This document discusses a Six Sigma project to eliminate sub frame mounting hole mismatches with frame nuts in a Tata Motors vehicle assembly plant. The problem causes rework and impacts productivity, costs, and quality. Key issues identified include sub frame holes not being centric with frame nuts after engine installation into the frame. Root causes are analyzed using a cause-and-effect diagram, with potential factors including unskilled labor, process sequence issues, fixture problems, and dimensional issues with the frame or sub frame. The project aims to reduce rework and improve other metrics through the DMAIC process of define, measure, analyze, improve, and control.