We begin with evaluation of the Glass Build as an Engineering Process of Synthesis in Architectural Design in ARK Mode. Now we examine the Economic Change as we position the product in the market by determining what engineering requirements are first and develop a Theoretical Production to develop pricing and costing of the project. We begin to study the constraints of Remote Building with Media Modeling using Pipes and Conduits and to define the Parametric Test for bounds of the Model we constructed.