Name Md Farid Talif End-of-course date 13/11/2015 Trainin
Ris
k
ass
ess
me
nt
for
m
Total m
Marks
Assessor’s name Md Farid Date
Description of process, activity or task to be risk assessed
Describe the location
where the activities
are taking place
The location located at Bandar Seri Begawan, which is the heart of Brunei Darussal
building, car park and near commercial building. We build Plan, negation, purposed
customer’s decided first if there want to customized their own dream house or we gi
new idea. The size of land 0.750 feet/sq2
. There is main door in front and the exit or
office beside toilet.
Describe the activities
being performed
We as Charted company are selected to be role model for their Lead Planner Archite
doing client renovation house, we always made our client satisfied with their own d
our company. But only half of the staff working Office Hours.
Describe the
equipment and/or
substances being
used
CCTV for monitoring activities, Desktop & laptop for easily working with the prog
measure and drawing Plan and Personal Protective Equipment for safety when visiti
cleaning chemical (toxic and corrosive) such as Clorox - 5 liter, Pleged – 3 liter, Kle
– 5 liter, Murphy Oil Soap – 6 liter. Perfume Lavender for toilet and office - 10 piec
Describe the people
involved in these
activities (and others
who might be
affected)
Security are present to public to enter and also monitor to movement of vehicle and
such as Architect, Consultants, Civil Engineering, Quantity and Survey, Client, Boa
Officers , Client and inspection visitor.
Risk assessment form
Description of
hazard and
hazardous event
Who might
be
harmed?
What risk
controls are
currently in
place?
Current
risk
rating*
Are further
controls
needed?
Date to
be
completed
Residual
risk
rating*
L C R L C R
L
o
c
a
t
i
H-Office
HE- The fire reduced
by water Sprinkler
and Fire
Extinguisher.
 Client
 Staff
 Supervisor
Buddy system
Clear
communication on
4 5 20
Always Supervise
Client and Staff
when doing work.
By next three days 3 1 2
A
c
t
i
v
i
t
H-getting in and out
HE-Burning / Trip
wires at desktop.
 Staff
 Supervisor
The fire from
burning computer
and trip wires are
reduced.
4 4 16
Properly label fire
tools and fire exit,
needed fire
protection.
By this week 3 2 6
Eq
u
i
p
m
e
n
 Fire
Extinguisher
 Fire Blanket
 Sodium
Oxide
-Client
-Unauthorized
Person
Proper fire
extinguisher to be
used.
4 4 16
Competent
personal to handle
situation and well-
person.
By this week 2 2 4
Marks
H = hazard
HE= hazard Event
Consequence of hazardous event
1 insignificant – no
injury
2 minor – minor injuries needing first aid
3 moderate – up to three days’ absence
4 major – more than seven days’ absence
5 catastrophic – death
Risk Rating Calculator
Likelihood that hazardous event will occur
1 very unlikely
2 unlikely
3 fairly
likely
4 likely
5 very likely
Action Level Table
Risk rating Action
20–25 Stop – stop activity and take immediate
action
15–16 Urgent action – take immediate action and stop activity if necessary, maintain existing controls rigorously
8–12 Action – improve within specified timescale
3–6 Monitor – look to improve at next review or if there is a significant change
1–2 No action – no further action but ensure controls are maintained and reviewed
Example risk assessment
Description of
hazard and
hazardous event
Who might
be
harmed?
What risk
controls are
currently in
place?
Current
risk
rating*
Are further
controls
needed?
Date to be
completed
by
Residual
risk
rating*
L C R L C R
Activiti
es
Filling car with
petrol, leading to
spillage
Person filling
vehicle and
others on
forecourt
Auto pump cut
off, signage and
plastic gloves
4 2 8 Make available
paper towels,
sand and
absorbent
material
By next week 3 2 6

More Related Content

What's hot

6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
HSE Management Plan
HSE Management PlanHSE Management Plan
HSE Management PlanPhilip Hà
 
313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheetPhạm Thành
 
Emergency Response Training
Emergency Response TrainingEmergency Response Training
Emergency Response Trainingdevan4ru
 
Aramco safety interview Questions .pdf
Aramco safety interview Questions .pdfAramco safety interview Questions .pdf
Aramco safety interview Questions .pdfjnanamaya Basu
 
New Employee Safety Orientation
New Employee Safety OrientationNew Employee Safety Orientation
New Employee Safety OrientationBeamer
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work trainingKarnav Rana
 
15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templates15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
Emergency response osha 2012
Emergency response osha 2012Emergency response osha 2012
Emergency response osha 2012Charles Brawley
 
Chris Withers Managing Safely Project
Chris Withers Managing Safely ProjectChris Withers Managing Safely Project
Chris Withers Managing Safely ProjectChris Withers
 
Health & Safety Induction Training
Health & Safety Induction Training Health & Safety Induction Training
Health & Safety Induction Training Claire
 
risk assessment - pile cap.pdf
risk assessment - pile cap.pdfrisk assessment - pile cap.pdf
risk assessment - pile cap.pdfmydl2
 
Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdfHSEXINYIPROJECT
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templatesDwarika Bhushan Sharma
 
Role Play Induction training
Role Play Induction training Role Play Induction training
Role Play Induction training Anne Every
 
Spill Prevention and Response Training by IMCOM
Spill Prevention and Response Training by IMCOMSpill Prevention and Response Training by IMCOM
Spill Prevention and Response Training by IMCOMAtlantic Training, LLC.
 
operational safety
operational safetyoperational safety
operational safetyudit dixit
 
21 confined space working risk assessment templates
21 confined space working risk assessment templates21 confined space working risk assessment templates
21 confined space working risk assessment templatesDwarika Bhushan Sharma
 

What's hot (20)

6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates
 
HSE Management Plan
HSE Management PlanHSE Management Plan
HSE Management Plan
 
313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet
 
Emergency Response Training
Emergency Response TrainingEmergency Response Training
Emergency Response Training
 
Aramco safety interview Questions .pdf
Aramco safety interview Questions .pdfAramco safety interview Questions .pdf
Aramco safety interview Questions .pdf
 
New Employee Safety Orientation
New Employee Safety OrientationNew Employee Safety Orientation
New Employee Safety Orientation
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
 
15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templates15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templates
 
PPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie EPPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie E
 
Emergency response osha 2012
Emergency response osha 2012Emergency response osha 2012
Emergency response osha 2012
 
Chris Withers Managing Safely Project
Chris Withers Managing Safely ProjectChris Withers Managing Safely Project
Chris Withers Managing Safely Project
 
Health & Safety Induction Training
Health & Safety Induction Training Health & Safety Induction Training
Health & Safety Induction Training
 
risk assessment - pile cap.pdf
risk assessment - pile cap.pdfrisk assessment - pile cap.pdf
risk assessment - pile cap.pdf
 
Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdf
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Role Play Induction training
Role Play Induction training Role Play Induction training
Role Play Induction training
 
Spill Prevention and Response Training by IMCOM
Spill Prevention and Response Training by IMCOMSpill Prevention and Response Training by IMCOM
Spill Prevention and Response Training by IMCOM
 
operational safety
operational safetyoperational safety
operational safety
 
HIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdfHIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdf
 
21 confined space working risk assessment templates
21 confined space working risk assessment templates21 confined space working risk assessment templates
21 confined space working risk assessment templates
 

Similar to 4.2 Risk assessment project (i)

CV Johan Venter new - Copy
CV Johan Venter new - CopyCV Johan Venter new - Copy
CV Johan Venter new - CopyJohan Venter
 
Habitat for Humanity Grand Traverse Action Plan - confidential
Habitat for Humanity Grand Traverse Action Plan - confidentialHabitat for Humanity Grand Traverse Action Plan - confidential
Habitat for Humanity Grand Traverse Action Plan - confidentialVictoria Kelly
 
NEW CV AM BLESSED
NEW CV AM BLESSEDNEW CV AM BLESSED
NEW CV AM BLESSEDJOY JOHNSON
 
The Project Status & The Portfolio
The Project Status & The PortfolioThe Project Status & The Portfolio
The Project Status & The PortfolioNed Johnson
 
Curriculum Vitae - Clinton Bernhardt
Curriculum Vitae - Clinton BernhardtCurriculum Vitae - Clinton Bernhardt
Curriculum Vitae - Clinton BernhardtClinton Bernhardt
 
Infraworks plumbing induction feb 19 v1.0
Infraworks plumbing induction feb 19 v1.0Infraworks plumbing induction feb 19 v1.0
Infraworks plumbing induction feb 19 v1.0Garry Pepper
 
Sr.Sales Executive
Sr.Sales ExecutiveSr.Sales Executive
Sr.Sales ExecutiveAbu Thalif
 
CURRICULUM_VITAE_imran Aslam
CURRICULUM_VITAE_imran AslamCURRICULUM_VITAE_imran Aslam
CURRICULUM_VITAE_imran Aslamimran aslam
 
(2) 2016 RESUME-WORD
(2) 2016 RESUME-WORD(2) 2016 RESUME-WORD
(2) 2016 RESUME-WORDWendell Nagel
 
How to write business proposal in professional manner
How to write business proposal in professional mannerHow to write business proposal in professional manner
How to write business proposal in professional mannerQazi Ali
 
update Khalid safety cv1
update Khalid safety cv1update Khalid safety cv1
update Khalid safety cv1Khalid Deragun
 
Cv of mr. mainraj safety officer.
Cv of mr. mainraj safety officer.Cv of mr. mainraj safety officer.
Cv of mr. mainraj safety officer.Mainraj
 
Resume of Llanwyn Johns
Resume of Llanwyn JohnsResume of Llanwyn Johns
Resume of Llanwyn JohnsLlanwyn Johns
 

Similar to 4.2 Risk assessment project (i) (20)

CV Johan Venter new - Copy
CV Johan Venter new - CopyCV Johan Venter new - Copy
CV Johan Venter new - Copy
 
A & L Industrial Services
A & L Industrial ServicesA & L Industrial Services
A & L Industrial Services
 
Habitat for Humanity Grand Traverse Action Plan - confidential
Habitat for Humanity Grand Traverse Action Plan - confidentialHabitat for Humanity Grand Traverse Action Plan - confidential
Habitat for Humanity Grand Traverse Action Plan - confidential
 
NEW CV AM BLESSED
NEW CV AM BLESSEDNEW CV AM BLESSED
NEW CV AM BLESSED
 
The Project Status & The Portfolio
The Project Status & The PortfolioThe Project Status & The Portfolio
The Project Status & The Portfolio
 
Curriculum Vitae - Clinton Bernhardt
Curriculum Vitae - Clinton BernhardtCurriculum Vitae - Clinton Bernhardt
Curriculum Vitae - Clinton Bernhardt
 
Infraworks plumbing induction feb 19 v1.0
Infraworks plumbing induction feb 19 v1.0Infraworks plumbing induction feb 19 v1.0
Infraworks plumbing induction feb 19 v1.0
 
Sr.Sales Executive
Sr.Sales ExecutiveSr.Sales Executive
Sr.Sales Executive
 
Lance Slaffa C.V DOC(1)-2-7
Lance Slaffa C.V DOC(1)-2-7Lance Slaffa C.V DOC(1)-2-7
Lance Slaffa C.V DOC(1)-2-7
 
Cristiano De los Reyes_C.V
Cristiano De los Reyes_C.VCristiano De los Reyes_C.V
Cristiano De los Reyes_C.V
 
office (1).pdf
office (1).pdfoffice (1).pdf
office (1).pdf
 
saad
saadsaad
saad
 
CURRICULUM_VITAE_imran Aslam
CURRICULUM_VITAE_imran AslamCURRICULUM_VITAE_imran Aslam
CURRICULUM_VITAE_imran Aslam
 
(2) 2016 RESUME-WORD
(2) 2016 RESUME-WORD(2) 2016 RESUME-WORD
(2) 2016 RESUME-WORD
 
How to write business proposal in professional manner
How to write business proposal in professional mannerHow to write business proposal in professional manner
How to write business proposal in professional manner
 
update Khalid safety cv1
update Khalid safety cv1update Khalid safety cv1
update Khalid safety cv1
 
Cv of mr. mainraj safety officer.
Cv of mr. mainraj safety officer.Cv of mr. mainraj safety officer.
Cv of mr. mainraj safety officer.
 
Resume of Llanwyn Johns
Resume of Llanwyn JohnsResume of Llanwyn Johns
Resume of Llanwyn Johns
 
Ali farhat resume - updated dec 1, 2015
Ali farhat   resume - updated dec 1, 2015Ali farhat   resume - updated dec 1, 2015
Ali farhat resume - updated dec 1, 2015
 
Ali farhat resume - updated dec 1, 2015
Ali farhat   resume - updated dec 1, 2015Ali farhat   resume - updated dec 1, 2015
Ali farhat resume - updated dec 1, 2015
 

4.2 Risk assessment project (i)

  • 1. Name Md Farid Talif End-of-course date 13/11/2015 Trainin Ris k ass ess me nt for m Total m
  • 2. Marks Assessor’s name Md Farid Date Description of process, activity or task to be risk assessed Describe the location where the activities are taking place The location located at Bandar Seri Begawan, which is the heart of Brunei Darussal building, car park and near commercial building. We build Plan, negation, purposed customer’s decided first if there want to customized their own dream house or we gi new idea. The size of land 0.750 feet/sq2 . There is main door in front and the exit or office beside toilet. Describe the activities being performed We as Charted company are selected to be role model for their Lead Planner Archite doing client renovation house, we always made our client satisfied with their own d our company. But only half of the staff working Office Hours. Describe the equipment and/or substances being used CCTV for monitoring activities, Desktop & laptop for easily working with the prog measure and drawing Plan and Personal Protective Equipment for safety when visiti cleaning chemical (toxic and corrosive) such as Clorox - 5 liter, Pleged – 3 liter, Kle – 5 liter, Murphy Oil Soap – 6 liter. Perfume Lavender for toilet and office - 10 piec
  • 3. Describe the people involved in these activities (and others who might be affected) Security are present to public to enter and also monitor to movement of vehicle and such as Architect, Consultants, Civil Engineering, Quantity and Survey, Client, Boa Officers , Client and inspection visitor.
  • 4. Risk assessment form Description of hazard and hazardous event Who might be harmed? What risk controls are currently in place? Current risk rating* Are further controls needed? Date to be completed Residual risk rating* L C R L C R L o c a t i H-Office HE- The fire reduced by water Sprinkler and Fire Extinguisher.  Client  Staff  Supervisor Buddy system Clear communication on 4 5 20 Always Supervise Client and Staff when doing work. By next three days 3 1 2 A c t i v i t H-getting in and out HE-Burning / Trip wires at desktop.  Staff  Supervisor The fire from burning computer and trip wires are reduced. 4 4 16 Properly label fire tools and fire exit, needed fire protection. By this week 3 2 6 Eq u i p m e n  Fire Extinguisher  Fire Blanket  Sodium Oxide -Client -Unauthorized Person Proper fire extinguisher to be used. 4 4 16 Competent personal to handle situation and well- person. By this week 2 2 4 Marks
  • 5.
  • 7. HE= hazard Event Consequence of hazardous event 1 insignificant – no injury 2 minor – minor injuries needing first aid 3 moderate – up to three days’ absence 4 major – more than seven days’ absence 5 catastrophic – death Risk Rating Calculator Likelihood that hazardous event will occur 1 very unlikely 2 unlikely 3 fairly likely 4 likely 5 very likely Action Level Table Risk rating Action 20–25 Stop – stop activity and take immediate action 15–16 Urgent action – take immediate action and stop activity if necessary, maintain existing controls rigorously 8–12 Action – improve within specified timescale 3–6 Monitor – look to improve at next review or if there is a significant change 1–2 No action – no further action but ensure controls are maintained and reviewed Example risk assessment
  • 8. Description of hazard and hazardous event Who might be harmed? What risk controls are currently in place? Current risk rating* Are further controls needed? Date to be completed by Residual risk rating* L C R L C R Activiti es Filling car with petrol, leading to spillage Person filling vehicle and others on forecourt Auto pump cut off, signage and plastic gloves 4 2 8 Make available paper towels, sand and absorbent material By next week 3 2 6