CV D. Maimbolwa

CURRICULUM VITAE
------------------------------------------------------------------------------------------------------------------------------------------
Maimbolwa David Muhau: Beng Mech, MEIZ, R.Eng
1.0 Summary
A self driven Reliability Engineer experienced in maximizing the reliability of the production process in the
most cost effective manner through the development and continuous refinement of failure management
policies and timely identification of proactive corrective maintenance.
• Detailed knowledge of HSE systems and displays leadership in driving incident free operations.
• Strong interpersonal skills with an ability to interact with people at all levels and across a variety
of cultures, both internally and externally, with positive effect.
• Demonstrated ability to work unsupervised and achieve required operational outputs.
• Good organizer and efficient resource allocator, skillfully handles formal procedures and
informal processes with a high level of attention to detail.
2.0 Personal Details
Sex: Male Marital Status: Married Date of Birth: 27th
August 1973
3.0 Professional Experience
3.1 Kalumbila Minerals Ltd (2014 to 2015)
Reliability Engineer – Fixed Plant (concentrator)
Duties include;
Preventive and Predictive Maintenance Practices
• Perform equipment criticality assessment (ECA)
• Create maintenance strategies for all plant equipment
• Create Maintenance tasks and plans according to the strategies and ECA
• Create condition monitoring points and schedule and upload into CMMS
• Create plant condition monitoring data capture, analysis and reporting templates
Plot 6494/31, Dag Hammerskold Avenue
Riverside, Chingola.
Cellphone: 00260977816381/0967801254
P.O Box 50303, Lusaka
Email: cliffzam@yahoo.com
• Writing and presenting progress reports to management on Asset Optimization
• Create Standard Maintenance Plans (SMPs) for critical equipment
• Monitor adherence to PM schedules in CMMS - Pronto
• Track the Break Down to Preventive Maintenance ratio on regular basis to measure
the effectiveness of the maintenance function
• Prepared the Condition Based Maintenance (CBM) Schedule, monitored compliance
and closure of the loop through Action Requests
• Initiate Equipment FMEAs for critical equipments
• Identification of RCA/MTTR based improvement projects and planned course of
action
Safety and regulatory (Statutory Compliance)
• Maintenance of plant log books and testing schedules of all statutory plant assets
• Color coding of tested slings, chain blocks and shackles and removal from circulation
non-compliant items
• Appointment of sub-ordinates and ensure compliance to mine safety log books
Safety and regulatory (Regulatory Compliance)
• Communication of the company’s EH&S vision, policies and standards to team
• Continuous identification and elimination of hazardous opportunities
• Ensure compliance to first aid training of the team and attendance of safety
meetings.
SOP/SMP Compliance
• Create Standard Operating Procedures (SOP) and/or Standard Maintenance
Procedures ( SMP) for critical equipment
• Ensure the operators and artisans are aware of the SOP/SMP's for the critical
equipment
• Conduct random site audits to check SOP/SMP compliance and make monthly
reports
Continuous Improvement (CI)
• Spearhead implementation of CI projects and prioritize projects through criticality &
payback
Budget & Cost Control
• Preparation of the departmental annual budgets and cost control
3.2 Konkola Copper Mines, konkola Division
Asset Optimisation Engineer - Engineering Services (2012 to August 2013)
The position involved the following;
• Uphold and Implement maintenance policies, strategies, procedures & specifications
to improve maintenance planning and scheduling.
• Continuous Asset Performance Improvement by continuously optimizing the
maintenance process through analysis of KPI trends, score-carding and
Implementing structures for Identification of short-comings in maintenance
standards and practices through field observations and improved MTBF and MTTR.
• Ensure control of changes to equipment, plant and support infrastructure at
Engineering Services & S. Plant are documented and approved. Provide guidance for
change management in to maintenance & operations team’s activities.
• Spares Management by conducting initial VED analysis followed scheduled spares
availability & procurement compliance reviews spares availability & procurement
compliance reviews.
• Develop and monitor performance indices, namely MTBF, MTTR, Failure Rate
Trending Down and work quality (repeated works).
• Conducting plant Site Assessment’s and Gap Analysis Verses world standards so as to
map the plants’ Reliability improvement programs.
• Writing and presenting progress reports to management on Asset Optimization
Head Condition Monitoring & Training – Engineering Services (2011)
As Head of Engineering training, the below duties apply;
• Schedule of training matrix for engineers and artisans across all trades.
• Conduct training classes including hands-on training.
• Conduct random on-site planned task observations of artisans.
• Determination of relevant courses through training needs assessment.
• Plan and implement graduate engineer’s development programs.
Condition Monitoring duties include;
• Draw-up a schedule for predictive and proactive maintenance techniques on all plant
equipment. This includes; thermography, vibration monitoring, oil analysis, non-
destructive tests and on-line/off-line motor testing.
• Monitor equipment health trends.
• Using reliability engineering principles and techniques to continually review and
improve maintenance methods and plans.
• Conducts root cause failure analysis (RCFA) on major breakdowns.
Equipment Reliability and Planning Engineer (ERG) - Concentrator Department (2008 to 2011)
Below are some of the tasks and successes achieved;
• Spearheaded the introduction and launch of the CMMS program SAP (PM Module) into
the department;
The project entailed;
- Capturing of the plants’ equipment data and uploading it into the system for
creation of function locations, stock codes and maintenance scheduling.
- Training of plant personnel in SAP and monitoring their usage of the system.
- Spares and Sub-assemblies Inventory Control.
• Established from first principles, the plant’s annual Preventive Maintenance Schedule in
the CMMS program Ellipse.
• Developed, reviewed maintenance Policies, procedures, specifications to improve
Maintenance Planning and Scheduling
• Providing engineering solutions to repetitive problems through conducting reliability
engineering techniques such as Root Cause Failure Analysis (RCFA).
Based on the FMEA results, successfully implemented various plant reliability
improvement projects and infused proactive and predictive maintenance plans into the
PM schedules to improve the overall effectiveness of the PM function.
Examples include;
- Overcoming impact rollers high failure rate by replacing them with impact beds.
- Minimizing mills downtime due to system voltage fluctuations by installing
accumulators on the trunnion bearings oil lubrication system.
3.4 Technical systems (T/a Assegai engineering services), Botswana. (2001-2005)
Project Engineer
Head of the projects team responsible for the planning and execution of various civil and
mechanical works tendered for mainly from the Government and various Councils.
Major achievement being successful commissioning of a 36km class 9 Upvc water pipeline
projects that included the erection of 3 x 75m3 GS tanks on 10m stands for shakawe Water
Works. The project was a joint venture with Paragon Services.
Other works done, including under sub-contracts encompass construction of schools, houses
and dewatering of sewer ponds and unblocking of sewer lines.
3.5 Mopani Copper Mines, Kitwe (1999 - 2000)
Senior Assistant engineer – Cobalt Plant
Below were the day to day duties;
• Hands-on maintenance and repair of plant equipment
• Cost and Spares Inventory control and management
• Execution of Concentrator’s improvement projects.
4.0 Qualifications: [1993-1998] University of Zambia: Beng in Mechanical Engineering
Thesis: Formulation of Maintenance Management System for a Fleet of company Vehicles
5.0 Key Sills: Computer literacy in CMMS programs SAP PM Module, Ellipse and MIMS as well as
the Microsoft office programs Excel, Word, MS Projects, Publisher and Power point
6.0 Professional Membership: Holder of a practicing license from the Engineering Registration
Board and a member of the Engineering Institute of Zambia
7.0 Extra-curricular Activities: Board member of CITHAM+, a community based HIV/AIDS
organization.
8.0 Languages: English, Lozi, Bemba, Nyanja, and Tshwana (Botswana)
9.0 References
Mr. Stephen Mulenga Mr.M Khosa Mr. John Kamwendo
Maintenance Manager M. Director Chief Engineer - Mechanical
BCL Copper Mines Assegai Engineering Mopani Copper Mines
Selebi Phikwe, Botswana Gaberone, Botswana Mufulira, Zambia
Cell: +260966315582/+26776446201 Cell: 00267 71607982 Cell: 260955860049/974860049
CV D. Maimbolwa
CV D. Maimbolwa

Recomendados

Venkat_Resume por
Venkat_ResumeVenkat_Resume
Venkat_Resumevenkata Narayana
120 vistas4 diapositivas
Wesley H. Riopel - Resume 2017 por
Wesley H. Riopel - Resume 2017Wesley H. Riopel - Resume 2017
Wesley H. Riopel - Resume 2017Wesley Riopel
97 vistas2 diapositivas
MDK Maintenance Manager 1 7+Year Experience por
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMohammed Kaleemuddin
227 vistas7 diapositivas
Sami Uddin Ahmed Zia resume1 por
Sami Uddin Ahmed Zia resume1Sami Uddin Ahmed Zia resume1
Sami Uddin Ahmed Zia resume1Sami Ahmed
105 vistas2 diapositivas
Edward Kurth Resume por
Edward Kurth ResumeEdward Kurth Resume
Edward Kurth ResumeEdward Kurth
165 vistas3 diapositivas
MuneerKhanResume v1 por
MuneerKhanResume v1MuneerKhanResume v1
MuneerKhanResume v1muneer khan
187 vistas6 diapositivas

Más contenido relacionado

La actualidad más candente

PACE: Process and Critical Equipment Conference in Dubai, Sept 24-25 por
PACE: Process and Critical Equipment Conference in Dubai, Sept 24-25PACE: Process and Critical Equipment Conference in Dubai, Sept 24-25
PACE: Process and Critical Equipment Conference in Dubai, Sept 24-25Ricky Smith CMRP, CMRT
2.8K vistas5 diapositivas
CV-Shreyas Shah 9.5 por
CV-Shreyas Shah 9.5CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5shreyas Shah
115 vistas3 diapositivas
new cv kishor por
new cv kishornew cv kishor
new cv kishorKishor Pal
206 vistas4 diapositivas
April 2016 CV_1 por
April 2016 CV_1April 2016 CV_1
April 2016 CV_15Asdfghjkl
80 vistas7 diapositivas
C.V. William 15 por
C.V. William 15C.V. William 15
C.V. William 15Herold Rebello
232 vistas3 diapositivas
DaleHobbsResume por
DaleHobbsResumeDaleHobbsResume
DaleHobbsResumeDale Hobbs
32 vistas2 diapositivas

La actualidad más candente(19)

PACE: Process and Critical Equipment Conference in Dubai, Sept 24-25 por Ricky Smith CMRP, CMRT
PACE: Process and Critical Equipment Conference in Dubai, Sept 24-25PACE: Process and Critical Equipment Conference in Dubai, Sept 24-25
PACE: Process and Critical Equipment Conference in Dubai, Sept 24-25
CV-Shreyas Shah 9.5 por shreyas Shah
CV-Shreyas Shah 9.5CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5
shreyas Shah115 vistas
new cv kishor por Kishor Pal
new cv kishornew cv kishor
new cv kishor
Kishor Pal206 vistas
April 2016 CV_1 por 5Asdfghjkl
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
5Asdfghjkl80 vistas
DaleHobbsResume por Dale Hobbs
DaleHobbsResumeDaleHobbsResume
DaleHobbsResume
Dale Hobbs32 vistas
Resume201512111001update por Eric Daniels
Resume201512111001updateResume201512111001update
Resume201512111001update
Eric Daniels296 vistas
Mark J. Redmond - Placement Presentation por Mark Redmond
Mark J. Redmond - Placement PresentationMark J. Redmond - Placement Presentation
Mark J. Redmond - Placement Presentation
Mark Redmond365 vistas
Irfan Ali Current por Irfan Ali
Irfan Ali CurrentIrfan Ali Current
Irfan Ali Current
Irfan Ali241 vistas
Wellington Shumba CV projects por weshumba
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projects
weshumba936 vistas
Maintenance module1 ppt number 3 por Dhanesh S
Maintenance module1 ppt number 3Maintenance module1 ppt number 3
Maintenance module1 ppt number 3
Dhanesh S620 vistas

Destacado

Poverty - G1 por
Poverty - G1Poverty - G1
Poverty - G1Bernard Sng
218 vistas6 diapositivas
BB044 H3 por
BB044 H3BB044 H3
BB044 H3Bernard Sng
138 vistas5 diapositivas
Pirineos por
PirineosPirineos
Pirineoscarminadima
98 vistas4 diapositivas
Poverty Value Venture Group C3 por
Poverty Value Venture Group C3Poverty Value Venture Group C3
Poverty Value Venture Group C3Bernard Sng
294 vistas6 diapositivas
Yoga is medicine for your soul syllabus por
Yoga is medicine for your soul syllabusYoga is medicine for your soul syllabus
Yoga is medicine for your soul syllabusTina Samaniego, MSHEP
375 vistas1 diapositiva
Jonathan por
JonathanJonathan
Jonathanjonhcox
135 vistas27 diapositivas

Similar a CV D. Maimbolwa

Reliability Engineer por
Reliability EngineerReliability Engineer
Reliability EngineerFaisal Ghaffar
562 vistas7 diapositivas
Resume por
ResumeResume
Resumebhupendra deshwal
86 vistas4 diapositivas
karthik 123 por
karthik 123karthik 123
karthik 123Karthik Kmd
174 vistas3 diapositivas
Tom Mikols Resume por
Tom Mikols ResumeTom Mikols Resume
Tom Mikols ResumeTom Mikols
288 vistas3 diapositivas
kashif( 23-2-15) por
kashif( 23-2-15)kashif( 23-2-15)
kashif( 23-2-15)Kashif Anwar
789 vistas10 diapositivas
resume_saran por
resume_saranresume_saran
resume_saransaran raj
109 vistas3 diapositivas

Similar a CV D. Maimbolwa(20)

Tom Mikols Resume por Tom Mikols
Tom Mikols ResumeTom Mikols Resume
Tom Mikols Resume
Tom Mikols288 vistas
resume_saran por saran raj
resume_saranresume_saran
resume_saran
saran raj109 vistas
Mechanical Maintenance Supervisor CV por vaithiya nathan
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CV
vaithiya nathan20.7K vistas
DaleHobbsResume por Dale Hobbs
DaleHobbsResumeDaleHobbsResume
DaleHobbsResume
Dale Hobbs53 vistas
01-Ahmed El Wazzan-Resume(Autosaved) por Ahmed El Wazzan
01-Ahmed El Wazzan-Resume(Autosaved)01-Ahmed El Wazzan-Resume(Autosaved)
01-Ahmed El Wazzan-Resume(Autosaved)
Ahmed El Wazzan423 vistas
Devon McDonald's (Resume)rev.1 por Devon McDonald
Devon McDonald's (Resume)rev.1Devon McDonald's (Resume)rev.1
Devon McDonald's (Resume)rev.1
Devon McDonald208 vistas
Afaq CV (April 17, 2016) por Afaq Ahmad
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
Afaq Ahmad110 vistas
Feras Al Hindi-CV (1) por Feras Hindi
Feras Al Hindi-CV (1)Feras Al Hindi-CV (1)
Feras Al Hindi-CV (1)
Feras Hindi641 vistas
karthigairaj Process control andTechnical service resume por Karthigairaj Kandan
karthigairaj Process control andTechnical service resumekarthigairaj Process control andTechnical service resume
karthigairaj Process control andTechnical service resume
Karthigairaj Kandan407 vistas

CV D. Maimbolwa

  • 1. CURRICULUM VITAE ------------------------------------------------------------------------------------------------------------------------------------------ Maimbolwa David Muhau: Beng Mech, MEIZ, R.Eng 1.0 Summary A self driven Reliability Engineer experienced in maximizing the reliability of the production process in the most cost effective manner through the development and continuous refinement of failure management policies and timely identification of proactive corrective maintenance. • Detailed knowledge of HSE systems and displays leadership in driving incident free operations. • Strong interpersonal skills with an ability to interact with people at all levels and across a variety of cultures, both internally and externally, with positive effect. • Demonstrated ability to work unsupervised and achieve required operational outputs. • Good organizer and efficient resource allocator, skillfully handles formal procedures and informal processes with a high level of attention to detail. 2.0 Personal Details Sex: Male Marital Status: Married Date of Birth: 27th August 1973 3.0 Professional Experience 3.1 Kalumbila Minerals Ltd (2014 to 2015) Reliability Engineer – Fixed Plant (concentrator) Duties include; Preventive and Predictive Maintenance Practices • Perform equipment criticality assessment (ECA) • Create maintenance strategies for all plant equipment • Create Maintenance tasks and plans according to the strategies and ECA • Create condition monitoring points and schedule and upload into CMMS • Create plant condition monitoring data capture, analysis and reporting templates Plot 6494/31, Dag Hammerskold Avenue Riverside, Chingola. Cellphone: 00260977816381/0967801254 P.O Box 50303, Lusaka Email: cliffzam@yahoo.com
  • 2. • Writing and presenting progress reports to management on Asset Optimization • Create Standard Maintenance Plans (SMPs) for critical equipment • Monitor adherence to PM schedules in CMMS - Pronto • Track the Break Down to Preventive Maintenance ratio on regular basis to measure the effectiveness of the maintenance function • Prepared the Condition Based Maintenance (CBM) Schedule, monitored compliance and closure of the loop through Action Requests • Initiate Equipment FMEAs for critical equipments • Identification of RCA/MTTR based improvement projects and planned course of action Safety and regulatory (Statutory Compliance) • Maintenance of plant log books and testing schedules of all statutory plant assets • Color coding of tested slings, chain blocks and shackles and removal from circulation non-compliant items • Appointment of sub-ordinates and ensure compliance to mine safety log books Safety and regulatory (Regulatory Compliance) • Communication of the company’s EH&S vision, policies and standards to team • Continuous identification and elimination of hazardous opportunities • Ensure compliance to first aid training of the team and attendance of safety meetings. SOP/SMP Compliance • Create Standard Operating Procedures (SOP) and/or Standard Maintenance Procedures ( SMP) for critical equipment • Ensure the operators and artisans are aware of the SOP/SMP's for the critical equipment • Conduct random site audits to check SOP/SMP compliance and make monthly reports Continuous Improvement (CI)
  • 3. • Spearhead implementation of CI projects and prioritize projects through criticality & payback Budget & Cost Control • Preparation of the departmental annual budgets and cost control 3.2 Konkola Copper Mines, konkola Division Asset Optimisation Engineer - Engineering Services (2012 to August 2013) The position involved the following; • Uphold and Implement maintenance policies, strategies, procedures & specifications to improve maintenance planning and scheduling. • Continuous Asset Performance Improvement by continuously optimizing the maintenance process through analysis of KPI trends, score-carding and Implementing structures for Identification of short-comings in maintenance standards and practices through field observations and improved MTBF and MTTR. • Ensure control of changes to equipment, plant and support infrastructure at Engineering Services & S. Plant are documented and approved. Provide guidance for change management in to maintenance & operations team’s activities. • Spares Management by conducting initial VED analysis followed scheduled spares availability & procurement compliance reviews spares availability & procurement compliance reviews. • Develop and monitor performance indices, namely MTBF, MTTR, Failure Rate Trending Down and work quality (repeated works). • Conducting plant Site Assessment’s and Gap Analysis Verses world standards so as to map the plants’ Reliability improvement programs. • Writing and presenting progress reports to management on Asset Optimization Head Condition Monitoring & Training – Engineering Services (2011) As Head of Engineering training, the below duties apply; • Schedule of training matrix for engineers and artisans across all trades.
  • 4. • Conduct training classes including hands-on training. • Conduct random on-site planned task observations of artisans. • Determination of relevant courses through training needs assessment. • Plan and implement graduate engineer’s development programs. Condition Monitoring duties include; • Draw-up a schedule for predictive and proactive maintenance techniques on all plant equipment. This includes; thermography, vibration monitoring, oil analysis, non- destructive tests and on-line/off-line motor testing. • Monitor equipment health trends. • Using reliability engineering principles and techniques to continually review and improve maintenance methods and plans. • Conducts root cause failure analysis (RCFA) on major breakdowns. Equipment Reliability and Planning Engineer (ERG) - Concentrator Department (2008 to 2011) Below are some of the tasks and successes achieved; • Spearheaded the introduction and launch of the CMMS program SAP (PM Module) into the department; The project entailed; - Capturing of the plants’ equipment data and uploading it into the system for creation of function locations, stock codes and maintenance scheduling. - Training of plant personnel in SAP and monitoring their usage of the system. - Spares and Sub-assemblies Inventory Control. • Established from first principles, the plant’s annual Preventive Maintenance Schedule in the CMMS program Ellipse. • Developed, reviewed maintenance Policies, procedures, specifications to improve Maintenance Planning and Scheduling • Providing engineering solutions to repetitive problems through conducting reliability engineering techniques such as Root Cause Failure Analysis (RCFA). Based on the FMEA results, successfully implemented various plant reliability improvement projects and infused proactive and predictive maintenance plans into the PM schedules to improve the overall effectiveness of the PM function. Examples include; - Overcoming impact rollers high failure rate by replacing them with impact beds. - Minimizing mills downtime due to system voltage fluctuations by installing accumulators on the trunnion bearings oil lubrication system. 3.4 Technical systems (T/a Assegai engineering services), Botswana. (2001-2005)
  • 5. Project Engineer Head of the projects team responsible for the planning and execution of various civil and mechanical works tendered for mainly from the Government and various Councils. Major achievement being successful commissioning of a 36km class 9 Upvc water pipeline projects that included the erection of 3 x 75m3 GS tanks on 10m stands for shakawe Water Works. The project was a joint venture with Paragon Services. Other works done, including under sub-contracts encompass construction of schools, houses and dewatering of sewer ponds and unblocking of sewer lines. 3.5 Mopani Copper Mines, Kitwe (1999 - 2000) Senior Assistant engineer – Cobalt Plant Below were the day to day duties; • Hands-on maintenance and repair of plant equipment • Cost and Spares Inventory control and management • Execution of Concentrator’s improvement projects. 4.0 Qualifications: [1993-1998] University of Zambia: Beng in Mechanical Engineering Thesis: Formulation of Maintenance Management System for a Fleet of company Vehicles 5.0 Key Sills: Computer literacy in CMMS programs SAP PM Module, Ellipse and MIMS as well as the Microsoft office programs Excel, Word, MS Projects, Publisher and Power point 6.0 Professional Membership: Holder of a practicing license from the Engineering Registration Board and a member of the Engineering Institute of Zambia 7.0 Extra-curricular Activities: Board member of CITHAM+, a community based HIV/AIDS organization. 8.0 Languages: English, Lozi, Bemba, Nyanja, and Tshwana (Botswana) 9.0 References Mr. Stephen Mulenga Mr.M Khosa Mr. John Kamwendo Maintenance Manager M. Director Chief Engineer - Mechanical BCL Copper Mines Assegai Engineering Mopani Copper Mines Selebi Phikwe, Botswana Gaberone, Botswana Mufulira, Zambia Cell: +260966315582/+26776446201 Cell: 00267 71607982 Cell: 260955860049/974860049