1. Cascading in Green
Wireless Power in Ark Maker Mode
MDIA
Glass Design Series
V1 Emerald Rotation
V2 Green Banks
V3 Rigid Regimen
V4 Mounting Platforms (Covalens)
Part I: Intro to Green Energy Wall
Part II: Functional Performance
Part III: Platform Covalens
A New Currency
2. ORIGIN OF
GLASS PROJECT
The Origin of our project was in developing Scorecard Metrics
related to the Business Cube.
When we emulated a glass plait of candle and lantern it took on
Ark dimensions for digital process, green energy and wireless
transmission, and building with glass forms and mix variations.
The first schema from the Morning Star shows IP Conversion and
creating the repository in the gated warehouse they sponsor. It is
recommended for agile that the more advanced methods can be
used in backward-ization for the sake of increasing intelligence.
They will mentor this relationship.
Part I: Intro to Green Energy Wall
2/22/2023
Brij Consulting, LLC Jean Marshall
2
Evergreen System
Trading in Green Energy becomes the
new currency
3. Double-Down
Delivery
The end of our Project Plan shows us
achieving the double-down effect. But three
variations to the wall enable the final delivery
mechanic.
The Green Wall is the first very important
achievement, seen in T3&T4 of our Timeline
The test of green energy is the simple double
down setup. GE needs to be directed along its
path. So, the blue wave and the model are also
necessary.
2/22/2023
Brij Consulting, LLC Jean Marshall
3
101.6 + 4.1 = 105.7 108.46-105.76= 2.7
1917+105.7= 2022.7
IF Glass is in
your FUTURE
don’t argue
with the
Morning Star
Agile Equation
4. Potential Energy is Like a Spring or Coil
The first winding arrangements are
through submersible pumps. Every part
of this assembly needs to become glass
And the energy associated mapped
Wind up
ambient
Wind down
green
Map Energy
Transform
Thread
Store and
Ship
Mix
Glass Mix is variegated for wave
acclimation and thread pull
2/22/2023
Brij Consulting, LLC Jean Marshall
4
Only ‘All glass’ components produce pure GE
5. Winding down
requires a storage
and then refinery
The initial storage of green energy formation is prior to its conditioning for various
forms of delivery, a kind of refining.
It needs to be encapsulated by at least three layers of glass, beginning of star
packaging.
The glass should have a mirror and shield in it to keep the potential charged lightly.
This raw green can be shipped to a refinery where it can be mapped and traded with
other dealers and devised for various uses such as car batteries and other new
componentization strategies. It must roll with specific blue wave requirements.
A royalty based on its growing usage can be provided to the raw green manufacturer.
And this is until the Green Wall strategy of total commitment is built. As soon as they
can replicate to the wall and store and refine there the ship to shore process will
change.
When they are capable of the winding and unwinding, storage and refinery and server-
based transmission the ship to shore process will be over. Those engaged in wall
transmission will also be part of the wall transition process. This becomes the Green
Energy Trade or ”GETi” Federation.
Wind down
Potential
Store Lightly
Refine Raw
Green
Blue Wave
Motivation
2/22/2023
Brij Consulting, LLC Jean Marshall
5
6. Glass and Green thread together
The many uses of Green
Energy cause it to need
to be versatile in its
applications so that its
variegated notions and
flavors are part of the
puzzle.
Transmission requires an
IP repository from
oversight.
IP
2/22/2023
Brij Consulting, LLC Jean Marshall
6
From slide 3
7. Process Theory of Green Energy
Translation (GETi)
Various graphic applications supply utilities to
the project and advance within each
stratification requirement From Dimensions in MV-Fab
Glass mix and emerald
rotation in the wall make
green energy viable
2/22/2023
Brij Consulting, LLC Jean Marshall
7
8. We used our
spintronics
mapping and
digital
dynamics
conversion
derived from
the
Benedictine
Medal
Digital Dynamics
2/22/2023
Brij Consulting, LLC Jean Marshall
8
9. 2/22/2023
Brij Consulting, LLC Jean Marshall
9
Within Science Journals we have not found strides in glass,
although wave glass is here. Industrial Physics is the most
promising outlook for glass and for green energy.
10. 2/22/2023
Brij Consulting, LLC Jean Marshall
10
This type of acclimation is
only available with the
Green Wall and the Blue
Wave as a Mobile Team
11. Discovery in
God
God made all things for Himself He did not make
them for us. But He did Plan to share His Wisdom
and Knowledge with us and if we allow His Ways
and Observances to become our own, we are
invited to live with Him forever.
People are failing with God because they believe
they can take the things of God and use them for
their own aggrandizement. God may bring about
a Glass Evolution in order to permit us to learn
more about Him. And share in the Benefits of the
Uncreated Light He enjoys teaching about. God is
known through the Soul.
Why does God not make
widespread use of this
Knowledge? Because people
are much too selfish and
because the devil is on the
prowl looking to bring about
ruin of all the things of God.
<glass>
>>
12. Part II: Functional Performance
Functional Performance is our NEXT TOPIC
Glass Design Series
V1 Emerald Rotation
V2 Green Banks
V3 Rigid Regimen
Viability
Storage
Transfer
2/22/2023
Brij Consulting, LLC Jean Marshall
12
God’s Light of Life is
functionally perfect
5 “Woe to me!” I cried. “I am ruined! For I am a man of
unclean lips, and I live among a people of unclean lips, and
my eyes have seen the King, the LORD Almighty.” Then one of
the seraphim flew to me with a live coal in his hand, which he
had taken with tongs from the altar. 7 With it he touched my
mouth and said, “See, this has touched your lips; your guilt is
taken away and your sin atoned for.” Isaiah 6
Carriage Burden is the wave
process KPI that indicates an
ENERGY TRANSFER is occurring.
CB ranges from 150 to 155 (77.5)
Part II: Functional Performance
Pure and Radiant Light
13. How does the Green Wall work?
2/22/2023
Brij Consulting, LLC Jean Marshall
13
Glass Design Series
V1 Emerald Rotation
V2 Green Banks
V3 Rigid Regimen
Viability
Storage
Transfer
You may notice that in the
Ark Mountain of God the
viability of emerald
rotation is at the top, the
storage on green banks is
on the side, and the
making of crystal into
glass leads to transfer
with secant engineering, in
a more rigid regimen.
Wind up ambient
Wind down Green
Store in Glass Mix
Refine for Specific
Use and Transfer
Use the Double
Down Model
The process that is
now refined and
mechanically
understood is
repeated with an
intelligence that
follows the
componentization
process
Emerald Rotation
Just as crystal is
changed into glass
and glass mix, energy
is changed into a
more viable mix with
wave content and
threaded utilities
The Double Down Effect appears at
the end of the project altered by
MIGRATIONS of the Project causing
changes to the Wall (see next)
Cascade
see slide 14
14. 2/22/2023
Brij Consulting, LLC Jean Marshall
14
Wall Utility
Multiple types of Wall Cascade
From the Ark Utility
Emerald
Rotation
see slide 13
15. Wall Migrations
The Wall does not remain the
same because subsequent
migrations add dimensional
layers to it. Graph shows final
phase graphic equations.
2/22/2023
Brij Consulting, LLC Jean Marshall
15
The Wall has a migrational pattern because
the project is migrating through the agile
phases. This is because of the supply chain
impact and the need for streamline and other
branching requirements. The Final Omega
shows a Distribution composition for the
STRABO Serialization Process
W = .0725 x 2 =145 Wall
W
Ca
Ω
Ca = -.3015
Ω = .427 x 2 = 85.4
17. Measuring the change in properties
2/22/2023
Brij Consulting, LLC Jean Marshall
17
It is necessary to keep
taking measurements
to understand what has
transpired to cause
changes in the metric
relations due to the
Wall Migrations
18. The View of Cascade "Then it will be the time of My Kingdom on Earth. There will be,
therefore, a respite from demoniacal crimes to give people
time to hear heaven's voices again. Once the force that
unleashes horror has been driven away, great spiritual streams
will come down like waterfalls of grace, like rivers of heavenly
waters, to speak words of light.” Endtimes, Maria Valtorta
2/22/2023
Brij Consulting, LLC Jean Marshall
18
From Garabandal, Unstoppable Waterfall
Learning to write cascading script
and dialogue is what makes the
wall become powerful with men.
Great Miracle of
Garabandal, April 11, 2024
Feast of Eucharistic Martyr,
Permanent Sign
X
Could be a local saint’s day
19. A Luminous Mystery
2/22/2023 Brij Consulting, LLC Jean Marshall 19
Ark based configurations
in the Mystery of Christ+
Angels of the Sepulcher Lampstands
Lampstands, Garment, outline of
Virgin and Saints appear on the
Chalice at Live Mass
Morning Star Associations
Esther’s restoration to her people is the not the
same as Mary, as Mary is both a Daughter of David,
and a member of the Morning Star. But Mary is
the Queen of Judah and Jerusalem in her own
right. The General Resurrection is at stake for all
men and women
No Meta Basis
No Time contentions
An Advancing and Eternal Plan
22. Part III: Platform Covalens
In a neat
packaging of
Lens Technology,
the Covalens
transfers lens
quality
treatments
across the
spectrum
2/22/2023
Brij Consulting, LLC Jean Marshall
22
Glass Transmission
We learned about a
Covalens® process that
transduces the covalence
bond to a true potential
energy. This is new here!
23. Construction of Wave and
Lens
Contents
V1 Fabrication
V2 Compositions
V3 Arrangements
• The Blue Wave and the Green Wave cascade
together when the wall is built (although the wall
already exists for the Ark itself.)
• It is necessary to study the use of the wall in
order to understand why it is necessary to
possess a competent wall in order to operate in
ark mode
• Some digital processes and testing for research
and development can begin with ship to store
methods of green energy
Wind, Wave and Living Water…
A cycle of Winding Wave and
Storage is important to
Instance Productions, and
the cascading pattern built
into the wall
17He also measured its wall: one hundred
and forty-four cubits* according to the
standard unit of measurement the angel
used.
18* The wall was constructed of jasper,
while the city was pure gold, clear as
glass.
24. Cloud and Star
Brij Consulting, LLC Jean Marshall
Energy Streams allow for the soft
transfer of energy specified for the
growth and maintenance of both living
and inert creations
Clouds and Stars operate together to
supply mobility and conveyance
Those who support the work are given
every benefit of the whole system
2/22/2023 24
25. System Tables
Small Form>>>Glass
Table Maps
Component>>>Supply
Chain
Forward >>>Market Forward
Component
Interior
Margin
Matrix
Small Form
(Table)
Interior
Margin
New Facts
Decision
Market
Ready?
Componen
t Specified
System
Table
Media
All Other
Y
N
Y
N
Y
N
We will begin to
plot an agile
delivery from our
waterfall tasking
The generation of
IP, New System
Facts and Market
Strategy are
already timed
Lifecycle changes
in our project are
agile once tasked
and engineered
events are
compiled
New Facts
related to the
table are already
mapped
IMF IMC IMS
Sum of IM = Low level carriage burden
Review for New Facts
Prep. For Market Ready
IP
2/22/2023
Brij Consulting, LLC Jean Marshall
25
1016 + 41
101.6 + 4.1 = 105.7
34.43 + .41 = 34.84
26. 2/22/2023
Brij Consulting, LLC Jean Marshall
26
TRANSITION
1.922
trans·duc·tion
1.The conversion of input energy of
one form into output energy of
another form. i.e., kinetic to green
The people sitting on the
Branch path will wait the
longest for IP but have the
most Intelligent Investment
1
2
The Outcome of
the Glass Path is
a Contiguous
Arrangement of
Wall Assimilation
here.
Thread Limit +.007
Appendix II
From “Supply Side”
Forward
Curve Compare
-11912+11932 = 20 + [1195 – 1193.2] =20 + 1.8 = 21.8-1.4 = 20.4 Curve
R=95.3
Wave Conversion is Lens and curve Related.
27. Our Next Paper in Design Series
2/22/2023
Brij Consulting, LLC Jean Marshall
27
1. The Scope of Glass Projects: Benchmarking and IF
Factor for the scope determination of Glass and STRABO
serialization for Agile
2. Glass Impact: Streaming the Engineering of Components,
Solid State Assemblage, Table Design Outcomes
3. Cascading in Green: The theories and concepts related to
the Green Wall and the starting compositing of green energy
and wall migrations.
THEN
28. 1. Portal Prosperity: An overview of Glass Theory and Ark
Design develops property reconcilement for Conveyance
2. Crossover Conveyance: Beginning with Remote Signature,
threading the advancing fingerprint with a glass path and
integral site management, moving into SIMULATIONS in
Real Time
3. Converge- The Remote Build: Tasks to consider the
process of converging to the Remote Build Site and what
considerations are given to producing a remote service or
build out of a productive requirement, introducing sandbox
theory. Phase I only considers the Kitchen Tech. Phase II
is involved in whole home Media and Tech in Glass.
Phase III develops the land and its attributes. This is three
separate papers.
Brij Consulting, LLC Jean Marshall 28
1. Studying T&MM: the requirement for certification of mobility
for competent conveyances
2. Portal Projects: the evidence, timing and intelligent use of
portals
3. Calling it Green: Components of Green Energy, short
review: Calling it Green requires new uses of potential and
^studies in wave glass and graphical relationships can raise up
a green energy fluency that will lead to energy self-sufficiency
4. Dimensions in Multivariant Fabrications: Determining Forms
and Contents of Green Energy and Blue Wave Cascade;
relating elements to current science and future requirements
5. Wave and Lens Assimilation: The means to compile and to
build in Glass Systems is described. The use of secant math.
6. Math Solutions for Wave and Lens Assimilations: See also
Commentary for Math Solutions
7. Supply Side Portfolio: Timing and Model of Glass and Green
events to fulfill path… Does the Tan Line help?
8. Partners in T Pluribus Unum: Measuring with Diacritical
Marks
1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic
requirement for Media to write and produce in Ark Science and
Dimensional Systems, Introduction of the Story “Eru finds a Golden
Pen.”
2. Ark Media: The Dialogue of the Story and the Construction of
Storyboards, Mix and Remix specifications, beginning crosswalk and
encryptions
3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and
the use of Secants to Build tooling
4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to
include Ark encryptions and design considerations
5. The Glass House: Magi and Marcus Engineering plans to invest in a
Plait Glass facility for building and research in remote Ark Science.
Start of Tooling and Secant Design for the Construction Industry
6. The Remote Build: Planning a Theoretical Production for untried
Architecture
7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads
into the Write Process
8. Bridging the Instance: Now operating multiple instances must bridge
the operations, learn about deciduous models and deliberate the
outcome of operations for the 2022 Plan of Magi and Marcus
9. Architectural Builds and Designs: Looking into Delivery Mechanics and
the Products themselves
10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System
assists with Land Products. See Number Theory
11. Continuous Modeling: Moving away from the Contiguous Model to a
strategy of seamless integration of methods and modes of operation.
See Number Theory.
12. The Glass Warehouse: From Start to Finish the streamlined operations
of the Marcus and Magi Engineering remote architectural process
13. Branch- Sound and Image Construction: Characterizing the branch
capability of new applications, appliances and mode[ls] of operations
1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning
study of Secants and Wheels for the “cube-ified glass” engineering of
Imaging, sound and motion characteristics.
2. The New Stone: Simulations and Re-instancing to package, confect and
view glass media
3. Dimensional Building: Dimensional Arrays, Z strength, Product Media,
Interdimensional Matrices.
4. The Dynamic Instance: Product Media Discussed
5. The Glass Build: Base Build and Modules Assembled, considering impact of
dimensional systems
6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP
Defined, Logos
7. Art of the Science: What can be made? Assimilation discussed, look at
basic product ideas
8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance
(Dialogue paper)
9. Imposition of Value Engineering: Establishing and Justifying the Load for
Pipe Transit
10. The Digital Plait Position: Engineering Design of the Load and Thruput
11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for
Operational Loads
12. Engineering Objects: The Purpose of this Paper is to Consider the means to
raise up a Digital Portal Production System using appliances gained through
Plait Object and Gate driven configurations that work with Digital Mechanics.
Six-Layer Glass and Appliances
13. Instancing at the Gate: Use of Gates and Instances, bridging of the
engineering process
14. Interpolative Scope: Use of a Demand and Production Scope for building
and delivery of product, learning to specify material, looking for union of
Vector
15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian
Analysis
16. The Glass Wall: This is a very difficult staging of advanced engineering to
depict …Motivated by sound it creates a means by sound to cascade light for
safe and wireless power
17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard,
and load value of Scrum
18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards
(Dialogue paper)
19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes
bottleneck (Dialogue paper)
20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking
old vs. new (Dialogue paper)
Motion Projects-8
Remote Theory-5
Ark Model-13 Digital-20
Go to https://www.slideshare.net/Marshallja/presentations
https://www.slideshare.net/Marshallja/commentary-for-math-solutions-for-
wave-and-lens-assimilationpdf
2/22/2023
Roadmap: #47 & #48 & #49
Dimensional Building in Ark Design
Glass Cars and New Product Roadmap
Calendar Cartography
Building with Glass #50
New
Remote Theory
Ark Model
Motion Projects