SlideShare a Scribd company logo
1 of 25
Office Buildings BOMA Measurement Standard s
Overview Overview  > Key Concepts > 1980 > 1996 > 2010 > Method A > Method B BOMA: Building Owners and Managers Association International ( www.boma.org )   Accepted and approved by the American National Standards Institute (ANSI)       1980 - 1989      1996       2010    -      Method A     -      Method B    
Area Calculations - Process Overview  > Key Concepts > 1980 > 1996 > 2010 > Method A > Method B
Area Calculations - Accuracy and tolerance ,[object Object],[object Object],[object Object],Overview  > Key Concepts > 1980 > 1996 > 2010 > Method A > Method B
Key Concepts – Gross Measured Area This is the total area within the perimeter Overview >  Key Concepts  > 1980 > 1996 > 2010 > Method A > Method B
Key Concepts – Dominant Portion Rules for surface to measure to at the floor plate perimeter Overview >  Key Concepts  > 1980 > 1996 > 2010 > Method A > Method B
Key Concepts – Major Vertical Penetrations These are excluded from Rentable Area Overview >  Key Concepts  > 1980 > 1996 > 2010 > Method A > Method B
Key Concepts - Usable Area Area available for tenant activity within their suite Overview >  Key Concepts  > 1980 > 1996 > 2010 > Method A > Method B
Key Concepts – Floor Common Area Washrooms, corridors, utility rooms etc. that serve the floor Overview >  Key Concepts  > 1980 > 1996 > 2010 > Method A > Method B
BOMA 1980 calculation Usable Area + Floor Common Areas Overview > Key Concepts >  1980  > 1996 > 2010 > Method A > Method B
BOMA 1996 - Building Common Area Shared by all building tenants Overview > Key Concepts > 1980 >  1996  > 2010 > Method A > Method B
BOMA 1996 - Global Summary of Areas Overview > Key Concepts > 1980 >  1996  > 2010 > Method A > Method B Usable Area  Floor R/U Building R/U Rentable Area Vertical Penetrations Building Common Floor  Common
BOMA 1996 – Area calculation Usable Area + Floor Common Area + Building Common Area Overview > Key Concepts > 1980 >  1996  > 2010 > Method A > Method B
BOMA 2010 - Overview Overview > Key Concepts > 1980 > 1996 >  2010  > Method A > Method B ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
BOMA 2010 - Terminology Overview > Key Concepts > 1980 > 1996 >  2010  > Method A > Method B BOMA 80-96 BOMA 2010    Gross Measured Area   Interior Gross Area (IGA)     Usable and Store Area   Occupant Area    Building Common Area     Building Service Area   Building Amenity Area     Floor Common Area   Floor Service Area   Floor Amenity Area    Building R/U Ratio   R/O ratio    Floor R/U Ratio   R/U ratio
BOMA 2010 - Methodology Overview > Key Concepts > 1980 > 1996 >  2010  > Method A > Method B ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
BOMA 2010 Method A - Principles Overview > Key Concepts > 1980 > 1996 >   2010 >  Method A  > Method B ,[object Object],[object Object],[object Object],[object Object],[object Object]
BOMA 2010 Method A - Global Summary Overview > Key Concepts > 1980 > 1996 >   2010 >  Method A  > Method B Usable Area  Floor R/U Building R/O Rentable Area Vertical Penetrations Building Amenity Floor  Common Building Service
BOMA 2010 Method A - Global Summary Parking and Storage areas Building Amenity and Building Service areas Provision for Capping Rentable Areas Overview > Key Concepts > 1980 > 1996 >   2010 >  Method A  > Method B
BOMA 2010 Method A - Area Calculation Overview > Key Concepts > 1980 > 1996 >   2010 >  Method A  > Method B
BOMA 2010 Method B- Principles Overview > Key Concepts > 1980 > 1996 >   2010 > Method A >  Method B ,[object Object],[object Object],[object Object]
BOMA 2010 Method B Base Building Circulation and Extended Circulation Areas Overview > Key Concepts > 1980 > 1996 >   2010 > Method A >  Method B
BOMA 2010 Method B - Global Summary Overview > Key Concepts > 1980 > 1996 >   2010 > Method A >  Method B Usable Area  Load Factor (B) Rentable Area Vertical Penetrations Service and Amenity Areas Base Building Circulation
BOMA 2010 Method B - Area Calculation Overview > Key Concepts > 1980 > 1996 >   2010 > Method A >  Method B
Summary Summary BOMA 1980 : Common areas distributed on a floor by floor basis BOMA 1996 : Allows for building common areas to be distributed to all tenants BOMA 2010 Method A : Similar to BOMA 1996 BOMA 2010 Method B : The same gross-up is applied to all the floors by creating “base building circulation” and assigning it to all floors regardless of layout More information Copies of measurement standards can ordered online:  www.boma.org Link to this presentation:  http://tinyurl.com/29xwcuc

More Related Content

What's hot

What's hot (20)

THE EDGE, Amsterdam
THE EDGE, AmsterdamTHE EDGE, Amsterdam
THE EDGE, Amsterdam
 
Deconstructivism by Sarthak Kaura
Deconstructivism by Sarthak KauraDeconstructivism by Sarthak Kaura
Deconstructivism by Sarthak Kaura
 
The Magnolia Residences - New Manila
The Magnolia Residences - New ManilaThe Magnolia Residences - New Manila
The Magnolia Residences - New Manila
 
BellaVita Socialized Housing of Ayala in Cavite
BellaVita Socialized Housing of Ayala in CaviteBellaVita Socialized Housing of Ayala in Cavite
BellaVita Socialized Housing of Ayala in Cavite
 
Fue theory 4 2018 lecture 5 - the formulation and analysis of architectural...
Fue theory 4 2018   lecture 5 - the formulation and analysis of architectural...Fue theory 4 2018   lecture 5 - the formulation and analysis of architectural...
Fue theory 4 2018 lecture 5 - the formulation and analysis of architectural...
 
Solinea Lazuli Tower Project Brief
Solinea Lazuli Tower Project BriefSolinea Lazuli Tower Project Brief
Solinea Lazuli Tower Project Brief
 
Fire station design sadeq al-salami
Fire station  design sadeq al-salamiFire station  design sadeq al-salami
Fire station design sadeq al-salami
 
Subdivision Plan of A Residential Area
Subdivision Plan of A Residential AreaSubdivision Plan of A Residential Area
Subdivision Plan of A Residential Area
 
Presentación BIM onilsa
Presentación BIM onilsaPresentación BIM onilsa
Presentación BIM onilsa
 
Artificial Intelligence (AI) in the Boiler Room!
Artificial Intelligence (AI) in the Boiler Room!Artificial Intelligence (AI) in the Boiler Room!
Artificial Intelligence (AI) in the Boiler Room!
 
Green one- The first 5 Star Rated SVAGRIHA Project
Green one- The first 5 Star Rated SVAGRIHA ProjectGreen one- The first 5 Star Rated SVAGRIHA Project
Green one- The first 5 Star Rated SVAGRIHA Project
 
Introduction to IGBC Green Factory Rating System_January 2015
Introduction to IGBC Green Factory Rating System_January 2015Introduction to IGBC Green Factory Rating System_January 2015
Introduction to IGBC Green Factory Rating System_January 2015
 
Índices Urbanisticos
Índices Urbanisticos Índices Urbanisticos
Índices Urbanisticos
 
national builiding codes
national builiding codesnational builiding codes
national builiding codes
 
Benefits of parametric design in architecture
Benefits of parametric design in architectureBenefits of parametric design in architecture
Benefits of parametric design in architecture
 
Demolition, Deconstruction & Dismantling
Demolition, Deconstruction & Dismantling Demolition, Deconstruction & Dismantling
Demolition, Deconstruction & Dismantling
 
Case study of G+2 Structure located at railway quarters, warangal
Case study of G+2 Structure located at railway quarters, warangalCase study of G+2 Structure located at railway quarters, warangal
Case study of G+2 Structure located at railway quarters, warangal
 
The Edge,Smart Building
The Edge,Smart BuildingThe Edge,Smart Building
The Edge,Smart Building
 
Building performance analysis system IES VE main features overview
Building performance analysis system IES VE main features overviewBuilding performance analysis system IES VE main features overview
Building performance analysis system IES VE main features overview
 
Peckham Library Case Study
Peckham Library Case StudyPeckham Library Case Study
Peckham Library Case Study
 

More from Mikael Sandblom

Space Database Customer Satisfaction Survey 2013
Space Database Customer Satisfaction Survey 2013Space Database Customer Satisfaction Survey 2013
Space Database Customer Satisfaction Survey 2013
Mikael Sandblom
 
Customer Satisfaction Survey Results 2012
Customer Satisfaction Survey Results 2012Customer Satisfaction Survey Results 2012
Customer Satisfaction Survey Results 2012
Mikael Sandblom
 
Customer Satisfaction Survey Results 2011
Customer Satisfaction Survey Results 2011Customer Satisfaction Survey Results 2011
Customer Satisfaction Survey Results 2011
Mikael Sandblom
 
Customer Satisfaction Survey 2010 Results
Customer Satisfaction Survey 2010 ResultsCustomer Satisfaction Survey 2010 Results
Customer Satisfaction Survey 2010 Results
Mikael Sandblom
 
Space Database Sacking Plans
Space Database Sacking PlansSpace Database Sacking Plans
Space Database Sacking Plans
Mikael Sandblom
 
Space Database Customer Satisfaction Survey 2009
Space Database Customer Satisfaction Survey 2009Space Database Customer Satisfaction Survey 2009
Space Database Customer Satisfaction Survey 2009
Mikael Sandblom
 

More from Mikael Sandblom (20)

Collective 20 at Gallery 1313
Collective 20 at Gallery 1313Collective 20 at Gallery 1313
Collective 20 at Gallery 1313
 
Collective20 book art spreads_online
Collective20 book art spreads_onlineCollective20 book art spreads_online
Collective20 book art spreads_online
 
Collective 20 Show Catalogue
Collective 20 Show CatalogueCollective 20 Show Catalogue
Collective 20 Show Catalogue
 
The Precious Land
The Precious LandThe Precious Land
The Precious Land
 
Where Home Is
Where Home IsWhere Home Is
Where Home Is
 
Gallery1313 futures campaign
Gallery1313 futures campaignGallery1313 futures campaign
Gallery1313 futures campaign
 
Space Database Customer Satisfaction Survey 2015
Space Database Customer Satisfaction Survey 2015Space Database Customer Satisfaction Survey 2015
Space Database Customer Satisfaction Survey 2015
 
Space Database Customer Satisfaction Survey Dec 2014
Space Database Customer Satisfaction Survey Dec 2014Space Database Customer Satisfaction Survey Dec 2014
Space Database Customer Satisfaction Survey Dec 2014
 
Space Database Customer Satisfaction Survey 2013
Space Database Customer Satisfaction Survey 2013Space Database Customer Satisfaction Survey 2013
Space Database Customer Satisfaction Survey 2013
 
Customer Satisfaction Survey Results 2012
Customer Satisfaction Survey Results 2012Customer Satisfaction Survey Results 2012
Customer Satisfaction Survey Results 2012
 
Building Leasing Website Gallery
Building Leasing Website Gallery Building Leasing Website Gallery
Building Leasing Website Gallery
 
Customer Satisfaction Survey Results 2011
Customer Satisfaction Survey Results 2011Customer Satisfaction Survey Results 2011
Customer Satisfaction Survey Results 2011
 
Corporate Overview
Corporate OverviewCorporate Overview
Corporate Overview
 
Customer Satisfaction Survey 2010 Results
Customer Satisfaction Survey 2010 ResultsCustomer Satisfaction Survey 2010 Results
Customer Satisfaction Survey 2010 Results
 
Space Database Planner
Space Database PlannerSpace Database Planner
Space Database Planner
 
Space Database Sacking Plans
Space Database Sacking PlansSpace Database Sacking Plans
Space Database Sacking Plans
 
Space Database Self-Serve Drawing Changes
Space Database Self-Serve Drawing ChangesSpace Database Self-Serve Drawing Changes
Space Database Self-Serve Drawing Changes
 
Space Database Drawing Updates and Space Plans
Space Database Drawing Updates and Space PlansSpace Database Drawing Updates and Space Plans
Space Database Drawing Updates and Space Plans
 
Space Database Overview
Space Database OverviewSpace Database Overview
Space Database Overview
 
Space Database Customer Satisfaction Survey 2009
Space Database Customer Satisfaction Survey 2009Space Database Customer Satisfaction Survey 2009
Space Database Customer Satisfaction Survey 2009
 

Recently uploaded

Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Recently uploaded (20)

Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 

BOMA Measurement Standards

  • 1. Office Buildings BOMA Measurement Standard s
  • 2. Overview Overview > Key Concepts > 1980 > 1996 > 2010 > Method A > Method B BOMA: Building Owners and Managers Association International ( www.boma.org )   Accepted and approved by the American National Standards Institute (ANSI)      1980 - 1989      1996       2010   -     Method A   -     Method B    
  • 3. Area Calculations - Process Overview > Key Concepts > 1980 > 1996 > 2010 > Method A > Method B
  • 4.
  • 5. Key Concepts – Gross Measured Area This is the total area within the perimeter Overview > Key Concepts > 1980 > 1996 > 2010 > Method A > Method B
  • 6. Key Concepts – Dominant Portion Rules for surface to measure to at the floor plate perimeter Overview > Key Concepts > 1980 > 1996 > 2010 > Method A > Method B
  • 7. Key Concepts – Major Vertical Penetrations These are excluded from Rentable Area Overview > Key Concepts > 1980 > 1996 > 2010 > Method A > Method B
  • 8. Key Concepts - Usable Area Area available for tenant activity within their suite Overview > Key Concepts > 1980 > 1996 > 2010 > Method A > Method B
  • 9. Key Concepts – Floor Common Area Washrooms, corridors, utility rooms etc. that serve the floor Overview > Key Concepts > 1980 > 1996 > 2010 > Method A > Method B
  • 10. BOMA 1980 calculation Usable Area + Floor Common Areas Overview > Key Concepts > 1980 > 1996 > 2010 > Method A > Method B
  • 11. BOMA 1996 - Building Common Area Shared by all building tenants Overview > Key Concepts > 1980 >  1996 > 2010 > Method A > Method B
  • 12. BOMA 1996 - Global Summary of Areas Overview > Key Concepts > 1980 >  1996 > 2010 > Method A > Method B Usable Area Floor R/U Building R/U Rentable Area Vertical Penetrations Building Common Floor Common
  • 13. BOMA 1996 – Area calculation Usable Area + Floor Common Area + Building Common Area Overview > Key Concepts > 1980 >  1996 > 2010 > Method A > Method B
  • 14.
  • 15. BOMA 2010 - Terminology Overview > Key Concepts > 1980 > 1996 > 2010 > Method A > Method B BOMA 80-96 BOMA 2010   Gross Measured Area   Interior Gross Area (IGA)   Usable and Store Area   Occupant Area   Building Common Area   Building Service Area   Building Amenity Area   Floor Common Area   Floor Service Area   Floor Amenity Area   Building R/U Ratio   R/O ratio   Floor R/U Ratio   R/U ratio
  • 16.
  • 17.
  • 18. BOMA 2010 Method A - Global Summary Overview > Key Concepts > 1980 > 1996 > 2010 > Method A > Method B Usable Area Floor R/U Building R/O Rentable Area Vertical Penetrations Building Amenity Floor Common Building Service
  • 19. BOMA 2010 Method A - Global Summary Parking and Storage areas Building Amenity and Building Service areas Provision for Capping Rentable Areas Overview > Key Concepts > 1980 > 1996 > 2010 > Method A > Method B
  • 20. BOMA 2010 Method A - Area Calculation Overview > Key Concepts > 1980 > 1996 > 2010 > Method A > Method B
  • 21.
  • 22. BOMA 2010 Method B Base Building Circulation and Extended Circulation Areas Overview > Key Concepts > 1980 > 1996 > 2010 > Method A > Method B
  • 23. BOMA 2010 Method B - Global Summary Overview > Key Concepts > 1980 > 1996 > 2010 > Method A > Method B Usable Area Load Factor (B) Rentable Area Vertical Penetrations Service and Amenity Areas Base Building Circulation
  • 24. BOMA 2010 Method B - Area Calculation Overview > Key Concepts > 1980 > 1996 > 2010 > Method A > Method B
  • 25. Summary Summary BOMA 1980 : Common areas distributed on a floor by floor basis BOMA 1996 : Allows for building common areas to be distributed to all tenants BOMA 2010 Method A : Similar to BOMA 1996 BOMA 2010 Method B : The same gross-up is applied to all the floors by creating “base building circulation” and assigning it to all floors regardless of layout More information Copies of measurement standards can ordered online: www.boma.org Link to this presentation: http://tinyurl.com/29xwcuc

Editor's Notes

  1. The BOMA Standards are the most widely accepted method of measureing area in commercial buildings and enable direct comparisons to be made between different properties. First standard was established back in 1915, with revisions over the years (52, 55, 71). Current standard in use are 80-89, 96. Latest one is 2010.
  2. Differences in terminology with previous standards