Developed for:
CS671 – Software Systems Engineering Process

                 Author:
   Loren Karl Schwappach, BSEE / BSCE
What is Risk Management?

                                 
 Risk management involves identifying applicable risks , analyzing
  those risks, managing/mitigating risks, and finally reviewing risks.
  [Potter02]

 Careful use of risk management techniques can help prevent problems
  from occurring and allow anticipation of future problems allowing
  process improvement to run smoothly [Boehm89, Potter01, Van
  Scoy92].




                                                           [1]
Six Steps to Risk Management

                                   
Step 1: Determine the Scope of the Risk
Step 2: Select the Team and Moderator
Step 3: Identify Risks
Step 4: Analyze Risks
Step 5: Plan to Mitigate Risks                                        [2]
Step 6: Plan for Periodic Risk Review

Note: There will be a hands-on example at the end of this presentation if time
permits.
Step 1: Determining the Scope

                                 
 The scope of the list should include the goals and problems that you
  plan to address in the next six months. [Potter02]

 The complete list of goals and problems from your action plan are the
  perfect candidates for determining your risk management scope.
  However, you should refine the goals/problems into a few that you
  plan to address in the near term.
[3]

   Step 2: Select the Team and Moderator

                                  
 The risk management team should include individuals who have an
  understanding of the risks that could prevent successful project
  completion. [Potter02]

 The team should include the improvement team, stakeholders
  (software developers, quality analysts, and managers), previous
  improvement project members, and subject area experts. [Potter02]

 Try to limit the group size to around nine people to keep the
  conversations on track. [Potter02]

 The moderator is responsible for keeping the discussions focused and
  should be able to explain the risk management process to team
  members. [Potter02]
Step 3: Identify Risks

                                                                                     [4]
 Risks: potential problems that are not guaranteed to occur. [Potter02]

 Start risk identification as a brainstorming session, allowing members to
  call out problems that could cause the improvement projects to fail.
  [Potter02]

 Consider the following: [Potter02]
       Weak areas such as unknown technology (tools, vendors, methodologies).
       Critical aspects necessary for the improvement project (timely delivery of
        training programs, management buy-in, training materials).
       Previous problems (loss of essential staff, resistance to change, shifts in
        priority).
Step 4: Analyze Risks

[5]                                      
      Sub-steps to risk analysis: [Potter02]
       Focus on removing ambiguities (example: “lack of management buy-
         in” to “manager X may not find any benefit to the new method” and
         “people might leave” to “subject master X may get pulled off of
         project) carefully clarifying each risk item. Note: Risk Items column.
       Enumerate the primary consequence if the risk were to occur. Note:
         Consequence column.
       Set priorities by agreeing on how likely a risk item is to occur (scale 1
         to 10 (very likely)), and then rate the impact if the risk were to occur
         (scale 1 to 10 (very large impact)). First select the item that rates the
         lowest and assign it a 1 and then select the item that rates the highest
         and assign it a 10. All other items should be rated within these
         boundaries. The final priority is the product of the two values!
       Select a few items to manage (top three risks or top 20 percent).
Step 5: Plan to Mitigate

                                                                           [6]

 Reduce the likelihood of risk occurring..
    One method used is to change the decision that caused the risk.
      Sometimes this can be done by eliminating the item altogether,
      however this can sometimes create addition risks.
    Another method used is to reduce the impact of the risk should it
      occur.
    Note: List the actions to reduce the risk likelihood and impact
      under their respective columns..
 Decide which actions to pursue. Focus on actions that reduce likelihood
  and provide a contingency.
 Assign responsibility to each risk reduction action. This includes
  identifying a responsible member and a realistic completion date.
Step 6: Plan for Periodic Risk Review

                               
 Periodic review provides visibility on the effectiveness of the
  risk management process.

 During the reviews determine whether any likelihood or
  impact numbers need revisiting and if needed repeat the
  complete risk management process to address any significant
  changes that occur.

 Measure the impacts of any risks that occur for future risk
  management decisions.
Summary
                               
Risk Management involves:

1: Determining the Scope of the Risk
       Goals/Problems within next 6 months.
2: Selecting the risk management team & moderator
       Limit to around 9 people from improvement team, stakeholders, previous
           improvement project members, and subject area experts.
3: Identify Risks
       Brainstorm session considering weak areas, critical aspects and previous problems.
4: Analyze Risks
       Remove ambiguities, enumerate consequences, set priorities, and select few for
           managing.
5: Plan to Mitigate Risks
       Choose actions that reduce the likelihood and impact of risk occurring, select best
           actions to pursue and assign responsibility.
6: Plan for Periodic Risk Review
References
                                   
[1] Image Retrieved from Lawns To Gardens Website on 27 April 2011 at
http://lawnstogardens.wordpress.com/2007/12/09/how-to-develop-a-peak-oil-risk-management-plan/

[2] Image Retrieved from Edge 360 Website on 27 April 2011 at http://www.edge360.com/services/risk-
management/

[3] Image Retrieved from eastpennsd.org Website on 27 April 2011 at
http://www.eastpennsd.org/shoemaker/Staff.html

[4] Image Retrieved from lovemeow.com Website on 27 April 2011 at http://lovemeow.com/2009/11/video-
cat-loves-mouse/

[5] Image Retrieved from Halfiranian.com Website on 27 April 2011 at
http://halfiranian.com/2009/09/01/britains-radical-moment/

[6] Image Retrieved from Julesbright.com Website on 27 April 2011 at http://julesbright.com/

[7] Image Retrieved from Enterprise-PM.com Website on 27 April 2011 at http://www.enterprise-
pm.com/pmbasics/risk-management-models
References Continued
              
[Boehm89] Boehm, B. Tutorial: Software Risk Management. New York: IEEE Computer Society,
1989

[Potter01] Potter, N., and M. Sakry. “Keep Your Project on Track.” Software Development 2001; 9,
no. 4.

[Potter02] Potter, N., and M. Sakry. “A Consise Action Guide for Software Managers and
Practitioners.” Making Process Improvement Work 2002.

[Van Scoy92] Van Scoy, Roger L. Software Development Risk: Opportunity, Not Problem. CMU/SEI-
92-TR-30, ADA 258743. Pittsburgh: SEI, 1992.
Questions?
                      
 You may see this information on the class final so be prepared!




                                               [7]
 Where to go for additional information:

Garvey, P., Analytical Methods for Risk Management: A Systems
Engineering Perspective, 2008.
Hands-on Example
       
     If time permits…
Step 4: Analyze Risks
                  Hands-On Example…
                                   
 Scenario: A System Engineer Firm (Over Priced Solutions Inc.) that
  develops software for a large TS/SCI satellite agency in partnership
  with the military and NSA.

 The Firm has one manager (Jerome Akins) who is not big on wasting
  time on process improvement efforts and often shifts priorities. One
  library control expert (Jay Deguzman) that is considering leaving the
  firm. Two software developers (Mitchell Williams and Ryan Lacroix)
  that have been with the firm for 20 years and are not interested in
  learning new tools (specifically the software requirement management tool
  which has a large learning curve). And, one overly exited project
  manager (Loren Schwappach). The firm is also expected to hire several
  new staff members within the next six months.
Step 4: Analyze Risks
                Hands-On Example…
                               
Software Company X – Identified Risks:
 Lack of management buy-in.
 People might leave.
 Software requirement management tool is hard to use.
 Management changes priorities often.
 Software requirement management tool may be delivered late.
 Creation of training materials takes a long time.
Step 4: Analyze Risks
                            Hands-On Example…

        Risk Items
                                               
                                        Consequence               Likelihood   Impact   Priority
Jerome Akins’ (Manager) buy-     Improvement program fails.          10          10       100
in for improvement methods
         diminishes.
  Jerome Akins’ (Manager)       Improvement program looses            9          9        81
changes priorities before any          credibility.
 milestones are completed.
   New Requirements               Mitchell Williams and Ryan          9          8        72
Management Tool has a huge         Lacroix give up on tool in
     learning curve.                      frustration.
  Jay Deguzman (Library           Wasted time training new            7          8        56
 Control) might leave firm.                person.
   Creation of specialized      Improvement implementation            4          5        20
 training materials for new             delayed.
     staff takes too long.
Requirements management         Pass up opportunity to test and       1          1         1
tool is delivered to the firm            use new tool.
             late.
Step 5: Plan to Mitigate
                                 Hands-On Example…
    Risk Items



  Jerome Akins’
                      Consequence



                      Improvement
                                        Like
                                         -lih
                                        -ood
                                         10
                                                Imp
                                                -act


                                                10
                                                       Prio
                                                       -rity


                                                       100
                                                                 Actions to
                                                                    Reduce
                                                                  Likelihood
                                                               1. Ensure that the
                                                                                     Actions to Reduce
                                                                                          Impact


                                                                                        3. Determine
                                                                                                             Respons
                                                                                                               ible


                                                                                                             Action
                                                                                                                         Due



                                                                                                                        4/27/11
                                                                                                                                    Status



                                                                                                                                  Completed
(Manager) buy-in      program fails.                             improvement         improvements that         1:
for improvement                                                      program          can be made at a       Loren
     methods                                                      addresses the          project level
   diminishes.                                                    management           without major
                                                               team’s problems             funding.
                                                                   and goals.           4. Explain the
                                                                  2. Establish a     problems and goals
                                                                     steering           that won’t be
                                                                  committee to       addressed because
                                                                   oversee the            of reduced
                                                                 improvement               funding.
                                                                      effort.
                                                               Meet Bimonthly.
   Jerome Akins’       Improvement       9       9      81       1. Present the         2. Determine         Action     5/6/11    In Progress
(Manager) changes     program looses                             action plan to      improvements that         1:
  priorities before     credibility.                           management and           can be made          Loren
 any milestones are                                            obtain agreement      regardless of which
    completed.                                                   that priorities       project is active.
                                                                     remain
                                                                  unchanged.
New Requirements         Mitchell        9       8      72      1. Start a pilot     2. Establish a cutoff   Action     5/12/11   In Progress
 Management Tool      Williams and                             project to test the      date when firm          1:
has a huge learning    Ryan Lacroix                                  tool.           will give up on tool    Mitchell
       curve.         give up on tool                                                 and use previous
                      in frustration.                                                      methods.
Handouts
   
Risk Management
                           Pop Quiz
                Graded by: Loren K. Schwappach

Name: __________________________
                                                 
                                       Date: ______________                   Grade: ______

Q1 (25pts/100pts): What are the six steps to risk management?
______________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________

Q2 (25pts/100pts): Risks are?
___________________________________________________________________________________________________
___________________________________________________________________________________.

Q3 (25pts/100pts): The risk management team should include the ___________________, ____________________,
_____________________________________, and _________________________________.

Q4 (25pts/100pts): Step four of the Risk Management Process involves removing ___________________,
enumerating the _____________________________________ if the risk were to occur, setting _______________ for
each risk, and selecting a few _________________________________________________.
Risk Management Risk Analysis
                  for Hands on Example

Risk Items                 
                      Consequence   Likelihood   Impact   Priority
Risk Management plan for Risk Mitigation
              for Hands on Example
Risk Items   Consequence   Like
                            -lih
                           -ood
                                   Imp
                                   -act
                                          Prio
                                          -rity
                                                  
                                                  Actions to
                                                    Reduce
                                                  Likelihood
                                                               Actions to Reduce
                                                                    Impact
                                                                                   Respons
                                                                                     ible
                                                                                             Due   Status

Más contenido relacionado

La actualidad más candente

Risk assesment template
Risk assesment templateRisk assesment template
Risk assesment templateGlen Alleman
 
Managing Risk as Opportunity
Managing Risk as OpportunityManaging Risk as Opportunity
Managing Risk as OpportunityGlen Alleman
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project SuccessGlen Alleman
 
Episode 25 : Project Risk Management
Episode 25 :  Project Risk ManagementEpisode 25 :  Project Risk Management
Episode 25 : Project Risk ManagementSAJJAD KHUDHUR ABBAS
 
Project risk management
Project risk managementProject risk management
Project risk managementBarnatuCoffee
 
Project Management Risks Review
Project Management Risks ReviewProject Management Risks Review
Project Management Risks ReviewDavid Tennant
 
Risk Management Plan Analysis PowerPoint Presentation Slides
Risk Management Plan Analysis PowerPoint Presentation Slides Risk Management Plan Analysis PowerPoint Presentation Slides
Risk Management Plan Analysis PowerPoint Presentation Slides SlideTeam
 
Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planningGlen Alleman
 
Essential views of the IPMR
Essential views of the IPMREssential views of the IPMR
Essential views of the IPMRGlen Alleman
 
Capabilities based planning essay
Capabilities based planning essayCapabilities based planning essay
Capabilities based planning essayGlen Alleman
 
Chapter 7 managing risk
Chapter 7   managing riskChapter 7   managing risk
Chapter 7 managing riskHammad Hashmi
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk managementejlp12
 

La actualidad más candente (20)

Risk assesment template
Risk assesment templateRisk assesment template
Risk assesment template
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
 
Managing Risk as Opportunity
Managing Risk as OpportunityManaging Risk as Opportunity
Managing Risk as Opportunity
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project Success
 
What is risk?
What is risk?What is risk?
What is risk?
 
Episode 25 : Project Risk Management
Episode 25 :  Project Risk ManagementEpisode 25 :  Project Risk Management
Episode 25 : Project Risk Management
 
Project risk management
Project risk managementProject risk management
Project risk management
 
Project risk management
Project risk managementProject risk management
Project risk management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Project Management Risks Review
Project Management Risks ReviewProject Management Risks Review
Project Management Risks Review
 
Risk Management Plan Analysis PowerPoint Presentation Slides
Risk Management Plan Analysis PowerPoint Presentation Slides Risk Management Plan Analysis PowerPoint Presentation Slides
Risk Management Plan Analysis PowerPoint Presentation Slides
 
Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planning
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Essential views of the IPMR
Essential views of the IPMREssential views of the IPMR
Essential views of the IPMR
 
8. project risk management
8. project risk management8. project risk management
8. project risk management
 
Risk ppt1672
Risk ppt1672Risk ppt1672
Risk ppt1672
 
Capabilities based planning essay
Capabilities based planning essayCapabilities based planning essay
Capabilities based planning essay
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Chapter 7 managing risk
Chapter 7   managing riskChapter 7   managing risk
Chapter 7 managing risk
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk management
 

Similar a Risk management plan loren schwappach

D.Q1Information System and Enterprise Systems· Identify.docx
D.Q1Information System and Enterprise Systems· Identify.docxD.Q1Information System and Enterprise Systems· Identify.docx
D.Q1Information System and Enterprise Systems· Identify.docxtheodorelove43763
 
Risk strategies presentation
Risk strategies presentationRisk strategies presentation
Risk strategies presentationRaven Morgan
 
Anju drolia
Anju droliaAnju drolia
Anju droliaPMI2011
 
Anjudrolia 131008015750-phpapp02
Anjudrolia 131008015750-phpapp02Anjudrolia 131008015750-phpapp02
Anjudrolia 131008015750-phpapp02PMI_IREP_TP
 
A Guide to Risk Management
A Guide to Risk ManagementA Guide to Risk Management
A Guide to Risk ManagementProjectCon
 
اهم برزنتيشن لجنك2222
اهم برزنتيشن لجنك2222اهم برزنتيشن لجنك2222
اهم برزنتيشن لجنك2222nashaat algrara
 
Project Risk Management
 Project Risk Management Project Risk Management
Project Risk ManagementHayat Denzi
 
Project Risk Management in Product Development
Project Risk Management in Product DevelopmentProject Risk Management in Product Development
Project Risk Management in Product DevelopmentPlaybook
 
RISK MANAGEMENT IN SOFTWARE ENGINEERING.ppt
RISK MANAGEMENT IN SOFTWARE ENGINEERING.pptRISK MANAGEMENT IN SOFTWARE ENGINEERING.ppt
RISK MANAGEMENT IN SOFTWARE ENGINEERING.pptmuhammad ijaz khan
 
Risk management in software engineering
Risk management in software engineeringRisk management in software engineering
Risk management in software engineeringFARZANARIAZBSCompute
 
Global Health Comparison Grid TemplateGlobal Health Co
Global Health Comparison Grid TemplateGlobal Health CoGlobal Health Comparison Grid TemplateGlobal Health Co
Global Health Comparison Grid TemplateGlobal Health CoMatthewTennant613
 
Webinar - Building Team Efficiency and Effectiveness
Webinar - Building Team Efficiency and EffectivenessWebinar - Building Team Efficiency and Effectiveness
Webinar - Building Team Efficiency and EffectivenessInvensis Learning
 
Corporate and Project Risk Management Toolkit
Corporate and Project Risk Management Toolkit Corporate and Project Risk Management Toolkit
Corporate and Project Risk Management Toolkit Aurelien Domont, MBA
 
MBA 6941, Managing Project Teams 1 Course Learning Ou.docx
 MBA 6941, Managing Project Teams 1 Course Learning Ou.docx MBA 6941, Managing Project Teams 1 Course Learning Ou.docx
MBA 6941, Managing Project Teams 1 Course Learning Ou.docxaryan532920
 
Project risk management model based on prince2 and scrum frameworks
Project risk management model based on prince2 and scrum frameworksProject risk management model based on prince2 and scrum frameworks
Project risk management model based on prince2 and scrum frameworksijseajournal
 
OOSE-PRESENTATION.pptx
OOSE-PRESENTATION.pptxOOSE-PRESENTATION.pptx
OOSE-PRESENTATION.pptxRanjitKdk
 

Similar a Risk management plan loren schwappach (20)

D.Q1Information System and Enterprise Systems· Identify.docx
D.Q1Information System and Enterprise Systems· Identify.docxD.Q1Information System and Enterprise Systems· Identify.docx
D.Q1Information System and Enterprise Systems· Identify.docx
 
Session 10 gdas pmp study group presentation
Session 10   gdas pmp study group presentationSession 10   gdas pmp study group presentation
Session 10 gdas pmp study group presentation
 
Risk strategies presentation
Risk strategies presentationRisk strategies presentation
Risk strategies presentation
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Anju drolia
Anju droliaAnju drolia
Anju drolia
 
Anjudrolia 131008015750-phpapp02
Anjudrolia 131008015750-phpapp02Anjudrolia 131008015750-phpapp02
Anjudrolia 131008015750-phpapp02
 
A Guide to Risk Management
A Guide to Risk ManagementA Guide to Risk Management
A Guide to Risk Management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
اهم برزنتيشن لجنك2222
اهم برزنتيشن لجنك2222اهم برزنتيشن لجنك2222
اهم برزنتيشن لجنك2222
 
Risk analysis
Risk analysisRisk analysis
Risk analysis
 
Project Risk Management
 Project Risk Management Project Risk Management
Project Risk Management
 
Project Risk Management in Product Development
Project Risk Management in Product DevelopmentProject Risk Management in Product Development
Project Risk Management in Product Development
 
RISK MANAGEMENT IN SOFTWARE ENGINEERING.ppt
RISK MANAGEMENT IN SOFTWARE ENGINEERING.pptRISK MANAGEMENT IN SOFTWARE ENGINEERING.ppt
RISK MANAGEMENT IN SOFTWARE ENGINEERING.ppt
 
Risk management in software engineering
Risk management in software engineeringRisk management in software engineering
Risk management in software engineering
 
Global Health Comparison Grid TemplateGlobal Health Co
Global Health Comparison Grid TemplateGlobal Health CoGlobal Health Comparison Grid TemplateGlobal Health Co
Global Health Comparison Grid TemplateGlobal Health Co
 
Webinar - Building Team Efficiency and Effectiveness
Webinar - Building Team Efficiency and EffectivenessWebinar - Building Team Efficiency and Effectiveness
Webinar - Building Team Efficiency and Effectiveness
 
Corporate and Project Risk Management Toolkit
Corporate and Project Risk Management Toolkit Corporate and Project Risk Management Toolkit
Corporate and Project Risk Management Toolkit
 
MBA 6941, Managing Project Teams 1 Course Learning Ou.docx
 MBA 6941, Managing Project Teams 1 Course Learning Ou.docx MBA 6941, Managing Project Teams 1 Course Learning Ou.docx
MBA 6941, Managing Project Teams 1 Course Learning Ou.docx
 
Project risk management model based on prince2 and scrum frameworks
Project risk management model based on prince2 and scrum frameworksProject risk management model based on prince2 and scrum frameworks
Project risk management model based on prince2 and scrum frameworks
 
OOSE-PRESENTATION.pptx
OOSE-PRESENTATION.pptxOOSE-PRESENTATION.pptx
OOSE-PRESENTATION.pptx
 

Más de Loren Schwappach

EE312 Embedded Microcontrollers Lab
EE312 Embedded Microcontrollers LabEE312 Embedded Microcontrollers Lab
EE312 Embedded Microcontrollers LabLoren Schwappach
 
Ee325 cmos design lab 7 report - loren k schwappach
Ee325 cmos design   lab 7 report - loren k schwappachEe325 cmos design   lab 7 report - loren k schwappach
Ee325 cmos design lab 7 report - loren k schwappachLoren Schwappach
 
Ee325 cmos design lab 6 report - loren k schwappach
Ee325 cmos design   lab 6 report - loren k schwappachEe325 cmos design   lab 6 report - loren k schwappach
Ee325 cmos design lab 6 report - loren k schwappachLoren Schwappach
 
Ee325 cmos design lab 5 report - loren k schwappach
Ee325 cmos design   lab 5 report - loren k schwappachEe325 cmos design   lab 5 report - loren k schwappach
Ee325 cmos design lab 5 report - loren k schwappachLoren Schwappach
 
Ee325 cmos design lab 4 report - loren k schwappach
Ee325 cmos design   lab 4 report - loren k schwappachEe325 cmos design   lab 4 report - loren k schwappach
Ee325 cmos design lab 4 report - loren k schwappachLoren Schwappach
 
Ee325 cmos design lab 3 report - loren k schwappach
Ee325 cmos design   lab 3 report - loren k schwappachEe325 cmos design   lab 3 report - loren k schwappach
Ee325 cmos design lab 3 report - loren k schwappachLoren Schwappach
 
Loren k. schwappach ee331 - lab 4
Loren k. schwappach   ee331 - lab 4Loren k. schwappach   ee331 - lab 4
Loren k. schwappach ee331 - lab 4Loren Schwappach
 
Loren k. schwappach ee331 - lab 3
Loren k. schwappach   ee331 - lab 3Loren k. schwappach   ee331 - lab 3
Loren k. schwappach ee331 - lab 3Loren Schwappach
 
Ee343 signals and systems - lab 2 - loren schwappach
Ee343   signals and systems - lab 2 - loren schwappachEe343   signals and systems - lab 2 - loren schwappach
Ee343 signals and systems - lab 2 - loren schwappachLoren Schwappach
 
Ee343 signals and systems - lab 1 - loren schwappach
Ee343   signals and systems - lab 1 - loren schwappachEe343   signals and systems - lab 1 - loren schwappach
Ee343 signals and systems - lab 1 - loren schwappachLoren Schwappach
 
Ee 352 lab 1 (tutorial) - schwappach - 15 oct 09
Ee 352   lab 1 (tutorial) - schwappach - 15 oct 09Ee 352   lab 1 (tutorial) - schwappach - 15 oct 09
Ee 352 lab 1 (tutorial) - schwappach - 15 oct 09Loren Schwappach
 
EE375 Electronics 1: lab 3
EE375   Electronics 1: lab 3EE375   Electronics 1: lab 3
EE375 Electronics 1: lab 3Loren Schwappach
 
EE375 Electronics 1: lab 1
EE375   Electronics 1: lab 1EE375   Electronics 1: lab 1
EE375 Electronics 1: lab 1Loren Schwappach
 
Ee395 lab 2 - loren - victor - taylor
Ee395   lab 2 - loren - victor - taylorEe395   lab 2 - loren - victor - taylor
Ee395 lab 2 - loren - victor - taylorLoren Schwappach
 
Ee395 lab 1 - bjt - loren - victor - taylor
Ee395   lab 1 - bjt - loren - victor - taylorEe395   lab 1 - bjt - loren - victor - taylor
Ee395 lab 1 - bjt - loren - victor - taylorLoren Schwappach
 
5 ee415 - adv electronics - presentation - schwappach
5   ee415 - adv electronics - presentation - schwappach5   ee415 - adv electronics - presentation - schwappach
5 ee415 - adv electronics - presentation - schwappachLoren Schwappach
 
4 ee414 - adv electroncs - lab 3 - loren schwappach
4   ee414 - adv electroncs - lab 3 - loren schwappach4   ee414 - adv electroncs - lab 3 - loren schwappach
4 ee414 - adv electroncs - lab 3 - loren schwappachLoren Schwappach
 
3 ee414 - adv electroncs - lab 2 - loren schwappach
3   ee414 - adv electroncs - lab 2 - loren schwappach3   ee414 - adv electroncs - lab 2 - loren schwappach
3 ee414 - adv electroncs - lab 2 - loren schwappachLoren Schwappach
 
2 ee414 - adv electroncs - lab 1 - loren schwappach
2   ee414 - adv electroncs - lab 1 - loren schwappach2   ee414 - adv electroncs - lab 1 - loren schwappach
2 ee414 - adv electroncs - lab 1 - loren schwappachLoren Schwappach
 

Más de Loren Schwappach (20)

Ubuntu OS Presentation
Ubuntu OS PresentationUbuntu OS Presentation
Ubuntu OS Presentation
 
EE312 Embedded Microcontrollers Lab
EE312 Embedded Microcontrollers LabEE312 Embedded Microcontrollers Lab
EE312 Embedded Microcontrollers Lab
 
Ee325 cmos design lab 7 report - loren k schwappach
Ee325 cmos design   lab 7 report - loren k schwappachEe325 cmos design   lab 7 report - loren k schwappach
Ee325 cmos design lab 7 report - loren k schwappach
 
Ee325 cmos design lab 6 report - loren k schwappach
Ee325 cmos design   lab 6 report - loren k schwappachEe325 cmos design   lab 6 report - loren k schwappach
Ee325 cmos design lab 6 report - loren k schwappach
 
Ee325 cmos design lab 5 report - loren k schwappach
Ee325 cmos design   lab 5 report - loren k schwappachEe325 cmos design   lab 5 report - loren k schwappach
Ee325 cmos design lab 5 report - loren k schwappach
 
Ee325 cmos design lab 4 report - loren k schwappach
Ee325 cmos design   lab 4 report - loren k schwappachEe325 cmos design   lab 4 report - loren k schwappach
Ee325 cmos design lab 4 report - loren k schwappach
 
Ee325 cmos design lab 3 report - loren k schwappach
Ee325 cmos design   lab 3 report - loren k schwappachEe325 cmos design   lab 3 report - loren k schwappach
Ee325 cmos design lab 3 report - loren k schwappach
 
Loren k. schwappach ee331 - lab 4
Loren k. schwappach   ee331 - lab 4Loren k. schwappach   ee331 - lab 4
Loren k. schwappach ee331 - lab 4
 
Loren k. schwappach ee331 - lab 3
Loren k. schwappach   ee331 - lab 3Loren k. schwappach   ee331 - lab 3
Loren k. schwappach ee331 - lab 3
 
Ee343 signals and systems - lab 2 - loren schwappach
Ee343   signals and systems - lab 2 - loren schwappachEe343   signals and systems - lab 2 - loren schwappach
Ee343 signals and systems - lab 2 - loren schwappach
 
Ee343 signals and systems - lab 1 - loren schwappach
Ee343   signals and systems - lab 1 - loren schwappachEe343   signals and systems - lab 1 - loren schwappach
Ee343 signals and systems - lab 1 - loren schwappach
 
Ee 352 lab 1 (tutorial) - schwappach - 15 oct 09
Ee 352   lab 1 (tutorial) - schwappach - 15 oct 09Ee 352   lab 1 (tutorial) - schwappach - 15 oct 09
Ee 352 lab 1 (tutorial) - schwappach - 15 oct 09
 
EE375 Electronics 1: lab 3
EE375   Electronics 1: lab 3EE375   Electronics 1: lab 3
EE375 Electronics 1: lab 3
 
EE375 Electronics 1: lab 1
EE375   Electronics 1: lab 1EE375   Electronics 1: lab 1
EE375 Electronics 1: lab 1
 
Ee395 lab 2 - loren - victor - taylor
Ee395   lab 2 - loren - victor - taylorEe395   lab 2 - loren - victor - taylor
Ee395 lab 2 - loren - victor - taylor
 
Ee395 lab 1 - bjt - loren - victor - taylor
Ee395   lab 1 - bjt - loren - victor - taylorEe395   lab 1 - bjt - loren - victor - taylor
Ee395 lab 1 - bjt - loren - victor - taylor
 
5 ee415 - adv electronics - presentation - schwappach
5   ee415 - adv electronics - presentation - schwappach5   ee415 - adv electronics - presentation - schwappach
5 ee415 - adv electronics - presentation - schwappach
 
4 ee414 - adv electroncs - lab 3 - loren schwappach
4   ee414 - adv electroncs - lab 3 - loren schwappach4   ee414 - adv electroncs - lab 3 - loren schwappach
4 ee414 - adv electroncs - lab 3 - loren schwappach
 
3 ee414 - adv electroncs - lab 2 - loren schwappach
3   ee414 - adv electroncs - lab 2 - loren schwappach3   ee414 - adv electroncs - lab 2 - loren schwappach
3 ee414 - adv electroncs - lab 2 - loren schwappach
 
2 ee414 - adv electroncs - lab 1 - loren schwappach
2   ee414 - adv electroncs - lab 1 - loren schwappach2   ee414 - adv electroncs - lab 1 - loren schwappach
2 ee414 - adv electroncs - lab 1 - loren schwappach
 

Último

5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdfSherl Simon
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
Kyryl Truskovskyi: Training and Serving Open-Sourced Foundational Models (UA)
Kyryl Truskovskyi: Training and Serving Open-Sourced Foundational Models (UA)Kyryl Truskovskyi: Training and Serving Open-Sourced Foundational Models (UA)
Kyryl Truskovskyi: Training and Serving Open-Sourced Foundational Models (UA)Lviv Startup Club
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
Rakhi sets symbolizing the bond of love.pptx
Rakhi sets symbolizing the bond of love.pptxRakhi sets symbolizing the bond of love.pptx
Rakhi sets symbolizing the bond of love.pptxRakhi Bazaar
 
Fundamentals Welcome and Inclusive DEIB
Fundamentals Welcome and  Inclusive DEIBFundamentals Welcome and  Inclusive DEIB
Fundamentals Welcome and Inclusive DEIBGregory DeShields
 
Customizable Contents Restoration Training
Customizable Contents Restoration TrainingCustomizable Contents Restoration Training
Customizable Contents Restoration TrainingCalvinarnold843
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
Entrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextEntrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextP&CO
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSendBig4
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 
Simplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansSimplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansNugget Global
 
Roman Kyslyi: Використання та побудова LLM агентів (UA)
Roman Kyslyi: Використання та побудова LLM агентів (UA)Roman Kyslyi: Використання та побудова LLM агентів (UA)
Roman Kyslyi: Використання та побудова LLM агентів (UA)Lviv Startup Club
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Aggregage
 
MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024Chandresh Chudasama
 

Último (20)

5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
Authentically Social - presented by Corey Perlman
Authentically Social - presented by Corey PerlmanAuthentically Social - presented by Corey Perlman
Authentically Social - presented by Corey Perlman
 
WAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdfWAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdf
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
Kyryl Truskovskyi: Training and Serving Open-Sourced Foundational Models (UA)
Kyryl Truskovskyi: Training and Serving Open-Sourced Foundational Models (UA)Kyryl Truskovskyi: Training and Serving Open-Sourced Foundational Models (UA)
Kyryl Truskovskyi: Training and Serving Open-Sourced Foundational Models (UA)
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
Rakhi sets symbolizing the bond of love.pptx
Rakhi sets symbolizing the bond of love.pptxRakhi sets symbolizing the bond of love.pptx
Rakhi sets symbolizing the bond of love.pptx
 
Fundamentals Welcome and Inclusive DEIB
Fundamentals Welcome and  Inclusive DEIBFundamentals Welcome and  Inclusive DEIB
Fundamentals Welcome and Inclusive DEIB
 
Customizable Contents Restoration Training
Customizable Contents Restoration TrainingCustomizable Contents Restoration Training
Customizable Contents Restoration Training
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
Entrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextEntrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider context
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.com
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 
Simplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansSimplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business Loans
 
Roman Kyslyi: Використання та побудова LLM агентів (UA)
Roman Kyslyi: Використання та побудова LLM агентів (UA)Roman Kyslyi: Використання та побудова LLM агентів (UA)
Roman Kyslyi: Використання та побудова LLM агентів (UA)
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
 
MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024
 

Risk management plan loren schwappach

  • 1. Developed for: CS671 – Software Systems Engineering Process Author: Loren Karl Schwappach, BSEE / BSCE
  • 2. What is Risk Management?   Risk management involves identifying applicable risks , analyzing those risks, managing/mitigating risks, and finally reviewing risks. [Potter02]  Careful use of risk management techniques can help prevent problems from occurring and allow anticipation of future problems allowing process improvement to run smoothly [Boehm89, Potter01, Van Scoy92]. [1]
  • 3. Six Steps to Risk Management  Step 1: Determine the Scope of the Risk Step 2: Select the Team and Moderator Step 3: Identify Risks Step 4: Analyze Risks Step 5: Plan to Mitigate Risks [2] Step 6: Plan for Periodic Risk Review Note: There will be a hands-on example at the end of this presentation if time permits.
  • 4. Step 1: Determining the Scope   The scope of the list should include the goals and problems that you plan to address in the next six months. [Potter02]  The complete list of goals and problems from your action plan are the perfect candidates for determining your risk management scope. However, you should refine the goals/problems into a few that you plan to address in the near term.
  • 5. [3] Step 2: Select the Team and Moderator   The risk management team should include individuals who have an understanding of the risks that could prevent successful project completion. [Potter02]  The team should include the improvement team, stakeholders (software developers, quality analysts, and managers), previous improvement project members, and subject area experts. [Potter02]  Try to limit the group size to around nine people to keep the conversations on track. [Potter02]  The moderator is responsible for keeping the discussions focused and should be able to explain the risk management process to team members. [Potter02]
  • 6. Step 3: Identify Risks  [4]  Risks: potential problems that are not guaranteed to occur. [Potter02]  Start risk identification as a brainstorming session, allowing members to call out problems that could cause the improvement projects to fail. [Potter02]  Consider the following: [Potter02]  Weak areas such as unknown technology (tools, vendors, methodologies).  Critical aspects necessary for the improvement project (timely delivery of training programs, management buy-in, training materials).  Previous problems (loss of essential staff, resistance to change, shifts in priority).
  • 7. Step 4: Analyze Risks [5]  Sub-steps to risk analysis: [Potter02]  Focus on removing ambiguities (example: “lack of management buy- in” to “manager X may not find any benefit to the new method” and “people might leave” to “subject master X may get pulled off of project) carefully clarifying each risk item. Note: Risk Items column.  Enumerate the primary consequence if the risk were to occur. Note: Consequence column.  Set priorities by agreeing on how likely a risk item is to occur (scale 1 to 10 (very likely)), and then rate the impact if the risk were to occur (scale 1 to 10 (very large impact)). First select the item that rates the lowest and assign it a 1 and then select the item that rates the highest and assign it a 10. All other items should be rated within these boundaries. The final priority is the product of the two values!  Select a few items to manage (top three risks or top 20 percent).
  • 8. Step 5: Plan to Mitigate  [6]  Reduce the likelihood of risk occurring..  One method used is to change the decision that caused the risk. Sometimes this can be done by eliminating the item altogether, however this can sometimes create addition risks.  Another method used is to reduce the impact of the risk should it occur.  Note: List the actions to reduce the risk likelihood and impact under their respective columns..  Decide which actions to pursue. Focus on actions that reduce likelihood and provide a contingency.  Assign responsibility to each risk reduction action. This includes identifying a responsible member and a realistic completion date.
  • 9. Step 6: Plan for Periodic Risk Review   Periodic review provides visibility on the effectiveness of the risk management process.  During the reviews determine whether any likelihood or impact numbers need revisiting and if needed repeat the complete risk management process to address any significant changes that occur.  Measure the impacts of any risks that occur for future risk management decisions.
  • 10. Summary  Risk Management involves: 1: Determining the Scope of the Risk  Goals/Problems within next 6 months. 2: Selecting the risk management team & moderator  Limit to around 9 people from improvement team, stakeholders, previous improvement project members, and subject area experts. 3: Identify Risks  Brainstorm session considering weak areas, critical aspects and previous problems. 4: Analyze Risks  Remove ambiguities, enumerate consequences, set priorities, and select few for managing. 5: Plan to Mitigate Risks  Choose actions that reduce the likelihood and impact of risk occurring, select best actions to pursue and assign responsibility. 6: Plan for Periodic Risk Review
  • 11. References  [1] Image Retrieved from Lawns To Gardens Website on 27 April 2011 at http://lawnstogardens.wordpress.com/2007/12/09/how-to-develop-a-peak-oil-risk-management-plan/ [2] Image Retrieved from Edge 360 Website on 27 April 2011 at http://www.edge360.com/services/risk- management/ [3] Image Retrieved from eastpennsd.org Website on 27 April 2011 at http://www.eastpennsd.org/shoemaker/Staff.html [4] Image Retrieved from lovemeow.com Website on 27 April 2011 at http://lovemeow.com/2009/11/video- cat-loves-mouse/ [5] Image Retrieved from Halfiranian.com Website on 27 April 2011 at http://halfiranian.com/2009/09/01/britains-radical-moment/ [6] Image Retrieved from Julesbright.com Website on 27 April 2011 at http://julesbright.com/ [7] Image Retrieved from Enterprise-PM.com Website on 27 April 2011 at http://www.enterprise- pm.com/pmbasics/risk-management-models
  • 12. References Continued  [Boehm89] Boehm, B. Tutorial: Software Risk Management. New York: IEEE Computer Society, 1989 [Potter01] Potter, N., and M. Sakry. “Keep Your Project on Track.” Software Development 2001; 9, no. 4. [Potter02] Potter, N., and M. Sakry. “A Consise Action Guide for Software Managers and Practitioners.” Making Process Improvement Work 2002. [Van Scoy92] Van Scoy, Roger L. Software Development Risk: Opportunity, Not Problem. CMU/SEI- 92-TR-30, ADA 258743. Pittsburgh: SEI, 1992.
  • 13. Questions?   You may see this information on the class final so be prepared! [7]  Where to go for additional information: Garvey, P., Analytical Methods for Risk Management: A Systems Engineering Perspective, 2008.
  • 14. Hands-on Example  If time permits…
  • 15. Step 4: Analyze Risks Hands-On Example…   Scenario: A System Engineer Firm (Over Priced Solutions Inc.) that develops software for a large TS/SCI satellite agency in partnership with the military and NSA.  The Firm has one manager (Jerome Akins) who is not big on wasting time on process improvement efforts and often shifts priorities. One library control expert (Jay Deguzman) that is considering leaving the firm. Two software developers (Mitchell Williams and Ryan Lacroix) that have been with the firm for 20 years and are not interested in learning new tools (specifically the software requirement management tool which has a large learning curve). And, one overly exited project manager (Loren Schwappach). The firm is also expected to hire several new staff members within the next six months.
  • 16. Step 4: Analyze Risks Hands-On Example…  Software Company X – Identified Risks:  Lack of management buy-in.  People might leave.  Software requirement management tool is hard to use.  Management changes priorities often.  Software requirement management tool may be delivered late.  Creation of training materials takes a long time.
  • 17. Step 4: Analyze Risks Hands-On Example… Risk Items  Consequence Likelihood Impact Priority Jerome Akins’ (Manager) buy- Improvement program fails. 10 10 100 in for improvement methods diminishes. Jerome Akins’ (Manager) Improvement program looses 9 9 81 changes priorities before any credibility. milestones are completed. New Requirements Mitchell Williams and Ryan 9 8 72 Management Tool has a huge Lacroix give up on tool in learning curve. frustration. Jay Deguzman (Library Wasted time training new 7 8 56 Control) might leave firm. person. Creation of specialized Improvement implementation 4 5 20 training materials for new delayed. staff takes too long. Requirements management Pass up opportunity to test and 1 1 1 tool is delivered to the firm use new tool. late.
  • 18. Step 5: Plan to Mitigate Hands-On Example… Risk Items Jerome Akins’ Consequence Improvement Like -lih -ood 10 Imp -act 10 Prio -rity 100  Actions to Reduce Likelihood 1. Ensure that the Actions to Reduce Impact 3. Determine Respons ible Action Due 4/27/11 Status Completed (Manager) buy-in program fails. improvement improvements that 1: for improvement program can be made at a Loren methods addresses the project level diminishes. management without major team’s problems funding. and goals. 4. Explain the 2. Establish a problems and goals steering that won’t be committee to addressed because oversee the of reduced improvement funding. effort. Meet Bimonthly. Jerome Akins’ Improvement 9 9 81 1. Present the 2. Determine Action 5/6/11 In Progress (Manager) changes program looses action plan to improvements that 1: priorities before credibility. management and can be made Loren any milestones are obtain agreement regardless of which completed. that priorities project is active. remain unchanged. New Requirements Mitchell 9 8 72 1. Start a pilot 2. Establish a cutoff Action 5/12/11 In Progress Management Tool Williams and project to test the date when firm 1: has a huge learning Ryan Lacroix tool. will give up on tool Mitchell curve. give up on tool and use previous in frustration. methods.
  • 19. Handouts
  • 20. Risk Management Pop Quiz Graded by: Loren K. Schwappach Name: __________________________  Date: ______________ Grade: ______ Q1 (25pts/100pts): What are the six steps to risk management? ______________________________________________________________________________ __________________________________________________________________________________ __________________________________________________________________________________ Q2 (25pts/100pts): Risks are? ___________________________________________________________________________________________________ ___________________________________________________________________________________. Q3 (25pts/100pts): The risk management team should include the ___________________, ____________________, _____________________________________, and _________________________________. Q4 (25pts/100pts): Step four of the Risk Management Process involves removing ___________________, enumerating the _____________________________________ if the risk were to occur, setting _______________ for each risk, and selecting a few _________________________________________________.
  • 21. Risk Management Risk Analysis for Hands on Example Risk Items  Consequence Likelihood Impact Priority
  • 22. Risk Management plan for Risk Mitigation for Hands on Example Risk Items Consequence Like -lih -ood Imp -act Prio -rity  Actions to Reduce Likelihood Actions to Reduce Impact Respons ible Due Status