Introduction
 The design, construction, and commissioning of a new facility
for the pharmaceutical industry is a complex.
 The approach that can be used by the designer to ensure that the
design, engineering and construction process can meet the
GMP requirements are completely based on the plan of a
validation strategy.
 Definition:-
 Validation master plan is an internallly approved
document that describes in clear and concise wording
the general expection method and approach to be used
during the entire validation effort.
Scope:-
VMP includes all relevant aspects to the Production of
pharmaceuticals in the production facility.
The principle of validation, the organization of
qualification and equipment are also described.
It covers all facilities used in variation production areas,
storage, services and the rooms for staff.
General Requirement
 Validation Master Plan may be defined as an internally
approved document that describes in clear, unequivocal
and concise wording, the general expectations,
intentions, methods and approach to be used during the
entire validation effort.
 The FDA inspectors during their audit ask for VMP as a
source document along with other important source
documents like:- site Master File or Calibration Master
Plan etc. Hence, this document must always be updated
and in the presentable form.
 The size of the master plan cannot be defined, but it
should not be just 4 or 5 pages, at the same time it
should not be as bulky as 400/ 500 pages also. Only acid
test for this is it must explain precisely and concisely
time table and persons responsible for carrying out
various activities. Normally a V.M.P. runs to about 40-
50 pages.
 The main advantages of the VMP is for the validation
people of the organization and the FDA and other auditors
and inspectors.
 Validation master plan must start as early as possible of in
case of new pharmaceutical plants.
 For new facilities it should be ready even before the
building plans are ready. In short U.R.S. and D.Q. should
be the beginning of the facility validation. Similarly before
selecting the equipment the D.Q. of the proposed
equipment should be ready and then it should follow the
I.Q., O.Q. and P.Q. Etc.
User Requirement Specification
Design Qualification
Installation Qualification
Operational Qualification
Performance Qualification
Step of validation
Change Control
Validation master plan
DQ
• Approved
documentation and
spacs.
IQ
• List system to be
qualified
OQ
• Identify
systems
and
subsystems
Calibration
• Identify
iteam to be
calibrated
for GMP
and safety.
• SOP’S /
Records
Cleaning
qualification
• Identify
systems to
be qualified
Personnel
• Training
• experience
Change control
• Project
• process
Specific Requirements
1) Approval page and table of content:
 Normally this document should be prepared by
one person, checked by another person and
approved and authorized by the head of QA or
location head, as per the policy of the company.
 The contents can ideally be in the following
sequence:-
a) Approval page
b) Table of contents
c) Introduction of objectives
d) Plant and process description
e) Personnel Planning and Scheduling
f) Responsibilities of committee members
g) Process control aspects
h) Equipment and apparatus, instruments to be
qualified
i) Process and systems to be validated
j) Acceptance criteria
k) Documentation required including reference to
validation protocols
l) SOP,s
m)Training requirements
2) Introduction and objectives:
 In this section you should introduction the
objectives of the documents.
 Te objectives may be something like this.
- to vaidate all facilities, equipment and
processes in this plan.
3) Plant and process description:
 A brief outline of the plant like where the plant
is situated age of the plant, technology used in
the plant e.g. you can mention we have fluid
bed processing technology in tableting high
output equipment in injectables RO. and EDI
system in water treatment plants. The idea here
is to give a feel for volumes of production
handled, caliber of people, you have advanced
analytical instruments in your Q.C lab etc.
4) Personnel, planning and scheduling:-
 In short describe in brief the team members of
validation team with their names, educational
qualification, experience they have in their field
and in the validation activities in this company as
well as in their earlier employment.
 This is actually to provide the auditor the
confidence in the work of validation that this
company is doing.
 Planning :- descibe complet scop of your
planned activies here, preferably in a proper
logical sequence like...
a. Facility validation
b. Equipment validation
c. Utilities validation like HVAC, water, electric
power etc.
 Scheduling:- time table to activity will start and
when it will get over.
 So normally all the activity are fist listed
vertically on the left side giving serial numbers
and right side provide three columns..
-date of start, date of completion, remarks
 Date may be replaced by week the month and the
year.
5) Responsibilities of committee members:
 Responsibilities of all the team member, e.g
responsibility of head of validation team can be
stated like this:
-to select and train team members
- to execute plans timely and satisfactorily.
6) Process control aspects:
 You have to identify all the controls you are
going to monitor during the process validation
and other activities. e. g. In sterilization process
you have to identity that tou are going to
maintain temp. and pressure.
7) Processes and System to be validated:
 Here also you have to make a list of processes and
systems which you plan to validate, e.g.
a) List of processes to be validated can run something
like this:
 Shifting Mixing
 Milling Autoclaving
 Filling
 Tab compression
b) List of system to be validated can run some thing
like this:
 HVAC
 Purified Water Water for injection
 Granulation of tablets etc.
8)Acceptance Criteria:
 Here define the parameters in each validation
activity and the limits of acceptance, e.g. in case
of mixing of dry powers the assay of the active
substance should be within 99 to 101% etc..
10)Documentation:
 List all documents related to validation activities,
e.g. various protocols and reports that you are
going to generate, SOPs. training manuals and all
deliverables from the validation department..
 It is advisable to specify who is going to
generate, approve and authorize these documents.
11)SOPS:
 List of SOPs relatedto validation activities
including those of calibration activities also.
12)Training requirements:
 Identify all persons who are responsible for
carrying out various validation activities and
their training needs and comment on how these
need will be satisfied.
GMP Validation Master Plan Guide

More Related Content

Similar to GMP Validation Master Plan Guide

Pharmaceuticalvalidation maharaja mla
Pharmaceuticalvalidation maharaja mlaPharmaceuticalvalidation maharaja mla
Pharmaceuticalvalidation maharaja mlaMuthu Maharaja Mla
 
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptxAUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptxShankar Maind Patil
 
Pharmaceutical Validation.pdf
Pharmaceutical Validation.pdfPharmaceutical Validation.pdf
Pharmaceutical Validation.pdfGireesh Kumar Eri
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical
 
Validation and calibration master plan
Validation and calibration master planValidation and calibration master plan
Validation and calibration master planBharatlal Sain
 
Validation Master Plan Modern Pharmaceutics
Validation Master Plan Modern PharmaceuticsValidation Master Plan Modern Pharmaceutics
Validation Master Plan Modern PharmaceuticsMittalGandhi
 
Facility & Equipment Quality System Outline
Facility & Equipment Quality System OutlineFacility & Equipment Quality System Outline
Facility & Equipment Quality System OutlineJoseph Busfield
 
THE DOCUMENTATION AND QUALITY POLICY IN PREPARATION OF MINOR LABORATORY OR I...
THE DOCUMENTATION AND QUALITY POLICY IN PREPARATION  OF MINOR LABORATORY OR I...THE DOCUMENTATION AND QUALITY POLICY IN PREPARATION  OF MINOR LABORATORY OR I...
THE DOCUMENTATION AND QUALITY POLICY IN PREPARATION OF MINOR LABORATORY OR I...sonamchuzin
 
Pharmaceutical validation
Pharmaceutical validationPharmaceutical validation
Pharmaceutical validationMadhavMady3
 
PHARMACEUTICAL VALIDATION
 PHARMACEUTICAL  VALIDATION PHARMACEUTICAL  VALIDATION
PHARMACEUTICAL VALIDATIONSACHIN C P
 
validationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptxvalidationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptxTanmayPanigrahy
 
Pharmaceutical validation, Quantification, streamlining, validation masterplan.
Pharmaceutical validation, Quantification, streamlining, validation masterplan.Pharmaceutical validation, Quantification, streamlining, validation masterplan.
Pharmaceutical validation, Quantification, streamlining, validation masterplan.begalavenu
 
TRS 937, 2006 ( validation HVAC).pdf
TRS 937, 2006 ( validation HVAC).pdfTRS 937, 2006 ( validation HVAC).pdf
TRS 937, 2006 ( validation HVAC).pdfleminhle2
 
Notes for the subject 'Pharmaceutical Validation'
Notes for the subject 'Pharmaceutical Validation' Notes for the subject 'Pharmaceutical Validation'
Notes for the subject 'Pharmaceutical Validation' Sanathoiba Singha
 

Similar to GMP Validation Master Plan Guide (20)

Pharmaceutical validation
Pharmaceutical validation Pharmaceutical validation
Pharmaceutical validation
 
Pharmaceuticalvalidation maharaja mla
Pharmaceuticalvalidation maharaja mlaPharmaceuticalvalidation maharaja mla
Pharmaceuticalvalidation maharaja mla
 
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptxAUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
 
Validation master plan
Validation master planValidation master plan
Validation master plan
 
Pharmaceutical Validation.pdf
Pharmaceutical Validation.pdfPharmaceutical Validation.pdf
Pharmaceutical Validation.pdf
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & Validation
 
Validation and calibration master plan
Validation and calibration master planValidation and calibration master plan
Validation and calibration master plan
 
ValidationMasterPlan
ValidationMasterPlanValidationMasterPlan
ValidationMasterPlan
 
Validation Master Plan Modern Pharmaceutics
Validation Master Plan Modern PharmaceuticsValidation Master Plan Modern Pharmaceutics
Validation Master Plan Modern Pharmaceutics
 
Facility & Equipment Quality System Outline
Facility & Equipment Quality System OutlineFacility & Equipment Quality System Outline
Facility & Equipment Quality System Outline
 
THE DOCUMENTATION AND QUALITY POLICY IN PREPARATION OF MINOR LABORATORY OR I...
THE DOCUMENTATION AND QUALITY POLICY IN PREPARATION  OF MINOR LABORATORY OR I...THE DOCUMENTATION AND QUALITY POLICY IN PREPARATION  OF MINOR LABORATORY OR I...
THE DOCUMENTATION AND QUALITY POLICY IN PREPARATION OF MINOR LABORATORY OR I...
 
Pharmaceutical validation
Pharmaceutical validationPharmaceutical validation
Pharmaceutical validation
 
Validation.pptx
Validation.pptxValidation.pptx
Validation.pptx
 
PHARMACEUTICAL VALIDATION
 PHARMACEUTICAL  VALIDATION PHARMACEUTICAL  VALIDATION
PHARMACEUTICAL VALIDATION
 
validationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptxvalidationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptx
 
Pharmaceutical validation, Quantification, streamlining, validation masterplan.
Pharmaceutical validation, Quantification, streamlining, validation masterplan.Pharmaceutical validation, Quantification, streamlining, validation masterplan.
Pharmaceutical validation, Quantification, streamlining, validation masterplan.
 
TRS 937, 2006 ( validation HVAC).pdf
TRS 937, 2006 ( validation HVAC).pdfTRS 937, 2006 ( validation HVAC).pdf
TRS 937, 2006 ( validation HVAC).pdf
 
Process validation
Process validationProcess validation
Process validation
 
Validation
ValidationValidation
Validation
 
Notes for the subject 'Pharmaceutical Validation'
Notes for the subject 'Pharmaceutical Validation' Notes for the subject 'Pharmaceutical Validation'
Notes for the subject 'Pharmaceutical Validation'
 

Recently uploaded

Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 

Recently uploaded (20)

Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 

GMP Validation Master Plan Guide

  • 1. VALIDATION MASTER PLAN Presented By: Mahesh Dhedhi M. Pharm 1st Semester Regulatory Affair
  • 2.
  • 3. Introduction  The design, construction, and commissioning of a new facility for the pharmaceutical industry is a complex.  The approach that can be used by the designer to ensure that the design, engineering and construction process can meet the GMP requirements are completely based on the plan of a validation strategy.
  • 4.  Definition:-  Validation master plan is an internallly approved document that describes in clear and concise wording the general expection method and approach to be used during the entire validation effort. Scope:- VMP includes all relevant aspects to the Production of pharmaceuticals in the production facility. The principle of validation, the organization of qualification and equipment are also described. It covers all facilities used in variation production areas, storage, services and the rooms for staff.
  • 5. General Requirement  Validation Master Plan may be defined as an internally approved document that describes in clear, unequivocal and concise wording, the general expectations, intentions, methods and approach to be used during the entire validation effort.  The FDA inspectors during their audit ask for VMP as a source document along with other important source documents like:- site Master File or Calibration Master Plan etc. Hence, this document must always be updated and in the presentable form.  The size of the master plan cannot be defined, but it should not be just 4 or 5 pages, at the same time it should not be as bulky as 400/ 500 pages also. Only acid test for this is it must explain precisely and concisely time table and persons responsible for carrying out various activities. Normally a V.M.P. runs to about 40- 50 pages.
  • 6.  The main advantages of the VMP is for the validation people of the organization and the FDA and other auditors and inspectors.  Validation master plan must start as early as possible of in case of new pharmaceutical plants.  For new facilities it should be ready even before the building plans are ready. In short U.R.S. and D.Q. should be the beginning of the facility validation. Similarly before selecting the equipment the D.Q. of the proposed equipment should be ready and then it should follow the I.Q., O.Q. and P.Q. Etc.
  • 7. User Requirement Specification Design Qualification Installation Qualification Operational Qualification Performance Qualification Step of validation Change Control
  • 8. Validation master plan DQ • Approved documentation and spacs. IQ • List system to be qualified OQ • Identify systems and subsystems Calibration • Identify iteam to be calibrated for GMP and safety. • SOP’S / Records Cleaning qualification • Identify systems to be qualified
  • 9. Personnel • Training • experience Change control • Project • process
  • 10. Specific Requirements 1) Approval page and table of content:  Normally this document should be prepared by one person, checked by another person and approved and authorized by the head of QA or location head, as per the policy of the company.  The contents can ideally be in the following sequence:- a) Approval page b) Table of contents c) Introduction of objectives d) Plant and process description
  • 11. e) Personnel Planning and Scheduling f) Responsibilities of committee members g) Process control aspects h) Equipment and apparatus, instruments to be qualified i) Process and systems to be validated j) Acceptance criteria k) Documentation required including reference to validation protocols l) SOP,s m)Training requirements
  • 12. 2) Introduction and objectives:  In this section you should introduction the objectives of the documents.  Te objectives may be something like this. - to vaidate all facilities, equipment and processes in this plan.
  • 13. 3) Plant and process description:  A brief outline of the plant like where the plant is situated age of the plant, technology used in the plant e.g. you can mention we have fluid bed processing technology in tableting high output equipment in injectables RO. and EDI system in water treatment plants. The idea here is to give a feel for volumes of production handled, caliber of people, you have advanced analytical instruments in your Q.C lab etc.
  • 14. 4) Personnel, planning and scheduling:-  In short describe in brief the team members of validation team with their names, educational qualification, experience they have in their field and in the validation activities in this company as well as in their earlier employment.  This is actually to provide the auditor the confidence in the work of validation that this company is doing.
  • 15.  Planning :- descibe complet scop of your planned activies here, preferably in a proper logical sequence like... a. Facility validation b. Equipment validation c. Utilities validation like HVAC, water, electric power etc.  Scheduling:- time table to activity will start and when it will get over.  So normally all the activity are fist listed vertically on the left side giving serial numbers and right side provide three columns.. -date of start, date of completion, remarks  Date may be replaced by week the month and the year.
  • 16. 5) Responsibilities of committee members:  Responsibilities of all the team member, e.g responsibility of head of validation team can be stated like this: -to select and train team members - to execute plans timely and satisfactorily. 6) Process control aspects:  You have to identify all the controls you are going to monitor during the process validation and other activities. e. g. In sterilization process you have to identity that tou are going to maintain temp. and pressure.
  • 17. 7) Processes and System to be validated:  Here also you have to make a list of processes and systems which you plan to validate, e.g. a) List of processes to be validated can run something like this:  Shifting Mixing  Milling Autoclaving  Filling  Tab compression b) List of system to be validated can run some thing like this:  HVAC  Purified Water Water for injection  Granulation of tablets etc.
  • 18. 8)Acceptance Criteria:  Here define the parameters in each validation activity and the limits of acceptance, e.g. in case of mixing of dry powers the assay of the active substance should be within 99 to 101% etc.. 10)Documentation:  List all documents related to validation activities, e.g. various protocols and reports that you are going to generate, SOPs. training manuals and all deliverables from the validation department..  It is advisable to specify who is going to generate, approve and authorize these documents.
  • 19. 11)SOPS:  List of SOPs relatedto validation activities including those of calibration activities also. 12)Training requirements:  Identify all persons who are responsible for carrying out various validation activities and their training needs and comment on how these need will be satisfied.