
Roadmap phase
(4-6 weeks)
• Recommendations-
•People- new roles as
needed
•Process – ESP Cadences
•Tools for road mapping
•Governance & Metrics
• 30-60-90 plan specific to
identified gaps in order to
improve process maturity
• recommend “Strategy canvas”
based Kanban system for
tracking strategy through
execution
#Step 4:
Pilot Phase
• Identify people for new Roles from
selected teams, if needed
• Training & Coaching
- Process
- ESP cadences, agendas, meetings
and
- People
- Changing roles & responsibilities
- Tools
- Roadmap sync with cadences
• Build-measure-learn
-learn to either pivot or persevere
• Validated learning
-socialize outcomes & communicate
plan of continuous improvement
#Step 5:
Wider Rollout
•Move the needle
• Build Community
• Transformation team &
charter
• Add champions, evangelists
• Cadence of events
• Execute Lean change plan for
scaling, apply process evaluator
tool with a centralized or
autonomous governance model
with Modern Agile values and
ESP cadences based on an
evolutionary (phased) framework
like Kanban and/or Scrumban
#Time line is context dependent after step 3
28
Approach (Modern Agile with ESP Cadences)
Improvement Plan for Operations
1. Understand Direction / Challenge(s)
• We need to work out challenges with hardware on-boarding and off-boarding
• a major bottleneck for Operations wide Tech Refresh initiative
2. Assess Current Condition
• Value stream mapping (VSM)
• Find operational inefficiencies
• Document “as is” state VSM
3. Achieve next feasible target condition
• Document “to-be” state VSM
• Design Kanban Boards for “to-be” workflows
• Visualize & limit work-in-progress
• Show improvements in cycle/lead times
• Further tuning…with controlled experiments
4. Iterate steps 1 to 3, to achieve more feasible targets with more experiments
• e.g. “dock to bootstrap” in 1-2 days with 1 empowered team
Goals of VSM (value stream mapping)
• Main goal of VSM is to create value by finding sources of muda (non-value-adding
wastes), whether necessary or unnecessary:
• Other goals of VSM are to eliminate mura (unevenness) and muri (overburdoning)
See also: https://www.lean.org/lexicon/muda-mura-muri
“As-Is” Value Stream Map – “Rack On-boarding” Workflow
Customer
Request to Dock (160+ d) Prepare (13-15d) Bootstrap (3d)
PO Creation ReceivedPO Processing Pre-Config Land @DC Configuration
160+ days 13 to 15 days 3 days
Pre-planning
for
Approved
Demand
Time
Ladder
(approx.) Lead Time. 176+ d
Value Add Time 42- 44 d
Non-VA Time 80-165 d
Electronic Information Flow
Operations
3
days
7
days
7
days
13-18
days
3
days
60-140
days
WIP (Inventory)PUSH- scheduled before neededExternal source
LEGEND
Eliminate Waste
Time Analysis
Non-Value Add vs. Total
50-75% or more
Value Add vs. Total
25-50% or less
Value Add vs. Non-VA
½ to 1/3 or less
Work In Progress
- Create RQSVR
- Approve RQSVR
- Shopping Cart
- Create PO
- Approve PO
- Create Asset via ASN
- Create PROCR
- Create LGSRV
- Approve LGSRV
- Execution smartsheet
- Asset arrival
- Scan asset
- Update TMA
- Close PROCR
- Close RQSVR
- CIE prep work
Post-Config
- SWFPA: rack profile
- Electrical/power WO
- Network Pre-Config
- Pre-cable network
- Move
- Scan
- Install
- Auto Verify
- Configure switch
- Check ILOM & Racks
- TMA status=in-Service
- Rack profile scripts
- SASRV: begin bootstrap
- Auto bootstrap (via API)
- Close SWFPA
- Resolve LGSRV
- Bootstrap completed
9
days
0 days
4-6
days
0 days
11
days
0 days
5
days
0 days
Asset Mgmt (8-10) Site Services (~40) Data Center TS (13) Network (8-10) Vendor (25-30)
Lack of standardized work, e.g.
Rack life expectancy, depreciation decisions
Network Bubble decisions Ports availability
“To-Be” Value Stream Map – “Rack On-boarding” Workflow
Customer
Pre-Config Land (on dock) Post-Config
Order
Request
Purchase Order
Purchase
Order
Dock
? days ? days ? days
Pre-planning
for
Approved
Demand
Time
Ladder
(approx.) Lead Time. ? d
Value Add Time ? d
Non-VA Time ? d
Electronic Information Flow
Operations
?day
s
?days
?days ?days
?days
?days
WIP (Inventory)PUSH- scheduled before neededExternal source
LEGEND
Eliminate Waste
Time Analysis
Non-Value Add vs. Total
? % or more
Value Add vs. Total
? % or less
Value Add vs. Non-VA
?
Not Started
Dock
?days
?days
?days
?days
?days
?days
?days
?days
Deploy
Standardized Work
One empowered team(80-100)?
Modern Agile ESP- PE-wide Proposal for Management Review
4 Pillars of Modern Agile
33
Make Safety
a
Prerequisite
Make People
Awesome
How do we make
people awesome
through our
product and how
do we make our
teams awesome?
How do we
promote safety
around
interactions with
one another as
well as make our
products safe to
use for our users?
Experiment &
Learn Rapidly
How do we
increase the
feedback loop?
When we get stuck
or aren’t learning
enough, we take it
as a sign that we
need to learn more
by running more
experiments.
Deliver Value
Continuously
How do we get
value into our
customer’s hands
as frequently as
possible?
01 02 03 04
Lean Change Canvas- format for Initiatives
Source:
https://www.slideshare.net/AgileRenee/entrprise-services-planning
https://www.slideshare.net/agilemanager/kanban-cadences-information-flow
Lean Canvas (Ebay example)
Strategy Canvas (Transformation example)

Más contenido relacionado

La actualidad más candente

How to Get Started with Kanban, and Why
How to Get Started with Kanban, and WhyHow to Get Started with Kanban, and Why
How to Get Started with Kanban, and WhyIngvald Skaug
 
Introduction to Kanban (June 2015)
Introduction to Kanban (June 2015)Introduction to Kanban (June 2015)
Introduction to Kanban (June 2015)Scrum & Kanban
 
Kanban
KanbanKanban
Kanbanbramoe
 
Introduction to Kanban boards
Introduction to Kanban boardsIntroduction to Kanban boards
Introduction to Kanban boardsProofHub
 
Kanban Basics for Beginners
Kanban Basics for BeginnersKanban Basics for Beginners
Kanban Basics for BeginnersZsolt Fabok
 
Kanban board 9th may 2017
Kanban board   9th may 2017Kanban board   9th may 2017
Kanban board 9th may 2017gagann78
 
Fast track to higher productivity with online Kanban boards
Fast track to higher productivity with online Kanban boardsFast track to higher productivity with online Kanban boards
Fast track to higher productivity with online Kanban boardsShore Labs
 
ScrumBan : Best of Both Worlds. A Fertile Hybrid
ScrumBan : Best of Both Worlds. A Fertile HybridScrumBan : Best of Both Worlds. A Fertile Hybrid
ScrumBan : Best of Both Worlds. A Fertile HybridJaya S
 
Kanban highlights
Kanban highlightsKanban highlights
Kanban highlightsYuval Yeret
 
Introduction to kanban lean ghm_02022010
Introduction to kanban lean ghm_02022010Introduction to kanban lean ghm_02022010
Introduction to kanban lean ghm_02022010Mads Troels Hansen
 
Kanban Lean Approach To Jit Training John Stevenson
Kanban Lean Approach To Jit Training John StevensonKanban Lean Approach To Jit Training John Stevenson
Kanban Lean Approach To Jit Training John StevensonSkills Matter
 
Cross-department Kanban Systems - 3 dimensions of scaling #llkd15
Cross-department Kanban Systems - 3 dimensions of scaling #llkd15Cross-department Kanban Systems - 3 dimensions of scaling #llkd15
Cross-department Kanban Systems - 3 dimensions of scaling #llkd15Andy Carmichael
 
5 Arguments Against Kanban
5 Arguments Against Kanban5 Arguments Against Kanban
5 Arguments Against KanbanNick Oostvogels
 
Introduction to Kanban
Introduction to KanbanIntroduction to Kanban
Introduction to KanbanWill Iverson
 

La actualidad más candente (20)

How to Get Started with Kanban, and Why
How to Get Started with Kanban, and WhyHow to Get Started with Kanban, and Why
How to Get Started with Kanban, and Why
 
Kanban English
Kanban   EnglishKanban   English
Kanban English
 
Introduction to Kanban (June 2015)
Introduction to Kanban (June 2015)Introduction to Kanban (June 2015)
Introduction to Kanban (June 2015)
 
Kanban
KanbanKanban
Kanban
 
Introduction to Kanban boards
Introduction to Kanban boardsIntroduction to Kanban boards
Introduction to Kanban boards
 
Kanban Basics for Beginners
Kanban Basics for BeginnersKanban Basics for Beginners
Kanban Basics for Beginners
 
Kanban Methodology
Kanban MethodologyKanban Methodology
Kanban Methodology
 
Kanban board 9th may 2017
Kanban board   9th may 2017Kanban board   9th may 2017
Kanban board 9th may 2017
 
Fast track to higher productivity with online Kanban boards
Fast track to higher productivity with online Kanban boardsFast track to higher productivity with online Kanban boards
Fast track to higher productivity with online Kanban boards
 
Scrumban
ScrumbanScrumban
Scrumban
 
ScrumBan : Best of Both Worlds. A Fertile Hybrid
ScrumBan : Best of Both Worlds. A Fertile HybridScrumBan : Best of Both Worlds. A Fertile Hybrid
ScrumBan : Best of Both Worlds. A Fertile Hybrid
 
Kanban highlights
Kanban highlightsKanban highlights
Kanban highlights
 
Introduction to kanban lean ghm_02022010
Introduction to kanban lean ghm_02022010Introduction to kanban lean ghm_02022010
Introduction to kanban lean ghm_02022010
 
Kanban Lean Approach To Jit Training John Stevenson
Kanban Lean Approach To Jit Training John StevensonKanban Lean Approach To Jit Training John Stevenson
Kanban Lean Approach To Jit Training John Stevenson
 
Kanban
Kanban Kanban
Kanban
 
Presentation ADM - SCRUMBAN
Presentation ADM - SCRUMBANPresentation ADM - SCRUMBAN
Presentation ADM - SCRUMBAN
 
Scrumban
ScrumbanScrumban
Scrumban
 
Cross-department Kanban Systems - 3 dimensions of scaling #llkd15
Cross-department Kanban Systems - 3 dimensions of scaling #llkd15Cross-department Kanban Systems - 3 dimensions of scaling #llkd15
Cross-department Kanban Systems - 3 dimensions of scaling #llkd15
 
5 Arguments Against Kanban
5 Arguments Against Kanban5 Arguments Against Kanban
5 Arguments Against Kanban
 
Introduction to Kanban
Introduction to KanbanIntroduction to Kanban
Introduction to Kanban
 

Similar a Lean Kanban India 2018 | Leveraging Lean and Kanban to implement Continuous Improvement - Ravi Tadwalkar

Pecha kucha format- how can devops be implemented with lean and agile
Pecha kucha format- how can devops be implemented with lean and agilePecha kucha format- how can devops be implemented with lean and agile
Pecha kucha format- how can devops be implemented with lean and agileRavi Tadwalkar
 
Lean Kanban India 2017 | Case Study in Pictures: Leveraging Lean, TPS and Agi...
Lean Kanban India 2017 | Case Study in Pictures: Leveraging Lean, TPS and Agi...Lean Kanban India 2017 | Case Study in Pictures: Leveraging Lean, TPS and Agi...
Lean Kanban India 2017 | Case Study in Pictures: Leveraging Lean, TPS and Agi...LeanKanbanIndia
 
DevOPs Transformation Workshop
DevOPs Transformation WorkshopDevOPs Transformation Workshop
DevOPs Transformation WorkshopJules Pierre-Louis
 
Agile planning with Rational Team Concert
Agile planning with Rational Team ConcertAgile planning with Rational Team Concert
Agile planning with Rational Team ConcertReedy Feggins Jr
 
Kanban.pptx software engineering scrum ppt
Kanban.pptx software engineering scrum pptKanban.pptx software engineering scrum ppt
Kanban.pptx software engineering scrum pptSabaKhalid48
 
Application Migration: How to Start, Scale and Succeed
Application Migration: How to Start, Scale and SucceedApplication Migration: How to Start, Scale and Succeed
Application Migration: How to Start, Scale and SucceedVMware Tanzu
 
Ag02 agile practices - dnc14 handouts
Ag02   agile practices - dnc14 handoutsAg02   agile practices - dnc14 handouts
Ag02 agile practices - dnc14 handoutsDotNetCampus
 
IBM Jazz Agile Collaborative Lifecycle Management 6.0.x What's new
IBM Jazz Agile Collaborative Lifecycle Management 6.0.x What's newIBM Jazz Agile Collaborative Lifecycle Management 6.0.x What's new
IBM Jazz Agile Collaborative Lifecycle Management 6.0.x What's newSandra Sergi
 
Chris OBrien - Azure DevOps for managing work
Chris OBrien - Azure DevOps for managing workChris OBrien - Azure DevOps for managing work
Chris OBrien - Azure DevOps for managing workChris O'Brien
 
Moving 65,000 Microsofties to DevOps with Visual Studio Team Services
Moving 65,000 Microsofties to DevOps with Visual Studio Team ServicesMoving 65,000 Microsofties to DevOps with Visual Studio Team Services
Moving 65,000 Microsofties to DevOps with Visual Studio Team ServicesVSTS Community MSFT
 
SOASTA Webinar: Process Compression For Mobile App Dev 120612
SOASTA Webinar: Process Compression For Mobile App Dev 120612SOASTA Webinar: Process Compression For Mobile App Dev 120612
SOASTA Webinar: Process Compression For Mobile App Dev 120612SOASTA
 
Introduction to product development flow
Introduction to product development flowIntroduction to product development flow
Introduction to product development flowYuval Yeret
 

Similar a Lean Kanban India 2018 | Leveraging Lean and Kanban to implement Continuous Improvement - Ravi Tadwalkar (20)

Pecha kucha format- how can devops be implemented with lean and agile
Pecha kucha format- how can devops be implemented with lean and agilePecha kucha format- how can devops be implemented with lean and agile
Pecha kucha format- how can devops be implemented with lean and agile
 
Lean Kanban India 2017 | Case Study in Pictures: Leveraging Lean, TPS and Agi...
Lean Kanban India 2017 | Case Study in Pictures: Leveraging Lean, TPS and Agi...Lean Kanban India 2017 | Case Study in Pictures: Leveraging Lean, TPS and Agi...
Lean Kanban India 2017 | Case Study in Pictures: Leveraging Lean, TPS and Agi...
 
Patton kanban fr
Patton kanban frPatton kanban fr
Patton kanban fr
 
Patton kanban 1
Patton kanban 1Patton kanban 1
Patton kanban 1
 
kanban.ppt
kanban.pptkanban.ppt
kanban.ppt
 
Patton kanban
Patton kanbanPatton kanban
Patton kanban
 
DevOPs Transformation Workshop
DevOPs Transformation WorkshopDevOPs Transformation Workshop
DevOPs Transformation Workshop
 
Go Lean IT with Kanban
Go Lean IT with KanbanGo Lean IT with Kanban
Go Lean IT with Kanban
 
Agile planning with Rational Team Concert
Agile planning with Rational Team ConcertAgile planning with Rational Team Concert
Agile planning with Rational Team Concert
 
Kanban.pptx software engineering scrum ppt
Kanban.pptx software engineering scrum pptKanban.pptx software engineering scrum ppt
Kanban.pptx software engineering scrum ppt
 
Application Migration: How to Start, Scale and Succeed
Application Migration: How to Start, Scale and SucceedApplication Migration: How to Start, Scale and Succeed
Application Migration: How to Start, Scale and Succeed
 
Ag02 agile practices - dnc14 handouts
Ag02   agile practices - dnc14 handoutsAg02   agile practices - dnc14 handouts
Ag02 agile practices - dnc14 handouts
 
Agile methodology and scrum development
Agile methodology and scrum developmentAgile methodology and scrum development
Agile methodology and scrum development
 
IBM Jazz Agile Collaborative Lifecycle Management 6.0.x What's new
IBM Jazz Agile Collaborative Lifecycle Management 6.0.x What's newIBM Jazz Agile Collaborative Lifecycle Management 6.0.x What's new
IBM Jazz Agile Collaborative Lifecycle Management 6.0.x What's new
 
Chris OBrien - Azure DevOps for managing work
Chris OBrien - Azure DevOps for managing workChris OBrien - Azure DevOps for managing work
Chris OBrien - Azure DevOps for managing work
 
Saurav_Kumar
Saurav_KumarSaurav_Kumar
Saurav_Kumar
 
Moving 65,000 Microsofties to DevOps with Visual Studio Team Services
Moving 65,000 Microsofties to DevOps with Visual Studio Team ServicesMoving 65,000 Microsofties to DevOps with Visual Studio Team Services
Moving 65,000 Microsofties to DevOps with Visual Studio Team Services
 
Automating the Quality
Automating the QualityAutomating the Quality
Automating the Quality
 
SOASTA Webinar: Process Compression For Mobile App Dev 120612
SOASTA Webinar: Process Compression For Mobile App Dev 120612SOASTA Webinar: Process Compression For Mobile App Dev 120612
SOASTA Webinar: Process Compression For Mobile App Dev 120612
 
Introduction to product development flow
Introduction to product development flowIntroduction to product development flow
Introduction to product development flow
 

Más de LeanKanbanIndia

Kanban India 2023 | Ashwinee Singh and Masa Maeda | A Kanban-centric Ecosyste...
Kanban India 2023 | Ashwinee Singh and Masa Maeda | A Kanban-centric Ecosyste...Kanban India 2023 | Ashwinee Singh and Masa Maeda | A Kanban-centric Ecosyste...
Kanban India 2023 | Ashwinee Singh and Masa Maeda | A Kanban-centric Ecosyste...LeanKanbanIndia
 
Kanban India 2023 | Dilip Mysore Devaraj | Efficient Deployment Flow with Dev...
Kanban India 2023 | Dilip Mysore Devaraj | Efficient Deployment Flow with Dev...Kanban India 2023 | Dilip Mysore Devaraj | Efficient Deployment Flow with Dev...
Kanban India 2023 | Dilip Mysore Devaraj | Efficient Deployment Flow with Dev...LeanKanbanIndia
 
Kanban India 2023 | Renjith Achuthanunni and Anoop Kadur Vijayakumar | DevOps...
Kanban India 2023 | Renjith Achuthanunni and Anoop Kadur Vijayakumar | DevOps...Kanban India 2023 | Renjith Achuthanunni and Anoop Kadur Vijayakumar | DevOps...
Kanban India 2023 | Renjith Achuthanunni and Anoop Kadur Vijayakumar | DevOps...LeanKanbanIndia
 
Kanban India 2023 | Ravishankar N | Don’t implement SRE like this!
Kanban India 2023 | Ravishankar N | Don’t implement SRE like this!Kanban India 2023 | Ravishankar N | Don’t implement SRE like this!
Kanban India 2023 | Ravishankar N | Don’t implement SRE like this!LeanKanbanIndia
 
Kanban India 2023 | Vishal Prasad | Agility in the World of ITES Business
Kanban India 2023 | Vishal  Prasad | Agility in the World of ITES BusinessKanban India 2023 | Vishal  Prasad | Agility in the World of ITES Business
Kanban India 2023 | Vishal Prasad | Agility in the World of ITES BusinessLeanKanbanIndia
 
Kanban India 2023 | Seshabhargavan R and Shobha Kumari | Project Ignite
Kanban India 2023 | Seshabhargavan R and Shobha Kumari | Project IgniteKanban India 2023 | Seshabhargavan R and Shobha Kumari | Project Ignite
Kanban India 2023 | Seshabhargavan R and Shobha Kumari | Project IgniteLeanKanbanIndia
 
Kanban India 2023 | Mohit Anand |Continuous Improvement aligned to Business V...
Kanban India 2023 | Mohit Anand |Continuous Improvement aligned to Business V...Kanban India 2023 | Mohit Anand |Continuous Improvement aligned to Business V...
Kanban India 2023 | Mohit Anand |Continuous Improvement aligned to Business V...LeanKanbanIndia
 
Kanban India 2023 | Sriram Rajagopalan | Using Kanban to Boost Business Agili...
Kanban India 2023 | Sriram Rajagopalan | Using Kanban to Boost Business Agili...Kanban India 2023 | Sriram Rajagopalan | Using Kanban to Boost Business Agili...
Kanban India 2023 | Sriram Rajagopalan | Using Kanban to Boost Business Agili...LeanKanbanIndia
 
Kanban India 2023 | Jayalatha Ramachandran and Sanjay Adasul | Embracing sim...
Kanban India 2023 | Jayalatha Ramachandran and Sanjay Adasul  | Embracing sim...Kanban India 2023 | Jayalatha Ramachandran and Sanjay Adasul  | Embracing sim...
Kanban India 2023 | Jayalatha Ramachandran and Sanjay Adasul | Embracing sim...LeanKanbanIndia
 
Kanban India 2023 | Mike Burrows | Between Spaces Scopes and Scales What the ...
Kanban India 2023 | Mike Burrows | Between Spaces Scopes and Scales What the ...Kanban India 2023 | Mike Burrows | Between Spaces Scopes and Scales What the ...
Kanban India 2023 | Mike Burrows | Between Spaces Scopes and Scales What the ...LeanKanbanIndia
 
Kanban India 2023| Priyank Pathak | Scrum Master's K.R.A. (Key Responsibility...
Kanban India 2023| Priyank Pathak | Scrum Master's K.R.A. (Key Responsibility...Kanban India 2023| Priyank Pathak | Scrum Master's K.R.A. (Key Responsibility...
Kanban India 2023| Priyank Pathak | Scrum Master's K.R.A. (Key Responsibility...LeanKanbanIndia
 
Kanban India 2023 | Mahadevan and Rajsekhar | Startup's and Hiccups.pptx
Kanban India 2023 | Mahadevan and Rajsekhar | Startup's and Hiccups.pptxKanban India 2023 | Mahadevan and Rajsekhar | Startup's and Hiccups.pptx
Kanban India 2023 | Mahadevan and Rajsekhar | Startup's and Hiccups.pptxLeanKanbanIndia
 
Kanban India 2023 | Usha Ramaswamy | Kanban Chronicles - A Tale of Plans and ...
Kanban India 2023 | Usha Ramaswamy | Kanban Chronicles - A Tale of Plans and ...Kanban India 2023 | Usha Ramaswamy | Kanban Chronicles - A Tale of Plans and ...
Kanban India 2023 | Usha Ramaswamy | Kanban Chronicles - A Tale of Plans and ...LeanKanbanIndia
 
Kanban India 2023 | Debbie Siah | Building Agile Communities with Kanban.pptx...
Kanban India 2023 | Debbie Siah | Building Agile Communities with Kanban.pptx...Kanban India 2023 | Debbie Siah | Building Agile Communities with Kanban.pptx...
Kanban India 2023 | Debbie Siah | Building Agile Communities with Kanban.pptx...LeanKanbanIndia
 
Kanban India 2023 | Vinod and Umesh | Evolution of Supply Chain Management th...
Kanban India 2023 | Vinod and Umesh | Evolution of Supply Chain Management th...Kanban India 2023 | Vinod and Umesh | Evolution of Supply Chain Management th...
Kanban India 2023 | Vinod and Umesh | Evolution of Supply Chain Management th...LeanKanbanIndia
 
Kanban India 2023 | Debopom Sanyal |Do you have the courage to break your sys...
Kanban India 2023 | Debopom Sanyal |Do you have the courage to break your sys...Kanban India 2023 | Debopom Sanyal |Do you have the courage to break your sys...
Kanban India 2023 | Debopom Sanyal |Do you have the courage to break your sys...LeanKanbanIndia
 
Kanban India 2023 | Sudipta Lahiri | Deliver MVV from your Kanban System.ppsm...
Kanban India 2023 | Sudipta Lahiri | Deliver MVV from your Kanban System.ppsm...Kanban India 2023 | Sudipta Lahiri | Deliver MVV from your Kanban System.ppsm...
Kanban India 2023 | Sudipta Lahiri | Deliver MVV from your Kanban System.ppsm...LeanKanbanIndia
 
Kanban India 2023 |Gopal Devanahalli | Modern Work Management in Healthcare....
Kanban India 2023 |Gopal Devanahalli |  Modern Work Management in Healthcare....Kanban India 2023 |Gopal Devanahalli |  Modern Work Management in Healthcare....
Kanban India 2023 |Gopal Devanahalli | Modern Work Management in Healthcare....LeanKanbanIndia
 
Kanban India 2022 | Priyank Pathak |Evangelising Agile Environment - to not l...
Kanban India 2022 | Priyank Pathak |Evangelising Agile Environment - to not l...Kanban India 2022 | Priyank Pathak |Evangelising Agile Environment - to not l...
Kanban India 2022 | Priyank Pathak |Evangelising Agile Environment - to not l...LeanKanbanIndia
 
Kanban India 2022 | Poornima V | Bringing Agile to schools
Kanban India 2022 | Poornima V | Bringing Agile to schoolsKanban India 2022 | Poornima V | Bringing Agile to schools
Kanban India 2022 | Poornima V | Bringing Agile to schoolsLeanKanbanIndia
 

Más de LeanKanbanIndia (20)

Kanban India 2023 | Ashwinee Singh and Masa Maeda | A Kanban-centric Ecosyste...
Kanban India 2023 | Ashwinee Singh and Masa Maeda | A Kanban-centric Ecosyste...Kanban India 2023 | Ashwinee Singh and Masa Maeda | A Kanban-centric Ecosyste...
Kanban India 2023 | Ashwinee Singh and Masa Maeda | A Kanban-centric Ecosyste...
 
Kanban India 2023 | Dilip Mysore Devaraj | Efficient Deployment Flow with Dev...
Kanban India 2023 | Dilip Mysore Devaraj | Efficient Deployment Flow with Dev...Kanban India 2023 | Dilip Mysore Devaraj | Efficient Deployment Flow with Dev...
Kanban India 2023 | Dilip Mysore Devaraj | Efficient Deployment Flow with Dev...
 
Kanban India 2023 | Renjith Achuthanunni and Anoop Kadur Vijayakumar | DevOps...
Kanban India 2023 | Renjith Achuthanunni and Anoop Kadur Vijayakumar | DevOps...Kanban India 2023 | Renjith Achuthanunni and Anoop Kadur Vijayakumar | DevOps...
Kanban India 2023 | Renjith Achuthanunni and Anoop Kadur Vijayakumar | DevOps...
 
Kanban India 2023 | Ravishankar N | Don’t implement SRE like this!
Kanban India 2023 | Ravishankar N | Don’t implement SRE like this!Kanban India 2023 | Ravishankar N | Don’t implement SRE like this!
Kanban India 2023 | Ravishankar N | Don’t implement SRE like this!
 
Kanban India 2023 | Vishal Prasad | Agility in the World of ITES Business
Kanban India 2023 | Vishal  Prasad | Agility in the World of ITES BusinessKanban India 2023 | Vishal  Prasad | Agility in the World of ITES Business
Kanban India 2023 | Vishal Prasad | Agility in the World of ITES Business
 
Kanban India 2023 | Seshabhargavan R and Shobha Kumari | Project Ignite
Kanban India 2023 | Seshabhargavan R and Shobha Kumari | Project IgniteKanban India 2023 | Seshabhargavan R and Shobha Kumari | Project Ignite
Kanban India 2023 | Seshabhargavan R and Shobha Kumari | Project Ignite
 
Kanban India 2023 | Mohit Anand |Continuous Improvement aligned to Business V...
Kanban India 2023 | Mohit Anand |Continuous Improvement aligned to Business V...Kanban India 2023 | Mohit Anand |Continuous Improvement aligned to Business V...
Kanban India 2023 | Mohit Anand |Continuous Improvement aligned to Business V...
 
Kanban India 2023 | Sriram Rajagopalan | Using Kanban to Boost Business Agili...
Kanban India 2023 | Sriram Rajagopalan | Using Kanban to Boost Business Agili...Kanban India 2023 | Sriram Rajagopalan | Using Kanban to Boost Business Agili...
Kanban India 2023 | Sriram Rajagopalan | Using Kanban to Boost Business Agili...
 
Kanban India 2023 | Jayalatha Ramachandran and Sanjay Adasul | Embracing sim...
Kanban India 2023 | Jayalatha Ramachandran and Sanjay Adasul  | Embracing sim...Kanban India 2023 | Jayalatha Ramachandran and Sanjay Adasul  | Embracing sim...
Kanban India 2023 | Jayalatha Ramachandran and Sanjay Adasul | Embracing sim...
 
Kanban India 2023 | Mike Burrows | Between Spaces Scopes and Scales What the ...
Kanban India 2023 | Mike Burrows | Between Spaces Scopes and Scales What the ...Kanban India 2023 | Mike Burrows | Between Spaces Scopes and Scales What the ...
Kanban India 2023 | Mike Burrows | Between Spaces Scopes and Scales What the ...
 
Kanban India 2023| Priyank Pathak | Scrum Master's K.R.A. (Key Responsibility...
Kanban India 2023| Priyank Pathak | Scrum Master's K.R.A. (Key Responsibility...Kanban India 2023| Priyank Pathak | Scrum Master's K.R.A. (Key Responsibility...
Kanban India 2023| Priyank Pathak | Scrum Master's K.R.A. (Key Responsibility...
 
Kanban India 2023 | Mahadevan and Rajsekhar | Startup's and Hiccups.pptx
Kanban India 2023 | Mahadevan and Rajsekhar | Startup's and Hiccups.pptxKanban India 2023 | Mahadevan and Rajsekhar | Startup's and Hiccups.pptx
Kanban India 2023 | Mahadevan and Rajsekhar | Startup's and Hiccups.pptx
 
Kanban India 2023 | Usha Ramaswamy | Kanban Chronicles - A Tale of Plans and ...
Kanban India 2023 | Usha Ramaswamy | Kanban Chronicles - A Tale of Plans and ...Kanban India 2023 | Usha Ramaswamy | Kanban Chronicles - A Tale of Plans and ...
Kanban India 2023 | Usha Ramaswamy | Kanban Chronicles - A Tale of Plans and ...
 
Kanban India 2023 | Debbie Siah | Building Agile Communities with Kanban.pptx...
Kanban India 2023 | Debbie Siah | Building Agile Communities with Kanban.pptx...Kanban India 2023 | Debbie Siah | Building Agile Communities with Kanban.pptx...
Kanban India 2023 | Debbie Siah | Building Agile Communities with Kanban.pptx...
 
Kanban India 2023 | Vinod and Umesh | Evolution of Supply Chain Management th...
Kanban India 2023 | Vinod and Umesh | Evolution of Supply Chain Management th...Kanban India 2023 | Vinod and Umesh | Evolution of Supply Chain Management th...
Kanban India 2023 | Vinod and Umesh | Evolution of Supply Chain Management th...
 
Kanban India 2023 | Debopom Sanyal |Do you have the courage to break your sys...
Kanban India 2023 | Debopom Sanyal |Do you have the courage to break your sys...Kanban India 2023 | Debopom Sanyal |Do you have the courage to break your sys...
Kanban India 2023 | Debopom Sanyal |Do you have the courage to break your sys...
 
Kanban India 2023 | Sudipta Lahiri | Deliver MVV from your Kanban System.ppsm...
Kanban India 2023 | Sudipta Lahiri | Deliver MVV from your Kanban System.ppsm...Kanban India 2023 | Sudipta Lahiri | Deliver MVV from your Kanban System.ppsm...
Kanban India 2023 | Sudipta Lahiri | Deliver MVV from your Kanban System.ppsm...
 
Kanban India 2023 |Gopal Devanahalli | Modern Work Management in Healthcare....
Kanban India 2023 |Gopal Devanahalli |  Modern Work Management in Healthcare....Kanban India 2023 |Gopal Devanahalli |  Modern Work Management in Healthcare....
Kanban India 2023 |Gopal Devanahalli | Modern Work Management in Healthcare....
 
Kanban India 2022 | Priyank Pathak |Evangelising Agile Environment - to not l...
Kanban India 2022 | Priyank Pathak |Evangelising Agile Environment - to not l...Kanban India 2022 | Priyank Pathak |Evangelising Agile Environment - to not l...
Kanban India 2022 | Priyank Pathak |Evangelising Agile Environment - to not l...
 
Kanban India 2022 | Poornima V | Bringing Agile to schools
Kanban India 2022 | Poornima V | Bringing Agile to schoolsKanban India 2022 | Poornima V | Bringing Agile to schools
Kanban India 2022 | Poornima V | Bringing Agile to schools
 

Último

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 

Último (20)

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 

Lean Kanban India 2018 | Leveraging Lean and Kanban to implement Continuous Improvement - Ravi Tadwalkar

  • 1. Case Study: Lean Manufacturing plant level continuous improvement Leveraging Lean and Kanban to implement Continuous Improvement LKNA2018 (Lean Kanban India 2018), September 21, 2018 LKNA2017 (Lean Kanban India 2017), September 16, 2017 Agile2016, Pecha Kucha Lightening Talk on July 27, 2016 by Ravi Tadwalkar in/rtadwalkar @tadwalkar rtadwalkar@gmail.com
  • 2. This is a story of Lean Manufacturing Plant Manager Shari, seeking plant value stream level continuous improvement. Shari intends to improve plant level visibility on SLAs, batch sizes (volumes) and WIP. Here are some pictures from this Lean Manufacturing plant.
  • 3. 3 Plant Manager Shari is trained by Lean Enterprise Institute. She has read Taiichi Ohno’s “TPS”, Eli Goldratt’s “Goal”, Gene Kim’s “Phoenix Project”! You can say that Shari is big on Lean, in just 10 pictures!
  • 4. 4 Shari implemented Lean manufacturing at this Plant she manages, influencing other 5 plants. She implemented Lean, starting with Lean House for tracking continuous improvement!
  • 6. 6 Shari implemented manufacturing kanban in all “cells” to visualize work related to continuous improvement.
  • 7. 7 Here Shari shows an example of kanban card that is attached to a product across workstations in a cell. She says plant has JIT (Just-In-Time) inventory almost, with at most 2 days of raw materials!
  • 8. 8 Shari implemented visual controls to visualize front-end work for products.
  • 9. 9 Shari implemented Lean tool 5S to complement other Lean tools used in all plant cells.
  • 10. 10 Shari implemented “Wall of Appreciation” in cells. Jurgen Apello talks about it in Management 3.0!
  • 11. 11 This is the latest cell Shari proudly shows during a plant tour. She intends to improve visibility of plant level value stream specific to monitoring SLAs, batch sizes and WIP.
  • 12. We saw some pictures from this Lean Manufacturing plant. We will see how DevOps can be implemented to seek plant level continuous improvements with Lean and Agile.
  • 13. Upstream Kanban: Downstream Kanban: 13 • Begin with the end in mind: create “Stop Starting, Start Finishing“ Kanban mindset • Visualize flow between Portfolio (“Upstream”) with Release Engineering (“Downstream”) • Visualize bottlenecks to flow at both upstream and downstream levels! • Use Portfolio Kanban board across Org Design (Team of Teams) • Use a simple Kanban board with a “Plan->Build->Run” or similar workflow Run F E I Idea Deploy to Prod G D GY PB MN 2 ∞ AB Biz Design Plan Build (Dev & QA) Architecture, resource plan Core team OMS … 3 3 DE Explicit policy: Feature is “done” only when last team working on it has completed “Deploy to Prod” Lead time ends at 1st infinite queue! There could be additional queues with no WIP limit. Lead time “clock” starts at 1st queue i.e. WIP limited input queue! 3 3 Deployed (Note touch time) NPD (New Prod Dev) (60%) Defect& Tech Debt (30%) Innovation (10%) 5 2 1 Expedite 1 3 Fixed Date Standard Intangible 2 2 3 WIP Limits based on classes of service (Release Engineering) WIP Limits based on work types (feature teams) Upstream (Portfolio) and Downstream (Release Engineering) Kanban Systems
  • 14. “As-Is” Value Stream Map – Illustrating Kaizen Lightening Bursts Customer Plan (Idea / Discovery) Build (Delivery) Run (Operations) Business Case PlanningPrioritization - Ideation - Biz & Tech Assessment - Go/No-go/Defer - Capacity Planning - Project Planning - Prioritization - Project Selection - RFE Approval Design (Arch) Build (Dev) Test (QA) - Technical Design - WBS - Integrate - Test Planning - Ops Planning - Get Approval - Deploy to QA - Configure Tests - Manual Testing - User Acceptance Production Go-Live Business-As-Usual Change Mgmt (ITIL) Environment Provisioning- Ops Planning - Config&Deploy - Wait for DBA - Get Approval Prod Support & Monitoring Ops Mgmt (DB, Network) 3 to 5 m 4 to 6 m 2 to 3 m Sustenance mode Business Portfolio: Governance & Oversight Environments & Tools Time Ladder (approx.) Lead Time ? Value Add Time ? Non-VA Time ? Electronic Information Flow Offshoring Teams 0.5 m 1 m 1 m 1 m 1-3 m 0.5 m 2 m 0.5 m 0.5 m 0.5 m 1-2 m 1-2 m 1-2 m 1 m WIP (Inventory)PUSH- scheduled before neededExternal source LEGEND Eliminate Waste Time Analysis Non-Value Add vs. Total 45% Value Add vs. Total 55% Value Add vs. Non-VA ? Sustenance 14
  • 15. “To-Be” Value Stream Map – Seek “Build” Process Improvements Customer Plan(A “Release”) Build(Deployables) Run (Operations) TDAD Multi- Sprint Plan Backlog Prep <Story Map> - Technical Design - Multi-team - At cadence - Ops work - 1 story map - per team - per epic Design (Artifacts) Sprint Plan + Sprint Retro Iterate (Dev & QA) - MVD (wiki) - Test Plans - UX artifact - 2 mtgs, 4hr each - Ops work included - Build w/ Unit Tests - Execute test cases - Expedite bug-fixes - Dev & Test NFRs Demo Business-As-Usual Change Mgmt (ITIL) Environment Provisioning- Env on demand - PO Acceptance - Production bugs - Proactive DBAs Prod Support & Monitoring Ops Mgmt (DB, Network) 3m 3m (4 sprints) 1m Sustenance mode Business Portfolio: Governance & Oversight Environments & Tools Time Ladder (approx.) Lead Time ~4m Value Add Time ~2m Non-VA Time ~2m Time Analysis Non-Value Add vs. Total 50% Value Add vs. Total 50% Value Add vs. Non-VA 1 Electronic Information Flow Offshoring Teams 2m 1w 1w .5 w NVA:1d 1m 0.5 w 1w.5 w 2w NVA:1d 1w WIP (Inventory)PUSH- scheduled before neededExternal source LEGEND Eliminate Waste 1w 3m (4 sprints) Sustenance 15
  • 16. 16 Begin with end in mind: visualize work on a “Plan->Build->Run” value stream of Enterprise Kanban Enterprise Kanban System with "Plan->Build->Run" value stream
  • 17. 17 In the beginning: A workflow automation solution requires starting with an end-to-end process simulation. Shari started solutioning by organizing use-case scenarios for process simulation of plant level process improvements. Process Simulation for Planning a workflow automation initiative round1: Discussion about sharing your experiences on implementing Process Simulation
  • 18. 18 Shari participated in solutioning by role playing as Plant Manager during User Story Mapping for plant simulations about improving Lean Manufacturing value stream with visibility on SLAs, batch sizes and WIP. Note how her persona shows up on a slide in this picture showing this user story map as well Story Map: Driver for Lean Portfolio Management round2: Discussion about sharing your experiences on implementing Story Mapping
  • 19. 19 Like Lean manufacturing plant, for continuous improvements, IT uses Kaizen events e.g. open spaces in corporate setting: Using Open Spaces to build communities of practice for “Kaizen”
  • 20. 20 Like Lean manufacturing plant, for continuous improvements, IT uses TQM’s PDCA loop on a Kanban board like this: Example of continuous improvement about introducing DevOps via feature toggle Example of Continuous Improvement Kanban Board with PDCA-loop round3: Discussion about sharing your experiences on implementing Kaizen for continuous
  • 21. 21 In summary: Workflow Automation Solutioning is an end-to-end process, starting with process simulation, to visualize epics on Enterprise Kanban, to big room planning, to implementing user stories based on DoD, to visualizing deployable artifacts on DevOps Kanban! Summary of visualizations used in Plan-Build-Run Value Stream
  • 22. During planning, create org alignment to improve flow (1st way of DevOps), using Portfolio Kanban system. 22 Role of Manager: Leading from the front, Applying 3 ways of DevOps Enable managers in shaping various communities of practice: create culture of continual experimentation & learning (3rd way of DevOps). • Begin with succinctly defined portfolio hierarchy or swim lanes that consist of strategic (CAPEX) and tactical (OPEX) investments: • Themes • Initiatives • Features • Create single-piece flow of portfolio items with Portfolio Kanban board. Apply lean metrics for continuous improvement. • Apply first way of DevOps: emphasize on performance of entire system by analyzing value streams, WIP, lead times & due date performance. During execution, enable continuous feedback loops (2nd way of DevOps) with obstacle boards to act on impediments & dysfunctions. • This requires low-fidelity obstacle escalation process. This can be a 2-level (team->management) process, or a 3-level (team->program>portfolio) process. • Example of obstacle board and related workflow:
  • 23. FYI: Swift-Kanban & Atlassian Tool Chains Integrated for DevOps with SAFe Development Tools Atlassian BitBucket (GIT) Developer writes code and check-in Associate JIRA Issue Types (Tasks / Bugs) Build gets triggered  Microsoft Visual Studio (For .NET)  Eclipse (For JAVA) Atlassian BAMBOO for CI Build Definitions for:  Database  .NET  Java Atlassian BAMBOO for Continuous Deployment (CD) Approve / Reject Build DIT1 Functional Testing • Continuous Integration • Scheduled Build Approve / Reject Build DIT2 Approve / Reject Build SIT Regression Testing Selenium Approve / Reject Build UAT UAT Testing Approve / Reject Build PROD Functional Testing DEVELOPMENT Branch QA Branch MASTER Branch FEATURE Branch Service & Data Mock Epics e.g. Ship to Home Pre-pay (JIRA Issue Type) User Stories (JIRA Issue Type) Monitoring Ngaios Initiatives e.g. Sports on Spectrum (JIRA Issue Type) Release Stream aka Agile Release Train (ART) Themes (Strategic Goals)  prevent defects related to Requirements problems  Test Planning  Test Execution  Traceability & Reporting  Defect Creation in JIRA  Track Coverage & Quality Metrics UX Team DB Team ART Engineer Product Managers Note: Integrate Atlassian Bamboo with “Chef” for non-windows deployments DevelopmentTasks Visualize Portfolio Timeline by Releases Swift-Kanban Metrics and/or EasyBI plugin (Reporting & Charting) On top of existing JQL queries Visualize Investment by Themes PMO-level Status Reporting Testing Tasks 23 Kanplan: backlog for Kanban and Scrumban teams 23
  • 24. In Summary: 24 That’s Lean Manufacturing workflow automation related continuous improvement case study. Implementing DevOps means creating DevOps mindset & culture. That requires lots of Lean, Six Sigma, TQM, Lean Startup, and yes, Bit of Agile with Lots of “Respect for People”: Top down approach: 30-60-90 strategic plan for continuous improvement with baseline assessment of DevOps capability maturity Bottom up approach: Crowd sourcing tactical plan for continuous improvement with assessment based open space events Inside out approach: PDCA Kanban board for feedback driven visibility with Lean Startup method (build-measure-learn loop) and TQM (PDCA loop) Implementing DevOps requires mindset & culture open to all approaches
  • 25. Appendix Approach, Details and Samples of various process artifacts
  • 26. Operations wide Proposal for Management Review
  • 27. How can Modern Agile & ESP work in Operations? • Operations currently has a plan driven management approach to align an ecosystem of interconnected and interdependent services. • For Operations , Modern Agile based transformation will enrich the management approach to be more value-driven, for faster “flow” of work. • Model Agile approach supports ESP (Enterprise Services Planning). • ESP is a Kanban based management system of cadences to coordinate and align across multiple interconnected services or domains, to create customer value • ESP enables business agility without loss of management control. • EPS enables speedier value delivery, improved optionality and business agility. • ESP will also make Operations leadership focus on flow efficiencies in addition to resource efficiencies, to achieve V2MOM level goals.
  • 28. Step 1: Intake & Planning (1- 2 weeks) •Define V2MOM level Goal(s) - e.g. Tech Refresh initiative for 1. on-time engineering wide provisioning (rack & loose gear on/off boarding) 2. Planning new compute capacity •Reduce Scope for incremental value (~1 quarter to 6 months)- leveled by capacity to do work- early adopter programs/products - e.g. rack onboarding process workflow •Identify key stakeholders: from Business, Dev/Engg, SQA/Test, Release Engg and/or Operations • Identify landscape: Value chain, initiatives, priorities, expectations, impediments, and known constraints •Create initial Lean change plan using canvasses such as: “Lean change canvases” for both initiatives, and “Strategy canvas” for tracking strategy through execution Step 2: Discovery phase (2-3 weeks) •Apply "learning to see” approach to Create value by finding sources of non- value-adding wastes, whether necessary or unnecessary; and to reduce or eliminate those. •Narrow down and validate current state value stream map (VSM)– identify current process workflows, analyze timings and identify NVA wastes (impediments) causing delays in flow. •Visualize future state VSM- “single piece flow” in ideal world. •Gap Analysis Workshops- to identify gaps between “as is” and “to be” VSMs in terms of key tenets related to people, process, tools, governance & metrics •Assessment of process maturity •Formal Report- Submit assessment worksheet highlighting gaps Step 3: Roadmap phase (4-6 weeks) • Recommendations- •People- new roles as needed •Process – ESP Cadences •Tools for road mapping •Governance & Metrics • 30-60-90 plan specific to identified gaps in order to improve process maturity • recommend “Strategy canvas” based Kanban system for tracking strategy through execution #Step 4: Pilot Phase • Identify people for new Roles from selected teams, if needed • Training & Coaching - Process - ESP cadences, agendas, meetings and - People - Changing roles & responsibilities - Tools - Roadmap sync with cadences • Build-measure-learn -learn to either pivot or persevere • Validated learning -socialize outcomes & communicate plan of continuous improvement #Step 5: Wider Rollout •Move the needle • Build Community • Transformation team & charter • Add champions, evangelists • Cadence of events • Execute Lean change plan for scaling, apply process evaluator tool with a centralized or autonomous governance model with Modern Agile values and ESP cadences based on an evolutionary (phased) framework like Kanban and/or Scrumban #Time line is context dependent after step 3 28 Approach (Modern Agile with ESP Cadences)
  • 29. Improvement Plan for Operations 1. Understand Direction / Challenge(s) • We need to work out challenges with hardware on-boarding and off-boarding • a major bottleneck for Operations wide Tech Refresh initiative 2. Assess Current Condition • Value stream mapping (VSM) • Find operational inefficiencies • Document “as is” state VSM 3. Achieve next feasible target condition • Document “to-be” state VSM • Design Kanban Boards for “to-be” workflows • Visualize & limit work-in-progress • Show improvements in cycle/lead times • Further tuning…with controlled experiments 4. Iterate steps 1 to 3, to achieve more feasible targets with more experiments • e.g. “dock to bootstrap” in 1-2 days with 1 empowered team
  • 30. Goals of VSM (value stream mapping) • Main goal of VSM is to create value by finding sources of muda (non-value-adding wastes), whether necessary or unnecessary: • Other goals of VSM are to eliminate mura (unevenness) and muri (overburdoning) See also: https://www.lean.org/lexicon/muda-mura-muri
  • 31. “As-Is” Value Stream Map – “Rack On-boarding” Workflow Customer Request to Dock (160+ d) Prepare (13-15d) Bootstrap (3d) PO Creation ReceivedPO Processing Pre-Config Land @DC Configuration 160+ days 13 to 15 days 3 days Pre-planning for Approved Demand Time Ladder (approx.) Lead Time. 176+ d Value Add Time 42- 44 d Non-VA Time 80-165 d Electronic Information Flow Operations 3 days 7 days 7 days 13-18 days 3 days 60-140 days WIP (Inventory)PUSH- scheduled before neededExternal source LEGEND Eliminate Waste Time Analysis Non-Value Add vs. Total 50-75% or more Value Add vs. Total 25-50% or less Value Add vs. Non-VA ½ to 1/3 or less Work In Progress - Create RQSVR - Approve RQSVR - Shopping Cart - Create PO - Approve PO - Create Asset via ASN - Create PROCR - Create LGSRV - Approve LGSRV - Execution smartsheet - Asset arrival - Scan asset - Update TMA - Close PROCR - Close RQSVR - CIE prep work Post-Config - SWFPA: rack profile - Electrical/power WO - Network Pre-Config - Pre-cable network - Move - Scan - Install - Auto Verify - Configure switch - Check ILOM & Racks - TMA status=in-Service - Rack profile scripts - SASRV: begin bootstrap - Auto bootstrap (via API) - Close SWFPA - Resolve LGSRV - Bootstrap completed 9 days 0 days 4-6 days 0 days 11 days 0 days 5 days 0 days Asset Mgmt (8-10) Site Services (~40) Data Center TS (13) Network (8-10) Vendor (25-30) Lack of standardized work, e.g. Rack life expectancy, depreciation decisions Network Bubble decisions Ports availability
  • 32. “To-Be” Value Stream Map – “Rack On-boarding” Workflow Customer Pre-Config Land (on dock) Post-Config Order Request Purchase Order Purchase Order Dock ? days ? days ? days Pre-planning for Approved Demand Time Ladder (approx.) Lead Time. ? d Value Add Time ? d Non-VA Time ? d Electronic Information Flow Operations ?day s ?days ?days ?days ?days ?days WIP (Inventory)PUSH- scheduled before neededExternal source LEGEND Eliminate Waste Time Analysis Non-Value Add vs. Total ? % or more Value Add vs. Total ? % or less Value Add vs. Non-VA ? Not Started Dock ?days ?days ?days ?days ?days ?days ?days ?days Deploy Standardized Work One empowered team(80-100)?
  • 33. Modern Agile ESP- PE-wide Proposal for Management Review 4 Pillars of Modern Agile 33 Make Safety a Prerequisite Make People Awesome How do we make people awesome through our product and how do we make our teams awesome? How do we promote safety around interactions with one another as well as make our products safe to use for our users? Experiment & Learn Rapidly How do we increase the feedback loop? When we get stuck or aren’t learning enough, we take it as a sign that we need to learn more by running more experiments. Deliver Value Continuously How do we get value into our customer’s hands as frequently as possible? 01 02 03 04
  • 34. Lean Change Canvas- format for Initiatives
  • 36. Lean Canvas (Ebay example)
  • 37.