Introduction to
Project Management
ECE 480
Erik Goodman
What is Project Management?
• a method for organizing tasks
• a structured framework to help a group
work productively
• tools to aid in task sequencing,
dependency analysis, resource
allocation, scheduling, etc.
• tools to track progress relative to plan
Why Need Project Management?
• Complex project needs coordination of:
• Multiple people
• Multiple resources (labs, equipment, etc.)
• Multiple tasks – some must precede others
• Multiple decision points – approvals
• Phased expenditure of funds
• Matching of people/resources to tasks
Task Dependencies and the
Critical Path
• Sometimes task B cannot be started before
task A is completed
• Other types of constraints – calendar, lags,
etc.
• Critical path – any slippage slips whole
project
• Helpful to know what tasks are on the critical
path
• Useful to try to shorten the critical path
Suggested Steps in
Project Management
• Generate a formal definition of the project, with
goals, constraints, assumptions
• Identify project start/end dates, any mandatory
milestones, including reports, signoffs,
deliverables, etc.
• List constraints – money, equipment availability,
holidays, etc.
• Identify tasks to be accomplished – high level
(i.e., by categories), then details within each,
using brainstorming method – green light
Suggested Steps, cont.
• Refine detailed task list, dropping/
combining, adding things omitted
Then, for each task in list:
• Estimate time (person hours, calendar
period)
• Identify dependencies among tasks
• Identify resources (people, money, parts,
etc.)
Suggested Steps, cont.
Organize task groups roughly by starting date
List dependencies that should or MUST hold
Use MS Project to make a GANTT chart
• First capture tasks and task groups, milestones
• Identify critical path, see if it can be shortened
(get more “slack”)
• Assign person-hours and specific team
member(s) to each task – identify “task leads”
Suggested Steps, cont.
As project progresses:
• Monitor, record progress on all tasks, at
least weekly – use “Tracking Gantt Chart”
• Pay particular attention to those on critical
path
• Revise plan as needed to take into account
changes, adapt to meet milestones
Project Management Using
Microsoft Project
• Allows many different ways of entering and
observing information
• includes many features to help identify
problems with a plan
• regular use can help a group refine plans
to make meeting targets more realistic
Our “Flyover” of Project 98
• Adding tasks, durations
• Setting dependencies
• Seeing critical path, etc.
• “Rolling up” subtasks
• Assigning resources
• Adjusting durations, time assignments, etc.
Our “Flyover” of Project 98
• Adding tasks, durations
• Setting dependencies
• Seeing critical path, etc.
• “Rolling up” subtasks
• Assigning resources
• Adjusting durations, time assignments, etc.
Our “Flyover” of Project 98
• Adding tasks, durations
• Setting dependencies
• Seeing critical path, etc.
• “Rolling up” subtasks
• Assigning resources
• Adjusting durations, time assignments, etc.
WATCH YOUR DEPENDENCY
CHOICES!!!
 If you choose something other than the “default”
finish/start constraints, you will probably LOSE
your ability to track the critical path
 So AVOID “finish by” or “start by” with particular
calendar dates, or other types of constraints.
 Break tasks apart as needed, in order to make
finish/start constraints realistic!
Our “Flyover” of Project 98
• Adding tasks, durations
• Setting dependencies
• Seeing critical path, etc.
• “Rolling up” subtasks
• Assigning resources
• Adjusting durations, time assignments, etc.
Our “Flyover” of Project 98
• Adding tasks, durations
• Setting dependencies
• Seeing critical path, etc.
• “Rolling up” subtasks
• Assigning resources
• Adjusting durations, time assignments, etc.
Our “Flyover” of Project 98
• Adding tasks, durations
• Setting dependencies
• Seeing critical path, etc.
• “Rolling up” subtasks
• Assigning resources
• Adjusting durations, time assignments, etc.
YOUR MS Project has a “Deadline” box
on this page! Use it to let you get warned
when something gets pushed back too far,
but STILL not assigning a “start no earlier
than” or “finish no later than” constraint to
it – still using “As soon as possible.”
Management of YOUR Project
With your team members
• Create a plan for the entire project
• Set milestones for tracking progress
• Provide more detail for near-term tasks
• Use with your facilitator to report progress and
revise/add detail to plan
• Assign specific tasks to team members
• Revise plan and activities as required to achieve
objectives

More Related Content

Similar to projmgtlectureohs.ppt

Managing the information system project
Managing the information system projectManaging the information system project
Managing the information system project
a23ccb
 
Managing the information system project
Managing the information system projectManaging the information system project
Managing the information system project
alpha1unity
 
component 5 project planning, monitoring and evaluation.pdf
component 5 project planning, monitoring and evaluation.pdfcomponent 5 project planning, monitoring and evaluation.pdf
component 5 project planning, monitoring and evaluation.pdf
Anatole9
 

Similar to projmgtlectureohs.ppt (20)

Project management
Project managementProject management
Project management
 
Sadchap03
Sadchap03Sadchap03
Sadchap03
 
Project Management
Project ManagementProject Management
Project Management
 
5. PMP Training - Time management
5. PMP Training - Time management5. PMP Training - Time management
5. PMP Training - Time management
 
Project Management Basics
Project Management BasicsProject Management Basics
Project Management Basics
 
programmed evaluation and review technique,
programmed evaluation and review technique,programmed evaluation and review technique,
programmed evaluation and review technique,
 
Introduction to Tech Communication & Project Management
Introduction toTech Communication &Project ManagementIntroduction toTech Communication &Project Management
Introduction to Tech Communication & Project Management
 
Managing the information system project
Managing the information system projectManaging the information system project
Managing the information system project
 
Managing the information system project
Managing the information system projectManaging the information system project
Managing the information system project
 
CAPM Week 2 Chapter 6
CAPM Week 2 Chapter 6CAPM Week 2 Chapter 6
CAPM Week 2 Chapter 6
 
pm--basic.pptx
pm--basic.pptxpm--basic.pptx
pm--basic.pptx
 
Ms project training ver 01
Ms project training ver 01Ms project training ver 01
Ms project training ver 01
 
Project management
Project managementProject management
Project management
 
Project planning and control
Project planning and controlProject planning and control
Project planning and control
 
component 5 project planning, monitoring and evaluation.pdf
component 5 project planning, monitoring and evaluation.pdfcomponent 5 project planning, monitoring and evaluation.pdf
component 5 project planning, monitoring and evaluation.pdf
 
Automate estimates, resource loading , and sprint plans!
Automate estimates, resource loading , and sprint plans! Automate estimates, resource loading , and sprint plans!
Automate estimates, resource loading , and sprint plans!
 
4) PTM & PCM .pptx
4) PTM & PCM .pptx4) PTM & PCM .pptx
4) PTM & PCM .pptx
 
Session 8 4th edition PMP
Session 8 4th edition PMPSession 8 4th edition PMP
Session 8 4th edition PMP
 
Unit v mha project evaluation review technique (pert)
Unit  v  mha project evaluation review technique (pert)Unit  v  mha project evaluation review technique (pert)
Unit v mha project evaluation review technique (pert)
 
Allocating resources
Allocating resourcesAllocating resources
Allocating resources
 

More from MdAliMujawar1

More from MdAliMujawar1 (10)

A Inspection of concrete bridges-final 280410.ppt
A Inspection of concrete bridges-final 280410.pptA Inspection of concrete bridges-final 280410.ppt
A Inspection of concrete bridges-final 280410.ppt
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptx
 
chemicalattackinconcrete-140929051100-phpapp01 (1).pptx
chemicalattackinconcrete-140929051100-phpapp01 (1).pptxchemicalattackinconcrete-140929051100-phpapp01 (1).pptx
chemicalattackinconcrete-140929051100-phpapp01 (1).pptx
 
chemicalattack-160926183221 (1).pdf
chemicalattack-160926183221 (1).pdfchemicalattack-160926183221 (1).pdf
chemicalattack-160926183221 (1).pdf
 
Air condition.pptx
Air condition.pptxAir condition.pptx
Air condition.pptx
 
3.1 LARGE SPAN STRUCTURES.pptx
3.1 LARGE SPAN STRUCTURES.pptx3.1 LARGE SPAN STRUCTURES.pptx
3.1 LARGE SPAN STRUCTURES.pptx
 
Rapid constructions.pptx
Rapid constructions.pptxRapid constructions.pptx
Rapid constructions.pptx
 
resourcelevellsfdf2.pptx
resourcelevellsfdf2.pptxresourcelevellsfdf2.pptx
resourcelevellsfdf2.pptx
 
resourcelevelling-220323191642.pdf
resourcelevelling-220323191642.pdfresourcelevelling-220323191642.pdf
resourcelevelling-220323191642.pdf
 
5e39f6039b7aeb2bfe66b2d2ae948071.pptx
5e39f6039b7aeb2bfe66b2d2ae948071.pptx5e39f6039b7aeb2bfe66b2d2ae948071.pptx
5e39f6039b7aeb2bfe66b2d2ae948071.pptx
 

Recently uploaded

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Recently uploaded (20)

FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 

projmgtlectureohs.ppt

  • 2. What is Project Management? • a method for organizing tasks • a structured framework to help a group work productively • tools to aid in task sequencing, dependency analysis, resource allocation, scheduling, etc. • tools to track progress relative to plan
  • 3. Why Need Project Management? • Complex project needs coordination of: • Multiple people • Multiple resources (labs, equipment, etc.) • Multiple tasks – some must precede others • Multiple decision points – approvals • Phased expenditure of funds • Matching of people/resources to tasks
  • 4. Task Dependencies and the Critical Path • Sometimes task B cannot be started before task A is completed • Other types of constraints – calendar, lags, etc. • Critical path – any slippage slips whole project • Helpful to know what tasks are on the critical path • Useful to try to shorten the critical path
  • 5. Suggested Steps in Project Management • Generate a formal definition of the project, with goals, constraints, assumptions • Identify project start/end dates, any mandatory milestones, including reports, signoffs, deliverables, etc. • List constraints – money, equipment availability, holidays, etc. • Identify tasks to be accomplished – high level (i.e., by categories), then details within each, using brainstorming method – green light
  • 6. Suggested Steps, cont. • Refine detailed task list, dropping/ combining, adding things omitted Then, for each task in list: • Estimate time (person hours, calendar period) • Identify dependencies among tasks • Identify resources (people, money, parts, etc.)
  • 7. Suggested Steps, cont. Organize task groups roughly by starting date List dependencies that should or MUST hold Use MS Project to make a GANTT chart • First capture tasks and task groups, milestones • Identify critical path, see if it can be shortened (get more “slack”) • Assign person-hours and specific team member(s) to each task – identify “task leads”
  • 8. Suggested Steps, cont. As project progresses: • Monitor, record progress on all tasks, at least weekly – use “Tracking Gantt Chart” • Pay particular attention to those on critical path • Revise plan as needed to take into account changes, adapt to meet milestones
  • 9. Project Management Using Microsoft Project • Allows many different ways of entering and observing information • includes many features to help identify problems with a plan • regular use can help a group refine plans to make meeting targets more realistic
  • 10. Our “Flyover” of Project 98 • Adding tasks, durations • Setting dependencies • Seeing critical path, etc. • “Rolling up” subtasks • Assigning resources • Adjusting durations, time assignments, etc.
  • 11.
  • 12.
  • 13.
  • 14. Our “Flyover” of Project 98 • Adding tasks, durations • Setting dependencies • Seeing critical path, etc. • “Rolling up” subtasks • Assigning resources • Adjusting durations, time assignments, etc.
  • 15.
  • 16.
  • 17.
  • 18. Our “Flyover” of Project 98 • Adding tasks, durations • Setting dependencies • Seeing critical path, etc. • “Rolling up” subtasks • Assigning resources • Adjusting durations, time assignments, etc.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23. WATCH YOUR DEPENDENCY CHOICES!!!  If you choose something other than the “default” finish/start constraints, you will probably LOSE your ability to track the critical path  So AVOID “finish by” or “start by” with particular calendar dates, or other types of constraints.  Break tasks apart as needed, in order to make finish/start constraints realistic!
  • 24. Our “Flyover” of Project 98 • Adding tasks, durations • Setting dependencies • Seeing critical path, etc. • “Rolling up” subtasks • Assigning resources • Adjusting durations, time assignments, etc.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38. Our “Flyover” of Project 98 • Adding tasks, durations • Setting dependencies • Seeing critical path, etc. • “Rolling up” subtasks • Assigning resources • Adjusting durations, time assignments, etc.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49.
  • 50. Our “Flyover” of Project 98 • Adding tasks, durations • Setting dependencies • Seeing critical path, etc. • “Rolling up” subtasks • Assigning resources • Adjusting durations, time assignments, etc.
  • 51.
  • 52.
  • 53.
  • 54.
  • 55.
  • 56. YOUR MS Project has a “Deadline” box on this page! Use it to let you get warned when something gets pushed back too far, but STILL not assigning a “start no earlier than” or “finish no later than” constraint to it – still using “As soon as possible.”
  • 57.
  • 58.
  • 59.
  • 60.
  • 61. Management of YOUR Project With your team members • Create a plan for the entire project • Set milestones for tracking progress • Provide more detail for near-term tasks • Use with your facilitator to report progress and revise/add detail to plan • Assign specific tasks to team members • Revise plan and activities as required to achieve objectives