Kevin Sneed, LEED AP, AIA, IIDA Partner, Director of Architecture; OTJ Architects sneed@otj.com, 202.621.1364 Lew Brode, LEED AP, PE Branch Manager; Greenman-Pedersen, Inc.  lbrode@gpinet.com, 240.268.1822   Lida Lewis, LEED AP, Associate AIA Project Designer;  OTJ Architects  An Introduction to LEED-EB O&M Presented By:
[object Object],[object Object],[object Object],LEED buildings make good business and financial sense: LEED buildings are in demand, and the available supply is relatively low.  Working to take advantage of the LEED supply/demand gap makes solid business sense now, and their lower operating costs will continue to make good business sense into the future. Two recent studies (one by the New Buildings Institute, the other by CoStar) have confirmed that, nationally: ,[object Object],[object Object]
Data taken from the national CoStar Realty Information Group study
Data taken from the national CoStar Realty Information Group study
Data taken from a joint study by Deloitte and Charles Lockwood, released July 2008 In a joint study released this summer by Deloitte and Charles Lockwood: The group analyzed more than  1,300 LEED Certified and ENERGY STAR buildings ,  representing about 351 million square feet  in CoStar’s commercial property database of roughly 44 billion square feet, and assessed those buildings against non-green properties with similar size, location, class, tenancy, and year-built characteristics to generate the results.
Data taken from a joint study by Deloitte and Charles Lockwood, released July 2008 “ By and large, our respondents’ green retrofits achieved many of the stated objectives.  93 %  of our respondents reported greater ability to attract talent,  81 %  saw greater employee retention,  87 %  reported an improvement in workforce productivity,  75 %  saw an improvement in employee health, and  73 %  reported that they had achieved cost reductions as a result of implementing green measures
”  Deloitte and Lockwood Study, continued:
LEED projects are becoming more common and numerous across the US:
LEED projects are certified through several rating systems, to four certification levels:
LEED-EB O&M ,[object Object],[object Object],[object Object],LEED-EB is a system that is in flux, as is the majority of the LEED system: No change Minor changes Significant changes New Credit LEED-EB 2.0 vs. LEED-EB O&M
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],LEED-EB O&M
A project MUST adhere to  ALL  of the prerequisites listed to obtain  ANY  LEED-EB certification rating LEED EB:  Prerequisites WE PR1:  Minimum Indoor Plumbing and Fixture Efficiency EA PR1:  Energy Efficiency:  Planning, Documentation, and Opportunity Assessment EA PR2:  Minimum Energy Efficiency Performance EA PR3:  Refrigerant Management MR PR1:  Sustainable Purchasing Policy MR PR2:  Solid Waste Management Policy EQ PR1:  Outdoor Air Introduction and Exhaust Systems EQ PR2:  Environmental Tobacco Smoke Control EQ PR3:  Green Cleaning Policy
LEED EB O&M:  Prerequisites WE PR1:  Minimum Indoor Plumbing Efficiency A project MUST adhere to  ALL  of the prerequisites listed to obtain  ANY  LEED-EB certification rating Reduce potable water use to a level equal to or below the water use baseline, which is calculated relative to the  building’s indoor plumbing fixtures and fittings compliance with the 2006 IPC, and sets a baseline relative to the substantial completion of the building’s plumbing system—which includes faucets, water closets, urinals, and showerheads. EA PR 1:  Energy Efficiency Best Management Practices Requires documenting the current sequence of operations for the building, developing a building operations and maintenance plan, writing a descriptive narrative of the building mechanical and electrical systems and equipment, creating a preventative maintenance narrative and plan, and conducting an energy audit that meets the requirements of ASHRAE Level I:  walk-through analysis. EA PR 2:  Minimum Energy Efficiency Performance The building must gain at least 2 points under EA CR 1, which requires a minimum score of 69 under the EPA’s building EnergyStar rating system.
LEED EB O&M:  Prerequisites WE PR 3:  Refrigerant Management Prohibits the use of CFC-based refrigerants in the building HVAC&R systems unless a third-party audit shows that system replacement or conversion is not economically feasible (that simple payback of the system is greater than 10 years), or it is demonstrated that a phase-out plan for CFC refrigerants is in place. MR PR 1:  Sustainable Purchasing Policy Requires the establishment of a policy, covering purchases within the building management’s control, for the sustainable purchase of ongoing building consumables, including at least one of MR credits 2, 3, or 4.  Potential guidelines for such sustainable purchasing are available under the EPA’s Environmentally Preferable Purchasing (EPP) Program. MR PR 2:  Solid Waste Management Policy Requires the establishment of a policy for the building and site addressing the solid waste management of Ongoing Consumables (MR CR 7), Durable Goods (MR CR 8), Facility Alterations & Additions (MR CR 9), and mercury-containing lamps.
LEED EB O&M:  Prerequisites EQ PR 1:  Outdoor Air Introduction & Exhaust Systems Offers two paths to compliance: Option A: Modify or maintain each outside air intake, supply fan, and/or ventilation distribution system to supply the outdoor air ventilation rate required by ASHRAE 62.1-2007. Option B: If meeting ASHRAE 62.1-2007 is infeasible due to physical constraints, modify or maintain the system to supply at least 10 cfm of outdoor air per person under all normal operating conditions. EQ PR 2:  Environmental Tobacco Smoke Control Offers two paths to compliance:  Either prohibit smoking within 25 feet of all operable windows, building entries, and outdoor air intakes; OR prohibit smoking in the building except in specially designed, negatively-pressured smoking rooms, and locate any exterior smoking areas 25 feet away from all operable windows, building entries, and outdoor air intakes.
LEED EB O&M:  Prerequisites EQ PR 3:  Green Cleaning Policy Requires that the building purchase sustainable cleaning and hard floor & carpet care products, and purchase sustainable cleaning equipment.  In addition, this prerequisite requires the establishment of policies regarding standard operating procedures, strategies for safe handling and storage of cleaning chemicals, requirements for promoting and improving hand hygiene, requirements for staff training, and provisions for collecting occupant feedback and maintaining continuous improvement based on that feedback. ,[object Object],[object Object],[object Object],Additional General Requirements
LEED EB O&M:  Sustainable Sites
LEED EB O&M:  Sustainable Sites SS CR 1:  LEED Certified Design & Construction One point is awarded to those buildings which have been previously certified under LEED-NC, OR certified under LEED-CS with at least 75% of tenant spaces certified under LEED-CI. SS CR 2:  Building Exterior & Hardscape Management Plan ,[object Object],[object Object],[object Object],[object Object],[object Object]
LEED EB O&M:  Sustainable Sites, continued SS CR 3:  Integrated Pest Management, Erosion Control, and Landscape Management Plan Requires the establishment of an environmentally sensitive management plan that reduces harmful chemical use, water and energy waste, solid waste, air pollution, and chemical runoff.  Systems and policies must address pest management; erosion, sedimentation, and landscape erosion and waste control; and chemical fertilizer use. For projects in urban sites with little or no setback, this credit may be earned with policies that address vegetated roof surfaces, as long as the plants used are native or adapted species and the vegetated area covers at least 5% of the LEED project site area. SS CRs 4.1-4.4:  Alternative Commuting Transportation Up to 4 points may be earned (depending on level of compliance), for increasing alternative commuting (commuting by bicycle, walking, carpool, metro, bus, telecommuting, car and van pools, low-emitting or alternative fuel vehicles, etc.).  Reduction of traditional (one commuter, in one standard fuel vehicle) commuting by 10%, 25%, 50%, or 75% is required.
LEED EB O&M:  Sustainable Sites, continued SS CR 5:  Reduced Site Disturbance:  Protect or Restore Open Space Awards 1 point to those projects which have native or adapted vegetation over at least 25% of the site area, excluding the building footprint.  Projects may also restore off-site areas, with each 2 SF of off-site area counting as 1 SF on-site. For projects in urban sites with little or no setback, this credit may be earned with policies that address vegetated roof surfaces, as long as the plants used are native or adapted species and the vegetated area covers at least 5% of the LEED project site area. SS CR 6:  Stormwater Management One point is awarded to those buildings which establish a stormwater management plan which infiltrates, collects, and reuses runoff from at least 15% of the precipitation falling on the project site. Offers two routes for compliance:  Option A requires the use of strategies such as open paving, high-SRI pavers, landscape shading, etc. for 50% of the site hardscape area, OR Option B of this credit requires that a minimum of 50% of on-site parking spaces be underground. SS CR 7.1:  Heat Island Reduction, Non-Roof
LEED EB O&M:  Sustainable Sites, continued SS CR 7.2:  Heat Island Reduction:  Roof Offers three routes to compliance: ,[object Object],[object Object],[object Object],Interior non-emergency lighting with a direct line of sight to openings in the building envelope must shut off automatically after hours; and exterior/site lighting 50 Watts and greater must be fully or partially shielded, so that light generated by those luminaires is restricted from reaching the night sky and causing light pollution. SS CR 8:  Light Pollution Reduction
LEED EB O&M:  Water Efficiency
WE CRs 1.1 & 1.2:  Water Performance Measurement LEED EB O&M:  Water Efficiency CR 1.1, whole building metering, requires that a water meter be permanently installed in the building which measures the total potable water use for the building and grounds, and that meter data is recorded on a regular basis, with monthly and annual summary reports.  CR 1.2, submetering, requires installation of submeters for one of the following:  irrigation, indoor plumbing fixtures, cooling towers, domestic hot water, and process water.  (Meters owned by third parties, such as utility companies, do not demonstrate compliance) WE CRs 2.1-2.3:  Additional Indoor Plumbing Fixture Efficiency Up to 3 credits may be obtained for strategies and systems which reduce indoor plumbing fixture potable water use below the baseline established in WE Prerequisite 1 by 10%, 20%, or 30%.
WE CRs 4.1 & 4.2:  Cooling Tower Water Management LEED EB O&M:  Water Efficiency, continued CR 4.1, chemical management, requires the development and implementation of a water management plan that addresses chemical treatment, bleed-off, biological control, and staff training in cooling tower maintenance, as well as installing and/or maintaining a conductivity meter and automatic controls.  CR 4.2, nonpotable water source use, requires the use of nonpotable water sources (such as harvested rainwater, harvested stormwater, treated wastewater, air-conditioner condensate, etc.) for cooling tower operations—where at least 50% of the water used in the cooling system comes from these nonpotable sources. WE CRs 3.1-3.3:  Water Efficient Landscaping Up to 3 credits may be obtained for strategies and systems which reduce landscaping (including urban zero lot line buildings with vegetation or planters covering 5% of the roof area) potable water use, compared to conventional means, by 50%, 75%, or 100%.
LEED EB O&M:  Energy & Atmosphere
Intended to increase the level of operating efficiency performance of LEED buildings relative to typical buildings of similar type.  The EPA’s Energy Star rating system for buildings is used to evaluate the building, and anywhere from 2  (2 points are mandatory under the prerequisites) to 15 credits are awarded, depending on the building’s rating under that program. EA CR 1:  Optimize Energy Efficiency Performance LEED EB O&M:  Energy & Atmosphere Through a systematic process known as commissioning, an understanding is developed of the operation of the building’s major energy-using systems.  Up to 6 points may be earned in this category. EA CRs 2.1-2.3:  Existing Building Commissioning ,[object Object],[object Object],[object Object]
Requires that a building have in place a computer-based building automation system (BAS) that monitors and controls key building systems including heating, cooling, ventilation, and lighting, and uses that system to inform decisions regarding changes in building operations and energy-saving investments. EA CR 3.1:  Performance Measurement:  Building Automation System LEED EB O&M:  Energy & Atmosphere, continued In order to provide energy use information and identify potential energy-saving opportunities, these credits require system metering.  In this credit, the team will first develop a breakdown of energy use in the building through energy bills or through EA CRs 2.1 & 2.2.  Then, system-level metering must be installed to cover 40% to 80% of the total expected energy consumption of the building.  Under CR 3.2, the building will have system-level metering in place for 40% of the total expected energy use, and in addition, at least one of the two largest energy use categories must be covered by 80% or more. Under CR 3.3, the building will have system-level metering in place for 80% of the total expected energy use, and in addition, at least two of the three largest energy use categories must be covered by 80% or more. Meters owned by third parties (such as utility companies) do not contribute toward compliance. EA CRs 3.2 & 3.3:  Performance Measurement:  System-Level Metering
LEED EB O&M:  Energy & Atmosphere, continued EA CRs 4.1-4.4:  On-Site and Off-Site Renewable Energy Over the performance period, meet some or all of the building’s total energy use through on-site or off-site (green-e certified power certificates) renewable energy sources. Points are awarded thusly: LEED-EB points on-site energy off-site energy 1 2 3 4 3% 6% 9% 12% 25% 50% 75% 100% EA CR 5:  Refrigerant Management Two compliance methods apply:  under Option A, buildings agree to not use HVAC&R equipment with refrigerants, and under Option B, some refrigerants may be used, which do not contribute to global warming. EA CR 6:  Emissions Reduction Reporting Identify, track, and record emissions reductions delivered by building sustainable features and procedures, and record them using a third-party reporting or certification program (Energy Star, for example).
LEED EB:  Materials & Resources
LEED EB:  Materials & Resources MR CRs 1.1-1.3:  Sustainable Purchasing:  Ongoing Consumables Under this credit, sustainable purchasing policies are implemented for low cost per unit items (such as paper, batteries, envelopes, toner, etc.).  This policy would encourage the use of items with high recycled content, FSC certification, local (within 500 miles) sourcing, et cetera.  1-3 points may be earned in this category. MR CRs 2.1 & 2.2:  Sustainable Purchasing:  Durable Goods Under this credit, sustainable purchasing policies are implemented for higher cost per unit items, are replaced infrequently, and/or may require capital improvement outlays CR 2.1, Electric-Powered Equipment, awards one point to projects which achieve sustainable purchases for at least 40% of electric-powered equipment (by cost), such as copiers, monitors, printers, appliances, televisions, and various types of AV equipment.  Such equipment will be Energy Star labeled, or replaces conventional gas-powered equipment (such as some types of landscaping and cleaning equipment). CR 2.2, Furniture, awards one point to those projects which sustainably purchase at least 40% of total furniture purchases (by cost).  These furniture types will typically be items with high recycled content, FSC certified components, local (within 500 miles) components, et cetera.
Under this credit category, a point is earned by implementing and maintaining a sustainable purchasing policy for building elements permanently or semi-permanently attached to the building itself.  This includes, but is not limited to, drywall, ceiling panels, adhesives, sealants, paint, wall studs, doors, etc.  This credit encourages the use of building elements with low VOC content, high recycled content, purchased within 500 miles of the project site, et cetera. MR CR 3:  Facility Alterations & Additions This credit requires the development of a lighting purchasing plan that keeps mercury levels below 70-90 picograms per lumen-hour, and 1-2 points may be earned, depending on the level of compliance achieved. MR CR 4:  Reduced Mercury in Lamps To reduce the environmental and transportation impacts associated with food purchase and distribution, a credit may be earned in this category by buildings which achieve sustainable purchasing levels (organic, Blue Eco-Label, Project Harvest Certified, etc., and purchased within 100 miles of the building) for 25% of food and beverage purchases (by cost). MR CR 5:  Food LEED EB:  Materials & Resources
LEED EB:  Materials & Resources, continued MR CR 6:  Waste Stream Audit Under this credit, the team must conduct a “waste stream audit”, identifying a current building baseline for waste types and amounts (including paper, glass, plastics, cardboard, and metals), and opportunities for waste diversion and increases in recycling. MR CRs 7.1-7.2:  Solid Waste Management:  Ongoing Consumables Maintain a waste reduction and recycling program, addressing materials with a low cost per unit item, and provide an easily accessible area that serves the entire building dedicated to the separation, collection, and storage of materials for recycling (including paper, glass, plastics, cardboard, and metals), of a capacity designed to accommodate 50 – 70% of the waste stream (1-2 points awarded). MR CR 8:  Solid Waste Management:  Durable Goods Maintain a waste reduction and recycling program, addressing durable, infrequently replaced materials (such as office equipment, appliances, televisions, power adapters, et cetera).  Reuse or recycle 75% of this waste stream, by weight, volume, or replacement value. MR CR 9:  Solid Waste Management:  Facility Alterations & Additions Divert at least 70% of waste (by volume) generated by facility alterations & additions from landfills.
LEED EB:  Indoor Environmental Quality
LEED EB:  Indoor Environmental Quality EQ CR 1.1:  IAQ Management Program In this category, a building will develop and implement, on an ongoing basis, an IAQ management program based on the EPA’s “Indoor Air Quality Building Education and Assessment Model (I-BEAM)”, which attempts to prevent the development of indoor air quality problems, and maintain the well-being of building occupants. EQ CR 1.2:  Outdoor Air Delivery Monitoring This credit requires the installation of permanent, continuous monitoring systems that provide feedback on ventilation system performance to ensure that the ventilation systems maintain expected system operating conditions within 15% of the design minimum.  Monitoring must be performed for at least 80% of the building’s outdoor air intake flow serving occupied spaces, and generate alarms when noncompliance levels occur. In addition, CO2 sensors and/or sampling locations must be installed and/or established for all densely occupied spaces. EQ CR 1.3:  Increased Ventilation For mechanically ventilated spaces, increase outdoor air ventilation rates for all air-handling units serving occupied spaces b at least 30% over ASHRAE 62.1-2007 minimums.
LEED EB:  Indoor Environmental Quality, continued EQ CR 1.4:  Reduce Particulates in Air Distribution To reduce exposure of building occupants and maintenance personnel to potentially hazardous particulate contaminants, have in place filtration media with a value greater than or equal to MERV 13 for all outside air intakes and inside air recirculation returns. EQ CR 1.5:  IAQ Management for Facility Alterations and Additions This credit aims to prevent indoor air quality problems after construction, by requiring an IAQ management plan for construction and occupancy phases, including monitoring during construction to ensure that the contractor is: following SMACNA IAQ guidelines,  protecting on-site absorptive construction materials,  using MERV-8 filters during construction, and replacing all of those filters post construction and prior to tenant occupancy,  and conducting a flush-out of the space after construction has concluded, and prior to occupancy by the tenant.
EQ CR 2.1:  Occupant Survey Conduct at least one occupant survey during the performance period, to collect anonymous responses about thermal comfort, acoustics, indoor air quality, lighting levels, building cleanliness, and other occupant comfort issues, collecting responses from at least 30% of occupants. LEED EB:  Indoor Environmental Quality, continued EQ CR 2.2:  Occupant Controlled Lighting Requires the use of lighting controls that enable adjustments to suit the task needs and preferences of individuals for at least 50% of individual workstations, AND for groups sharing a multi-occupant space or working area for at least 50% of multi-occupant spaces in the building. EQ CR 2.3:  Thermal Comfort Monitoring Aimed at providing a high level of control for building occupants, fostering greater workplace satisfaction and productivity, this credit requires the provision of a thermally comfortable environment, by designing a space that complies with ASHRAE Standard 55-2004.  In addition to this compliance, there must be provided a permanent monitoring system to ensure that the systems are performing in accordance with ASHRAE Standard 55-2004.
LEED EB:  Indoor Environmental Quality, continued EQ CRs 2.4 & 2.5:  Daylight & Views In order to ensure that all building occupants have a connection to the outdoors, with access to daylight and views in all or most of the regularly occupied tenant spaces.  Under CR 2.4, a 2% daylight factor must be achieved for 50% of spaces occupied for critical visual tasks, OR direct line of site vision glazing must be achieved for building occupants in 45% of all regularly occupied spaces. CR 2.5 requires that a 2% daylight factor be achieved for 75% of occupied critical visual task areas, OR direct lines of sight to vision glazing for building occupants in 90% of regularly occupied spaces.
LEED EB:  Indoor Environmental Quality, continued EQ CRs 3.1-3.9:  Green Cleaning In these credit categories, points are awarded for achieving increased sustainability and ergonomic performance levels in cleaning equipment, practices, and materials: ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
LEED EB:  Innovation & Design
LEED  Gold:  Union of Concerned Scientists ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Has been awarded a USBGC LEED Gold Rating
LEED  Gold:   The American Wind Energy Association ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Currently submitted to the USBGC LEED Online site with a LEED Gold Rating (under review)
LEED  Gold:  The American Legacy Foundation Winner of the AIA DC Chapter Presidential Citation for Sustainable Design ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

More Related Content

What's hot

LEED Presentation_V4.pptx
LEED Presentation_V4.pptxLEED Presentation_V4.pptx
LEED Presentation_V4.pptxKumar Ramaiah
 
Notre dame de paris
Notre dame de parisNotre dame de paris
Notre dame de parisFatma Mowafi
 
Chapter 2 introduction-to_leed_rating_systems
Chapter 2 introduction-to_leed_rating_systemsChapter 2 introduction-to_leed_rating_systems
Chapter 2 introduction-to_leed_rating_systemsVenkatesh S
 
LEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdfLEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdfSunshineBeats
 
Dr. Faten Al-Attar - Green building and waste management
Dr. Faten Al-Attar - Green building and waste managementDr. Faten Al-Attar - Green building and waste management
Dr. Faten Al-Attar - Green building and waste managementpromediakw
 
Ű§Ù„ŰŁŰłŰȘŰŻŰ§Ù…Ű©
Ű§Ù„ŰŁŰłŰȘŰŻŰ§Ù…Ű©Ű§Ù„ŰŁŰłŰȘŰŻŰ§Ù…Ű©
Ű§Ù„ŰŁŰłŰȘŰŻŰ§Ù…Ű©Abdullah Algaroushah
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminarOsama Khadra
 
Pmbok6 to 7 transformation
Pmbok6 to 7 transformationPmbok6 to 7 transformation
Pmbok6 to 7 transformationZaur Ahmadov, PMP
 
Designing with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratingsDesigning with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratingsReshma Philip
 
CASBEE
CASBEECASBEE
CASBEEmisschand
 
LEED Green Associate Study Session #1
LEED Green Associate Study Session #1LEED Green Associate Study Session #1
LEED Green Associate Study Session #1mattvaughn33
 
THE GREEN BUILDING
THE GREEN BUILDINGTHE GREEN BUILDING
THE GREEN BUILDINGsangeetkhule
 
Leed green buildings
Leed green buildingsLeed green buildings
Leed green buildingsAbdualla Alhoot
 
Green Building Rating LEED
Green Building Rating LEEDGreen Building Rating LEED
Green Building Rating LEEDOmkar Tattu
 
Location and Transportation Final
Location and Transportation FinalLocation and Transportation Final
Location and Transportation FinalDanielle Gavin
 
LEED(leadership in energy & enviromental design)
LEED(leadership in energy & enviromental design)LEED(leadership in energy & enviromental design)
LEED(leadership in energy & enviromental design)mohammedshahjalal1
 

What's hot (20)

LEED Presentation_V4.pptx
LEED Presentation_V4.pptxLEED Presentation_V4.pptx
LEED Presentation_V4.pptx
 
Notre dame de paris
Notre dame de parisNotre dame de paris
Notre dame de paris
 
Chapter 2 introduction-to_leed_rating_systems
Chapter 2 introduction-to_leed_rating_systemsChapter 2 introduction-to_leed_rating_systems
Chapter 2 introduction-to_leed_rating_systems
 
LEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdfLEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdf
 
Dr. Faten Al-Attar - Green building and waste management
Dr. Faten Al-Attar - Green building and waste managementDr. Faten Al-Attar - Green building and waste management
Dr. Faten Al-Attar - Green building and waste management
 
Ű§Ù„ŰŁŰłŰȘŰŻŰ§Ù…Ű©
Ű§Ù„ŰŁŰłŰȘŰŻŰ§Ù…Ű©Ű§Ù„ŰŁŰłŰȘŰŻŰ§Ù…Ű©
Ű§Ù„ŰŁŰłŰȘŰŻŰ§Ù…Ű©
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminar
 
Pmbok6 to 7 transformation
Pmbok6 to 7 transformationPmbok6 to 7 transformation
Pmbok6 to 7 transformation
 
Designing with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratingsDesigning with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratings
 
LEED
LEEDLEED
LEED
 
KAFD Design Manual Guidelines
KAFD Design Manual GuidelinesKAFD Design Manual Guidelines
KAFD Design Manual Guidelines
 
CASBEE
CASBEECASBEE
CASBEE
 
LEED Green Associate Study Session #1
LEED Green Associate Study Session #1LEED Green Associate Study Session #1
LEED Green Associate Study Session #1
 
THE GREEN BUILDING
THE GREEN BUILDINGTHE GREEN BUILDING
THE GREEN BUILDING
 
Leed green buildings
Leed green buildingsLeed green buildings
Leed green buildings
 
Green Building Rating LEED
Green Building Rating LEEDGreen Building Rating LEED
Green Building Rating LEED
 
LEED Presentation
LEED PresentationLEED Presentation
LEED Presentation
 
Location and Transportation Final
Location and Transportation FinalLocation and Transportation Final
Location and Transportation Final
 
Breeam
BreeamBreeam
Breeam
 
LEED(leadership in energy & enviromental design)
LEED(leadership in energy & enviromental design)LEED(leadership in energy & enviromental design)
LEED(leadership in energy & enviromental design)
 

Viewers also liked

Rainiero leon leed_ap_building_operations_maintenance
Rainiero leon leed_ap_building_operations_maintenanceRainiero leon leed_ap_building_operations_maintenance
Rainiero leon leed_ap_building_operations_maintenanceRainiero Leon
 
LEED Canada - Existing Building Commissioning_Mar1st
LEED Canada - Existing Building Commissioning_Mar1stLEED Canada - Existing Building Commissioning_Mar1st
LEED Canada - Existing Building Commissioning_Mar1stMichael Clarke
 
GovernEE: towards better governance in energy management of public buildings
GovernEE: towards better governance in energy management of public buildingsGovernEE: towards better governance in energy management of public buildings
GovernEE: towards better governance in energy management of public buildingsGovernEE
 
Webinar: Become a LEED AP and Maintain Your Credential
Webinar: Become a LEED AP and Maintain Your CredentialWebinar: Become a LEED AP and Maintain Your Credential
Webinar: Become a LEED AP and Maintain Your CredentialSustainable Performance Institute
 
Gunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating SystemsGunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating SystemsGeoffrey Lewis
 

Viewers also liked (6)

Optimizing Building Operations and Maintenance Practices
Optimizing Building Operations and Maintenance PracticesOptimizing Building Operations and Maintenance Practices
Optimizing Building Operations and Maintenance Practices
 
Rainiero leon leed_ap_building_operations_maintenance
Rainiero leon leed_ap_building_operations_maintenanceRainiero leon leed_ap_building_operations_maintenance
Rainiero leon leed_ap_building_operations_maintenance
 
LEED Canada - Existing Building Commissioning_Mar1st
LEED Canada - Existing Building Commissioning_Mar1stLEED Canada - Existing Building Commissioning_Mar1st
LEED Canada - Existing Building Commissioning_Mar1st
 
GovernEE: towards better governance in energy management of public buildings
GovernEE: towards better governance in energy management of public buildingsGovernEE: towards better governance in energy management of public buildings
GovernEE: towards better governance in energy management of public buildings
 
Webinar: Become a LEED AP and Maintain Your Credential
Webinar: Become a LEED AP and Maintain Your CredentialWebinar: Become a LEED AP and Maintain Your Credential
Webinar: Become a LEED AP and Maintain Your Credential
 
Gunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating SystemsGunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating Systems
 

Similar to LEED-EB O&M Basics

LEED-EB Presentation
LEED-EB PresentationLEED-EB Presentation
LEED-EB PresentationKevin Sneed
 
10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.pptMd Mizanur Rahman
 
10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.pptSWAPNILKRISHNA3
 
GREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)ppt
GREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)pptGREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)ppt
GREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)pptDataFile3
 
10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.pptssuserbc5970
 
Leed Green Associate Study Slides
Leed Green Associate Study SlidesLeed Green Associate Study Slides
Leed Green Associate Study SlidesMelad Alaqra, PMP MIET
 
Sustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment SystemsSustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment SystemsTerri Meyer Boake
 
LEED Green Factory
LEED Green FactoryLEED Green Factory
LEED Green Factoryenayet hossain
 
July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13GreenHomeNYC
 
BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11MairaNoor4
 
Beth brummitt energy and climate legislation and your business
Beth brummitt energy and climate legislation and your businessBeth brummitt energy and climate legislation and your business
Beth brummitt energy and climate legislation and your businessCenter for Sustainable Energy
 
Leed Civil Engineering Strategies
Leed Civil Engineering StrategiesLeed Civil Engineering Strategies
Leed Civil Engineering StrategiesSean Merrell
 
Presentation green construction
Presentation   green constructionPresentation   green construction
Presentation green constructionMukhtar Malik
 
July2013 ghnyc -alternatives to leed
July2013 ghnyc -alternatives to leedJuly2013 ghnyc -alternatives to leed
July2013 ghnyc -alternatives to leedGreenHomeNYC
 
How green buildings can save you money(finished)
How green buildings can save you money(finished)How green buildings can save you money(finished)
How green buildings can save you money(finished)RandyBett
 
Green Path Criteria
Green Path CriteriaGreen Path Criteria
Green Path Criteriacabq
 
The evolution of green buildings in nigeria
The evolution of green buildings in nigeria The evolution of green buildings in nigeria
The evolution of green buildings in nigeria amfacilities
 

Similar to LEED-EB O&M Basics (20)

LEED-EB Presentation
LEED-EB PresentationLEED-EB Presentation
LEED-EB Presentation
 
10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt
 
10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt
 
GREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)ppt
GREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)pptGREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)ppt
GREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)ppt
 
10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt
 
Leed Green Associate Study Slides
Leed Green Associate Study SlidesLeed Green Associate Study Slides
Leed Green Associate Study Slides
 
Sustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment SystemsSustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment Systems
 
LEED Green Factory
LEED Green FactoryLEED Green Factory
LEED Green Factory
 
July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13
 
LEED
LEEDLEED
LEED
 
ENERGY STAR Portfolio Manager and LEED: Bill Willis, West Virginia Division O...
ENERGY STAR Portfolio Manager and LEED: Bill Willis, West Virginia Division O...ENERGY STAR Portfolio Manager and LEED: Bill Willis, West Virginia Division O...
ENERGY STAR Portfolio Manager and LEED: Bill Willis, West Virginia Division O...
 
BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11
 
Usgbc intro
Usgbc introUsgbc intro
Usgbc intro
 
Beth brummitt energy and climate legislation and your business
Beth brummitt energy and climate legislation and your businessBeth brummitt energy and climate legislation and your business
Beth brummitt energy and climate legislation and your business
 
Leed Civil Engineering Strategies
Leed Civil Engineering StrategiesLeed Civil Engineering Strategies
Leed Civil Engineering Strategies
 
Presentation green construction
Presentation   green constructionPresentation   green construction
Presentation green construction
 
July2013 ghnyc -alternatives to leed
July2013 ghnyc -alternatives to leedJuly2013 ghnyc -alternatives to leed
July2013 ghnyc -alternatives to leed
 
How green buildings can save you money(finished)
How green buildings can save you money(finished)How green buildings can save you money(finished)
How green buildings can save you money(finished)
 
Green Path Criteria
Green Path CriteriaGreen Path Criteria
Green Path Criteria
 
The evolution of green buildings in nigeria
The evolution of green buildings in nigeria The evolution of green buildings in nigeria
The evolution of green buildings in nigeria
 

More from Lida_Lewis

Texture + Pattern | Walls + Surfaces
Texture + Pattern | Walls + SurfacesTexture + Pattern | Walls + Surfaces
Texture + Pattern | Walls + SurfacesLida_Lewis
 
Flooring
FlooringFlooring
FlooringLida_Lewis
 
LEED and WELL - An Introduction
LEED and WELL - An IntroductionLEED and WELL - An Introduction
LEED and WELL - An IntroductionLida_Lewis
 
WELL Building Standard Introduction
WELL Building Standard IntroductionWELL Building Standard Introduction
WELL Building Standard IntroductionLida_Lewis
 
Lida Lewis - Applied Workplace Research Sample, New OTJ Office
Lida Lewis - Applied Workplace Research Sample, New OTJ OfficeLida Lewis - Applied Workplace Research Sample, New OTJ Office
Lida Lewis - Applied Workplace Research Sample, New OTJ OfficeLida_Lewis
 
OTJ Architects
OTJ ArchitectsOTJ Architects
OTJ ArchitectsLida_Lewis
 

More from Lida_Lewis (6)

Texture + Pattern | Walls + Surfaces
Texture + Pattern | Walls + SurfacesTexture + Pattern | Walls + Surfaces
Texture + Pattern | Walls + Surfaces
 
Flooring
FlooringFlooring
Flooring
 
LEED and WELL - An Introduction
LEED and WELL - An IntroductionLEED and WELL - An Introduction
LEED and WELL - An Introduction
 
WELL Building Standard Introduction
WELL Building Standard IntroductionWELL Building Standard Introduction
WELL Building Standard Introduction
 
Lida Lewis - Applied Workplace Research Sample, New OTJ Office
Lida Lewis - Applied Workplace Research Sample, New OTJ OfficeLida Lewis - Applied Workplace Research Sample, New OTJ Office
Lida Lewis - Applied Workplace Research Sample, New OTJ Office
 
OTJ Architects
OTJ ArchitectsOTJ Architects
OTJ Architects
 

Recently uploaded

How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Malegaon Call Girls Service ☎ 82500–77686 ☎ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ 82500–77686 ☎ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ 82500–77686 ☎ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ 82500–77686 ☎ Enjoy 24/7 Escort ServiceDamini Dixit
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Call Girls In Noida 959961âŠč3876 Independent Escort Service Noida
Call Girls In Noida 959961âŠč3876 Independent Escort Service NoidaCall Girls In Noida 959961âŠč3876 Independent Escort Service Noida
Call Girls In Noida 959961âŠč3876 Independent Escort Service Noidadlhescort
 
Call Girls Zirakpur👧 Book NowđŸ“±7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book NowđŸ“±7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book NowđŸ“±7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book NowđŸ“±7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Call Girls From Pari Chowk Greater Noida ❀8448577510 âŠčBest Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❀8448577510 âŠčBest Escorts Service I...Call Girls From Pari Chowk Greater Noida ❀8448577510 âŠčBest Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❀8448577510 âŠčBest Escorts Service I...lizamodels9
 
Chandigarh Escorts Service 📞8868886958📞 JustđŸ“Č Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 JustđŸ“Č Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 JustđŸ“Č Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 JustđŸ“Č Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 

Recently uploaded (20)

How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Malegaon Call Girls Service ☎ 82500–77686 ☎ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ 82500–77686 ☎ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ 82500–77686 ☎ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ 82500–77686 ☎ Enjoy 24/7 Escort Service
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls In Noida 959961âŠč3876 Independent Escort Service Noida
Call Girls In Noida 959961âŠč3876 Independent Escort Service NoidaCall Girls In Noida 959961âŠč3876 Independent Escort Service Noida
Call Girls In Noida 959961âŠč3876 Independent Escort Service Noida
 
Call Girls Zirakpur👧 Book NowđŸ“±7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book NowđŸ“±7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book NowđŸ“±7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book NowđŸ“±7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Call Girls From Pari Chowk Greater Noida ❀8448577510 âŠčBest Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❀8448577510 âŠčBest Escorts Service I...Call Girls From Pari Chowk Greater Noida ❀8448577510 âŠčBest Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❀8448577510 âŠčBest Escorts Service I...
 
Chandigarh Escorts Service 📞8868886958📞 JustđŸ“Č Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 JustđŸ“Č Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 JustđŸ“Č Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 JustđŸ“Č Call Nihal Chandigarh Call Girl...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 

LEED-EB O&M Basics

  • 1. Kevin Sneed, LEED AP, AIA, IIDA Partner, Director of Architecture; OTJ Architects sneed@otj.com, 202.621.1364 Lew Brode, LEED AP, PE Branch Manager; Greenman-Pedersen, Inc. lbrode@gpinet.com, 240.268.1822 Lida Lewis, LEED AP, Associate AIA Project Designer; OTJ Architects An Introduction to LEED-EB O&M Presented By:
  • 2.
  • 3. Data taken from the national CoStar Realty Information Group study
  • 4. Data taken from the national CoStar Realty Information Group study
  • 5. Data taken from a joint study by Deloitte and Charles Lockwood, released July 2008 In a joint study released this summer by Deloitte and Charles Lockwood: The group analyzed more than 1,300 LEED Certified and ENERGY STAR buildings , representing about 351 million square feet in CoStar’s commercial property database of roughly 44 billion square feet, and assessed those buildings against non-green properties with similar size, location, class, tenancy, and year-built characteristics to generate the results.
  • 6. Data taken from a joint study by Deloitte and Charles Lockwood, released July 2008 “ By and large, our respondents’ green retrofits achieved many of the stated objectives. 93 % of our respondents reported greater ability to attract talent, 81 % saw greater employee retention, 87 % reported an improvement in workforce productivity, 75 % saw an improvement in employee health, and 73 % reported that they had achieved cost reductions as a result of implementing green measures
” Deloitte and Lockwood Study, continued:
  • 7. LEED projects are becoming more common and numerous across the US:
  • 8. LEED projects are certified through several rating systems, to four certification levels:
  • 9.
  • 10.
  • 11. A project MUST adhere to ALL of the prerequisites listed to obtain ANY LEED-EB certification rating LEED EB: Prerequisites WE PR1: Minimum Indoor Plumbing and Fixture Efficiency EA PR1: Energy Efficiency: Planning, Documentation, and Opportunity Assessment EA PR2: Minimum Energy Efficiency Performance EA PR3: Refrigerant Management MR PR1: Sustainable Purchasing Policy MR PR2: Solid Waste Management Policy EQ PR1: Outdoor Air Introduction and Exhaust Systems EQ PR2: Environmental Tobacco Smoke Control EQ PR3: Green Cleaning Policy
  • 12. LEED EB O&M: Prerequisites WE PR1: Minimum Indoor Plumbing Efficiency A project MUST adhere to ALL of the prerequisites listed to obtain ANY LEED-EB certification rating Reduce potable water use to a level equal to or below the water use baseline, which is calculated relative to the building’s indoor plumbing fixtures and fittings compliance with the 2006 IPC, and sets a baseline relative to the substantial completion of the building’s plumbing system—which includes faucets, water closets, urinals, and showerheads. EA PR 1: Energy Efficiency Best Management Practices Requires documenting the current sequence of operations for the building, developing a building operations and maintenance plan, writing a descriptive narrative of the building mechanical and electrical systems and equipment, creating a preventative maintenance narrative and plan, and conducting an energy audit that meets the requirements of ASHRAE Level I: walk-through analysis. EA PR 2: Minimum Energy Efficiency Performance The building must gain at least 2 points under EA CR 1, which requires a minimum score of 69 under the EPA’s building EnergyStar rating system.
  • 13. LEED EB O&M: Prerequisites WE PR 3: Refrigerant Management Prohibits the use of CFC-based refrigerants in the building HVAC&R systems unless a third-party audit shows that system replacement or conversion is not economically feasible (that simple payback of the system is greater than 10 years), or it is demonstrated that a phase-out plan for CFC refrigerants is in place. MR PR 1: Sustainable Purchasing Policy Requires the establishment of a policy, covering purchases within the building management’s control, for the sustainable purchase of ongoing building consumables, including at least one of MR credits 2, 3, or 4. Potential guidelines for such sustainable purchasing are available under the EPA’s Environmentally Preferable Purchasing (EPP) Program. MR PR 2: Solid Waste Management Policy Requires the establishment of a policy for the building and site addressing the solid waste management of Ongoing Consumables (MR CR 7), Durable Goods (MR CR 8), Facility Alterations & Additions (MR CR 9), and mercury-containing lamps.
  • 14. LEED EB O&M: Prerequisites EQ PR 1: Outdoor Air Introduction & Exhaust Systems Offers two paths to compliance: Option A: Modify or maintain each outside air intake, supply fan, and/or ventilation distribution system to supply the outdoor air ventilation rate required by ASHRAE 62.1-2007. Option B: If meeting ASHRAE 62.1-2007 is infeasible due to physical constraints, modify or maintain the system to supply at least 10 cfm of outdoor air per person under all normal operating conditions. EQ PR 2: Environmental Tobacco Smoke Control Offers two paths to compliance: Either prohibit smoking within 25 feet of all operable windows, building entries, and outdoor air intakes; OR prohibit smoking in the building except in specially designed, negatively-pressured smoking rooms, and locate any exterior smoking areas 25 feet away from all operable windows, building entries, and outdoor air intakes.
  • 15.
  • 16. LEED EB O&M: Sustainable Sites
  • 17.
  • 18. LEED EB O&M: Sustainable Sites, continued SS CR 3: Integrated Pest Management, Erosion Control, and Landscape Management Plan Requires the establishment of an environmentally sensitive management plan that reduces harmful chemical use, water and energy waste, solid waste, air pollution, and chemical runoff. Systems and policies must address pest management; erosion, sedimentation, and landscape erosion and waste control; and chemical fertilizer use. For projects in urban sites with little or no setback, this credit may be earned with policies that address vegetated roof surfaces, as long as the plants used are native or adapted species and the vegetated area covers at least 5% of the LEED project site area. SS CRs 4.1-4.4: Alternative Commuting Transportation Up to 4 points may be earned (depending on level of compliance), for increasing alternative commuting (commuting by bicycle, walking, carpool, metro, bus, telecommuting, car and van pools, low-emitting or alternative fuel vehicles, etc.). Reduction of traditional (one commuter, in one standard fuel vehicle) commuting by 10%, 25%, 50%, or 75% is required.
  • 19. LEED EB O&M: Sustainable Sites, continued SS CR 5: Reduced Site Disturbance: Protect or Restore Open Space Awards 1 point to those projects which have native or adapted vegetation over at least 25% of the site area, excluding the building footprint. Projects may also restore off-site areas, with each 2 SF of off-site area counting as 1 SF on-site. For projects in urban sites with little or no setback, this credit may be earned with policies that address vegetated roof surfaces, as long as the plants used are native or adapted species and the vegetated area covers at least 5% of the LEED project site area. SS CR 6: Stormwater Management One point is awarded to those buildings which establish a stormwater management plan which infiltrates, collects, and reuses runoff from at least 15% of the precipitation falling on the project site. Offers two routes for compliance: Option A requires the use of strategies such as open paving, high-SRI pavers, landscape shading, etc. for 50% of the site hardscape area, OR Option B of this credit requires that a minimum of 50% of on-site parking spaces be underground. SS CR 7.1: Heat Island Reduction, Non-Roof
  • 20.
  • 21. LEED EB O&M: Water Efficiency
  • 22. WE CRs 1.1 & 1.2: Water Performance Measurement LEED EB O&M: Water Efficiency CR 1.1, whole building metering, requires that a water meter be permanently installed in the building which measures the total potable water use for the building and grounds, and that meter data is recorded on a regular basis, with monthly and annual summary reports. CR 1.2, submetering, requires installation of submeters for one of the following: irrigation, indoor plumbing fixtures, cooling towers, domestic hot water, and process water. (Meters owned by third parties, such as utility companies, do not demonstrate compliance) WE CRs 2.1-2.3: Additional Indoor Plumbing Fixture Efficiency Up to 3 credits may be obtained for strategies and systems which reduce indoor plumbing fixture potable water use below the baseline established in WE Prerequisite 1 by 10%, 20%, or 30%.
  • 23. WE CRs 4.1 & 4.2: Cooling Tower Water Management LEED EB O&M: Water Efficiency, continued CR 4.1, chemical management, requires the development and implementation of a water management plan that addresses chemical treatment, bleed-off, biological control, and staff training in cooling tower maintenance, as well as installing and/or maintaining a conductivity meter and automatic controls. CR 4.2, nonpotable water source use, requires the use of nonpotable water sources (such as harvested rainwater, harvested stormwater, treated wastewater, air-conditioner condensate, etc.) for cooling tower operations—where at least 50% of the water used in the cooling system comes from these nonpotable sources. WE CRs 3.1-3.3: Water Efficient Landscaping Up to 3 credits may be obtained for strategies and systems which reduce landscaping (including urban zero lot line buildings with vegetation or planters covering 5% of the roof area) potable water use, compared to conventional means, by 50%, 75%, or 100%.
  • 24. LEED EB O&M: Energy & Atmosphere
  • 25.
  • 26. Requires that a building have in place a computer-based building automation system (BAS) that monitors and controls key building systems including heating, cooling, ventilation, and lighting, and uses that system to inform decisions regarding changes in building operations and energy-saving investments. EA CR 3.1: Performance Measurement: Building Automation System LEED EB O&M: Energy & Atmosphere, continued In order to provide energy use information and identify potential energy-saving opportunities, these credits require system metering. In this credit, the team will first develop a breakdown of energy use in the building through energy bills or through EA CRs 2.1 & 2.2. Then, system-level metering must be installed to cover 40% to 80% of the total expected energy consumption of the building. Under CR 3.2, the building will have system-level metering in place for 40% of the total expected energy use, and in addition, at least one of the two largest energy use categories must be covered by 80% or more. Under CR 3.3, the building will have system-level metering in place for 80% of the total expected energy use, and in addition, at least two of the three largest energy use categories must be covered by 80% or more. Meters owned by third parties (such as utility companies) do not contribute toward compliance. EA CRs 3.2 & 3.3: Performance Measurement: System-Level Metering
  • 27. LEED EB O&M: Energy & Atmosphere, continued EA CRs 4.1-4.4: On-Site and Off-Site Renewable Energy Over the performance period, meet some or all of the building’s total energy use through on-site or off-site (green-e certified power certificates) renewable energy sources. Points are awarded thusly: LEED-EB points on-site energy off-site energy 1 2 3 4 3% 6% 9% 12% 25% 50% 75% 100% EA CR 5: Refrigerant Management Two compliance methods apply: under Option A, buildings agree to not use HVAC&R equipment with refrigerants, and under Option B, some refrigerants may be used, which do not contribute to global warming. EA CR 6: Emissions Reduction Reporting Identify, track, and record emissions reductions delivered by building sustainable features and procedures, and record them using a third-party reporting or certification program (Energy Star, for example).
  • 28. LEED EB: Materials & Resources
  • 29. LEED EB: Materials & Resources MR CRs 1.1-1.3: Sustainable Purchasing: Ongoing Consumables Under this credit, sustainable purchasing policies are implemented for low cost per unit items (such as paper, batteries, envelopes, toner, etc.). This policy would encourage the use of items with high recycled content, FSC certification, local (within 500 miles) sourcing, et cetera. 1-3 points may be earned in this category. MR CRs 2.1 & 2.2: Sustainable Purchasing: Durable Goods Under this credit, sustainable purchasing policies are implemented for higher cost per unit items, are replaced infrequently, and/or may require capital improvement outlays CR 2.1, Electric-Powered Equipment, awards one point to projects which achieve sustainable purchases for at least 40% of electric-powered equipment (by cost), such as copiers, monitors, printers, appliances, televisions, and various types of AV equipment. Such equipment will be Energy Star labeled, or replaces conventional gas-powered equipment (such as some types of landscaping and cleaning equipment). CR 2.2, Furniture, awards one point to those projects which sustainably purchase at least 40% of total furniture purchases (by cost). These furniture types will typically be items with high recycled content, FSC certified components, local (within 500 miles) components, et cetera.
  • 30. Under this credit category, a point is earned by implementing and maintaining a sustainable purchasing policy for building elements permanently or semi-permanently attached to the building itself. This includes, but is not limited to, drywall, ceiling panels, adhesives, sealants, paint, wall studs, doors, etc. This credit encourages the use of building elements with low VOC content, high recycled content, purchased within 500 miles of the project site, et cetera. MR CR 3: Facility Alterations & Additions This credit requires the development of a lighting purchasing plan that keeps mercury levels below 70-90 picograms per lumen-hour, and 1-2 points may be earned, depending on the level of compliance achieved. MR CR 4: Reduced Mercury in Lamps To reduce the environmental and transportation impacts associated with food purchase and distribution, a credit may be earned in this category by buildings which achieve sustainable purchasing levels (organic, Blue Eco-Label, Project Harvest Certified, etc., and purchased within 100 miles of the building) for 25% of food and beverage purchases (by cost). MR CR 5: Food LEED EB: Materials & Resources
  • 31. LEED EB: Materials & Resources, continued MR CR 6: Waste Stream Audit Under this credit, the team must conduct a “waste stream audit”, identifying a current building baseline for waste types and amounts (including paper, glass, plastics, cardboard, and metals), and opportunities for waste diversion and increases in recycling. MR CRs 7.1-7.2: Solid Waste Management: Ongoing Consumables Maintain a waste reduction and recycling program, addressing materials with a low cost per unit item, and provide an easily accessible area that serves the entire building dedicated to the separation, collection, and storage of materials for recycling (including paper, glass, plastics, cardboard, and metals), of a capacity designed to accommodate 50 – 70% of the waste stream (1-2 points awarded). MR CR 8: Solid Waste Management: Durable Goods Maintain a waste reduction and recycling program, addressing durable, infrequently replaced materials (such as office equipment, appliances, televisions, power adapters, et cetera). Reuse or recycle 75% of this waste stream, by weight, volume, or replacement value. MR CR 9: Solid Waste Management: Facility Alterations & Additions Divert at least 70% of waste (by volume) generated by facility alterations & additions from landfills.
  • 32. LEED EB: Indoor Environmental Quality
  • 33. LEED EB: Indoor Environmental Quality EQ CR 1.1: IAQ Management Program In this category, a building will develop and implement, on an ongoing basis, an IAQ management program based on the EPA’s “Indoor Air Quality Building Education and Assessment Model (I-BEAM)”, which attempts to prevent the development of indoor air quality problems, and maintain the well-being of building occupants. EQ CR 1.2: Outdoor Air Delivery Monitoring This credit requires the installation of permanent, continuous monitoring systems that provide feedback on ventilation system performance to ensure that the ventilation systems maintain expected system operating conditions within 15% of the design minimum. Monitoring must be performed for at least 80% of the building’s outdoor air intake flow serving occupied spaces, and generate alarms when noncompliance levels occur. In addition, CO2 sensors and/or sampling locations must be installed and/or established for all densely occupied spaces. EQ CR 1.3: Increased Ventilation For mechanically ventilated spaces, increase outdoor air ventilation rates for all air-handling units serving occupied spaces b at least 30% over ASHRAE 62.1-2007 minimums.
  • 34. LEED EB: Indoor Environmental Quality, continued EQ CR 1.4: Reduce Particulates in Air Distribution To reduce exposure of building occupants and maintenance personnel to potentially hazardous particulate contaminants, have in place filtration media with a value greater than or equal to MERV 13 for all outside air intakes and inside air recirculation returns. EQ CR 1.5: IAQ Management for Facility Alterations and Additions This credit aims to prevent indoor air quality problems after construction, by requiring an IAQ management plan for construction and occupancy phases, including monitoring during construction to ensure that the contractor is: following SMACNA IAQ guidelines, protecting on-site absorptive construction materials, using MERV-8 filters during construction, and replacing all of those filters post construction and prior to tenant occupancy, and conducting a flush-out of the space after construction has concluded, and prior to occupancy by the tenant.
  • 35. EQ CR 2.1: Occupant Survey Conduct at least one occupant survey during the performance period, to collect anonymous responses about thermal comfort, acoustics, indoor air quality, lighting levels, building cleanliness, and other occupant comfort issues, collecting responses from at least 30% of occupants. LEED EB: Indoor Environmental Quality, continued EQ CR 2.2: Occupant Controlled Lighting Requires the use of lighting controls that enable adjustments to suit the task needs and preferences of individuals for at least 50% of individual workstations, AND for groups sharing a multi-occupant space or working area for at least 50% of multi-occupant spaces in the building. EQ CR 2.3: Thermal Comfort Monitoring Aimed at providing a high level of control for building occupants, fostering greater workplace satisfaction and productivity, this credit requires the provision of a thermally comfortable environment, by designing a space that complies with ASHRAE Standard 55-2004. In addition to this compliance, there must be provided a permanent monitoring system to ensure that the systems are performing in accordance with ASHRAE Standard 55-2004.
  • 36. LEED EB: Indoor Environmental Quality, continued EQ CRs 2.4 & 2.5: Daylight & Views In order to ensure that all building occupants have a connection to the outdoors, with access to daylight and views in all or most of the regularly occupied tenant spaces. Under CR 2.4, a 2% daylight factor must be achieved for 50% of spaces occupied for critical visual tasks, OR direct line of site vision glazing must be achieved for building occupants in 45% of all regularly occupied spaces. CR 2.5 requires that a 2% daylight factor be achieved for 75% of occupied critical visual task areas, OR direct lines of sight to vision glazing for building occupants in 90% of regularly occupied spaces.