INDUSTRIAL VISIT REPORT- UTTAM
TRANSFORMERS
Departmentof Electrical Engineering,PoornimaCollege of Engineering organized an industrial visit
on 25th
March 2017 to Uttam (Bharat) Electricals Private Limited, addressed at B-189/A, Road No.
9(F), Vishwakarma Industrial Area, Jaipur for students of the Branch. The visit was organized with
priorpermissionandguidance of Dr.VirendraSangtani,Headof Department.Total40studentsalong
with faculty members Mr. Rohit Sharma and Mr. Amba Lal as coordinators visited the same.
We started from the college at 9:15 AM. and it took us approximately two hours to reach our
destination via College transport.
The main objective of the visitwastoknow theoretical termswithindustrial(practical) exposure and
working of Uttam Transformers.
An engineer at Uttam transformers welcomed all of us at the entrance and took us in batches to
explain the manufacturing process and working of Transformers in detail.
COMPANY PROFILE:
Uttam Bharat) Electricals Private Limited is an ISO 9001:2008 certified leading manufacturer of
PowerandDistributionTransformers from 5KVA to 12500 KVA upto 11-22-33 KV class, Single-Three
Phase having a turnover of approx. 112 crores.
The company hasmachine facilitiestoDesign,Manufacture andtestTransformersasperIS:2026/BS-
171/IEC-76 international standards.Transformersupto12500 KVA rating33 KV classhave beentype
tested for Short circuit and Impulse test at CPRI and other government approved laboratories.
The company has received SE2B rating by CRISIL which denotes high performance capability
adjudged in relation to other SSI’s.
The company has been meeting specific requirements such as dual-ratio transformer, Furnace
transformers, Transformers with OLTC or conversion of existing transformer to any voltage ratio.
Uttam transformers have developed and supplied fail safe Distribution transformers, wound core
transformers and are in the process of developing Amorphous core, and Dry type transformers.
Uttam made transformers are approved by Telecom, CPWD, MES, Railways, PWD and various
utilities ans state electricity boards.In a span of over 30 years, the company has supplied over
1,50,000 Power and Distribution transformers at various ratings and voltages to users in India and
Abroad. The company has exported transformers to Jordan, Nigeria, Bhutan, Sri Lanka and Nepal.
The salient features of the company include Robust Design, Economical losses, Stringent Quality
control,timelydelivery,extendedguarantee period,efficientandpromptaftersalesservice. We
were explained the following details about transformers:
There are two types of circuits in a transformer-
 Magnetic circuit (core)
 Electric circuit
Basic Parts of a Transformer:
1) Laminated core
2) Windings
3) Insulating Materials
4) Transformer oil
5) Tap changer
6) Conservator
7) Breather
8) Cooling tubes
9) Buchholz Relay
10) Explosion vent
Core:
The core is used to support the windings in the transformer.
Cold-rolledgrain-oriented(CRGO) steel is used for the manufacture of transformer core.It has low
magnetichysteresislooparea,whichminimizes magneticlosses&highsiliconcontentwhichleadsto
high resistance, decreasing eddy current losses. So, overall losses are reduced.
Amorphous Core: Amorphous core material offers both reduced hysteresis loss and eddy current
lossbecause this material has a random grain and magnetic domain structure which results in high
permeability, which ensures a narrow hysteresis curve compared to conventional CRGO material.
The thickness of Amorphous sheet is about 1/10th
that of CRGO.
Core Assembly:
It consists of:
1) Core made up of CRGO steel.
2) Core bolt
3) Three limbs
4) Top Yoke and Bottom yoke
5) Tie rod
6) LT & HT Windings
WINDINGS:-
LT Windings are connected in star and HT Windings are connected in Delta.
Enamel isusedto insulate the windingsof low voltagetransformers. For power transformers, paper
insulation is used for winding wire as well as in the form of strips of paper insulation between
winding layers.
Cross winding-
It is made of circular conductor used for High voltage windings of relatively small transformers.
Helical winding:
We use helical winding where we need to draw more current.It consists of large no. of parallel
conductors piled in the radial direction and wound. It is used for windings of low voltage(20 KV or
below) & large current.
Between layers, no insulation other than conductor insulation is required as voltage between the
layers is low.
The parallel circuits bring in the problem of current sharing.Transposition is adopted to reduce
unequal current distribution. The modern trend is to use transposed and bunched conductors.
MS Tank
Mild Steel Tank consists of three phase windings along with Neutral.
It is filled with Transformer oil.
Gasket- Oil seal is used to prevent any leakage.
TRANSFORMER OIL:-
ON-AN (Oil Natural Air Natural) transformers have inbuilt properties of cooling down oil inside it.
ON (Oil Natural)- AF (Air Force) Transformers have to be provided with external air force to cool
down the temperature.
OVEN:
Core assembly is heated in the oven.
Conservator Tank:
It is placed on the Mils Steel Tank and is filled with Transformer Oil.
Breather Pipe:
It is used to carry moisture-free, dry air into the tank.
Equalizer Pipe- It is used to equalize pressure.
The expected life of a transformer is 20-25 Years.
Testing Lab is used for the Health check of the transformers.
Tap No. PT Ratio
1 600/600
2 1200/600
3 1800/600
4 2400/600
5 3000/600
MarshallingBox:Itis a weather-proof terminal box which connects the transformer’s fittings to the
protective schemes to give alarm under abnormal conditions.
It also houses Oil temperature indicator (OTI) and Winding temperature indicator (WTI).
Buchholz Relay:
It is connected between the Conservator tank and Transformer tank.
Explosion vent pipe:
It is the top-most and weakest part of the transforer to ensure transformer protection. A very thin
brass metal is used which breaks if there is any fault in the transformer.

Más contenido relacionado

La actualidad más candente

Different types of Transformers used in Generating Station
Different types of Transformers used in Generating StationDifferent types of Transformers used in Generating Station
Different types of Transformers used in Generating StationVasanthan Ravichandran
 
Testing of circuit breakers
Testing of circuit breakersTesting of circuit breakers
Testing of circuit breakersKabilesh K
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.Hemendra Kumar Rajput
 
automatic power factor correction
automatic power factor correction automatic power factor correction
automatic power factor correction Febin Paul
 
Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenancekarikalan123
 
DISTANCE PROTECTION RELAY
DISTANCE PROTECTION RELAYDISTANCE PROTECTION RELAY
DISTANCE PROTECTION RELAYRaviraj solanki
 
Types Of Substations
Types Of SubstationsTypes Of Substations
Types Of Substationssapna186
 
Power factor presentation
Power factor presentationPower factor presentation
Power factor presentationAzhar Abbas
 
digital testing of high voltage circuit breaker
digital testing of high voltage circuit breakerdigital testing of high voltage circuit breaker
digital testing of high voltage circuit breakerRenuka Verma
 
Power Electronics-Introduction
Power Electronics-IntroductionPower Electronics-Introduction
Power Electronics-Introductionsangeetha rakhi
 
APFC project presentation
APFC project presentationAPFC project presentation
APFC project presentationkartickmp613
 
Solar based wireless charging of electric vehicle
Solar based wireless charging of electric vehicleSolar based wireless charging of electric vehicle
Solar based wireless charging of electric vehicleAshutosh kumar
 
Internship doc 33 11 kv substation
Internship doc 33 11 kv substation  Internship doc 33 11 kv substation
Internship doc 33 11 kv substation Madeen Kumar
 
Directional over current relay
Directional over current relayDirectional over current relay
Directional over current relayCS V
 
220KV Substation Training Report
220KV Substation Training Report220KV Substation Training Report
220KV Substation Training ReportSWAPNILKUMARGUPTA
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)Prateek Agarwal
 

La actualidad más candente (20)

Different types of Transformers used in Generating Station
Different types of Transformers used in Generating StationDifferent types of Transformers used in Generating Station
Different types of Transformers used in Generating Station
 
Testing of circuit breakers
Testing of circuit breakersTesting of circuit breakers
Testing of circuit breakers
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
 
automatic power factor correction
automatic power factor correction automatic power factor correction
automatic power factor correction
 
Distribution transformer
Distribution transformerDistribution transformer
Distribution transformer
 
Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenance
 
DISTANCE PROTECTION RELAY
DISTANCE PROTECTION RELAYDISTANCE PROTECTION RELAY
DISTANCE PROTECTION RELAY
 
Types Of Substations
Types Of SubstationsTypes Of Substations
Types Of Substations
 
Power factor presentation
Power factor presentationPower factor presentation
Power factor presentation
 
digital testing of high voltage circuit breaker
digital testing of high voltage circuit breakerdigital testing of high voltage circuit breaker
digital testing of high voltage circuit breaker
 
Power Electronics-Introduction
Power Electronics-IntroductionPower Electronics-Introduction
Power Electronics-Introduction
 
APFC project presentation
APFC project presentationAPFC project presentation
APFC project presentation
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
132 kv
132 kv132 kv
132 kv
 
Solar based wireless charging of electric vehicle
Solar based wireless charging of electric vehicleSolar based wireless charging of electric vehicle
Solar based wireless charging of electric vehicle
 
Transformer basic
Transformer basicTransformer basic
Transformer basic
 
Internship doc 33 11 kv substation
Internship doc 33 11 kv substation  Internship doc 33 11 kv substation
Internship doc 33 11 kv substation
 
Directional over current relay
Directional over current relayDirectional over current relay
Directional over current relay
 
220KV Substation Training Report
220KV Substation Training Report220KV Substation Training Report
220KV Substation Training Report
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)
 

Similar a Industrial visit report uttam transformers

Industrial training report
Industrial training report Industrial training report
Industrial training report Pritam Samanta
 
Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Nik Sharma
 
Transformer protection & maintenance
Transformer protection & maintenanceTransformer protection & maintenance
Transformer protection & maintenancePradeep Avanigadda
 
Seminar report theory
Seminar report theorySeminar report theory
Seminar report theoryRanjan kumar
 
Transformer report-Siemens
Transformer report-SiemensTransformer report-Siemens
Transformer report-SiemensMahmood Ali
 
Tbea vocatinal training
Tbea vocatinal trainingTbea vocatinal training
Tbea vocatinal trainingDeep Shah
 
transformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationtransformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationFawaz Baik
 
summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...Rahul Akinapelli
 
Inovative Solution by Transformers Manufacturers in India
Inovative Solution by Transformers Manufacturers in IndiaInovative Solution by Transformers Manufacturers in India
Inovative Solution by Transformers Manufacturers in IndiaSynergy Transformers
 
University college of engineering, rajasthan technical university
University college of engineering, rajasthan technical universityUniversity college of engineering, rajasthan technical university
University college of engineering, rajasthan technical universityDivyansh Gupta
 
A vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power LimitedA vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power LimitedKishan Gabel
 
Power Transformer in DPL
Power Transformer in DPLPower Transformer in DPL
Power Transformer in DPLAbhishek Roy
 
transformer Manufactures and exporters in India
transformer Manufactures and exporters in Indiatransformer Manufactures and exporters in India
transformer Manufactures and exporters in Indiaseo27poogle
 
Industrial training 220 KV moradabad
Industrial training 220 KV moradabadIndustrial training 220 KV moradabad
Industrial training 220 KV moradabadMONU KUMAR
 

Similar a Industrial visit report uttam transformers (20)

TELK Industrial Visit Report
TELK Industrial Visit ReportTELK Industrial Visit Report
TELK Industrial Visit Report
 
Transformer ppt
Transformer pptTransformer ppt
Transformer ppt
 
Industrial training report
Industrial training report Industrial training report
Industrial training report
 
Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE]
 
Transformer protection & maintenance
Transformer protection & maintenanceTransformer protection & maintenance
Transformer protection & maintenance
 
Seminar report theory
Seminar report theorySeminar report theory
Seminar report theory
 
Transformer report-Siemens
Transformer report-SiemensTransformer report-Siemens
Transformer report-Siemens
 
Makpower - Furnace Transformer Manufacturer in India
Makpower - Furnace Transformer Manufacturer in IndiaMakpower - Furnace Transformer Manufacturer in India
Makpower - Furnace Transformer Manufacturer in India
 
Tbea vocatinal training
Tbea vocatinal trainingTbea vocatinal training
Tbea vocatinal training
 
transformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationtransformer Sales, after sales & service presentation
transformer Sales, after sales & service presentation
 
summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...
 
Inovative Solution by Transformers Manufacturers in India
Inovative Solution by Transformers Manufacturers in IndiaInovative Solution by Transformers Manufacturers in India
Inovative Solution by Transformers Manufacturers in India
 
University college of engineering, rajasthan technical university
University college of engineering, rajasthan technical universityUniversity college of engineering, rajasthan technical university
University college of engineering, rajasthan technical university
 
A vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power LimitedA vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power Limited
 
Emt megatherm a site visit report
Emt megatherm a site visit reportEmt megatherm a site visit report
Emt megatherm a site visit report
 
Power Transformer in DPL
Power Transformer in DPLPower Transformer in DPL
Power Transformer in DPL
 
ZUNED ATIK.pptx
ZUNED ATIK.pptxZUNED ATIK.pptx
ZUNED ATIK.pptx
 
transformer Manufactures and exporters in India
transformer Manufactures and exporters in Indiatransformer Manufactures and exporters in India
transformer Manufactures and exporters in India
 
Internship report
Internship report Internship report
Internship report
 
Industrial training 220 KV moradabad
Industrial training 220 KV moradabadIndustrial training 220 KV moradabad
Industrial training 220 KV moradabad
 

Último

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 

Último (20)

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 

Industrial visit report uttam transformers

  • 1. INDUSTRIAL VISIT REPORT- UTTAM TRANSFORMERS Departmentof Electrical Engineering,PoornimaCollege of Engineering organized an industrial visit on 25th March 2017 to Uttam (Bharat) Electricals Private Limited, addressed at B-189/A, Road No. 9(F), Vishwakarma Industrial Area, Jaipur for students of the Branch. The visit was organized with priorpermissionandguidance of Dr.VirendraSangtani,Headof Department.Total40studentsalong with faculty members Mr. Rohit Sharma and Mr. Amba Lal as coordinators visited the same. We started from the college at 9:15 AM. and it took us approximately two hours to reach our destination via College transport. The main objective of the visitwastoknow theoretical termswithindustrial(practical) exposure and working of Uttam Transformers. An engineer at Uttam transformers welcomed all of us at the entrance and took us in batches to explain the manufacturing process and working of Transformers in detail. COMPANY PROFILE: Uttam Bharat) Electricals Private Limited is an ISO 9001:2008 certified leading manufacturer of PowerandDistributionTransformers from 5KVA to 12500 KVA upto 11-22-33 KV class, Single-Three Phase having a turnover of approx. 112 crores. The company hasmachine facilitiestoDesign,Manufacture andtestTransformersasperIS:2026/BS- 171/IEC-76 international standards.Transformersupto12500 KVA rating33 KV classhave beentype tested for Short circuit and Impulse test at CPRI and other government approved laboratories. The company has received SE2B rating by CRISIL which denotes high performance capability adjudged in relation to other SSI’s. The company has been meeting specific requirements such as dual-ratio transformer, Furnace transformers, Transformers with OLTC or conversion of existing transformer to any voltage ratio. Uttam transformers have developed and supplied fail safe Distribution transformers, wound core transformers and are in the process of developing Amorphous core, and Dry type transformers. Uttam made transformers are approved by Telecom, CPWD, MES, Railways, PWD and various utilities ans state electricity boards.In a span of over 30 years, the company has supplied over 1,50,000 Power and Distribution transformers at various ratings and voltages to users in India and Abroad. The company has exported transformers to Jordan, Nigeria, Bhutan, Sri Lanka and Nepal. The salient features of the company include Robust Design, Economical losses, Stringent Quality control,timelydelivery,extendedguarantee period,efficientandpromptaftersalesservice. We were explained the following details about transformers:
  • 2. There are two types of circuits in a transformer-  Magnetic circuit (core)  Electric circuit Basic Parts of a Transformer: 1) Laminated core 2) Windings 3) Insulating Materials 4) Transformer oil 5) Tap changer 6) Conservator 7) Breather 8) Cooling tubes 9) Buchholz Relay 10) Explosion vent Core: The core is used to support the windings in the transformer. Cold-rolledgrain-oriented(CRGO) steel is used for the manufacture of transformer core.It has low magnetichysteresislooparea,whichminimizes magneticlosses&highsiliconcontentwhichleadsto high resistance, decreasing eddy current losses. So, overall losses are reduced. Amorphous Core: Amorphous core material offers both reduced hysteresis loss and eddy current lossbecause this material has a random grain and magnetic domain structure which results in high permeability, which ensures a narrow hysteresis curve compared to conventional CRGO material. The thickness of Amorphous sheet is about 1/10th that of CRGO. Core Assembly: It consists of: 1) Core made up of CRGO steel. 2) Core bolt 3) Three limbs 4) Top Yoke and Bottom yoke 5) Tie rod 6) LT & HT Windings WINDINGS:- LT Windings are connected in star and HT Windings are connected in Delta.
  • 3. Enamel isusedto insulate the windingsof low voltagetransformers. For power transformers, paper insulation is used for winding wire as well as in the form of strips of paper insulation between winding layers. Cross winding- It is made of circular conductor used for High voltage windings of relatively small transformers. Helical winding: We use helical winding where we need to draw more current.It consists of large no. of parallel conductors piled in the radial direction and wound. It is used for windings of low voltage(20 KV or below) & large current. Between layers, no insulation other than conductor insulation is required as voltage between the layers is low. The parallel circuits bring in the problem of current sharing.Transposition is adopted to reduce unequal current distribution. The modern trend is to use transposed and bunched conductors. MS Tank Mild Steel Tank consists of three phase windings along with Neutral. It is filled with Transformer oil. Gasket- Oil seal is used to prevent any leakage. TRANSFORMER OIL:- ON-AN (Oil Natural Air Natural) transformers have inbuilt properties of cooling down oil inside it. ON (Oil Natural)- AF (Air Force) Transformers have to be provided with external air force to cool down the temperature. OVEN: Core assembly is heated in the oven. Conservator Tank: It is placed on the Mils Steel Tank and is filled with Transformer Oil. Breather Pipe: It is used to carry moisture-free, dry air into the tank. Equalizer Pipe- It is used to equalize pressure. The expected life of a transformer is 20-25 Years.
  • 4. Testing Lab is used for the Health check of the transformers. Tap No. PT Ratio 1 600/600 2 1200/600 3 1800/600 4 2400/600 5 3000/600 MarshallingBox:Itis a weather-proof terminal box which connects the transformer’s fittings to the protective schemes to give alarm under abnormal conditions. It also houses Oil temperature indicator (OTI) and Winding temperature indicator (WTI). Buchholz Relay: It is connected between the Conservator tank and Transformer tank. Explosion vent pipe: It is the top-most and weakest part of the transforer to ensure transformer protection. A very thin brass metal is used which breaks if there is any fault in the transformer.