SlideShare a Scribd company logo
Enviar búsqueda
Cargar
Iniciar sesión
Registrarse
Manufacturing Models and Metrics.pptx
Denunciar
MasAyuHassan1
Seguir
28 de May de 2023
•
0 recomendaciones
•
13 vistas
1
de
14
Manufacturing Models and Metrics.pptx
28 de May de 2023
•
0 recomendaciones
•
13 vistas
Descargar ahora
Descargar para leer sin conexión
Denunciar
Educación
Models & Metrics
MasAyuHassan1
Seguir
Recomendados
Manufacturing models and metrics costs
D. Palani Kumar / Kamaraj College of Engineering & Technology
833 vistas
•
14 diapositivas
Single-Station Manufacturing Cells
VADLAJAGADEESHWARAAC
4K vistas
•
28 diapositivas
Production System-1.ppt
AbhishekChavan77
14 vistas
•
33 diapositivas
67034 ch01
vivekverma357
43 vistas
•
33 diapositivas
Introduction CIM
Nafis Ahmad
174 vistas
•
46 diapositivas
Automated Production Lines.ppt
AbhishekChavan77
179 vistas
•
33 diapositivas
Más contenido relacionado
Similar a Manufacturing Models and Metrics.pptx
overview of mfg
Mahros Darsin
1.6K vistas
•
36 diapositivas
Manual Assembly Lines1
VADLAJAGADEESHWARAAC
3K vistas
•
38 diapositivas
Automated-Assembly-Systems.ppt
AbhishekChavan77
13 vistas
•
28 diapositivas
automation method.ppt
AbhijitBhattacherjee4
1 vista
•
28 diapositivas
NC Programming
Vishnuvardhan Reddy S
4K vistas
•
110 diapositivas
Automated Assembly Systems
VADLAJAGADEESHWARAAC
318 vistas
•
28 diapositivas
Similar a Manufacturing Models and Metrics.pptx
(20)
overview of mfg
Mahros Darsin
•
1.6K vistas
Manual Assembly Lines1
VADLAJAGADEESHWARAAC
•
3K vistas
Automated-Assembly-Systems.ppt
AbhishekChavan77
•
13 vistas
automation method.ppt
AbhijitBhattacherjee4
•
1 vista
NC Programming
Vishnuvardhan Reddy S
•
4K vistas
Automated Assembly Systems
VADLAJAGADEESHWARAAC
•
318 vistas
Module 1 Lecture 1 Introduction To Automation In Production Systems.ppt
Khalil Alhatab
•
537 vistas
2. automation & control technology
Mahros Darsin
•
1.9K vistas
3. industrial control system
Mahros Darsin
•
4.7K vistas
4-Automated material handling systems , AGV Transfer mechanism , Buffer stora...
RuthviCool1
•
15 vistas
67042 ch09
Nilesh Jugurnath
•
4.6K vistas
Ch 5 Industrial Control Systems.ppt
Khalil Alhatab
•
624 vistas
Scheduling Dedicated
ahmad bassiouny
•
222 vistas
Lecture_14b_-_Industrial_Robotics_-_Ch_8[1].pdf
kyaswanth3
•
7 vistas
Automatic Identification and Data Capture Techniques
Nafis Ahmad
•
90 vistas
Industry Solutions - Chemical Industry
Asprova
•
1.3K vistas
Automating "Network Ready for Use" with pytest
Jeremy Schulman
•
793 vistas
B Kindilien Finding Efficiency In Mach 120408
jgIpotiwon
•
798 vistas
Planes, Trains, and Automobiles: A Data Scientist’s Guide to Modeling Engine ...
April Song
•
1.9K vistas
Automation in Manufacturing (Unit-5) by Varun Pratap Singh.pdf
Varun Pratap Singh
•
52 vistas
Último
BPOPS203 PRINCIPLES OF PROGRAMMING USING C LAB Manual.pdf
Syed Mustafa
44 vistas
•
25 diapositivas
Vani-Oct 2023 issue.pdf
Savipriya Raghavendra
308 vistas
•
12 diapositivas
Induction Session - 2023.pdf
GDSCBanasthaliVidyap
295 vistas
•
47 diapositivas
10 Years of World Heutagogy Day
London Knowledge Lab
168 vistas
•
33 diapositivas
Verb phrase and adverbs.pptx
AncyTEnglish
253 vistas
•
13 diapositivas
ACTIVITY BOOK key 00.pptx
Mar Caston Palacio
320 vistas
•
4 diapositivas
Último
(20)
BPOPS203 PRINCIPLES OF PROGRAMMING USING C LAB Manual.pdf
Syed Mustafa
•
44 vistas
Vani-Oct 2023 issue.pdf
Savipriya Raghavendra
•
308 vistas
Induction Session - 2023.pdf
GDSCBanasthaliVidyap
•
295 vistas
10 Years of World Heutagogy Day
London Knowledge Lab
•
168 vistas
Verb phrase and adverbs.pptx
AncyTEnglish
•
253 vistas
ACTIVITY BOOK key 00.pptx
Mar Caston Palacio
•
320 vistas
Project Management Starters.pptx
AnkitaNayak83
•
74 vistas
BIOFUEL.pptx
Laraibzafar15
•
45 vistas
Personal Brand Exploration - Michael Q Trucks
Michael Trucks
•
233 vistas
SHEYA DEY - 23COMD18 & 33 & 57 ACCOUNTING WITH DRONES.pptx
Kumarasamy Dr.PK
•
131 vistas
Generative AI
Corinne Weisgerber
•
100 vistas
GenAI Cloud Jam.pdf
JAISHANABINDHUPRIYAJ
•
86 vistas
SY Sem 3 Paper 1 Electrochemistry 30sep 23.pdf
Dr. Aqeela Sattar
•
68 vistas
UH 1.docx
nisrinamadani2
•
102 vistas
ACTIVITY BOOK key 00.pptx
Mar Caston Palacio
•
92 vistas
listen to the mountain 1.pptx
AncyTEnglish
•
256 vistas
Primary Healing-5.pptx
Kolkata,west bengal, India
•
43 vistas
In vitro.pptx
HimadripriyaGogoi2
•
152 vistas
Food Hygiene 1 - Intro to food hygiene.pptx
CJMcErlean
•
149 vistas
Temenos_Global_Report_Final_Sep22.pdf
Chris Skinner
•
317 vistas
Manufacturing Models and Metrics.pptx
1.
Ch 3 Manufacturing
Models and Metrics ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. Learning Objectives: By the end of the lecture the student should be able to: ■ Apply mathematical models of production performance problems. ■ Explain the concepts of fixed and variable manufacturing costs
2.
Production Concepts and Mathematical
Models ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. ■ Production rate Rp ■ Production capacity PC ■ Utilization U ■ Availability A ■ Manufacturing lead time MLT ■ Work-in-progress WIP
3.
Operation Cycle Time ©2008
Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. Typical cycle time for a production operation: Tc = To + Th + Tth where Tc = cycle time, To = processing time for the operation, Th = handling time (e.g., loading and unloading the production machine), and Tth = tool handling time (e.g., time to change tools)
4.
Production Rate ©2008 Pearson
Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. Batch production: batch time Tb = Tsu + QTc Average production time per work unit Tp = Tb/Q Production rate Rp = 1/Tp Job shop production: For Q = 1, Tp = Tsu + Tc For quantity high production: Rp = Rc = 60/Tp since Tsu/Q 0
5.
Production Capacity Plant capacity
for facility in which parts are made in one operation (no = 1): PCw = n Sw Hs Rp where PCw = weekly plant capacity, units/wk Plant capacity for facility in which parts require multiple operations (no > 1): PCw = nSwHsRp where no = number of operations in the routing o ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. n
6.
Utilization and Availability Utilization:
U = where Q = quantity actually produced, and PC = plant capacity Availability: A = where MTBF = mean time between failures, and MTTR = mean time to repair PC Q MTBF ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. MTBF MTTR
7.
Availability - MTBF and
MTTR Defined ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover.
8.
Manufacturing Lead Time
(Batch) ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. MLT = no (Tsu + QTc + Tno) where MLT = manufacturing lead time, no = number of operations, Tsu = setup time, Q = batch quantity, Tc cycle time per part, and Tno = non-operation time
9.
Work-In-Process ©2008 Pearson Education,
Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. WIP = where WIP = work-in-process, pc; A = availability, U = utilization, PC = plant capacity, pc/wk; MLT = manufacturing lead time, hr; Sw = shifts per week, Hsh = hours per shift, hr/shift AU PCMLT Sw Hsh
10.
Costs of Manufacturing
Operations ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. ■ Two major categories of manufacturing costs: 1. Fixed costs - remain constant for any output level 2. Variable costs - vary in proportion to production output level ■ Adding fixed and variable costs TC = FC + VC(Q) where TC = total costs, FC = fixed costs (e.g., building, equipment, taxes), VC = variable costs (e.g., labor, materials, utilities), Q = output level.
11.
Fixed and Variable
Costs ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover.
12.
Manufacturing Costs ©2008 Pearson
Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. ■ Alternative classification of manufacturing costs: 1. Direct labor - wages and benefits paid to workers 2. Materials - costs of raw materials 3. Overhead - all of the other expenses associated with running the manufacturing firm ■ Factory overhead ■ Corporate overhead
13.
Typical Manufacturing Costs ©2008
Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover.
14.
Overhead Rates Factory overhead
rate: FOHR = Corporate overhead rate: COHR = where DLC = direct labor costs DLC FOHC DLC ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. COHC