This document discusses green energy and glass technology. It covers topics like the timing of green investments, digital portals, paradigm shifts, and the future of glass as an "Ark Model" for new creation. Secant engineering concepts are introduced to optimize glass production processes. The timeline of glass development depends on advances in green energy and mobility. The goal is a model where all paths of glass, from digital to legacy, are enabled by green energy and build a new world economy many times larger than the current one.
1. The Green Side
of Supply
In the Plait Mode of Glass
MDIA
Contents
V1 Timing of Green
V2 Investment in Glass
V3 Digital Portal to Ark Custom
V4 The Paradigm Shift
The Rapidly Expanding Rapidly Contracting World of Digital
Glass and its Future as an Ark Model of the New Creation
Paradigm Shift
P
*
2. Green Mobility
• Green Mobility feeds economic
drivers
• Glass founds a ONE basis
• Work is economic plant of trading
in green and working to wind and
cascade for large form industry.
• Small mobile benefits emerge first
• Consolidating the Ark Wall
6/22/2022 Brij Consulting, LLC Jean Marshall 2
754
Products
See
21
Polling
3. Important
questions…
• In our last paper about “Wave and Lens Assimilation” we asked important
questions about the timing of green and glass products.
• We will work to achieve a model for wave acclimations, thread and green
energy trading to accommodate the future of the Glass Path.
Our Wave and
Lens compilation
paper is all
inclusive of Math
Solutions but
also see our
commentary
click
click
6/21/2022 Brij Consulting, LLC Jean Marshall 3
See
21
4. Importance of Secant Engineering
Define
Secant
Data
Step 1
Data
Ascribe
the Tan
Line
Step 2
Line
Use
Secant
Math
Step 3
Math
Notice that A1 may
be sitting inside a
build area
6/22/2022 Brij Consulting, LLC Jean Marshall 4
5. SECANT
ENGINEERING
• The Assimilation helps to put the data in secant accessible order
• Secant Engineering needs to find the Tan Line accessible to the
operation in order to work the composition. This enables a wide avenue of
operations to occur in Glass
6/21/2022 Brij Consulting, LLC Jean Marshall 5
See Appendix I Example
Step 1
Data
6. Tan
Composition
• We added to this some additional math and became convinced we could work this in
programmatically. It may or may not suit the energy delivery program. But it helps us see
the financial ramification of knowing what the tan line represents. After the Green IP is
deducted the glass mix (889) remains along with the scrum, the rate, e and the labor
• Because it operates financially, Green Energy favors trade immediately, and is the
underlying currency of all green engineering
6/21/2022 Brij Consulting, LLC Jean Marshall 6
It is necessary to find and to define the Tan
Line in order to create Secant operations
for the Build. This suggested method may
not be the best solution but finds
attributes.
914 =
Green IP
Step 2
Line
8. Green Energy is the
Driver
• By adding the critical path to the green pull we can see that the value
of work will enhance the green energy mix to start up the tan line
toward Intellectual Property acquisition
See Math
Solutions
Go to https://www.slideshare.net/Marshallja/presentations
https://www.slideshare.net/Marshallja/commentary-for-math-solutions-
for-wave-and-lens-assimilationpdf
6/21/2022
Brij Consulting, LLC Jean Marshall 8
9. How Does Investment occur?
• In our “Dimensions in MVF”
paper we begin to discuss
staging the winding and
unwinding of energy thread
Ω
“Dynamics of GREEN”
We showed Green
Energy as means to
enhanced mobile
conveyance and
bifurcated the IP
Map/Wall related difference
m
6/21/2022
Brij Consulting, LLC Jean Marshall 9
10. Repair, Maintenance, Upgrade
• How can we determine when portal arrangements
will be successful in making a green outcome possible?
Timekeeping
The Critical Path needs
to be visible both from
the standpoint of the
machine and work value
of the people
Scope
The Scope of the Project
is determined by its
Payback, but the various
stages of the project
become instances of
scope
Delivery
The Delivery of the
Project is the combined
response of Testing and
Agreement of
Deliverables by all
parties to the Contract
Feedback
Feedback on the job is a
demand requirement in
order that some
efficiency of the process
may be gained
Evaluation
The evaluation of the
effort is considering also
what can be prospered
remotely in the future
Model Path Instances
Supply
Chain Oversight
Conveyances
6/21/2022 Brij Consulting, LLC Jean Marshall 10
11. The former things will pass
away, the greater things come
The New Creation
∆
6/21/2022 Brij Consulting, LLC Jean Marshall 11
12. The Tan Line
Measuring the Timeline
One Piece at a TIME
At the end of the seventh week the Sevenfold Book of Creation opens
… according to the Book of Enoch… the Lamb Breaks the Seals
∆αω≅+
6/21/2022
Brij Consulting, LLC Jean Marshall 12
≅+
∆
α
ω
13. Partner Investments
y = -15,411,230,860.11020ln(x) +
32,523,480,785.48410
R² = 0.15180
y = 906,677,539,722.99600ln(x) -
235,989,460,005.27100
R² = 0.22145
-
10,000,000,000
20,000,000,000
30,000,000,000
40,000,000,000
50,000,000,000
60,000,000,000
70,000,000,000
(500,000,000,000)
-
500,000,000,000
1,000,000,000,000
1,500,000,000,000
2,000,000,000,000
2,500,000,000,000
3,000,000,000,000
3,500,000,000,000
ARK GLASS COMMUNITY
6/21/2022 Brij Consulting, LLC Jean Marshall 13
^Oversight Committee LOC (Morningstar)
m
513,292,157,466
This remote path builds infrastructure assets
14. The Glass Path with Green IP
y = -9,105,348,281,869.69x + 36,812,982,437,718.00
R² = 0.31
(40,000,000,000,000)
(30,000,000,000,000)
(20,000,000,000,000)
(10,000,000,000,000)
-
10,000,000,000,000
20,000,000,000,000
30,000,000,000,000
40,000,000,000,000
50,000,000,000,000
Cash Intellectual Property Production Other Properties Partner Distribution
Branch and Remote Path Legacy Path Digital Path SUM ALL Linear ( SUM ALL )
4.04
+4x
The remote path (BR) builds infrastructure assets and is the true tan line ==232
6/21/2022 Brij Consulting, LLC Jean Marshall 14
15. Path Emulation for Glass and Green
• All Paths Operate
• Green enables all works
• Glass builds a new world
(50,000,000,000,000)
-
50,000,000,000,000
Branch and Remote Path Legacy Path Digital Path SUM ALL
Green Contribution
Cash Intellectual Property Production
Other Properties Partner Distribution
75.8
New World Economy has Growth Potential 21 times current GNP
6/21/2022 Brij Consulting, LLC Jean Marshall 15
16. Timeline of Glass depends on the Timeline of Green
MODEL
2023-2033 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
2023-2043 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
6/21/2022 Brij Consulting, LLC Jean Marshall 16
PATH SUPPLY CHAIN
July 20XX
2023-2053-
2073 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Digital Glass: Furniture, Appliances and Media
Legacy Glass: Houses, Cars and Road/Utility
Remote Glass: Portals, Conveyances, Build Cases, Warehouses
INSTANCES OVERSIGHT
≅+
∆ α ω
W
EXPANSION OF
THE MODEL TO
GREEN WALL
LENS CRAFTING
SECANT
ENGINEERING
PIPES/PLAITS
FORMS & MIX
COVENANT
PRACTICE
DEPENDENCIES
e
e
Only Green Plait and Star Methods remove e
1
2
Purchase IP
Branch Path
Corner when you can divide
your production
n Green Markers
See Slide 17,18
Future
Timing
Interior Sq
Partner Br
e
M
M
M
Paradigm Shift
P
≅
See Slide 20
*
*
*
*
*
17. Measures of Progress
Glass Tan line Investment
• In V2 we will discuss measuring
the true Tan line progress of
Glass, i.e., can we be specific
now?
Ark Custom
• In V3 we will view what will
become the Custom of Ark
Process, i.e., schema knowledge
6/21/2022 Brij Consulting, LLC Jean Marshall 17
Contents
V1 Timing of Green
V2 Investment in Glass
V3 Digital Portal to Ark Custom
V4 The Paradigm Shift
Paradigm Shift
P
There is a
Paradigm Shift
in the meaning
of the Covenant
Relationships
A Paradigm
Shift is a
change in the
Model of a
significant
arrangement
This type of
Model does not
lend itself to
determination of
the magnitude of
change
No
Multiple Instances are Required
in a Contiguous Arrangement
Single Instances are Required in
a deciduous Arrangement T2
T1
18. 6/21/2022 Brij Consulting, LLC Jean Marshall 18
TRANSITION
1.922
trans·duc·tion
1.The conversion of input energy of
one form into output energy of
another form. i.e., kinetic to green
The Green Pull points to the
Transition in Green Engineering
Products and specifically the
Remote Assembly that builds
the Infrastructure and Green
Wall into the Blue Cloud-star
The people sitting on the
Branch path will wait the
longest for IP but have the
most Intelligent Investment
1
2
n Slide 16
APP II
The Outcome
of the Plan is a
Contiguous
Arrangement
of Wall
Assimilation
here.
Thread Limit +.007
19. Brij
Consulting,
LLC
Jean
Marshall
6/22/2022 19
B
A1
B
C
Certain markers
will indicate the
timing of
transactions to
invest in the
adjacent path
per Plan
Purchase IP
Branch Path
Interior Sq
Partner Br
Corner when you can divide
your production See Slide 16
e
Timing
B
Future
M
See Slide 20
Single Instances are Required in a
deciduous Arrangement
T1
T2
T2
Magi and Marcus Trade Up on their assets from
Legacy to Branch and Streamline IP
Interior Scale changes on slide 22 show
impact of T1 and T2
20. 6/21/2022
Brij Consulting, LLC Jean Marshall
20
The Branch Path has specialized Glass Mix in
it and Remote Access through a Portal
Arrangement (not just a Window.) Also, a
specialized warehouse, build cases and
appliances must be prepared, for a Mega
Performance requirement. Branch Mobility
creates a Paradigm Shift (change in the
Model,) and Ark Standards are deployed
M
M
Double Scope of
Mega Performance
≅
Based on Assets
Streamline Instances
Ark Wall
Utilities/Standards
Wall Based Warehouse
Branch Mobility
Land/Wall T-Pipes
Based on Forms
Remote
Distancing
Specialized Tooling,
Appliances and
Conveyances
≅+
Paradigm Shift
P
Christopher Columbus
Expanded Scope
Interior Sq
Partner Br
Multiple Instances are Required
in a Contiguous Arrangement
T1
21. 6/22/2022 Brij Consulting, LLC Jean Marshall 21
Paradigm Shift
P According to the
Transitional Side of our
Build equation by the
year (4080/2=) 2040
we should have the Ark
Wall and major
components concepts
ready for acclimation
There are 13 layers and
58 types of product
level compositions
The magnitude of the
shift is more demand
than the world is
prepared for
Christopher Columbus
underestimated the scope of
the demand for his project
because he miscalculated the
size of the earth
The Plan is not
do-able under
legacy methods
Specialized
Assets
*
Start Candle Stone
Multiple Instances are Required
in a Contiguous Arrangement
T1
We need to
break this
timeline in
T1 and T2
components
Multiple Instances are Required
in a Contiguous Arrangement
T1
754
22. 6/22/2022 Brij Consulting, LLC Jean Marshall 22
Streamline Instances
Ark Wall
Utilities/Standards
Wall Based Warehouse
Branch Mobility
Land/Wall T-Pipes
Specialized Tooling,
Appliances and
Conveyances
Specialized Assets
T1
M
M
Site Access
Site
Development
Going Remote
Need C-B Fixed
position with
critical path
23. Timeline of Glass depends on the Timeline of Green
MODEL
2023-2033 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
2023-2043 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
6/22/2022 Brij Consulting, LLC Jean Marshall 23
PATH SUPPLY CHAIN
July 20XX
2023-2053 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Digital Glass: Furniture, Appliances and Media
Legacy Glass: Houses, Cars and Road/Utility (Repair, Maintenance, Upgrade)
Architectural Builds: Site Level Development
INSTANCES OVERSIGHT
≅+
∆ α ω
W
EXPANSION OF
THE MODEL TO
GREEN WALL
LENS CRAFTING
SECANT
ENGINEERING
PIPES/PLAITS
FORMS & MIX
COVENANT
PRACTICE
DEPENDENCIES
e
1
2
e
M
Remote Glass: Portals, Conveyances, Build Cases, Warehouses
M
M
≅
2023-2073 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Paradigm Shift
P
T2
T1
Multiple Instances are Required
in a Contiguous Arrangement
T1
Single Instances are Required in a
deciduous Arrangement
T2
Portal Window- Site Access
Portal Bridge- Site Development
Access Window-18 Layer
Local Window-6 layer
24. Secant Map
• We are broadly defining Secant
relationships that need to be
engineered specifically to the task.
• We are describing the parts as
GEODESIC as they have no metal and
require an API script
6/21/2022 Brij Consulting, LLC Jean Marshall 24
From “Architecture Builds and
Designs”
Ark
Relational
Media
25. Why T&MM?
• Dual Motion and extensive
interior workings in mobile
objects require a motion cloud
• Green Energy requires various
patterns with an energy
cascading requirement that varies
depending on the timing of the
object itself
• Secant Wave Theory allows for
individual and specific action
within the interior of mobile
objects
Dual Motion
Green Energy
Secant Wav
Appendix II
6/21/2022 Brij Consulting, LLC Jean Marshall 25
28. 1. Portal Prosperity: An overview of Glass Theory and Ark
Design develops property reconcilement for Conveyance
2. Crossover Conveyance: Beginning with Remote Signature,
threading the advancing fingerprint with a glass path and
integral site management, moving into SIMULATIONS in
Real Time
3. Converge- The Remote Build: Tasks to consider the
process of converging to the Remote Build Site and what
considerations are given to producing a remote service or
build out of a productive requirement, introducing sandbox
theory. Phase I only considers the Kitchen Tech. Phase II
is involved in whole home Media and Tech in Glass.
Phase III develops the land and its attributes. This is three
separate papers. Brij Consulting, LLC Jean Marshall 28
1. Studying T&MM: the requirement for certification of mobility
for competent conveyances
2. Portal Projects: the evidence, timing and intelligent use of
portals
3. Calling it Green: Components of Green Energy, short
review: Calling it Green requires new uses of potential and
^studies in wave glass and graphical relationships can raise up
a green energy fluency that will lead to energy self-sufficiency
4. Dimensions in Multivariant Fabrications: Determining Forms
and Contents of Green Energy and Blue Wave Cascade;
relating elements to current science and future requirements
5. Wave and Lens Assimilation: The means to compile and to
build in Glass Systems is described. The use of secant math.
6. Math Solutions for Wave and Lens Assimilations: See also
Commentary for Math Solutions
7. Supply Side Portfolio: Timing and Model of Glass and Green
events to fulfill path… Does the Tan Line help?
1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic
requirement for Media to write and produce in Ark Science and
Dimensional Systems, Introduction of the Story “Eru finds a Golden
Pen.”
2. Ark Media: The Dialogue of the Story and the Construction of
Storyboards, Mix and Remix specifications, beginning crosswalk and
encryptions
3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and
the use of Secants to Build tooling
4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to
include Ark encryptions and design considerations
5. The Glass House: Magi and Marcus Engineering plans to invest in a
Plait Glass facility for building and research in remote Ark Science.
Start of Tooling and Secant Design for the Construction Industry
6. The Remote Build: Planning a Theoretical Production for untried
Architecture
7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads
into the Write Process
8. Bridging the Instance: Now operating multiple instances must bridge
the operations, learn about deciduous models and deliberate the
outcome of operations for the 2022 Plan of Magi and Marcus
9. Architectural Builds and Designs: Looking into Delivery Mechanics and
the Products themselves
10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System
assists with Land Products. See Number Theory
11. Continuous Modeling: Moving away from the Contiguous Model to a
strategy of seamless integration of methods and modes of operation.
See Number Theory.
12. The Glass Warehouse: From Start to Finish the streamlined operations
of the Marcus and Magi Engineering remote architectural process
13. Branch- Sound and Image Construction: Characterizing the branch
capability of new applications, appliances and mode[ls] of operations
1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning study of
Secants and Wheels for the “cube-ified glass” engineering of Imaging, sound and
motion characteristics.
2. The New Stone: Simulations and Re-instancing to package, confect and view glass
media
3. Dimensional Building: Dimensional Arrays, Z strength, Product Media,
Interdimensional Matrices.
4. The Dynamic Instance: Product Media Discussed
5. The Glass Build: Base Build and Modules Assembled, considering impact of
dimensional systems
6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP Defined,
Logos
7. Art of the Science: What can be made? Assimilation discussed, look at basic
product ideas
8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance (Dialogue
paper)
9. Imposition of Value Engineering: Establishing and Justifying the Load for Pipe
Transit
10. The Digital Plait Position: Engineering Design of the Load and Thruput
11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for Operational
Loads
12. Engineering Objects: The Purpose of this Paper is to Consider the means to raise
up a Digital Portal Production System using appliances gained through Plait Object
and Gate driven configurations that work with Digital Mechanics. Six-Layer Glass
and Appliances
13. Instancing at the Gate: Use of Gates and Instances, bridging of the engineering
process
14. Interpolative Scope: Use of a Demand and Production Scope for building and
delivery of product, learning to specify material, looking for union of Vector
15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian Analysis
16. The Glass Wall: This is a very difficult staging of advanced engineering to depict
…Motivated by sound it creates a means by sound to cascade light for safe and
wireless power
17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard, and load
value of Scrum
18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards (Dialogue
paper)
19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes
bottleneck (Dialogue paper)
20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking old
vs. new (Dialogue paper)
Motion Projects
Remote Theory-5
Ark Model-13 Digital-20
Go to https://www.slideshare.net/Marshallja/presentations
https://www.slideshare.net/Marshallja/commentary-for-math-solutions-
for-wave-and-lens-assimilationpdf
New
6/21/2022