Compressing the Critical
Path with Lean Six Sigma
      2011 PM Challenge
Compressing the Critical Path with Lean Six Sigma

INTRODUCTION


               Compressing the Critical Path with Lean Six Sigma   Slide 2
Presenters

Joe Wiley                                         Ron Kiker
 MSFOC Lead Facilitator                           MSFOC Lead Facilitator

 Lean Six Sigma Black                             Lean Six Sigma Black
  Belt (DOD)                                        Belt (NASA)
 Established Enterprise Air                       Lean Six Sigma Master
  Speed Program, Belle                              Certificate (Villanova)
  Chasse NAS                                       Applied Project
 Master Instructor (USN)                           Management Master
 20+ years instructional                           Certificate (Villanova)
  experience                                       Certified Professional in
                                                    Learning and
                                                    Performance (ASTD)
               Compressing the Critical Path with Lean Six Sigma   Slide 3
Previous PM Challenge Lean Six Sigma topics
   “Lean Six Sigma: What Every Program Manager Should
    Know” – 2010
   “Lean+ Tying it All Together” – 2008
   “Project Management – Putting Lean Into Action” – 2006
   “Applying Lean Principles to the Risk management
    Process” - 2006




                 Compressing the Critical Path with Lean Six Sigma   Slide 4
Question…
   What is the normal process used when developing a
    project plan/WBS?
    – Use a previous project as a template and then modify for the
      current project.
    – Brainstorm and include every activity imaginable so that you
      don‟t get caught with a short timeline/schedule.

   The problem with these approaches is that they build
    waste into the project




                  Compressing the Critical Path with Lean Six Sigma   Slide 5
What are the typical ways of compressing the
critical path?

   Fast Tracking –
    performing activities in
    parallel
   Crashing – adding
    resources
   “Across the Board”
    Compression –
    compress everything




                Compressing the Critical Path with Lean Six Sigma   Slide 6
Compressing the Critical Path with Lean Six Sigma

LEAN SIX SIGMA ORIGINS &
FOCUS

               Compressing the Critical Path with Lean Six Sigma   Slide 7
Origins of Lean Six Sigma
          Lean                                                 Six Sigma
                                                               Variation Reduction
                                                                     (1900s)

      Toyota Production                                      Quality Improvement
        System („50s)                                        Tools („30s and ‟40s)

        Just-In-Time                                             Total Quality
     Manufacturing („70s)                                      Management („50s)

       Lean Production
            („80s)                                           Six Sigma (mid-‟80s)




             –Lean Six Sigma (mid ‟90s)

               Compressing the Critical Path with Lean Six Sigma         Slide 8
Lean’s Focus
   Identification of value-adding (VA) and non-value-adding
    (NVA) activities
   Removal of NVA (waste) activities from the process
   Analyzing process flow and delays
   Maximizing process velocity
   Use of process analysis and idea creation tools
   Utilizes kaizen events (Rapid Improvement Events)

      Day 1               Day 2                       Day 3                         Day 4                    Day 5

• Lean training     • Measure and             • Create and map                • Evaluate               • Present results
• Begin mapping       analyze current           new process                     improvements           • Celebrate!!
  current process     process                                                 • “Test drive” new
• VA/NVA            • Brainstorm new                                            process
  analysis            process                                                 • Modify as
                                                                                needed




                          Compressing the Critical Path with Lean Six Sigma                  Slide 9
Six Sigma’s Focus
   Elimination of defects as defined by the customer
   Reducing variation
   Use of data collection and analysis, cause analysis, and
    basic quality tools
   Utilizes the DMAIC process




    Define      Measure                   Analyze                    Implement         Control




                 Compressing the Critical Path with Lean Six Sigma          Slide 10
Compressing the Critical Path with Lean Six Sigma

SPECIFIC TOOLS


               Compressing the Critical Path with Lean Six Sigma   Slide 11
LSS tools for compressing the critical path
   Current State Process Mapping
   Value-Added Analysis
   Future State Process Mapping




                Compressing the Critical Path with Lean Six Sigma   Slide 12
Current State Process Mapping
   Assemble team & determine scope of mapping event
    – Ensure team has authority to make critical path decisions
    – Scope my include entire critical path or a portion of the
      critical path
    – You could break the entire critical path up into logical
      portions and conduct improvement event on each section

                          B                      C

           A              D                     E                     F          I

                                                 G                    H


                  Compressing the Critical Path with Lean Six Sigma       Slide 13
Create a Functional Process Map
   Shows not only the linear sequence of activities, but also
    the responsible functions for each activity

                    A           D                     E                     F          I


    Dept D


    Dept C

    Dept B


    Dept M

    Dept S

             TIME


                        Compressing the Critical Path with Lean Six Sigma       Slide 14
Value-Added Analysis

              Non-Value-Added – activities that
                   consume resources but creates no
                   value in the eyes of the customer.

              Non-Value-Added Required – activities
                   that add no value but which cannot be
                   eliminated due to regulations, customer
                   requirement, current technology, etc.

              Value-Added – activities which change
                   the form, fit, function, or usability and
                   which the customer is willing to pay for
                   and which is done right the first time.


          Compressing the Critical Path with Lean Six Sigma   Slide 15
The Forms of Waste
Waste – anything that adds cost or time without adding
value.


1. Excessive Inventory                            5. Over-Production
2. Excessive                                      6. Waiting
   Transportation                                 7. Producing Defects
3. Excessive Motion                               8. Injuries
4. Over-Processing




               Compressing the Critical Path with Lean Six Sigma   Slide 16
Excessive Inventory
Any unnecessary supplies or materials.


 Excess supplies and                              Files awaiting signatures
  materials                                         or approvals
 Backlogs of work                                 Files awaiting task
 Obsolete databases, files,                        completion
  and folders                                      Obsolete office
                                                    equipment




               Compressing the Critical Path with Lean Six Sigma   Slide 17
Excessive Transportation
Any unnecessary movement of materials or information.


 Delivering documents                             E-mailing documents that
  that are not required                             are not used
 Document storage                                 Routing for unnecessary
 Excessive filing                                  approvals or processing




               Compressing the Critical Path with Lean Six Sigma   Slide 18
Excessive Motion
Any movement of people that does not add value to the
service.


 Searching for computer                            Travel to unnecessary
  files                                              meetings
 Searching for work                                Hand-carrying paperwork
  documents                                         Return trips back to the
 Trips to printer or copier                         office for supplies or
                                                     materials




                Compressing the Critical Path with Lean Six Sigma   Slide 19
Over-Processing
Putting more work or effort into the process than is required by
the customer.


 Duplicating reports or                             Constantly revising
  information                                         documents
 Duplicate data entry                               Reformatting
 Unnecessary reviews or                             Unnecessary process
  approvals                                           steps




                 Compressing the Critical Path with Lean Six Sigma   Slide 20
Over-Production
Producing work or providing a service prior to it being required or
requested. Producing more than is needed.


 Producing reports no one                           Entering same
  reads or needs                                      information multiple times
 Making extra copies                                Working ahead
 Excessive e-mails                                  Producing at a faster
                                                      pace than needed




                 Compressing the Critical Path with Lean Six Sigma   Slide 21
Waiting
Idle time in the process in which no value is being added to the
process. Both people and products/services can wait.


 Waiting on approvals                               Electronic queues
 Waiting for information or                         Waiting in meeting
  decisions                                          Conflicting commitments
 Waiting for others to                              Over-flowing in-boxes
  complete tasks




                 Compressing the Critical Path with Lean Six Sigma   Slide 22
Producing Defects
All processing required to correct a defect.


 Data entry errors                                Forwarding partial
 Missing information                               documentation
 Errors in documents                              Any work that does not
 Any type of rework
                                                    meet customer
                                                    requirements




               Compressing the Critical Path with Lean Six Sigma   Slide 23
Injuries
Work-related personnel injuries.


 Injured personnel                                 Improper ergonomics
 Near misses                                       Slips, trips, and falls
 Lost work days                                    Worker‟s Comp claims




                Compressing the Critical Path with Lean Six Sigma   Slide 24
Value-Added Analysis
   Identify every activity on the current process map as
    either VA, NVA Required, or NVA



    Dept D


    Dept C

    Dept B


    Dept M

    Dept S

             TIME




                    Compressing the Critical Path with Lean Six Sigma   Slide 25
Future State Process Map
   Remove the waste and the critical path is automatically
    compressed
   Also a good time to consider what activities can be
    performed in parallel for fast tracking

    Dept D


    Dept C

    Dept B


    Dept M

    Dept S

             TIME




                    Compressing the Critical Path with Lean Six Sigma   Slide 26
Compressing the Critical Path with Lean Six Sigma

SUMMARY


               Compressing the Critical Path with Lean Six Sigma   Slide 27

More Related Content

What's hot

Scrum: Agile Project Management
Scrum: Agile Project ManagementScrum: Agile Project Management
Scrum: Agile Project ManagementZefren Edior
 
LKIN2018: leveraging Lean and Kanban to implement continuous improvement
LKIN2018: leveraging Lean and Kanban to implement continuous improvementLKIN2018: leveraging Lean and Kanban to implement continuous improvement
LKIN2018: leveraging Lean and Kanban to implement continuous improvementRavi Tadwalkar
 
Crack That Wip 2
Crack That Wip 2Crack That Wip 2
Crack That Wip 2Linda Cook
 
Lean & Agile Thinking Principles for Leaders
Lean & Agile Thinking Principles for LeadersLean & Agile Thinking Principles for Leaders
Lean & Agile Thinking Principles for LeadersDavid Rico
 
Lean Principles for Agile Teams
Lean Principles for Agile TeamsLean Principles for Agile Teams
Lean Principles for Agile TeamsElizabeth Woodward
 
Lean & Agile Enterprise Frameworks: For Managing Large U.S. Government Cloud ...
Lean & Agile Enterprise Frameworks: For Managing Large U.S. Government Cloud ...Lean & Agile Enterprise Frameworks: For Managing Large U.S. Government Cloud ...
Lean & Agile Enterprise Frameworks: For Managing Large U.S. Government Cloud ...David Rico
 
Agile transformation strategy
Agile transformation strategyAgile transformation strategy
Agile transformation strategyajit.alwe
 
LKIN2019: Lean transformation journey of infra briefing for business agility...
LKIN2019: Lean transformation journey of infra  briefing for business agility...LKIN2019: Lean transformation journey of infra  briefing for business agility...
LKIN2019: Lean transformation journey of infra briefing for business agility...Ravi Tadwalkar
 
Agile development: Problems and Process
Agile development: Problems and ProcessAgile development: Problems and Process
Agile development: Problems and ProcessDkadilak62263
 
Training - Introducing Agile, Lean and Kanban
Training - Introducing Agile, Lean and KanbanTraining - Introducing Agile, Lean and Kanban
Training - Introducing Agile, Lean and KanbanSudipta Lahiri
 
Exec Leadership workshop
Exec Leadership workshopExec Leadership workshop
Exec Leadership workshopRavi Tadwalkar
 
Return on Investment (ROI) of Lean & Agile Methods
Return on Investment (ROI) of Lean & Agile MethodsReturn on Investment (ROI) of Lean & Agile Methods
Return on Investment (ROI) of Lean & Agile MethodsDavid Rico
 
Identifying and Managing Waste in Complex Product Development Environments
Identifying and Managing Waste in Complex Product Development EnvironmentsIdentifying and Managing Waste in Complex Product Development Environments
Identifying and Managing Waste in Complex Product Development EnvironmentsKen Power
 
Scaling Agile: A Guide for the Perplexed
Scaling Agile: A Guide for the PerplexedScaling Agile: A Guide for the Perplexed
Scaling Agile: A Guide for the PerplexedLitheSpeed
 
Scaling Agile - Multiple Team Dynamics
Scaling Agile - Multiple Team DynamicsScaling Agile - Multiple Team Dynamics
Scaling Agile - Multiple Team DynamicsVersionOne
 
Kanban For Software Engineering Apr 242
Kanban For Software Engineering Apr 242Kanban For Software Engineering Apr 242
Kanban For Software Engineering Apr 242Ross Lawley
 
Visual management white board standard structures from waterfall to agile v3
Visual management   white board  standard structures from waterfall to agile v3Visual management   white board  standard structures from waterfall to agile v3
Visual management white board standard structures from waterfall to agile v3Jean-François Nguyen
 

What's hot (20)

Scrum: Agile Project Management
Scrum: Agile Project ManagementScrum: Agile Project Management
Scrum: Agile Project Management
 
LKIN2018: leveraging Lean and Kanban to implement continuous improvement
LKIN2018: leveraging Lean and Kanban to implement continuous improvementLKIN2018: leveraging Lean and Kanban to implement continuous improvement
LKIN2018: leveraging Lean and Kanban to implement continuous improvement
 
Crack That Wip 2
Crack That Wip 2Crack That Wip 2
Crack That Wip 2
 
Lean & Agile Thinking Principles for Leaders
Lean & Agile Thinking Principles for LeadersLean & Agile Thinking Principles for Leaders
Lean & Agile Thinking Principles for Leaders
 
Lean Principles for Agile Teams
Lean Principles for Agile TeamsLean Principles for Agile Teams
Lean Principles for Agile Teams
 
Lean & Agile Enterprise Frameworks: For Managing Large U.S. Government Cloud ...
Lean & Agile Enterprise Frameworks: For Managing Large U.S. Government Cloud ...Lean & Agile Enterprise Frameworks: For Managing Large U.S. Government Cloud ...
Lean & Agile Enterprise Frameworks: For Managing Large U.S. Government Cloud ...
 
Agile transformation strategy
Agile transformation strategyAgile transformation strategy
Agile transformation strategy
 
Feb Apln OC Shawna C
Feb Apln OC  Shawna CFeb Apln OC  Shawna C
Feb Apln OC Shawna C
 
Agile Transformation Journey on Large Scale Projects
Agile Transformation Journey on Large Scale ProjectsAgile Transformation Journey on Large Scale Projects
Agile Transformation Journey on Large Scale Projects
 
B282
B282B282
B282
 
LKIN2019: Lean transformation journey of infra briefing for business agility...
LKIN2019: Lean transformation journey of infra  briefing for business agility...LKIN2019: Lean transformation journey of infra  briefing for business agility...
LKIN2019: Lean transformation journey of infra briefing for business agility...
 
Agile development: Problems and Process
Agile development: Problems and ProcessAgile development: Problems and Process
Agile development: Problems and Process
 
Training - Introducing Agile, Lean and Kanban
Training - Introducing Agile, Lean and KanbanTraining - Introducing Agile, Lean and Kanban
Training - Introducing Agile, Lean and Kanban
 
Exec Leadership workshop
Exec Leadership workshopExec Leadership workshop
Exec Leadership workshop
 
Return on Investment (ROI) of Lean & Agile Methods
Return on Investment (ROI) of Lean & Agile MethodsReturn on Investment (ROI) of Lean & Agile Methods
Return on Investment (ROI) of Lean & Agile Methods
 
Identifying and Managing Waste in Complex Product Development Environments
Identifying and Managing Waste in Complex Product Development EnvironmentsIdentifying and Managing Waste in Complex Product Development Environments
Identifying and Managing Waste in Complex Product Development Environments
 
Scaling Agile: A Guide for the Perplexed
Scaling Agile: A Guide for the PerplexedScaling Agile: A Guide for the Perplexed
Scaling Agile: A Guide for the Perplexed
 
Scaling Agile - Multiple Team Dynamics
Scaling Agile - Multiple Team DynamicsScaling Agile - Multiple Team Dynamics
Scaling Agile - Multiple Team Dynamics
 
Kanban For Software Engineering Apr 242
Kanban For Software Engineering Apr 242Kanban For Software Engineering Apr 242
Kanban For Software Engineering Apr 242
 
Visual management white board standard structures from waterfall to agile v3
Visual management   white board  standard structures from waterfall to agile v3Visual management   white board  standard structures from waterfall to agile v3
Visual management white board standard structures from waterfall to agile v3
 

Viewers also liked

Six sigma-and-supply-chain
Six sigma-and-supply-chainSix sigma-and-supply-chain
Six sigma-and-supply-chainStephen Depoe
 
Lean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingLean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingAnkit Sharma
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentationvivekissar
 
Free Lean Six Sigma Training (Yellow Belt Preview) by GoLeanSixSigma.com
Free Lean Six Sigma Training (Yellow Belt Preview) by GoLeanSixSigma.comFree Lean Six Sigma Training (Yellow Belt Preview) by GoLeanSixSigma.com
Free Lean Six Sigma Training (Yellow Belt Preview) by GoLeanSixSigma.comGoLeanSixSigma.com
 
Creating Unforgettable Ppt Presentations By Ning De Guzman
Creating Unforgettable Ppt Presentations By Ning De GuzmanCreating Unforgettable Ppt Presentations By Ning De Guzman
Creating Unforgettable Ppt Presentations By Ning De GuzmanNing de Guzman
 
IC Management - Measuring the Immeasurable
IC Management - Measuring the ImmeasurableIC Management - Measuring the Immeasurable
IC Management - Measuring the ImmeasurableJoris Claeys
 
Change Management for Lean Six Sigma based Transformation
Change Management for Lean Six Sigma based TransformationChange Management for Lean Six Sigma based Transformation
Change Management for Lean Six Sigma based TransformationAjay Koul
 
Build a Lean Six Sigma Process for Inventory Management in Hospitals
Build a Lean Six Sigma Process for Inventory Management in HospitalsBuild a Lean Six Sigma Process for Inventory Management in Hospitals
Build a Lean Six Sigma Process for Inventory Management in HospitalsJump Technologies, Inc.
 
Scor Model Convergence With Lean & Six Sigma
Scor Model Convergence With Lean & Six SigmaScor Model Convergence With Lean & Six Sigma
Scor Model Convergence With Lean & Six SigmaOssama Ismail
 
Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectSumit K Jha
 
Lean Six Sigma 101
Lean Six Sigma 101Lean Six Sigma 101
Lean Six Sigma 101shailsood
 
How to Improve Your Bottom-Line Through Lean Six Sigma
How to Improve Your Bottom-Line Through Lean Six SigmaHow to Improve Your Bottom-Line Through Lean Six Sigma
How to Improve Your Bottom-Line Through Lean Six SigmaDrake International
 
TLS: TOC Lean Six Sigma - TOCICO 2013 Annual conference Frankfurt
TLS: TOC Lean Six Sigma - TOCICO 2013 Annual conference FrankfurtTLS: TOC Lean Six Sigma - TOCICO 2013 Annual conference Frankfurt
TLS: TOC Lean Six Sigma - TOCICO 2013 Annual conference FrankfurtMARRIS Consulting
 

Viewers also liked (19)

Six sigma-and-supply-chain
Six sigma-and-supply-chainSix sigma-and-supply-chain
Six sigma-and-supply-chain
 
Lean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingLean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete training
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
 
Free Lean Six Sigma Training (Yellow Belt Preview) by GoLeanSixSigma.com
Free Lean Six Sigma Training (Yellow Belt Preview) by GoLeanSixSigma.comFree Lean Six Sigma Training (Yellow Belt Preview) by GoLeanSixSigma.com
Free Lean Six Sigma Training (Yellow Belt Preview) by GoLeanSixSigma.com
 
DMAIC Improvement Approach
DMAIC Improvement Approach DMAIC Improvement Approach
DMAIC Improvement Approach
 
Lean Six Sigma
Lean Six SigmaLean Six Sigma
Lean Six Sigma
 
Creating Unforgettable Ppt Presentations By Ning De Guzman
Creating Unforgettable Ppt Presentations By Ning De GuzmanCreating Unforgettable Ppt Presentations By Ning De Guzman
Creating Unforgettable Ppt Presentations By Ning De Guzman
 
Lean vs six sigma -jk
Lean vs six sigma  -jkLean vs six sigma  -jk
Lean vs six sigma -jk
 
IC Management - Measuring the Immeasurable
IC Management - Measuring the ImmeasurableIC Management - Measuring the Immeasurable
IC Management - Measuring the Immeasurable
 
SCM PROJECT
SCM PROJECTSCM PROJECT
SCM PROJECT
 
Change Management for Lean Six Sigma based Transformation
Change Management for Lean Six Sigma based TransformationChange Management for Lean Six Sigma based Transformation
Change Management for Lean Six Sigma based Transformation
 
What Is 6 Sigma
What Is 6 SigmaWhat Is 6 Sigma
What Is 6 Sigma
 
Build a Lean Six Sigma Process for Inventory Management in Hospitals
Build a Lean Six Sigma Process for Inventory Management in HospitalsBuild a Lean Six Sigma Process for Inventory Management in Hospitals
Build a Lean Six Sigma Process for Inventory Management in Hospitals
 
The Face of Supply Chain in 2025
The Face of Supply Chain in 2025The Face of Supply Chain in 2025
The Face of Supply Chain in 2025
 
Scor Model Convergence With Lean & Six Sigma
Scor Model Convergence With Lean & Six SigmaScor Model Convergence With Lean & Six Sigma
Scor Model Convergence With Lean & Six Sigma
 
Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt project
 
Lean Six Sigma 101
Lean Six Sigma 101Lean Six Sigma 101
Lean Six Sigma 101
 
How to Improve Your Bottom-Line Through Lean Six Sigma
How to Improve Your Bottom-Line Through Lean Six SigmaHow to Improve Your Bottom-Line Through Lean Six Sigma
How to Improve Your Bottom-Line Through Lean Six Sigma
 
TLS: TOC Lean Six Sigma - TOCICO 2013 Annual conference Frankfurt
TLS: TOC Lean Six Sigma - TOCICO 2013 Annual conference FrankfurtTLS: TOC Lean Six Sigma - TOCICO 2013 Annual conference Frankfurt
TLS: TOC Lean Six Sigma - TOCICO 2013 Annual conference Frankfurt
 

Similar to Kiker.ronald

Modul 2.1: Six Sigma as a process and project
Modul 2.1: Six Sigma as a process and projectModul 2.1: Six Sigma as a process and project
Modul 2.1: Six Sigma as a process and projectLean Knowledge Base UG
 
Adrian.mark
Adrian.markAdrian.mark
Adrian.markNASAPMC
 
Adrian.mark
Adrian.markAdrian.mark
Adrian.markNASAPMC
 
Six sigma vs lean
Six sigma vs leanSix sigma vs lean
Six sigma vs leankiran
 
The Lean Six Sigma Curriculum Rev 2
The Lean Six Sigma Curriculum Rev 2The Lean Six Sigma Curriculum Rev 2
The Lean Six Sigma Curriculum Rev 2ciaranmay
 
Importance of CI & Lean methodologies in Logistics - Kesavakrishnan (Agilent ...
Importance of CI & Lean methodologies in Logistics - Kesavakrishnan (Agilent ...Importance of CI & Lean methodologies in Logistics - Kesavakrishnan (Agilent ...
Importance of CI & Lean methodologies in Logistics - Kesavakrishnan (Agilent ...ELSCC
 
Lean 6 sigma simplified
Lean 6 sigma simplified Lean 6 sigma simplified
Lean 6 sigma simplified Blenson Paul
 
Limited WIP Society Bangalore Chapter - Jun 6 2014 Meetup
Limited WIP Society Bangalore Chapter - Jun 6 2014 MeetupLimited WIP Society Bangalore Chapter - Jun 6 2014 Meetup
Limited WIP Society Bangalore Chapter - Jun 6 2014 MeetupSudipta Lahiri
 
Using an Agile Framework in a BI Team
Using an Agile Framework in a BI TeamUsing an Agile Framework in a BI Team
Using an Agile Framework in a BI TeamCatherine Carleton
 
Integrating Six Sigma and Lean Manufacturing the Challenges & Benefits
Integrating Six Sigma and Lean Manufacturing the Challenges & BenefitsIntegrating Six Sigma and Lean Manufacturing the Challenges & Benefits
Integrating Six Sigma and Lean Manufacturing the Challenges & BenefitsAdvent Design Corporation
 
Integrating Six Sigma and Lean Manufacturing the Challenges & Benefits
Integrating Six Sigma and Lean Manufacturing the Challenges & BenefitsIntegrating Six Sigma and Lean Manufacturing the Challenges & Benefits
Integrating Six Sigma and Lean Manufacturing the Challenges & BenefitsAdvent Design Corporation
 
Six Sigma Workshop for World Bank, Chennai - India
Six Sigma Workshop for World Bank, Chennai -  IndiaSix Sigma Workshop for World Bank, Chennai -  India
Six Sigma Workshop for World Bank, Chennai - IndiaMurali Nandigama, Ph.D.
 
Six sigma for managers
Six sigma for managersSix sigma for managers
Six sigma for managersZaini Ithnin
 

Similar to Kiker.ronald (20)

Modul 2.1: Six Sigma as a process and project
Modul 2.1: Six Sigma as a process and projectModul 2.1: Six Sigma as a process and project
Modul 2.1: Six Sigma as a process and project
 
Adrian.mark
Adrian.markAdrian.mark
Adrian.mark
 
Adrian.mark
Adrian.markAdrian.mark
Adrian.mark
 
Six sigma vs lean
Six sigma vs leanSix sigma vs lean
Six sigma vs lean
 
The Lean Six Sigma Curriculum Rev 2
The Lean Six Sigma Curriculum Rev 2The Lean Six Sigma Curriculum Rev 2
The Lean Six Sigma Curriculum Rev 2
 
Importance of CI & Lean methodologies in Logistics - Kesavakrishnan (Agilent ...
Importance of CI & Lean methodologies in Logistics - Kesavakrishnan (Agilent ...Importance of CI & Lean methodologies in Logistics - Kesavakrishnan (Agilent ...
Importance of CI & Lean methodologies in Logistics - Kesavakrishnan (Agilent ...
 
Road to cpi #2
Road to cpi #2Road to cpi #2
Road to cpi #2
 
Lean six sigma
Lean six sigmaLean six sigma
Lean six sigma
 
Total Quality Management
Total Quality Management Total Quality Management
Total Quality Management
 
Lean 6 sigma simplified
Lean 6 sigma simplified Lean 6 sigma simplified
Lean 6 sigma simplified
 
Limited WIP Society Bangalore Chapter - Jun 6 2014 Meetup
Limited WIP Society Bangalore Chapter - Jun 6 2014 MeetupLimited WIP Society Bangalore Chapter - Jun 6 2014 Meetup
Limited WIP Society Bangalore Chapter - Jun 6 2014 Meetup
 
Using an Agile Framework in a BI Team
Using an Agile Framework in a BI TeamUsing an Agile Framework in a BI Team
Using an Agile Framework in a BI Team
 
B282 Web
B282 WebB282 Web
B282 Web
 
T345 P Iweb
T345 P IwebT345 P Iweb
T345 P Iweb
 
T345
T345T345
T345
 
Integrating Six Sigma and Lean Manufacturing the Challenges & Benefits
Integrating Six Sigma and Lean Manufacturing the Challenges & BenefitsIntegrating Six Sigma and Lean Manufacturing the Challenges & Benefits
Integrating Six Sigma and Lean Manufacturing the Challenges & Benefits
 
Integrating Six Sigma and Lean Manufacturing the Challenges & Benefits
Integrating Six Sigma and Lean Manufacturing the Challenges & BenefitsIntegrating Six Sigma and Lean Manufacturing the Challenges & Benefits
Integrating Six Sigma and Lean Manufacturing the Challenges & Benefits
 
Six Sigma Workshop for World Bank, Chennai - India
Six Sigma Workshop for World Bank, Chennai -  IndiaSix Sigma Workshop for World Bank, Chennai -  India
Six Sigma Workshop for World Bank, Chennai - India
 
Six sigma for managers
Six sigma for managersSix sigma for managers
Six sigma for managers
 
B282
B282B282
B282
 

More from NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski johnNASAPMC
 
Yew manson
Yew mansonYew manson
Yew mansonNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joeNASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuartNASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahmNASAPMC
 
Snow lee
Snow leeSnow lee
Snow leeNASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krageNASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marcoNASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mikeNASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karleneNASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Paradis william
Paradis williamParadis william
Paradis williamNASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeffNASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe williamNASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralfNASAPMC
 

More from NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 

Recently uploaded

Entrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextEntrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextP&CO
 
How to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHow to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHelp Desk Migration
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...PRnews2
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverseSiemens
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
Customizable Contents Restoration Training
Customizable Contents Restoration TrainingCustomizable Contents Restoration Training
Customizable Contents Restoration TrainingCalvinarnold843
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024Chandresh Chudasama
 
71368-80-4.pdf Fast delivery good quality
71368-80-4.pdf Fast delivery  good quality71368-80-4.pdf Fast delivery  good quality
71368-80-4.pdf Fast delivery good qualitycathy664059
 
Types of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfTypes of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfASGITConsulting
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 

Recently uploaded (20)

Entrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextEntrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider context
 
How to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHow to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your Business
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverse
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
Toyota and Seven Parts Storage Techniques
Toyota and Seven Parts Storage TechniquesToyota and Seven Parts Storage Techniques
Toyota and Seven Parts Storage Techniques
 
Customizable Contents Restoration Training
Customizable Contents Restoration TrainingCustomizable Contents Restoration Training
Customizable Contents Restoration Training
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024
 
71368-80-4.pdf Fast delivery good quality
71368-80-4.pdf Fast delivery  good quality71368-80-4.pdf Fast delivery  good quality
71368-80-4.pdf Fast delivery good quality
 
Types of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfTypes of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdf
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 

Kiker.ronald

  • 1. Compressing the Critical Path with Lean Six Sigma 2011 PM Challenge
  • 2. Compressing the Critical Path with Lean Six Sigma INTRODUCTION Compressing the Critical Path with Lean Six Sigma Slide 2
  • 3. Presenters Joe Wiley Ron Kiker  MSFOC Lead Facilitator  MSFOC Lead Facilitator  Lean Six Sigma Black  Lean Six Sigma Black Belt (DOD) Belt (NASA)  Established Enterprise Air  Lean Six Sigma Master Speed Program, Belle Certificate (Villanova) Chasse NAS  Applied Project  Master Instructor (USN) Management Master  20+ years instructional Certificate (Villanova) experience  Certified Professional in Learning and Performance (ASTD) Compressing the Critical Path with Lean Six Sigma Slide 3
  • 4. Previous PM Challenge Lean Six Sigma topics  “Lean Six Sigma: What Every Program Manager Should Know” – 2010  “Lean+ Tying it All Together” – 2008  “Project Management – Putting Lean Into Action” – 2006  “Applying Lean Principles to the Risk management Process” - 2006 Compressing the Critical Path with Lean Six Sigma Slide 4
  • 5. Question…  What is the normal process used when developing a project plan/WBS? – Use a previous project as a template and then modify for the current project. – Brainstorm and include every activity imaginable so that you don‟t get caught with a short timeline/schedule.  The problem with these approaches is that they build waste into the project Compressing the Critical Path with Lean Six Sigma Slide 5
  • 6. What are the typical ways of compressing the critical path?  Fast Tracking – performing activities in parallel  Crashing – adding resources  “Across the Board” Compression – compress everything Compressing the Critical Path with Lean Six Sigma Slide 6
  • 7. Compressing the Critical Path with Lean Six Sigma LEAN SIX SIGMA ORIGINS & FOCUS Compressing the Critical Path with Lean Six Sigma Slide 7
  • 8. Origins of Lean Six Sigma Lean Six Sigma Variation Reduction (1900s) Toyota Production Quality Improvement System („50s) Tools („30s and ‟40s) Just-In-Time Total Quality Manufacturing („70s) Management („50s) Lean Production („80s) Six Sigma (mid-‟80s) –Lean Six Sigma (mid ‟90s) Compressing the Critical Path with Lean Six Sigma Slide 8
  • 9. Lean’s Focus  Identification of value-adding (VA) and non-value-adding (NVA) activities  Removal of NVA (waste) activities from the process  Analyzing process flow and delays  Maximizing process velocity  Use of process analysis and idea creation tools  Utilizes kaizen events (Rapid Improvement Events) Day 1 Day 2 Day 3 Day 4 Day 5 • Lean training • Measure and • Create and map • Evaluate • Present results • Begin mapping analyze current new process improvements • Celebrate!! current process process • “Test drive” new • VA/NVA • Brainstorm new process analysis process • Modify as needed Compressing the Critical Path with Lean Six Sigma Slide 9
  • 10. Six Sigma’s Focus  Elimination of defects as defined by the customer  Reducing variation  Use of data collection and analysis, cause analysis, and basic quality tools  Utilizes the DMAIC process Define Measure Analyze Implement Control Compressing the Critical Path with Lean Six Sigma Slide 10
  • 11. Compressing the Critical Path with Lean Six Sigma SPECIFIC TOOLS Compressing the Critical Path with Lean Six Sigma Slide 11
  • 12. LSS tools for compressing the critical path  Current State Process Mapping  Value-Added Analysis  Future State Process Mapping Compressing the Critical Path with Lean Six Sigma Slide 12
  • 13. Current State Process Mapping  Assemble team & determine scope of mapping event – Ensure team has authority to make critical path decisions – Scope my include entire critical path or a portion of the critical path – You could break the entire critical path up into logical portions and conduct improvement event on each section B C A D E F I G H Compressing the Critical Path with Lean Six Sigma Slide 13
  • 14. Create a Functional Process Map  Shows not only the linear sequence of activities, but also the responsible functions for each activity A D E F I Dept D Dept C Dept B Dept M Dept S TIME Compressing the Critical Path with Lean Six Sigma Slide 14
  • 15. Value-Added Analysis  Non-Value-Added – activities that consume resources but creates no value in the eyes of the customer.  Non-Value-Added Required – activities that add no value but which cannot be eliminated due to regulations, customer requirement, current technology, etc.  Value-Added – activities which change the form, fit, function, or usability and which the customer is willing to pay for and which is done right the first time. Compressing the Critical Path with Lean Six Sigma Slide 15
  • 16. The Forms of Waste Waste – anything that adds cost or time without adding value. 1. Excessive Inventory 5. Over-Production 2. Excessive 6. Waiting Transportation 7. Producing Defects 3. Excessive Motion 8. Injuries 4. Over-Processing Compressing the Critical Path with Lean Six Sigma Slide 16
  • 17. Excessive Inventory Any unnecessary supplies or materials.  Excess supplies and  Files awaiting signatures materials or approvals  Backlogs of work  Files awaiting task  Obsolete databases, files, completion and folders  Obsolete office equipment Compressing the Critical Path with Lean Six Sigma Slide 17
  • 18. Excessive Transportation Any unnecessary movement of materials or information.  Delivering documents  E-mailing documents that that are not required are not used  Document storage  Routing for unnecessary  Excessive filing approvals or processing Compressing the Critical Path with Lean Six Sigma Slide 18
  • 19. Excessive Motion Any movement of people that does not add value to the service.  Searching for computer  Travel to unnecessary files meetings  Searching for work  Hand-carrying paperwork documents  Return trips back to the  Trips to printer or copier office for supplies or materials Compressing the Critical Path with Lean Six Sigma Slide 19
  • 20. Over-Processing Putting more work or effort into the process than is required by the customer.  Duplicating reports or  Constantly revising information documents  Duplicate data entry  Reformatting  Unnecessary reviews or  Unnecessary process approvals steps Compressing the Critical Path with Lean Six Sigma Slide 20
  • 21. Over-Production Producing work or providing a service prior to it being required or requested. Producing more than is needed.  Producing reports no one  Entering same reads or needs information multiple times  Making extra copies  Working ahead  Excessive e-mails  Producing at a faster pace than needed Compressing the Critical Path with Lean Six Sigma Slide 21
  • 22. Waiting Idle time in the process in which no value is being added to the process. Both people and products/services can wait.  Waiting on approvals  Electronic queues  Waiting for information or  Waiting in meeting decisions  Conflicting commitments  Waiting for others to  Over-flowing in-boxes complete tasks Compressing the Critical Path with Lean Six Sigma Slide 22
  • 23. Producing Defects All processing required to correct a defect.  Data entry errors  Forwarding partial  Missing information documentation  Errors in documents  Any work that does not  Any type of rework meet customer requirements Compressing the Critical Path with Lean Six Sigma Slide 23
  • 24. Injuries Work-related personnel injuries.  Injured personnel  Improper ergonomics  Near misses  Slips, trips, and falls  Lost work days  Worker‟s Comp claims Compressing the Critical Path with Lean Six Sigma Slide 24
  • 25. Value-Added Analysis  Identify every activity on the current process map as either VA, NVA Required, or NVA Dept D Dept C Dept B Dept M Dept S TIME Compressing the Critical Path with Lean Six Sigma Slide 25
  • 26. Future State Process Map  Remove the waste and the critical path is automatically compressed  Also a good time to consider what activities can be performed in parallel for fast tracking Dept D Dept C Dept B Dept M Dept S TIME Compressing the Critical Path with Lean Six Sigma Slide 26
  • 27. Compressing the Critical Path with Lean Six Sigma SUMMARY Compressing the Critical Path with Lean Six Sigma Slide 27

Editor's Notes

  1. This presentation by Mark Adrian is in the PM Challenge archives and is an overview of the history of NASA’s lean six sigma program. It also has some introductory materials on what lean six sigma is. The archives include both the slides and an audio recording of Mark’s presentation.Our presentation will focus on applying specific lean tools to shorten a project’s critical path.
  2. Question the group as to how they develop a project plan for a new project. Have volunteers briefly describe their typical process. Answers will be similar to what is shown on the slide.The problem with this approach is that there is not serious consideration given to whether every activity included in the project plan is really necessary and actually adds value to the finished product. Also, the steps that makeup each activity are not closely examined to determine the value-adding aspect of each step.
  3. The typical ways of compressing the critical path in the PM world are to either fast track or crash, or even worse compress everything across the board (the lazy path).With fast tracking, you examine the activities in the project, especially along the critical path, and identify activities that can be run in parallel with each other, thus shortening the critical path. Could increase the cost if additional resources are needed to run the parallel activities.With crashing, you simply add as many resources as necessary to shorten the amount of time the critical path activities take to complete. Obviously, this increases the cost of the project.With lean six sigma, you can reduce the scope which automatically reduces the cost and schedule, while still maintaining (or actually increasing) the quality of the project.
  4. Six SigmaVariation Reduction: in the early 1900s, an American statistician named Walter Shewhart began studying variation, the major and minor fluctuations we see in any given process or sequence of tasks every single day.Quality Improvement Tools: Shewhart began developing a group of quality improvement tools, what today has become statistical process control tools, to reduce the amount of variation in any process and then monitor and control that variation over the long term. W. Edwards Deming was a follower of Shewhart who got involved in the study of processes and system improvement in the 1930s and ‘40s.Total Quality Management: In 1950 W. Edwards Deming was invited to Japan to teach them about variation and process improvement. His work in Japan gave rise to the original Total Quality Management (TQM) system, which focused on reducing variation and improving quality. One of the people that studied under Deming was TaiichiOhno, an employee of a small manufacturing company called Toyoda.Six Sigma: In the mid ‘80s an engineer at Motorola named Bill Smith took much of Shewhart’s, Deming’s, and Juran’s principles, modified them, applied a strict methodology for implementing the principles (the DMAIC process) and developed Six Sigma. Six Sigma was so successful for Motorola that before long partners of Motorola began asking Motorola to teach them the Six Sigma methodology. Companies like GE, Allied Signal/Honeywell, Black & Decker, DuPont, Dow Chemical, Bombardier, Federal Express, Johnson & Johnson, Seagate Technologies, Sony, and Toshiba were all early adopters of Six Sigma.LeanIn the mid 20th century, a small Japanese manufacturing company named Toyoda wanted to manufacture cars in Japan. Employees went to the Ford Motor Company to observe how Ford manufactured cars. Upon returning to Japan, those company leaders realized that they did not have the capital to manufacture on a scale comparable to Ford. So, they invented their own manufacturing system that focused on having only value-adding activities in the system, removing all non-value-adding activities, because as a small upstart they could not afford to do any activity that did not add value to the product and which they could collect monies for doing. One of the people involved in starting this auto manufacturer was TaiichiOhno who had studied under Deming. Ohno concentrated on making sure the manufacturing process had as little variation as possible, which allowed them to consistently manufacture high-quality products. This company became Toyota.Just-In-Time Manufacturing: Toyota modified their production system even more so that they did not manufacture any vehicles until they were needed in the supply line. They concentrated on minimizing large inventories of finished vehicles for which they had no buyers. This allowed them to maintain a good cash flow and allowed them to have several inventory turns per year. Toyota then began working with their suppliers to implement JIT supply so that Toyota did not have to pay for large quantities of raw materials. This method of manufacturing became know as the Toyota Production System.Lean Production: When the Toyota Production System was brought to the US, its name was changed to lean manufacturing/production.Lean Six SigmaIn the mid-1990s, companies began realizing that Lean and Six Sigma needed each other. Like the early days of TQM, Lean suffered because of the lack of infrastructure. Six Sigma was great at reducing defects and improving quality, but wasn’t really suited to eliminating the waste that slowed processes down. People saw the futility of improving a wasteful process. So, lean and six sigma were combined into Lean Six Sigma.Manufacturing to TransactionalSeveral of the early adopters of six sigma started applying six sigma methodologies to the transactional/service processes that supported their manufacturing process. They found that not only did improvements on the service (transactional) side of the house make their manufacturing side run better, they also found that the improvements realized on the service side were even more significant than what they were seeing on the manufacturing side. They also found that they frequently saved as much, or even more money, by improving the service side than they did from improving the manufacturing side.Before long, six sigma was being applied in organizations that were strictly service and did no manufacturing.When lean and six sigma were combined into lean six sigma and applied in the service sector, many found that the lean tools achieved greater results faster than the six sigma tools.
  5. One of the strongest and most effective tools in the lean toolbox is the identification of value-added versus non-value-added activities. Once a processes has been completely mapped, the next step is to identify every task in the process as being value-adding or non-value-adding and removing as many of the non-value-adding tasks as possible. This removes the waste from the processes which automatically speeds up the process and frees up a lot of employee time.Lean also looks closely at the process flow and identifies where and why delays occur. Several tools can be used to identify and remove the process delays which maximizes the process velocity. Greater process velocity results in happier customers because they are not having to wait for the process to be completed.Some of the tools used in lean events include: Value stream mapping Process or functional process mapping Physical process mapping (spaghetti diagrams) VA/NVA analysisTakt time analysis Failure modes and effects analysis (FMEA)Mistake-proofing Load balance evaluations Root cause analysis Brainstorming solutions Affinity diagrams for organizing large numbers of ideasThe primary vehicle for accomplishing lean’s goals is the kaizen event. Kaizen is a Japanese word that means “good change for all.” These events are also called process improvement events. We’ll look at the format for a kaizen in detail in a few minutes.
  6. Let’s talk now about the focus of the six sigma side of the lean six sigma coin.Six sigma’s focus is on the elimination of defects as defined by the customer and the reduction of variation in the process. Variation could be variations in the quality of the service or variations in the amount of time to complete the service. Why does one customer get good service and another get poor service? Why does a process take 10 minutes to complete one time, and an hour to complete the next time? The six sigma tools answer these questions and fix the problems of variation.Some of the tools used during a six sigma event include: Check sheets Control charts Histograms Correlation and Regression Analysis (to determine relationships) Cause-and-Effect diagrams (AKA: Fishbone, Ishikawa) Pareto charts (for determining significance of factors) Run charts Root cause analysisSix sigma uses the DMAIC process which stands for Define, Measure, Analyze, Implement, and Control the process.
  7. Value-added Analysis is one of the most effect tools in the lean tool box.Once a process is thoroughly mapped, an analysis is done on each step in the process to determine whether the step is adding value from the customer’s perspective. Tasks can either be classified as value-adding, non-value-adding, or non-value adding but required.Value-added activities are activities which change the form, fit, function, or usability and which the customer is willing to pay for and which is done right the first time.Non-value-added activities are activities that consume resources but creates no value in the eyes of the customer. These activities are removed from the process which creates immediate savings in personnel time and non-personnel costs associated with the removed tasks.Sometimes tasks add no value to the process, but they cannot be removed from the process. These tasks fall into the non-value-adding but required category. These are activities that add no value but which cannot be eliminated due to regulations, customer requirement, current technology, etc. With these tasks you concentrate on doing them as quickly and as inexpensively as possible while you look for ways to remove them.
  8. Anything that falls into one of the non-value-adding categories is considered waste. These are the forms of waste. The first seven are the seven traditional forms of waste.Many organizations also add the 8th waste, injuries, so as to keep safety in the forefront of employees minds and concentrate efforts to remove or mitigate all injury causing activities from processes.Let’s look at each of these forms of waste, define them, and look at examples of them to see if we can spot any of them in our projects.