Publicidad

Manish_Sagar 4 Year

Engineer- Operation & Maintenance at KEPCO Plant Services and Engineering Co. Ltd.
24 de Nov de 2014
Manish_Sagar 4 Year
Manish_Sagar 4 Year
Manish_Sagar 4 Year
Próximo SlideShare
Resume RResume R
Cargando en ... 3
1 de 3
Publicidad

Más contenido relacionado

Publicidad

Manish_Sagar 4 Year

  1. MANISH SAGAR Email Id: manishsagar31@gmail.com Male M. No: 8800118373, 8489913415 OVERVIEW  A competent professional with nearly 4 Years & above experience in Power Plant Project Management / Engineering /Planning & Scheduling /Erection/ Operation & Maintenance.  Presently Working as Project Engineer on 2X150 MW Nagai Thermal Power Project, Nagapattinam (T. N.).  Worked as Shift Engineer on 63 MW SV Power Pvt Ltd (Korba, CG). Mainly the Control room desk operation.  B.TECH in Mechanical Engg and PGDC in Thermal Power Plant from NPTI (Badarpur, N.D.).  An effective communicator with analytical and interpersonal skills .  Willingness to learn and manage the changes. Area of Expertise Project Management, Engineering and Planning  Monitoring project activities and coordinating with various agencies to maintain targeted schedules.  Engineering drawings and P&ID’s review for PF Boiler, Steam Turbine and Thermal cycle and also check the implementation of comments.  Design reviews for Piping layout, Equipment layout and also checks the implementation of comments.  Reviewed the(Basic and Detail Engineering) Design Basis Report, P&ID’s and Technical Specification of BOP packages – Air Cooled Condenser, Plant Water System, Coal Handling System, Ash Handling System, Mill Reject System, Cooling Tower and check the implementation of Comments.  Working knowledge of Primavera P6 and MS Project software for Planning and scheduling.  Maintain project schedule, Progress and MIS Report.  Prepare project summary & frame in technical reports. Project Erection  Supervision for erection of Boiler structure, Pressure parts, ESP and Rotating Equipments –ID, FD & PA Fans and Air Cooled Condenser structure.  Handling site preparations, mobilization of contractors for carrying out erection activities . Operation & Maintenance  Worked as a shift Engineer to take care of shift operation. Operations of the steam turbine, boiler, generator. Mainly the control room desk operations.  During long shut down take care of preservation of Boiler, Steam Turbine and rotating equipment’s like PA fan, FD fan , ID fan and BFP. Work Experience (52 Months) From Jan’13 to till date with 2X150 MW Nagai Power Project, Nagapattinam (T.N.) as Engineer Projects. Responsibilities  Supervise the Erection of Boiler structure, Pressure Parts, ESP Structure and Rotating Equipments - ID, FD and PA Fans & its alignment and Air cooled condenser. From Mar’11 to Dec’12 with 2X150 MW Nagai power Project (KVK Energy) Hyedrabad as Engineer Projects (Mechanical).  Review the Basic and Detail drawings in BTG – Boiler P&ID’s, Turbine, Generator, Piping and other equipment’s coming Inside the Power House Building and in BOP -Air Cooled Condenser, Plant Water system, Coal Handling Plant and Ash Handling Plant  Co-ordination between our Engineering team, EPC contractor, Turbine vendor & sub vendor, Air cooled condenser vendor and our consultant for resolving engineering issues.  Maintain project schedule, Progress and MIS Report.  Technical follow-ups with the vendors for all related drawings.  Follow up with vendors regarding material delivery / manufacturing Status.  Leading Weekly Progress meetings with all departments (Civil, Mechanical, Electrical and C&I) to monitor their progress and recording it in MS Excel and circulating to everyone involved with the Project.  Frame Monthly Progress Report for Lender’s Engineer.  Involved in review meetings held by Top Management with vendors on Monthly Basis.
  2.  Preparing MOMs of the meetings and circulating it to everyone involved in meeting.  To review and make comments on draft of Monthly progress report received from EPC contractor.  Certify the bill of exchange raised by EPC contractor and sub vendors . Achievements  Actively involved from initial stage of Project .  Successfully did an assignment on Water Balance Diagram to reduce the consumption of water.  Project Management for IPP.  Developed good relations with vendors, which has given immense benefit to the company in terms of spares and service. From Aug’10 to Feb’11 on 63 MW Thermal Power Plant as Shift Engineer (MECH). Responsibilities  Control room Desk Operation for Boiler, Turbine and Generator.  Cost calculation of Generation.  During shutdown Preservation of Boiler, Turbine and rotating equipment’s .. Practical Exposure /Industrial Training Organization: NTPC, Badarpur September ‘09 – August’10  One year industrial training in NTPC-BADARPUR, O&M of 210MW LMW turbine and 684 tons P.F. Boiler, (under the PGDC course of NPTI(PETS) is duly recognized by AICTE and Central Electricity Authority).Also, it authorizes the engineer to operate or undertake the maintenance of 100MW or above capacity power plant.  Completed scheme tracing modules for various steam, water, coal cycles for the 210MW (Unit -5).  Completed rotational on job trainings (operation & maintenance) for an entire 45 days period. Organization: National Power Training Institute (PETS), New Delhi and Faridabad Feb’10 (20 Days)  Completed four week training in Fossil Fuel Fired Power Plant Simulator 500MW and 210MW. Organization: NTPC, Dadri June’07(15 Days)  Undertaken summer training in Ash Handling Plant. Academic Background 2010 PGDC (Thermal Power Plant) from National Power Training Institute, Badarpur, secured 73%. 2008 B.Tech. (Mechanical) from AKGEC, Ghaziabad under UPTU, Lucknow secured 61%. 2003 B.SC-1st Year (PCM) from Govt. National College,Sirsa (HR). 2002 XII (Science) from Central Senior Secondary School, Sirsa (HR) secured 55.8%. 1999 X from Anupam Senior High School,Sirsa (HR), secured 76.5%. Academic Achievements  Distinction in 10th Standard. IT Tool Awareness  Primavera P6, MS Project  Auto CAD, Pro-Engineer Wildfire  MS Office (Word, Excel and PowerPoint)  Windows (2000, XP,7,8) Extra-Curricular Activities  Won Second Prize in Robonoid in tech fest08 at college level in 2008.  Won Third Prize in Beat The Weight in tech fest08 at college level in 2008.  Participated in Play Glani in cultural fest at college level in 2007.  Head of discipline committee Personal Dossier Date of Birth : 31October’1984 Permanent Address : H. NO-B 3, HSDC Colony Hissar Raod, Sirsa Haryana -125055 Contact Address : No 11, 1st Floor,2nd cross, Bharathidasan Nagar, Karaikal (UT-Pondicheery). Linguistic Abilities : Hindi, English, Haryanvi and Punjabi.
Publicidad