Q-Star Advance Project 1© Copyright, Confidential, Tata Motors Ltd
Lean Six Sigma ProjectLean Six Sigma Project
onon
To eliminate sub frame mtg. holeTo eliminate sub frame mtg. hole
mismatch with frame nut in TCFmismatch with frame nut in TCF
Submitted by Pradeep Tiwari Ticket No. 602551
Deptt. Biw – 1C Program /Module SIX SIGMA
Q-Star Advance Project 4© Copyright, Confidential, Tata Motors Ltd
Project Selection Check ListProject Selection Check List
No. Criteria Yes No
1 Project is a strategic priority, aligned with a Big Y √
2 There is no overlap with other GB / BB projects √
3 Scope of the project is under the area of my influence √
4 Project scope is limited to only one product / one type of defect √
5 It is related to repetitive problem (chronic, not sporadic) √
6 Team cannot solve it by engineering judgment. √
7 A significant ROI expectation has been established √
8 Right vertical & horizontal team members are available √
9 Several team members are top talent & innovative thinkers √
10 Management is willing to commit serious resources to solutions √
11 Project is capable of completion within 2~4 months √
12 Capable team leader and champion assigned √
Q-Star Advance Project 5© Copyright, Confidential, Tata Motors Ltd
Business Case / Justification for Project Selection Opportunity Statement
The project supports DRR & DRL improvement, COPQ
Reduction and line stoppage reduction of TCF Shop.
Pain : Product is getting reworked at TCF and extra 2
manpower deployed it’s repairing. Majorly produced vehicle
are having same defect.
Quantification : DPV of product is 3.5 & Daily 2 manpower
are required for reworking this particular defect.
Impact of pain in Rs. (or soft) : Rs.20.9 lack p.a. is paid
for this rework.
Goal statement Project scope
Metric Current level Target The scope of the project begins at the time of cab being
received at TCF from Paint Shop until the vehicle is fully
assembled and made ready for dispatch.
Sub frame rework in
Super Ace / Venture
70-75% rework Zero Rework
DPV- 3.5 DPV-1.0
Project plan Team
Phase Start End Role Name Dept.
Sponsor Mr. S. Waghchaure BIW – 1C
Define 01/09/14 12/10/14 Champion / Guide Mr. Mohanish Q O
Measure 13/10/14 24/10/14 Leader Pradeep Tiwari BIW – 1C
Analyze 02/11/14 29/11/14 Member Ganga Singh BIW – 1C
Improve 30/11/14 31/12/14 Member Vikrant TCF – 1C
Control 01/01/15 30/01/15 Member Pankaj Adhikari BIW – 1C
Member Ritesh Chattoo SQIG
Project CharterProject Charter
Q-Star Advance Project 6© Copyright, Confidential, Tata Motors Ltd
•The issue of Sub frame rework in DRR TCF 1C was taken up as Six Sigma project and the
reason is evident from the above table. Since there are multiple and complex causes with no
proper solution, I have, with the support of the management, decided to use DMAIC approach
to solve the problem.
Why Sub frame fitment problem as a Six sigma project?
Q-Star Advance Project 7© Copyright, Confidential, Tata Motors Ltd
DEFINE
What is the pain?
Q-Star Advance Project 8© Copyright, Confidential, Tata Motors Ltd
DEFINE PHASE
Problem Identification & JustificationProblem Identification & Justification
(KPM Tree – Business Goal)(KPM Tree – Business Goal)
PLANT QUALITY PERFORMANCE IMPROVEMENTPLANT QUALITY PERFORMANCE IMPROVEMENTPLANT QUALITY PERFORMANCE IMPROVEMENTPLANT QUALITY PERFORMANCE IMPROVEMENT
CPACPA
IMPROVEMENTIMPROVEMENT
CPACPA
IMPROVEMENTIMPROVEMENT
REDUCE CUSTOMERREDUCE CUSTOMER
(TCF) COMPLAINS(TCF) COMPLAINS
REDUCE CUSTOMERREDUCE CUSTOMER
(TCF) COMPLAINS(TCF) COMPLAINS
Big Y
(Metric)
Small y’s
(Key drivers)
Vital X’s
DIRECT RUN LOSSDIRECT RUN LOSS
IMPROVEMENTIMPROVEMENT
DIRECT RUN LOSSDIRECT RUN LOSS
IMPROVEMENTIMPROVEMENT
DIRECT RUN RATEDIRECT RUN RATE
IMPROVEMENTIMPROVEMENT
DIRECT RUN RATEDIRECT RUN RATE
IMPROVEMENTIMPROVEMENT
SHOP QUALITY PERFORMANCE IMPROVEMENTSHOP QUALITY PERFORMANCE IMPROVEMENTSHOP QUALITY PERFORMANCE IMPROVEMENTSHOP QUALITY PERFORMANCE IMPROVEMENT
Engine coverEngine cover
to consoleto console
gap N.G.gap N.G.
Engine coverEngine cover
to consoleto console
gap N.G.gap N.G.
DoorDoor
glassglass
HardHard
DoorDoor
glassglass
HardHard
L/B tail gateL/B tail gate
panel foulpanel foul
L/B tail gateL/B tail gate
panel foulpanel foul
Sub frame mtg.Sub frame mtg.
hole mismatchhole mismatch
Sub frame mtg.Sub frame mtg.
hole mismatchhole mismatch
Tail gateTail gate
to sideto side
panel gappanel gap
N.G.N.G.
Tail gateTail gate
to sideto side
panel gappanel gap
N.G.N.G.
Q-Star Advance Project 9© Copyright, Confidential, Tata Motors Ltd
Problem Identification & Justification(Pareto & Trend Chart)Problem Identification & Justification(Pareto & Trend Chart)
DEFINE PHASE
Q-Star Advance Project 10© Copyright, Confidential, Tata Motors Ltd
Assy. Sub frame with frame
Two Center Stud (LH/ RH)
used to mount the engine carrying
sub frame
Mounting of remaining 8 studs
and 6 bolts was done after the
engine stuffing process.
Q-Star Advance Project 11© Copyright, Confidential, Tata Motors Ltd
DEFINITION OF PROBLEM
Frame & Sub frame hole
mismatch with jack mount
stud position.
Side Bkt Nut offset with Sub
frame
Mismatch with front stud
Sub frame hole mismatch
with Frame Inner BKT
FRAME
SUB FRAME
Q-Star Advance Project 12© Copyright, Confidential, Tata Motors Ltd
TCF Process
Engine assy. With Sub
Frame.
Sub frame fastener
torquing.
Comp. Assy sub fame from
BIW
Assy. Comp. frame
from BIW end
Assy. Engine in TCF with
Sub Frame
Matching of sub frame &
frame in TCF
Q-Star Advance Project 13© Copyright, Confidential, Tata Motors Ltd
Assy comp. frame S.Ace
Side Mtg Bkt
Front Stud
Mtg Bkt
Jack Mtg Bkt
Centre Stud
Mtg Bkt
Total No. of
Sub frame mtg
Nuts 16 No.
Q-Star Advance Project 14© Copyright, Confidential, Tata Motors Ltd
Finished Assy. Sub frame
Rack & Pinion
Mtg Bkt
Side Mtg Bolt
Front Stud
Mtg Hole
Jack Mtg
Hole
Rack & Pinion
Mtg Bkt
Side Mtg
Bolt
Centre Stud
Mtg Hole
Total No. of mtg.
10 stud + 6 Bolt
Q-Star Advance Project 15© Copyright, Confidential, Tata Motors Ltd
Matching of Sub frame with Frame .
Assy
SubFrame
Assy
Frame
Q-Star Advance Project 16© Copyright, Confidential, Tata Motors Ltd
CTQ & CTP Drill-DownCTQ & CTP Drill-Down
Critical to
Quality
Critical
customer
requirement
Customer
issues
Voice of
customer
DRL to be
improved
Proper
tightening of
Bolt & Stud as
per specification
Sub frame &
Frame mismatch
issues should be
avoided.
Sub frame
rework issues
are very high in
DRL.
Voice of
business
Business
issues
Critical
business
requirement
Critical for
processes
High customer
dissatisfaction
Issues in finished
vehicles to be
eliminated
No mismatch
issues
DPV 3.5 TO 1.0
Tips :
1. Voice of customer and voice of business to be prioritized to those which are related to project objective
2. Use VOB or VOC or both depending on the project objectives
3. CTQ / CTP should be in NUT form (Name of the parameter, Unit of Measure, Target value)
DEFINE PHASE
Q-Star Advance Project 17© Copyright, Confidential, Tata Motors Ltd
What
What is the problem? Frame nut mismatch with Sub frame mtg hole
What has the problem? (part no,
Lot no, etc.)
Frame
What is the impact of the
problem? (money, people, time,
etc.)
High Rework impacts on time , Less Productivity, High DRL, Low Employee Moral, High Cost & Unsafe work.
Where
Where is problem located on
Product/Part?
Frame & Sub frame
Where does the problem occur
in the process?
TCF Under Body Line St - 6
Where was the problem
observed in the process?
After Engine Stuffing with frame
When
When was the problem first
noticed?
From the first day of production
When has it been noticed since? Regular Basis
Who
Who is affected by the problem? Line operator
Who first observed the problem? Line Operator
To whom was the problem
reported?
Production / BIW
How
How much is the problem / impact
of problem?
Line stoppages in TCF
How is the problem being
rectified / corrected?
Rework by grinding & tapping.
Problem Explanation (4W-1H)Problem Explanation (4W-1H)
DEFINE PHASE
Q-Star Advance Project 18© Copyright, Confidential, Tata Motors Ltd
SIPOC DiagramSIPOC Diagram
Engine
Stuffing
Engine
Stuffing
Sub-processes
DEFINE PHASE
Suppliers Inputs
BIW Sub Frame
Panse Frame
Engine Shop Engine Assy
TCF Engine Assy with
Sub Frame
Outputs Customers
Finished Vehicle Final PDI
Assy Sub Frame
Engine Assy On
Sub Frame
Body on Frame Engine Stuffing
Q-Star Advance Project 19© Copyright, Confidential, Tata Motors Ltd
Top Down ChartTop Down Chart
DEFINE PHASE
Step-1 Step-2 Step-3 Step-4
Assy. Sub frame Engine Assy On Sub
Frame
Body on Frame Engine Stuffing
Bush welding Assy. Side mbr LH
& RH
Sub frame, Spring Coil & Lower Link
loading on fixture
Frame comes from Panse
Body comes from U/B S.No-4 and Sub
frame with engine comes.
Rack & Pinion ,FRT X mbr , RR X
mbr weld
Rack & Pinion , sub frame bkt & Power
steering bottle fitment
Assy U/ B weld with frame
Lift up sub frame up to frame height
and sub frame hole match with frame
nuts
SPM drilling (bush hole enlarge) FRT axle strut fitment Side wall , roof weld with frame
Qualifying stud & bolt on sub frame
mtg. nuts
Final inspection Engine loading & fitment on sub frame
Door , L/B fitment & final
inspection
Torqueing done as per spec.
Send to Badve for powder
coating
Inspection engine with sub frame Comp. BIW send to paint shop
Sent to TCF Engine loading
Body comes Mech. Line from
Paint shop
Engine with sub frame unload on dolly Body comes U/B S. No. -5
Send dolly to U/B S. N.- 5
Activities
Q-Star Advance Project 20© Copyright, Confidential, Tata Motors Ltd
Operational Definition
Sl. No. Performance Indicator (Y) Operational Definition
Y1
Sub frame hole not centric with
frame M10 nuts
Any mismatch of sub frame hole with frame nut defect
which is visible to the bare. Mismatching defect may be
one or more in number in a single Body but considered
to be one single defective product.
Sl. No. Process / input Indicator (X) Operational Definition
X1 Assy. Sub frame welding Sub frame child part welding by MAG welding.
X2
Complete BIW
To weld cabin with frame called BIW.
X3
Engine assy. On the S.F.
To assemble Engine on the sub frame.
X4
Engine stuffing When Engine Assembled sub frame matching with BIW
frame that’s called engine stuffing operation.
X5
Torqueing
Tighten nuts as per spec. Called torqueing.
X6
Operator Name of the operator who matching sub frame with
BIW frame.
X7
X8
Q-Star Advance Project 21© Copyright, Confidential, Tata Motors Ltd
PROCESS WALKTHROUGH (3G)
Final
inspection
Sub frame
Sub frame
stage -2
Sub frame
stage -1
Send to Badve
for ED & paint
Engine
Stuffing
U/B ST. N. -6
Mismatch
Problem occurs
here
Assy. Frame
comes BIW -1c
from supplier
Comp. BIW
with frame
Send to
Paint
shop
Dropping TCF –
1C Mech. line
U/B ST.
N. -5
Sub frame
comes TCF
from Badve
Engine Sub
Assy.-1,2
&3
Engine loading
on Sub frame
St. N. -4
Engine with sub
frame inspection &
send to U/ B line
Engine with sub
frame loading
on Dolly
U/B ST. N. -7
U/B ST. N. -11
Torqueing
U/B ST. N. –
1, 2 ,3 & 4
Q-Star Advance Project 22© Copyright, Confidential, Tata Motors Ltd
Area
What Standard
says?
What is Observed? Photo / Sketch
Potential Quick-
win opportunities
TCF 1C
U/B Line
Stage -6
Proper
matching of
sub frame hole
with Frame
mtg. nuts
Sub frame hole
mismatch with frame
mtg. nuts.
(Sub frame mtg. hole
not centric with
frame nuts)
1.Sub frame mtg.
hole (FRT STUD
HOLE) cutting and
nut tapping.
2. Frame old nut
replace with new
nut weld.
Process Walk Through (3G)Process Walk Through (3G)
DEFINE PHASE
Q-Star Advance Project 23© Copyright, Confidential, Tata Motors Ltd
Quick-Win Selection & ImplementationQuick-Win Selection & Implementation
DEFINE PHASE
Q-Star Advance Project 24© Copyright, Confidential, Tata Motors Ltd
24
FRA
ME
NO.
5949
FRA
ME
NO.
5950
FRAM
E
NO.
5951
FRAM
E
NO.
5952
FRA
ME
NO.
5953
FRAM
E
NO.
5954
FRAM
E
NO.
5955
FRAM
E
NO.
5956
FRAM
E
NO.
5957
FRA
ME
NO.
5958
RESULT OK NOT
OK
OK OK OK OK NOT
OK
OK OK NOT
OK
STUD IN A TAPPER
WITH FRAME FRA
ME
NO.
5959
FRA
ME
NO.
5960
FRAM
E
NO.
5961
FRAM
E
NO.
5962
FRA
ME
NO.
5963
FRAM
E
NO.
5964
FRAM
E
NO.
5966
FRAM
E
NO.
5967
FRAM
E
NO.
5968
FRA
ME
NO.
5959
RESULT OK OK OK OK OK OK NOT
OK
OK OK OK
Process Walk Through (3G)Process Walk Through (3G)
Q-Star Advance Project 25© Copyright, Confidential, Tata Motors Ltd
DEFINE PHASE
Area
What Standard
says?
What is Observed? Photo / Sketch
Potential Quick-win
opportunities
TCF U/B
STUD SHOULD BE
QUALIFING
PERPENDICULAR.
Nut welded with a taper due
to no standard Welding
process. Above
PROJECTION WELDING
STARTED IN PLACE OF MAG
WELDING.
BeforeBefore AfterAfter
Nut weld by
MAG welding
Nut weld by
Projection
weldingStud not perpendicular
Process Walk Through (3G)Process Walk Through (3G)
Q-Star Advance Project 26© Copyright, Confidential, Tata Motors Ltd
MEASURE
What is the root cause?
Q-Star Advance Project 27© Copyright, Confidential, Tata Motors Ltd
27
Sub frame
mtg. Hole
mismatch
with frame in
TCF
Unskilled
manpower
Behavior
Irregular
operator
Lack of
awareness
Preventive maintenance
of sub frame fixture
Process
Sequence
not ok
WIS not
followed
Tightening
sequence not
ok
Frame Dim. Not ok
Sub frame Dim.
Not okNut tapered on
frame
Fixture Resting
block condition
MachineMan
Material Method
CAUSE AND EFFECT DIAGRAM
Environment
Improper Visibility
Improper Space
Q-Star Advance Project 28© Copyright, Confidential, Tata Motors Ltd
Prioritization of CausesPrioritization of Causes
Mismatch
10
1- Nut taper welded in frame 3 3
2- Sub frame dim. N.G. 9 9
3- Frame DIM. N.G> 9 9
4- Low tolerance of sub frame hole 9 9
5- Wrong vehicle resting pad 3 3
6- Preventive maintenance of fixture 3 3
7- Fixture clamp & block condition 3 0
8- Unskill manpower 0 0
9- Irregular operator 0 0
10- Lack of awareness 0 0
Effect >>
Importance >>
Final Score
Causes
Relationship Scale
0 – No Relation, 1 – Week Relation, 3 – Moderate Relation, 9 – Strong Relation
MEASURE PHASE
Q-Star Advance Project 29© Copyright, Confidential, Tata Motors Ltd
Prioritization of CausesPrioritization of Causes
Mismatch
10
11- WIS not followed 3 3
14- Process sequence not followed 9 9
15- Tighting sequence not ok 0 0
16- Operator training 0 0
17- Improper visiblity 0 0
18- Improper space 0 0
Effect >>
Importance >>
Final
Score
Causes
Relationship Scale
0 – No Relation, 1 – Week Relation, 3 – Moderate Relation, 9 – Strong Relation
MEASURE PHASE
Q-Star Advance Project 30© Copyright, Confidential, Tata Motors Ltd
Who will
collecte
the data
How will
the data
be collected
How
will
the
data
be
used
How will
the data
be
displayed
Instrument Type Make Srl no.
Operating
Range
Least
count
Last
calibrated
on
Next
calibratio
n
due date
Method
to be
used
No. of
parts
to be
taken
No.of
appraisers
(& Name)
No. of
reading /
part
/appraiser
Acceptan
ce
criteria
Resp.
Target
Date
Attribute 50 3 1
As per
sheet
Pankaj 20/11/14
1-Anand
2-Gurdeep
3-Hargovind
SN.
Measurement system details Measurement system analysis plan
Performance
measure
(Ys /Xs)
Operational
Definition
Data
source
and
location
Sampling
method
sample
size &Freq.
When will
the data
be collected
Other data that
should be collected
at the same time
MSA Plan
Data Collection Plan
MSA PLAN FOR CRITICAL DIMENSIONS AT BIW
Q-Star Advance Project 31© Copyright, Confidential, Tata Motors Ltd
MSAMSA
MEASURE PHASE
Date :-
Part:-
Part Type:-
Parameter:-
Specification:-
Part A-1 A-2 A-3 B-1 B-2 B-3 C-1 0.3 C-3 Ref. Value
1 1 1 1 1 1 1 1 1 1 1
2 1 1 1 1 1 1 1 1 1 1
3 1 1 1 1 1 1 1 1 1 1
4 1 1 1 1 1 1 1 1 1 1
5 1 1 1 1 1 1 1 1 1 1
6 1 1 1 1 1 1 1 1 1 1
7 1 1 1 1 1 1 1 1 1 1
8 1 1 1 1 1 1 1 1 1 1
9 0 0 0 0 0 0 0 0 0 0
10 0 0 0 0 0 0 0 0 0 0
11 1 1 1 1 1 1 1 1 1 1
12 0 0 0 0 0 0 0 0 0 0
13 1 1 1 1 1 1 1 1 1 1
14 1 1 1 1 1 1 1 1 1 1
15 1 1 1 1 1 1 1 1 1 1
16 1 1 1 1 1 1 1 1 1 1
17 1 1 1 1 1 1 1 1 1 1
18 1 0 0 1 0 0 0 0 0 0
19 0 0 0 0 0 0 0 0 0 0
20 1 1 1 1 1 1 1 1 1 1
21 0 0 0 0 0 0 0 0 0 0
22 1 1 1 1 1 1 1 1 1 1
23 1 1 1 1 1 1 1 1 1 1
24 1 1 1 1 1 1 1 1 1 1
25 1 1 1 1 1 1 1 1 1 1
Attribute Last Calibration:- NA
WELD SHOP DEFECTS Calibration Status:- OK
Anand Gurdeep Hargovind
5-Aug-14 Gauge: NA
NA Gauge No.:- NA
NA Calibration Frequency:- 6 MONTH
CROSS TABULATION METHOD
ATTRIBUTE STUDY
26 1 1 1 1 1 1 1 1 1 1
27 1 1 1 1 1 1 1 1 1 1
28 0 0 0 0 0 0 0 0 0 0
29 1 1 1 1 1 1 1 1 1 1
30 1 1 1 1 1 1 1 1 1 1
31 1 1 1 1 1 1 1 1 1 1
32 1 1 1 1 1 1 1 1 1 1
33 1 1 1 1 1 1 1 1 1 1
34 1 1 1 1 1 1 1 1 1 1
35 0 0 0 0 0 0 0 0 0 0
36 1 1 1 1 1 1 1 1 1 1
37 0 0 0 0 0 0 0 0 0 0
38 1 1 1 1 1 1 1 1 1 1
39 0 0 0 0 0 0 0 0 0 0
40 1 1 1 1 1 1 1 1 1 1
41 1 1 1 1 1 1 1 1 1 1
42 1 1 1 1 1 1 1 1 1 1
43 1 1 1 0 0 1 1 1 1 1
44 0 0 0 0 0 0 0 0 0 0
45 0 0 0 0 0 0 0 0 0 0
46 1 1 1 1 1 1 1 1 1 1
47 0 0 1 0 1 1 0 0 1 1
48 0 0 0 0 0 0 0 0 0 0
49 1 1 1 1 1 1 1 1 1 1
50 1 1 1 1 1 1 1 1 1 1
Q-Star Advance Project 32© Copyright, Confidential, Tata Motors Ltd
MSAMSA
MEASURE PHASE
0 1 0 1
39 1 40 38 2 40
10.93 29.07 40 10.40 29.60 40
2 108 110 1 109 110
30.07 79.933 110 28.60 81.40 110
41 109 150 39 111 150
41.00 109 150 39.00 111 150
P0 - Pe Po 0.98 P0 - Pe Po 0.98
1 - Pe Pe 0.61 1 - Pe Pe 0.61
Kappa 0.95 Kappa 0.95
Miss Rate 2.564103
False Alarm 1.80
0 1 0 1
39 2 41 38 3 41
11.21 29.79 41 10.66 30.34 41
2 107 109 1 108 109
29.79 79.207 109 28.34 80.66 109
41 109 150 39 111 150
41.00 109 150 39.00 111 150
P0 - Pe Po 0.97 P0 - Pe Po 0.97
1 - Pe Pe 0.60 1 - Pe Pe 0.61
Kappa 0.93 Kappa 0.93
Miss Rate 2.564103
False Alarm 2.70
0 1 0 1
40 0 40 39 2 41
10.93 29.07 40 10.66 30.34 41
1 109 110 0 109 109
30.07 79.93 110 28.34 80.66 109
41 109 150 39 111 150
41.00 109 150 39.00 111 150
P0 - Pe Po 0.99333333 P0 - Pe Po 0.986667
1 - Pe Pe 0.61 1 - Pe Pe 0.61
Kappa 0.98 Kappa 0.97
Miss Rate 0
False Alarm 1.80
kappa kappa
Total
Count
Total
Count
Expected Count Expected Count
1
Count
1
Count
Expected Count Expected Count
Ref value
Total
A
0
Count
C
0
Count
Expected Count Expected Count
kappa kappa
A*C Cross Tabulation
C
Total C*Ref Value Cross Tabulation
Total
Count
Total
Count
Expected Count Expected Count
1
Count
1
Count
Expected Count Expected Count
Ref value
Total
B
0
Count
B
0
Count
Expected Count Expected Count
kappa kappa
B*C Cross Tabulation
C
Total B*Ref Value Cross Tabulation
1
Count
Expected Count Expected Count
Total
Count
Total
Count
Expected Count Expected Count
A
0
Count
A
0
Count
Expected Count Expected Count
1
Count
A*B Cross Tabulation
B
Total A*Ref Value Cross Tabulation
Ref value
Total
Q-Star Advance Project 33© Copyright, Confidential, Tata Motors Ltd
MSAMSA
MEASURE PHASE
CONCLUSION :
Target A B C
kappa > 0.75 0.95 0.93 0.97
Miss Rate Max 2% 2.56 2.56 0.00
False Alarm Max 6% 1.80 2.70 1.80
0.98 0.97 0.99
0.03 0.027 0.02
0.03 0.000 0.00
Effectiveness
Pfa
PM
Q-Star Advance Project 34© Copyright, Confidential, Tata Motors Ltd
DEFECT CONTRIBUTION
34
2
1
3
1
2
3
S.N. PROBLEM %
1 FRT STUD 60%
2 CENTER STUD 10%
3 JACK MTG 30%
MEASURE PHASE
Q-Star Advance Project 35© Copyright, Confidential, Tata Motors Ltd
I
SUB FRAME DIM SPECIFICATION
B 826
C 710
D 50
E 50
F 50
G 80
H 974
I 761
B
AD
C
F
G
E
H
Points Dimension
A 710
MEASURE PHASE
Q-Star Advance Project 36© Copyright, Confidential, Tata Motors Ltd
SUB FRAME DIM MEASUREMENTSUB FRAME DIM MEASUREMENT
MEASURE
P
O
I
N
T
SP
EC.
SB
NO.
937
15
SB
NO.
937
16
SB
NO.
9371
7
SB
NO.
9371
8
SB
NO.
937
19
SB
NO.
937
20
SB
NO.
9372
1
SB
NO.
9372
2
SB
NO.
9372
3
SB
NO.
93724
A 710 708 709 707 708 709 707 709 708 706 707
B 826 824 823 425 826 825 824 825 823 824 824
C 710 710 710 709 708 709 710 709 710 708 709
D 50 49 51 50 50 49 50 49 50 50 50
E 50 50 50 49 50 50 49 49 50 50 49
F 50 50 49 50 50 50 50 50 49 50 50
G 80 79 80 79 80 80 80 80 80 79 80
H 974 972 971 973 972 974 973 972 972 973 973
I 761 761 760 761 759 759 758 758 759 759 758
I
B
A
D
C
F
G
E
H
ALL DIM MEASURED IN mm BY MEASURING TAPE .ALL DIM MEASURED IN mm BY MEASURING TAPE .
Q-Star Advance Project 37© Copyright, Confidential, Tata Motors Ltd
1st
Step : -CMM Report Part Level (Before )
MEASURE & ANALYZE PHASE
Q-Star Advance Project 38© Copyright, Confidential, Tata Motors Ltd
FRAME SPECIFICATION
H
BA
D
C
F
G
E
B 826
C 710
D 50
E 50
F 50
G 80
H 974
Points Dimension
A 710
MEASURE
Q-Star Advance Project 39© Copyright, Confidential, Tata Motors Ltd
FRAME OBSERVED DATA
MEASURE & ANALYZE PHASE
P
O
I
N
T
SPE
C. FRA
ME
NO.
570
7
FRA
ME
NO.
5708
FRA
ME
NO.
5709
FRA
ME
NO.
5710
FRA
ME
NO.
5711
FRA
ME
NO.
5713
FRA
ME
NO.
5714
FRA
ME
NO.
5715
FRA
ME
NO.
5716
FRA
ME
NO.
5718
A 710 710 711 713 712 712 711 712 712 711 712
B 826 825 823 424 826 824 823 824 824 823 824
C 710 709 708 709 708 709 708 708 709 710 709
D 50 50 49 50 50 49 50 49 49 50 50
E 50 50 48 49 50 50 49 49 50 49 48
F 50 50 49 50 50 50 50 50 50 50 50
G 80 79 80 79 80 80 80 80 80 80 80
H 974 974 977 975 978 977 976 975 976 975 975
A B
C
D
E F
G
H
Q-Star Advance Project 40© Copyright, Confidential, Tata Motors Ltd
40
40
S.NO. POINT NO. AXIS
NOMINAL
LH
NOMINA
L RH
ERROR LH ERROR RH ERROR LH ERROR RH
X -78 -78 -0.58 -1.61 -0.84 -0.75
A Y -355 355 0.26 0.6 0.11 0.66
Z -102.5 -102.5 -0.79 1.04 -1.23 -2.21
X 285 285 -0.59 -1.7 -1.59 -2.23
B Y -355 355 -1.45 -1.22 1.03 0.84
Z -110.5 -110.5 -2.88 -0.81 -0.84 -3.82
X 507.5 507.5 0.69 -2.81 -1.29 -2.35
C Y -355 355 -2.41 -1.77 0.27 -0.52
Z -122.5 -122.5 -3.16 -1.01 -3.44 -3.46
X 587.5 587.5 -0.23 -1.76 -2.19 -2.83
D Y -355 355 -1.92 -2.01 0.15 0.06
Z -122.5 -122.5 -3.59 -1.66 -3.66 -3.68
X 91 91 -1.2 -2.48 -1.75 -1.52
8 Y -412.95 412.95 -2.44 1.88 -2.23 2.83
Z -102.5 102.5 -1.38 0.67 -3.19 -2.7
X 507.5 507.5 -1.38 -2.59 -1.62 -2.56
9 Y -304.72 405.28 -1.59 -2.14 0.26 0.2
Z -122.5 -122.5 -4.57 -1.1 0.96 -0.28
X 587.5 587.5 -1.59 -1.58 -1.1 -1.55
10 Y -304.72 405.28 -1.48 -2.54 2.35 -1.99
Z -122.5 -122.5 -2.97 -2.05 0.37 -1.14
X -78 -78 -0.88 -2.11 -1.29 -2.55
11 Y -304.66 -304.66 1.62 -2.94 1.44 -3.16
Z -102 -102 0.39 0.57 -1.91 -0.92
SUPER ACE FRAME CMM REPORT
P1423822 (14.08.2014)
P1422978
(06.08.2014)
6
8
4
1
7
2
SUB FRAME MTG
3
5
Frame CMM Report
Q-Star Advance Project 41© Copyright, Confidential, Tata Motors Ltd
Analyze & Improve
Q-Star Advance Project 42© Copyright, Confidential, Tata Motors Ltd
Why –Why 1: Sub frame hole mismatch with frame nut
Why –Why 2: Position of holes in sub frame shifted
Why –Why 3: Sub frame dimension not ok as per CMM
Why –Why 4: Position of locating pin shifted in Sub frame
welding fixture.
42
Root Cause:-
Locating pin shifted
in Sub frame
welding fixture
WHY WHY ANALYSIS - 1
Q-Star Advance Project 43© Copyright, Confidential, Tata Motors Ltd
LH side bkt position shifted in +Y dir by 2.0
mm.
RH side bkt position shifted in +Y dir by
2.0 mm.
Correction on Side member for Sub frame mtg at M/S Autoline
IMPROVE PHASE
Q-Star Advance Project 44© Copyright, Confidential, Tata Motors Ltd
Jack Mtg. Hole position LH shifted in +Y
direction by 2.0 mm
Correction on Assy subframe at BIW 1C
Jack Mtg. Hole position RH shifted in +Y
direction by 2.0 mm
IMPROVE PHASE
Q-Star Advance Project 45© Copyright, Confidential, Tata Motors Ltd
45
CMM Report Part Level ( After )
IMPROVE PHASE
Q-Star Advance Project 46© Copyright, Confidential, Tata Motors Ltd
46
LH side bkt position corrected
in X dir by +2.0 mm.
RH side bkt position
corrected in X dir. By
– 2.0 mm
LH side bkt position
corrected in X dir by -2.0 mm.
RH side bkt position
corrected in X dir. By
+ 2.0 mm
LH side bkt position
corrected in X dir by 2.0 mm.
RH side bkt position
corrected in X dir. By
– 2.0 mm
Correction on frame at Supplier
IMPROVE PHASE
Q-Star Advance Project 47© Copyright, Confidential, Tata Motors Ltd
47
LH side bkt position
corrected in X dir by 2.0 mm.
RH side bkt position
corrected in X dir. By
– 2.0 mm
Correction on frame Jack Mtg. point at Supplier
IMPROVE PHASE
Q-Star Advance Project 48© Copyright, Confidential, Tata Motors Ltd
48
48
CMM Report Frame (After Improvement)
S.NO. POINT NO. AXIS
NOMINAL
LH NOMINAL RH
ERROR LH ERROR RH ERROR LH ERROR RH
X -78 -78 -0.2 -0.66 0.49 0.17
A Y -355 355 0.84 -0.55 1.15 1.03
Z -102.5 -102.5 1.19 1.94 0.57 1.04
X 285 285 -0.08 -1.19 0.54 -0.01
B Y -355 355 -0.29 -0.35 0.13 0.81
Z -110.5 -110.5 0.04 -0.61 -1.75 -0.69
X 507.5 507.5 0.21 -1.01 0.31 -0.33
C Y -355 355 -1.28 -0.74 -1.45 0.5
Z -122.5 -122.5 -0.54 2.35 0.02 -1.32
X 587.5 587.5 0.32 -1.01 -0.01 -1.03
D Y -355 355 -0.75 0.11 -1.1 0.77
Z -122.5 -122.5 1.62 -0.94 -0.36 -1.71
X 91 91 0.2 -1.45 0.33 -1.03
8 Y -412.95 412.95 -1.89 1.1 -1.06 0.74
Z -102.5 102.5 0.51 1.47 0.35 0.47
X 507.5 507.5 0.11 0.56 0.7 -0.85
9 Y -304.72 405.28 -0.39 1.03 -0.88 0.83
Z -122.5 -122.5 1.94 1.37 1.47 -1.89
X 587.5 587.5 0.36 -1.58 0.58 -1.02
10 Y -304.72 405.28 -0.33 0.09 -1.25 1.12
Z -122.5 -122.5 0.77 0.31 -1.87
X -78 -78 -0.6 -0.73 0.51 -1.54
11 Y -304.66 -304.66 1.26 -1.06 1.27 -1.2
Z -102 -102 1.35 -0.81 2.55 1.05
6
7
8
3
4
5
P1426791 (05.09.2014) P1427105 (10.09.2014)
1
SUB FRAME MTG
2
SUPER ACE FRAME CMM REPORT
P1426791 (11.8.14) P1427105(14.8.14)
Q-Star Advance Project 49© Copyright, Confidential, Tata Motors Ltd 49
IMPROVE PHASE
Q-Star Advance Project 50© Copyright, Confidential, Tata Motors Ltd
Why –Why 1: Sub frame hole mismatch with frame nut
Why –Why 2: Sub frame twisted during coil spring fitment.
Why –Why 3: Gap observed B/W resting block and sub
frame during coil spring fitment process.
Why –Why 4: Resting block wear out.
50
Root Cause:- Sub
frame twisted due to
resting block wear
out.
WHY WHY ANALYSIS - 2
Why –Why 4: Check point not availed for resting block
condition in JH sheet.
Q-Star Advance Project 51© Copyright, Confidential, Tata Motors Ltd
51
DEVELOPMENT OF SOLUTION
710MM
705 MM
Before fitment of coil spring DIM
After fitment of coil spring
Coil spring fitment with Sub Frame
Q-Star Advance Project 52© Copyright, Confidential, Tata Motors Ltd
SUB FRAME DIM 710mmSUB FRAME DIM 710mm
MEASURE & ANALYZE PHASE
ALL DIM MEASURED IN mmALL DIM MEASURED IN mm
Q-Star Advance Project 53© Copyright, Confidential, Tata Motors Ltd
53
Resting block wear out leads
to sub frame twisting
New resting block installed
DEVELOPMENT OF SOLUTION
Q-Star Advance Project 54© Copyright, Confidential, Tata Motors Ltd 54
IMPROVE PHASE
Q-Star Advance Project 55© Copyright, Confidential, Tata Motors Ltd
Why –Why 1: Sub frame hole mismatch with frame nut.
Why –Why 2: Sub frame long mbr twists after engine stuffing
operation due to high twisting moment .
Why –Why 3: Weight of Sub frame-engine assembly
concentrated only on 2 studs
Why –Why 4:Assembly mounted with only 2 studs before
rest of the studs/bolts are mounted.
55
Root Cause:- Twisting of sub
frame during engine stuffing
due to the use of only 2 studs
during the initial mounting
process.
WHY WHY ANALYSIS - 3
Why –Why 5: Insufficient gap for stud qualifying B/W Engine
stuffing bed and sub frame.
Q-Star Advance Project 56© Copyright, Confidential, Tata Motors Ltd
SUB FRAME ASSY PROCESS SEQUENCE (BEFORE)
Two Center Stud (LH/ RH)
used to mount the engine carrying
sub frame
Mounting of remaining 8 studs
and 6 bolts was done after the
engine stuffing process.
Q-Star Advance Project 57© Copyright, Confidential, Tata Motors Ltd
SUB FRAME ASSY PROCESS SEQUENCE (AFTER)
2 Center studs+ 4 JACK Mtg studs
+ 4 FRONT Studs (LH/RH) are now
mounted before the engine stuffing
operation.
Remaining 6 bolts are mounted
after the engine stuffing process.
Q-Star Advance Project 58© Copyright, Confidential, Tata Motors Ltd
CURRENT STATUS (AFTER IMPLEMENTATION)
Q-Star Advance Project 59© Copyright, Confidential, Tata Motors Ltd
59
Improvement
Now stud qualifying is done before engine stuffing
Q-Star Advance Project 60© Copyright, Confidential, Tata Motors Ltd
Improvement
60
BEFORE
AFTER
Hole side increase 13 mm to 16mm
Q-Star Advance Project 61© Copyright, Confidential, Tata Motors Ltd
Improvement
61
BEFORE
AFTER
Sub frame Panel Side member LH
hole size increase 11 mm to 12.5 mm
Q-Star Advance Project 62© Copyright, Confidential, Tata Motors Ltd
Improvement
62
BEFORE
AFTER
Sub frame Panel Side member RH
hole size increase 12.5 mm to 14.0mm
Q-Star Advance Project 63© Copyright, Confidential, Tata Motors Ltd 63
IMPROVE PHASE
Q-Star Advance Project 64© Copyright, Confidential, Tata Motors Ltd
64
TARGET ACHIEVED
Sub Frame Rework % after improvement
IMPROVE PHASEReworkin%
Q-Star Advance Project 65© Copyright, Confidential, Tata Motors Ltd
Control
Q-Star Advance Project 66© Copyright, Confidential, Tata Motors Ltd
Hard Control
Soft Control
• Frame critical DIM. Inspection Gauge made.
• Frame critical DIM. Inspection Gauge made.
• Calibration of welding fixture done
• Trolley modification done to avoid transit damage.
• Work Instruction Updated & display in shop floor
• Check point added in JH sheet for resting block condition.
• Die spotting & polishing frequency revised & added in Die History card
• On job training provided to operators for Proper matching sub frame with frame.
Way of Control Mechanism
CONTROL PHASE
Q-Star Advance Project 67© Copyright, Confidential, Tata Motors Ltd
STANDARDISATION
67
2 + Front stud 4 SMALL SIDE INTERNAL THREAD PNEUMATIC GUN LH &
RH
4 JACK SMALL SIDE
CONTROL PHASE
Q-Star Advance Project 68© Copyright, Confidential, Tata Motors Ltd
68
CONTROL PHASE
JH CHECK SHEET
Q-Star Advance Project 69© Copyright, Confidential, Tata Motors Ltd
BEFORE AFTER
There was No gauge for checking sub frame
dimension 710mm.
Now we have gauge for checking sub
frame dimension 710mm.
BENEFITS:- Zero Rework , Quality improve , Cost & moral.
69
No Gauge for checking
sub frame dimension.
CONTROL PHASE
Q-Star Advance Project 70© Copyright, Confidential, Tata Motors Ltd
BEFORE AFTER
There was No gauge for checking frame
dimension 710mm.
Now we have gauge for checking frame
dimension 710mm.
BENEFITS:- Zero Rework , Quality improve , Cost & moral.
70
No Gauge for checking
frame dimension.
CONTROL PHASE
Q-Star Advance Project 71© Copyright, Confidential, Tata Motors Ltd
71
Frame to be check on checking fixture from supplier end.
CONTROL PHASE
Q-Star Advance Project 72© Copyright, Confidential, Tata Motors Ltd
72
4 TIMES / SEASON
BENEFITS
Tangible Benefits:-
We save rework manpower (2 in nos.) cost of 30000Rs. per month
30000 *12 (month)= 3,60,000 Rs. p.a.
4 Taps & 1 Conical bit per day (670Rs.) = 17420Rs. per month
17420* 12 (month) = 2,09,040 Rs. p.a.
4 Drill bits Cost per day (4900Rs.) = 127400Rs. per month
127400 * 12 = 15,28,800 Rs. p.a.
Total Amount = 20,97,840 Rs. Per annum
Cost saving of Rs 20.97 Lacs/ annum
Q-Star Advance Project 73© Copyright, Confidential, Tata Motors Ltd
 Eliminate customer complain.
 Improved presentation skill.
 Improved analytical knowledge.
73
Intangible Benefits:-
BENEFITS
 Knowledge about 6 Sigma tools.
 Improved team work & self
confidence.
Q-Star Advance Project 74© Copyright, Confidential, Tata Motors Ltd
YOUR ARE
74

More Related Content

What's hot

Lean Six Sigma project Caponera
Lean Six Sigma project CaponeraLean Six Sigma project Caponera
Lean Six Sigma project CaponeraAnnalisa Caponera
 
8D Problem Solving - Automotive Industry
8D Problem Solving - Automotive Industry8D Problem Solving - Automotive Industry
8D Problem Solving - Automotive IndustryGestion Projet Auto
 
8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving Approach8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving ApproachJ. García - Verdugo
 
Achieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and ImplementationAchieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and ImplementationApril Bright
 
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortHow A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortGoLeanSixSigma.com
 
Lean Six Sigma Leadership 062507
Lean Six Sigma Leadership 062507Lean Six Sigma Leadership 062507
Lean Six Sigma Leadership 062507larrypenni
 
Six sigma green belt project template
Six sigma green belt project templateSix sigma green belt project template
Six sigma green belt project templateShankaran Rd
 
Project Storyboard: Reducing Cycle Time for Bid Tab Creation by 33%
Project Storyboard: Reducing Cycle Time for Bid Tab Creationby 33%Project Storyboard: Reducing Cycle Time for Bid Tab Creationby 33%
Project Storyboard: Reducing Cycle Time for Bid Tab Creation by 33%GoLeanSixSigma.com
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectSumit K Jha
 
Six Sigma Black Belt Project
Six Sigma Black Belt ProjectSix Sigma Black Belt Project
Six Sigma Black Belt ProjectAndrey Lygin
 
Lean Six Sigma methodology
Lean Six Sigma methodologyLean Six Sigma methodology
Lean Six Sigma methodologyRamiro Cid
 
Green Belt Project Storyboard Template Example
Green Belt Project Storyboard Template Example Green Belt Project Storyboard Template Example
Green Belt Project Storyboard Template Example GoLeanSixSigma.com
 
SPC - Statistical process control
SPC  - Statistical process controlSPC  - Statistical process control
SPC - Statistical process controlSenthil kumar
 

What's hot (20)

Lean Six Sigma project Caponera
Lean Six Sigma project CaponeraLean Six Sigma project Caponera
Lean Six Sigma project Caponera
 
8D Problem Solving - Automotive Industry
8D Problem Solving - Automotive Industry8D Problem Solving - Automotive Industry
8D Problem Solving - Automotive Industry
 
8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving Approach8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving Approach
 
Achieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and ImplementationAchieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and Implementation
 
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortHow A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
 
LEAN SIX SIGMA PROJECT - FINAL
LEAN SIX SIGMA PROJECT - FINALLEAN SIX SIGMA PROJECT - FINAL
LEAN SIX SIGMA PROJECT - FINAL
 
Lean Six Sigma Leadership 062507
Lean Six Sigma Leadership 062507Lean Six Sigma Leadership 062507
Lean Six Sigma Leadership 062507
 
Six sigma green belt project template
Six sigma green belt project templateSix sigma green belt project template
Six sigma green belt project template
 
shainippt
shainipptshainippt
shainippt
 
Project Storyboard: Reducing Cycle Time for Bid Tab Creation by 33%
Project Storyboard: Reducing Cycle Time for Bid Tab Creationby 33%Project Storyboard: Reducing Cycle Time for Bid Tab Creationby 33%
Project Storyboard: Reducing Cycle Time for Bid Tab Creation by 33%
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Six Sigma Project- GB
Six Sigma Project- GBSix Sigma Project- GB
Six Sigma Project- GB
 
Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt project
 
Six Sigma Black Belt Project
Six Sigma Black Belt ProjectSix Sigma Black Belt Project
Six Sigma Black Belt Project
 
Yellow Belt Training
Yellow Belt TrainingYellow Belt Training
Yellow Belt Training
 
Lean Six Sigma methodology
Lean Six Sigma methodologyLean Six Sigma methodology
Lean Six Sigma methodology
 
ABC's of Problem Solving
ABC's of Problem SolvingABC's of Problem Solving
ABC's of Problem Solving
 
Green Belt Project Storyboard Template Example
Green Belt Project Storyboard Template Example Green Belt Project Storyboard Template Example
Green Belt Project Storyboard Template Example
 
SPC - Statistical process control
SPC  - Statistical process controlSPC  - Statistical process control
SPC - Statistical process control
 
Quality engineering
Quality engineeringQuality engineering
Quality engineering
 

Viewers also liked

Viewers also liked (9)

Six Sigma Project
Six Sigma ProjectSix Sigma Project
Six Sigma Project
 
El carnaval
El carnavalEl carnaval
El carnaval
 
Lean Implementation Overview
Lean Implementation OverviewLean Implementation Overview
Lean Implementation Overview
 
Six sigma in Wipro
Six sigma in WiproSix sigma in Wipro
Six sigma in Wipro
 
Lean Six Sigma in various Industries
Lean Six Sigma in various IndustriesLean Six Sigma in various Industries
Lean Six Sigma in various Industries
 
tata profile
tata profiletata profile
tata profile
 
Tata Steel-ppt
Tata Steel-pptTata Steel-ppt
Tata Steel-ppt
 
Asian paint ppt
Asian paint pptAsian paint ppt
Asian paint ppt
 
six sigma ppt
six sigma pptsix sigma ppt
six sigma ppt
 

Similar to Six Sigma Project Final

Evolution of Vehicle aftter it has been released, How its made and managed
Evolution of Vehicle aftter it has been released, How its made and managedEvolution of Vehicle aftter it has been released, How its made and managed
Evolution of Vehicle aftter it has been released, How its made and managedSamuel Festus
 
Teague brian resume9 20-13century. seatdocx
Teague brian resume9 20-13century. seatdocxTeague brian resume9 20-13century. seatdocx
Teague brian resume9 20-13century. seatdocxbriansrobert
 
Brian teague resume10.29.14
Brian teague    resume10.29.14Brian teague    resume10.29.14
Brian teague resume10.29.14briansrobert
 
Brian teague resume10.29.14
Brian teague    resume10.29.14Brian teague    resume10.29.14
Brian teague resume10.29.14briansrobert
 
Brian teague resume10.29.14
Brian teague    resume10.29.14Brian teague    resume10.29.14
Brian teague resume10.29.14briansrobert
 
CAE for Digital Development
CAE for Digital DevelopmentCAE for Digital Development
CAE for Digital DevelopmentAltair
 
Production Engineer - AISIN TAKAOKA INDIA
Production Engineer - AISIN TAKAOKA INDIAProduction Engineer - AISIN TAKAOKA INDIA
Production Engineer - AISIN TAKAOKA INDIASurendra M
 
mahadev prasad resume_feb2016
mahadev prasad resume_feb2016mahadev prasad resume_feb2016
mahadev prasad resume_feb2016Mahadev Prasad
 
Resume _Sandeep Kumar Ghosh_ Senior position
Resume _Sandeep Kumar Ghosh_ Senior positionResume _Sandeep Kumar Ghosh_ Senior position
Resume _Sandeep Kumar Ghosh_ Senior positionSandeep Ghosh
 
6-Sigma Training-Awareness for automobile industries
6-Sigma Training-Awareness for automobile industries6-Sigma Training-Awareness for automobile industries
6-Sigma Training-Awareness for automobile industriesVivekSingh140912
 
Va.ve approach
Va.ve approachVa.ve approach
Va.ve approachAnujKSingh
 

Similar to Six Sigma Project Final (20)

Evolution of Vehicle aftter it has been released, How its made and managed
Evolution of Vehicle aftter it has been released, How its made and managedEvolution of Vehicle aftter it has been released, How its made and managed
Evolution of Vehicle aftter it has been released, How its made and managed
 
RANJITH_RESUME
RANJITH_RESUMERANJITH_RESUME
RANJITH_RESUME
 
f_FinalA3-VPD1
f_FinalA3-VPD1f_FinalA3-VPD1
f_FinalA3-VPD1
 
Teague brian resume9 20-13century. seatdocx
Teague brian resume9 20-13century. seatdocxTeague brian resume9 20-13century. seatdocx
Teague brian resume9 20-13century. seatdocx
 
chirag cv_
chirag cv_chirag cv_
chirag cv_
 
Brian teague resume10.29.14
Brian teague    resume10.29.14Brian teague    resume10.29.14
Brian teague resume10.29.14
 
Brian teague resume10.29.14
Brian teague    resume10.29.14Brian teague    resume10.29.14
Brian teague resume10.29.14
 
Brian teague resume10.29.14
Brian teague    resume10.29.14Brian teague    resume10.29.14
Brian teague resume10.29.14
 
M202 Design Project
M202 Design ProjectM202 Design Project
M202 Design Project
 
CAE for Digital Development
CAE for Digital DevelopmentCAE for Digital Development
CAE for Digital Development
 
Bishnu Prasad
Bishnu PrasadBishnu Prasad
Bishnu Prasad
 
Production Engineer - AISIN TAKAOKA INDIA
Production Engineer - AISIN TAKAOKA INDIAProduction Engineer - AISIN TAKAOKA INDIA
Production Engineer - AISIN TAKAOKA INDIA
 
Tata Motors Project1.pptx
Tata Motors Project1.pptxTata Motors Project1.pptx
Tata Motors Project1.pptx
 
mahadev prasad resume_feb2016
mahadev prasad resume_feb2016mahadev prasad resume_feb2016
mahadev prasad resume_feb2016
 
tata motors
tata motorstata motors
tata motors
 
Resume _Sandeep Kumar Ghosh_ Senior position
Resume _Sandeep Kumar Ghosh_ Senior positionResume _Sandeep Kumar Ghosh_ Senior position
Resume _Sandeep Kumar Ghosh_ Senior position
 
resume_dharmendrakumar
resume_dharmendrakumarresume_dharmendrakumar
resume_dharmendrakumar
 
Hariharan 2016
Hariharan 2016Hariharan 2016
Hariharan 2016
 
6-Sigma Training-Awareness for automobile industries
6-Sigma Training-Awareness for automobile industries6-Sigma Training-Awareness for automobile industries
6-Sigma Training-Awareness for automobile industries
 
Va.ve approach
Va.ve approachVa.ve approach
Va.ve approach
 

Six Sigma Project Final

  • 1. Q-Star Advance Project 1© Copyright, Confidential, Tata Motors Ltd Lean Six Sigma ProjectLean Six Sigma Project onon To eliminate sub frame mtg. holeTo eliminate sub frame mtg. hole mismatch with frame nut in TCFmismatch with frame nut in TCF Submitted by Pradeep Tiwari Ticket No. 602551 Deptt. Biw – 1C Program /Module SIX SIGMA
  • 2. Q-Star Advance Project 4© Copyright, Confidential, Tata Motors Ltd Project Selection Check ListProject Selection Check List No. Criteria Yes No 1 Project is a strategic priority, aligned with a Big Y √ 2 There is no overlap with other GB / BB projects √ 3 Scope of the project is under the area of my influence √ 4 Project scope is limited to only one product / one type of defect √ 5 It is related to repetitive problem (chronic, not sporadic) √ 6 Team cannot solve it by engineering judgment. √ 7 A significant ROI expectation has been established √ 8 Right vertical & horizontal team members are available √ 9 Several team members are top talent & innovative thinkers √ 10 Management is willing to commit serious resources to solutions √ 11 Project is capable of completion within 2~4 months √ 12 Capable team leader and champion assigned √
  • 3. Q-Star Advance Project 5© Copyright, Confidential, Tata Motors Ltd Business Case / Justification for Project Selection Opportunity Statement The project supports DRR & DRL improvement, COPQ Reduction and line stoppage reduction of TCF Shop. Pain : Product is getting reworked at TCF and extra 2 manpower deployed it’s repairing. Majorly produced vehicle are having same defect. Quantification : DPV of product is 3.5 & Daily 2 manpower are required for reworking this particular defect. Impact of pain in Rs. (or soft) : Rs.20.9 lack p.a. is paid for this rework. Goal statement Project scope Metric Current level Target The scope of the project begins at the time of cab being received at TCF from Paint Shop until the vehicle is fully assembled and made ready for dispatch. Sub frame rework in Super Ace / Venture 70-75% rework Zero Rework DPV- 3.5 DPV-1.0 Project plan Team Phase Start End Role Name Dept. Sponsor Mr. S. Waghchaure BIW – 1C Define 01/09/14 12/10/14 Champion / Guide Mr. Mohanish Q O Measure 13/10/14 24/10/14 Leader Pradeep Tiwari BIW – 1C Analyze 02/11/14 29/11/14 Member Ganga Singh BIW – 1C Improve 30/11/14 31/12/14 Member Vikrant TCF – 1C Control 01/01/15 30/01/15 Member Pankaj Adhikari BIW – 1C Member Ritesh Chattoo SQIG Project CharterProject Charter
  • 4. Q-Star Advance Project 6© Copyright, Confidential, Tata Motors Ltd •The issue of Sub frame rework in DRR TCF 1C was taken up as Six Sigma project and the reason is evident from the above table. Since there are multiple and complex causes with no proper solution, I have, with the support of the management, decided to use DMAIC approach to solve the problem. Why Sub frame fitment problem as a Six sigma project?
  • 5. Q-Star Advance Project 7© Copyright, Confidential, Tata Motors Ltd DEFINE What is the pain?
  • 6. Q-Star Advance Project 8© Copyright, Confidential, Tata Motors Ltd DEFINE PHASE Problem Identification & JustificationProblem Identification & Justification (KPM Tree – Business Goal)(KPM Tree – Business Goal) PLANT QUALITY PERFORMANCE IMPROVEMENTPLANT QUALITY PERFORMANCE IMPROVEMENTPLANT QUALITY PERFORMANCE IMPROVEMENTPLANT QUALITY PERFORMANCE IMPROVEMENT CPACPA IMPROVEMENTIMPROVEMENT CPACPA IMPROVEMENTIMPROVEMENT REDUCE CUSTOMERREDUCE CUSTOMER (TCF) COMPLAINS(TCF) COMPLAINS REDUCE CUSTOMERREDUCE CUSTOMER (TCF) COMPLAINS(TCF) COMPLAINS Big Y (Metric) Small y’s (Key drivers) Vital X’s DIRECT RUN LOSSDIRECT RUN LOSS IMPROVEMENTIMPROVEMENT DIRECT RUN LOSSDIRECT RUN LOSS IMPROVEMENTIMPROVEMENT DIRECT RUN RATEDIRECT RUN RATE IMPROVEMENTIMPROVEMENT DIRECT RUN RATEDIRECT RUN RATE IMPROVEMENTIMPROVEMENT SHOP QUALITY PERFORMANCE IMPROVEMENTSHOP QUALITY PERFORMANCE IMPROVEMENTSHOP QUALITY PERFORMANCE IMPROVEMENTSHOP QUALITY PERFORMANCE IMPROVEMENT Engine coverEngine cover to consoleto console gap N.G.gap N.G. Engine coverEngine cover to consoleto console gap N.G.gap N.G. DoorDoor glassglass HardHard DoorDoor glassglass HardHard L/B tail gateL/B tail gate panel foulpanel foul L/B tail gateL/B tail gate panel foulpanel foul Sub frame mtg.Sub frame mtg. hole mismatchhole mismatch Sub frame mtg.Sub frame mtg. hole mismatchhole mismatch Tail gateTail gate to sideto side panel gappanel gap N.G.N.G. Tail gateTail gate to sideto side panel gappanel gap N.G.N.G.
  • 7. Q-Star Advance Project 9© Copyright, Confidential, Tata Motors Ltd Problem Identification & Justification(Pareto & Trend Chart)Problem Identification & Justification(Pareto & Trend Chart) DEFINE PHASE
  • 8. Q-Star Advance Project 10© Copyright, Confidential, Tata Motors Ltd Assy. Sub frame with frame Two Center Stud (LH/ RH) used to mount the engine carrying sub frame Mounting of remaining 8 studs and 6 bolts was done after the engine stuffing process.
  • 9. Q-Star Advance Project 11© Copyright, Confidential, Tata Motors Ltd DEFINITION OF PROBLEM Frame & Sub frame hole mismatch with jack mount stud position. Side Bkt Nut offset with Sub frame Mismatch with front stud Sub frame hole mismatch with Frame Inner BKT FRAME SUB FRAME
  • 10. Q-Star Advance Project 12© Copyright, Confidential, Tata Motors Ltd TCF Process Engine assy. With Sub Frame. Sub frame fastener torquing. Comp. Assy sub fame from BIW Assy. Comp. frame from BIW end Assy. Engine in TCF with Sub Frame Matching of sub frame & frame in TCF
  • 11. Q-Star Advance Project 13© Copyright, Confidential, Tata Motors Ltd Assy comp. frame S.Ace Side Mtg Bkt Front Stud Mtg Bkt Jack Mtg Bkt Centre Stud Mtg Bkt Total No. of Sub frame mtg Nuts 16 No.
  • 12. Q-Star Advance Project 14© Copyright, Confidential, Tata Motors Ltd Finished Assy. Sub frame Rack & Pinion Mtg Bkt Side Mtg Bolt Front Stud Mtg Hole Jack Mtg Hole Rack & Pinion Mtg Bkt Side Mtg Bolt Centre Stud Mtg Hole Total No. of mtg. 10 stud + 6 Bolt
  • 13. Q-Star Advance Project 15© Copyright, Confidential, Tata Motors Ltd Matching of Sub frame with Frame . Assy SubFrame Assy Frame
  • 14. Q-Star Advance Project 16© Copyright, Confidential, Tata Motors Ltd CTQ & CTP Drill-DownCTQ & CTP Drill-Down Critical to Quality Critical customer requirement Customer issues Voice of customer DRL to be improved Proper tightening of Bolt & Stud as per specification Sub frame & Frame mismatch issues should be avoided. Sub frame rework issues are very high in DRL. Voice of business Business issues Critical business requirement Critical for processes High customer dissatisfaction Issues in finished vehicles to be eliminated No mismatch issues DPV 3.5 TO 1.0 Tips : 1. Voice of customer and voice of business to be prioritized to those which are related to project objective 2. Use VOB or VOC or both depending on the project objectives 3. CTQ / CTP should be in NUT form (Name of the parameter, Unit of Measure, Target value) DEFINE PHASE
  • 15. Q-Star Advance Project 17© Copyright, Confidential, Tata Motors Ltd What What is the problem? Frame nut mismatch with Sub frame mtg hole What has the problem? (part no, Lot no, etc.) Frame What is the impact of the problem? (money, people, time, etc.) High Rework impacts on time , Less Productivity, High DRL, Low Employee Moral, High Cost & Unsafe work. Where Where is problem located on Product/Part? Frame & Sub frame Where does the problem occur in the process? TCF Under Body Line St - 6 Where was the problem observed in the process? After Engine Stuffing with frame When When was the problem first noticed? From the first day of production When has it been noticed since? Regular Basis Who Who is affected by the problem? Line operator Who first observed the problem? Line Operator To whom was the problem reported? Production / BIW How How much is the problem / impact of problem? Line stoppages in TCF How is the problem being rectified / corrected? Rework by grinding & tapping. Problem Explanation (4W-1H)Problem Explanation (4W-1H) DEFINE PHASE
  • 16. Q-Star Advance Project 18© Copyright, Confidential, Tata Motors Ltd SIPOC DiagramSIPOC Diagram Engine Stuffing Engine Stuffing Sub-processes DEFINE PHASE Suppliers Inputs BIW Sub Frame Panse Frame Engine Shop Engine Assy TCF Engine Assy with Sub Frame Outputs Customers Finished Vehicle Final PDI Assy Sub Frame Engine Assy On Sub Frame Body on Frame Engine Stuffing
  • 17. Q-Star Advance Project 19© Copyright, Confidential, Tata Motors Ltd Top Down ChartTop Down Chart DEFINE PHASE Step-1 Step-2 Step-3 Step-4 Assy. Sub frame Engine Assy On Sub Frame Body on Frame Engine Stuffing Bush welding Assy. Side mbr LH & RH Sub frame, Spring Coil & Lower Link loading on fixture Frame comes from Panse Body comes from U/B S.No-4 and Sub frame with engine comes. Rack & Pinion ,FRT X mbr , RR X mbr weld Rack & Pinion , sub frame bkt & Power steering bottle fitment Assy U/ B weld with frame Lift up sub frame up to frame height and sub frame hole match with frame nuts SPM drilling (bush hole enlarge) FRT axle strut fitment Side wall , roof weld with frame Qualifying stud & bolt on sub frame mtg. nuts Final inspection Engine loading & fitment on sub frame Door , L/B fitment & final inspection Torqueing done as per spec. Send to Badve for powder coating Inspection engine with sub frame Comp. BIW send to paint shop Sent to TCF Engine loading Body comes Mech. Line from Paint shop Engine with sub frame unload on dolly Body comes U/B S. No. -5 Send dolly to U/B S. N.- 5 Activities
  • 18. Q-Star Advance Project 20© Copyright, Confidential, Tata Motors Ltd Operational Definition Sl. No. Performance Indicator (Y) Operational Definition Y1 Sub frame hole not centric with frame M10 nuts Any mismatch of sub frame hole with frame nut defect which is visible to the bare. Mismatching defect may be one or more in number in a single Body but considered to be one single defective product. Sl. No. Process / input Indicator (X) Operational Definition X1 Assy. Sub frame welding Sub frame child part welding by MAG welding. X2 Complete BIW To weld cabin with frame called BIW. X3 Engine assy. On the S.F. To assemble Engine on the sub frame. X4 Engine stuffing When Engine Assembled sub frame matching with BIW frame that’s called engine stuffing operation. X5 Torqueing Tighten nuts as per spec. Called torqueing. X6 Operator Name of the operator who matching sub frame with BIW frame. X7 X8
  • 19. Q-Star Advance Project 21© Copyright, Confidential, Tata Motors Ltd PROCESS WALKTHROUGH (3G) Final inspection Sub frame Sub frame stage -2 Sub frame stage -1 Send to Badve for ED & paint Engine Stuffing U/B ST. N. -6 Mismatch Problem occurs here Assy. Frame comes BIW -1c from supplier Comp. BIW with frame Send to Paint shop Dropping TCF – 1C Mech. line U/B ST. N. -5 Sub frame comes TCF from Badve Engine Sub Assy.-1,2 &3 Engine loading on Sub frame St. N. -4 Engine with sub frame inspection & send to U/ B line Engine with sub frame loading on Dolly U/B ST. N. -7 U/B ST. N. -11 Torqueing U/B ST. N. – 1, 2 ,3 & 4
  • 20. Q-Star Advance Project 22© Copyright, Confidential, Tata Motors Ltd Area What Standard says? What is Observed? Photo / Sketch Potential Quick- win opportunities TCF 1C U/B Line Stage -6 Proper matching of sub frame hole with Frame mtg. nuts Sub frame hole mismatch with frame mtg. nuts. (Sub frame mtg. hole not centric with frame nuts) 1.Sub frame mtg. hole (FRT STUD HOLE) cutting and nut tapping. 2. Frame old nut replace with new nut weld. Process Walk Through (3G)Process Walk Through (3G) DEFINE PHASE
  • 21. Q-Star Advance Project 23© Copyright, Confidential, Tata Motors Ltd Quick-Win Selection & ImplementationQuick-Win Selection & Implementation DEFINE PHASE
  • 22. Q-Star Advance Project 24© Copyright, Confidential, Tata Motors Ltd 24 FRA ME NO. 5949 FRA ME NO. 5950 FRAM E NO. 5951 FRAM E NO. 5952 FRA ME NO. 5953 FRAM E NO. 5954 FRAM E NO. 5955 FRAM E NO. 5956 FRAM E NO. 5957 FRA ME NO. 5958 RESULT OK NOT OK OK OK OK OK NOT OK OK OK NOT OK STUD IN A TAPPER WITH FRAME FRA ME NO. 5959 FRA ME NO. 5960 FRAM E NO. 5961 FRAM E NO. 5962 FRA ME NO. 5963 FRAM E NO. 5964 FRAM E NO. 5966 FRAM E NO. 5967 FRAM E NO. 5968 FRA ME NO. 5959 RESULT OK OK OK OK OK OK NOT OK OK OK OK Process Walk Through (3G)Process Walk Through (3G)
  • 23. Q-Star Advance Project 25© Copyright, Confidential, Tata Motors Ltd DEFINE PHASE Area What Standard says? What is Observed? Photo / Sketch Potential Quick-win opportunities TCF U/B STUD SHOULD BE QUALIFING PERPENDICULAR. Nut welded with a taper due to no standard Welding process. Above PROJECTION WELDING STARTED IN PLACE OF MAG WELDING. BeforeBefore AfterAfter Nut weld by MAG welding Nut weld by Projection weldingStud not perpendicular Process Walk Through (3G)Process Walk Through (3G)
  • 24. Q-Star Advance Project 26© Copyright, Confidential, Tata Motors Ltd MEASURE What is the root cause?
  • 25. Q-Star Advance Project 27© Copyright, Confidential, Tata Motors Ltd 27 Sub frame mtg. Hole mismatch with frame in TCF Unskilled manpower Behavior Irregular operator Lack of awareness Preventive maintenance of sub frame fixture Process Sequence not ok WIS not followed Tightening sequence not ok Frame Dim. Not ok Sub frame Dim. Not okNut tapered on frame Fixture Resting block condition MachineMan Material Method CAUSE AND EFFECT DIAGRAM Environment Improper Visibility Improper Space
  • 26. Q-Star Advance Project 28© Copyright, Confidential, Tata Motors Ltd Prioritization of CausesPrioritization of Causes Mismatch 10 1- Nut taper welded in frame 3 3 2- Sub frame dim. N.G. 9 9 3- Frame DIM. N.G> 9 9 4- Low tolerance of sub frame hole 9 9 5- Wrong vehicle resting pad 3 3 6- Preventive maintenance of fixture 3 3 7- Fixture clamp & block condition 3 0 8- Unskill manpower 0 0 9- Irregular operator 0 0 10- Lack of awareness 0 0 Effect >> Importance >> Final Score Causes Relationship Scale 0 – No Relation, 1 – Week Relation, 3 – Moderate Relation, 9 – Strong Relation MEASURE PHASE
  • 27. Q-Star Advance Project 29© Copyright, Confidential, Tata Motors Ltd Prioritization of CausesPrioritization of Causes Mismatch 10 11- WIS not followed 3 3 14- Process sequence not followed 9 9 15- Tighting sequence not ok 0 0 16- Operator training 0 0 17- Improper visiblity 0 0 18- Improper space 0 0 Effect >> Importance >> Final Score Causes Relationship Scale 0 – No Relation, 1 – Week Relation, 3 – Moderate Relation, 9 – Strong Relation MEASURE PHASE
  • 28. Q-Star Advance Project 30© Copyright, Confidential, Tata Motors Ltd Who will collecte the data How will the data be collected How will the data be used How will the data be displayed Instrument Type Make Srl no. Operating Range Least count Last calibrated on Next calibratio n due date Method to be used No. of parts to be taken No.of appraisers (& Name) No. of reading / part /appraiser Acceptan ce criteria Resp. Target Date Attribute 50 3 1 As per sheet Pankaj 20/11/14 1-Anand 2-Gurdeep 3-Hargovind SN. Measurement system details Measurement system analysis plan Performance measure (Ys /Xs) Operational Definition Data source and location Sampling method sample size &Freq. When will the data be collected Other data that should be collected at the same time MSA Plan Data Collection Plan MSA PLAN FOR CRITICAL DIMENSIONS AT BIW
  • 29. Q-Star Advance Project 31© Copyright, Confidential, Tata Motors Ltd MSAMSA MEASURE PHASE Date :- Part:- Part Type:- Parameter:- Specification:- Part A-1 A-2 A-3 B-1 B-2 B-3 C-1 0.3 C-3 Ref. Value 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 3 1 1 1 1 1 1 1 1 1 1 4 1 1 1 1 1 1 1 1 1 1 5 1 1 1 1 1 1 1 1 1 1 6 1 1 1 1 1 1 1 1 1 1 7 1 1 1 1 1 1 1 1 1 1 8 1 1 1 1 1 1 1 1 1 1 9 0 0 0 0 0 0 0 0 0 0 10 0 0 0 0 0 0 0 0 0 0 11 1 1 1 1 1 1 1 1 1 1 12 0 0 0 0 0 0 0 0 0 0 13 1 1 1 1 1 1 1 1 1 1 14 1 1 1 1 1 1 1 1 1 1 15 1 1 1 1 1 1 1 1 1 1 16 1 1 1 1 1 1 1 1 1 1 17 1 1 1 1 1 1 1 1 1 1 18 1 0 0 1 0 0 0 0 0 0 19 0 0 0 0 0 0 0 0 0 0 20 1 1 1 1 1 1 1 1 1 1 21 0 0 0 0 0 0 0 0 0 0 22 1 1 1 1 1 1 1 1 1 1 23 1 1 1 1 1 1 1 1 1 1 24 1 1 1 1 1 1 1 1 1 1 25 1 1 1 1 1 1 1 1 1 1 Attribute Last Calibration:- NA WELD SHOP DEFECTS Calibration Status:- OK Anand Gurdeep Hargovind 5-Aug-14 Gauge: NA NA Gauge No.:- NA NA Calibration Frequency:- 6 MONTH CROSS TABULATION METHOD ATTRIBUTE STUDY 26 1 1 1 1 1 1 1 1 1 1 27 1 1 1 1 1 1 1 1 1 1 28 0 0 0 0 0 0 0 0 0 0 29 1 1 1 1 1 1 1 1 1 1 30 1 1 1 1 1 1 1 1 1 1 31 1 1 1 1 1 1 1 1 1 1 32 1 1 1 1 1 1 1 1 1 1 33 1 1 1 1 1 1 1 1 1 1 34 1 1 1 1 1 1 1 1 1 1 35 0 0 0 0 0 0 0 0 0 0 36 1 1 1 1 1 1 1 1 1 1 37 0 0 0 0 0 0 0 0 0 0 38 1 1 1 1 1 1 1 1 1 1 39 0 0 0 0 0 0 0 0 0 0 40 1 1 1 1 1 1 1 1 1 1 41 1 1 1 1 1 1 1 1 1 1 42 1 1 1 1 1 1 1 1 1 1 43 1 1 1 0 0 1 1 1 1 1 44 0 0 0 0 0 0 0 0 0 0 45 0 0 0 0 0 0 0 0 0 0 46 1 1 1 1 1 1 1 1 1 1 47 0 0 1 0 1 1 0 0 1 1 48 0 0 0 0 0 0 0 0 0 0 49 1 1 1 1 1 1 1 1 1 1 50 1 1 1 1 1 1 1 1 1 1
  • 30. Q-Star Advance Project 32© Copyright, Confidential, Tata Motors Ltd MSAMSA MEASURE PHASE 0 1 0 1 39 1 40 38 2 40 10.93 29.07 40 10.40 29.60 40 2 108 110 1 109 110 30.07 79.933 110 28.60 81.40 110 41 109 150 39 111 150 41.00 109 150 39.00 111 150 P0 - Pe Po 0.98 P0 - Pe Po 0.98 1 - Pe Pe 0.61 1 - Pe Pe 0.61 Kappa 0.95 Kappa 0.95 Miss Rate 2.564103 False Alarm 1.80 0 1 0 1 39 2 41 38 3 41 11.21 29.79 41 10.66 30.34 41 2 107 109 1 108 109 29.79 79.207 109 28.34 80.66 109 41 109 150 39 111 150 41.00 109 150 39.00 111 150 P0 - Pe Po 0.97 P0 - Pe Po 0.97 1 - Pe Pe 0.60 1 - Pe Pe 0.61 Kappa 0.93 Kappa 0.93 Miss Rate 2.564103 False Alarm 2.70 0 1 0 1 40 0 40 39 2 41 10.93 29.07 40 10.66 30.34 41 1 109 110 0 109 109 30.07 79.93 110 28.34 80.66 109 41 109 150 39 111 150 41.00 109 150 39.00 111 150 P0 - Pe Po 0.99333333 P0 - Pe Po 0.986667 1 - Pe Pe 0.61 1 - Pe Pe 0.61 Kappa 0.98 Kappa 0.97 Miss Rate 0 False Alarm 1.80 kappa kappa Total Count Total Count Expected Count Expected Count 1 Count 1 Count Expected Count Expected Count Ref value Total A 0 Count C 0 Count Expected Count Expected Count kappa kappa A*C Cross Tabulation C Total C*Ref Value Cross Tabulation Total Count Total Count Expected Count Expected Count 1 Count 1 Count Expected Count Expected Count Ref value Total B 0 Count B 0 Count Expected Count Expected Count kappa kappa B*C Cross Tabulation C Total B*Ref Value Cross Tabulation 1 Count Expected Count Expected Count Total Count Total Count Expected Count Expected Count A 0 Count A 0 Count Expected Count Expected Count 1 Count A*B Cross Tabulation B Total A*Ref Value Cross Tabulation Ref value Total
  • 31. Q-Star Advance Project 33© Copyright, Confidential, Tata Motors Ltd MSAMSA MEASURE PHASE CONCLUSION : Target A B C kappa > 0.75 0.95 0.93 0.97 Miss Rate Max 2% 2.56 2.56 0.00 False Alarm Max 6% 1.80 2.70 1.80 0.98 0.97 0.99 0.03 0.027 0.02 0.03 0.000 0.00 Effectiveness Pfa PM
  • 32. Q-Star Advance Project 34© Copyright, Confidential, Tata Motors Ltd DEFECT CONTRIBUTION 34 2 1 3 1 2 3 S.N. PROBLEM % 1 FRT STUD 60% 2 CENTER STUD 10% 3 JACK MTG 30% MEASURE PHASE
  • 33. Q-Star Advance Project 35© Copyright, Confidential, Tata Motors Ltd I SUB FRAME DIM SPECIFICATION B 826 C 710 D 50 E 50 F 50 G 80 H 974 I 761 B AD C F G E H Points Dimension A 710 MEASURE PHASE
  • 34. Q-Star Advance Project 36© Copyright, Confidential, Tata Motors Ltd SUB FRAME DIM MEASUREMENTSUB FRAME DIM MEASUREMENT MEASURE P O I N T SP EC. SB NO. 937 15 SB NO. 937 16 SB NO. 9371 7 SB NO. 9371 8 SB NO. 937 19 SB NO. 937 20 SB NO. 9372 1 SB NO. 9372 2 SB NO. 9372 3 SB NO. 93724 A 710 708 709 707 708 709 707 709 708 706 707 B 826 824 823 425 826 825 824 825 823 824 824 C 710 710 710 709 708 709 710 709 710 708 709 D 50 49 51 50 50 49 50 49 50 50 50 E 50 50 50 49 50 50 49 49 50 50 49 F 50 50 49 50 50 50 50 50 49 50 50 G 80 79 80 79 80 80 80 80 80 79 80 H 974 972 971 973 972 974 973 972 972 973 973 I 761 761 760 761 759 759 758 758 759 759 758 I B A D C F G E H ALL DIM MEASURED IN mm BY MEASURING TAPE .ALL DIM MEASURED IN mm BY MEASURING TAPE .
  • 35. Q-Star Advance Project 37© Copyright, Confidential, Tata Motors Ltd 1st Step : -CMM Report Part Level (Before ) MEASURE & ANALYZE PHASE
  • 36. Q-Star Advance Project 38© Copyright, Confidential, Tata Motors Ltd FRAME SPECIFICATION H BA D C F G E B 826 C 710 D 50 E 50 F 50 G 80 H 974 Points Dimension A 710 MEASURE
  • 37. Q-Star Advance Project 39© Copyright, Confidential, Tata Motors Ltd FRAME OBSERVED DATA MEASURE & ANALYZE PHASE P O I N T SPE C. FRA ME NO. 570 7 FRA ME NO. 5708 FRA ME NO. 5709 FRA ME NO. 5710 FRA ME NO. 5711 FRA ME NO. 5713 FRA ME NO. 5714 FRA ME NO. 5715 FRA ME NO. 5716 FRA ME NO. 5718 A 710 710 711 713 712 712 711 712 712 711 712 B 826 825 823 424 826 824 823 824 824 823 824 C 710 709 708 709 708 709 708 708 709 710 709 D 50 50 49 50 50 49 50 49 49 50 50 E 50 50 48 49 50 50 49 49 50 49 48 F 50 50 49 50 50 50 50 50 50 50 50 G 80 79 80 79 80 80 80 80 80 80 80 H 974 974 977 975 978 977 976 975 976 975 975 A B C D E F G H
  • 38. Q-Star Advance Project 40© Copyright, Confidential, Tata Motors Ltd 40 40 S.NO. POINT NO. AXIS NOMINAL LH NOMINA L RH ERROR LH ERROR RH ERROR LH ERROR RH X -78 -78 -0.58 -1.61 -0.84 -0.75 A Y -355 355 0.26 0.6 0.11 0.66 Z -102.5 -102.5 -0.79 1.04 -1.23 -2.21 X 285 285 -0.59 -1.7 -1.59 -2.23 B Y -355 355 -1.45 -1.22 1.03 0.84 Z -110.5 -110.5 -2.88 -0.81 -0.84 -3.82 X 507.5 507.5 0.69 -2.81 -1.29 -2.35 C Y -355 355 -2.41 -1.77 0.27 -0.52 Z -122.5 -122.5 -3.16 -1.01 -3.44 -3.46 X 587.5 587.5 -0.23 -1.76 -2.19 -2.83 D Y -355 355 -1.92 -2.01 0.15 0.06 Z -122.5 -122.5 -3.59 -1.66 -3.66 -3.68 X 91 91 -1.2 -2.48 -1.75 -1.52 8 Y -412.95 412.95 -2.44 1.88 -2.23 2.83 Z -102.5 102.5 -1.38 0.67 -3.19 -2.7 X 507.5 507.5 -1.38 -2.59 -1.62 -2.56 9 Y -304.72 405.28 -1.59 -2.14 0.26 0.2 Z -122.5 -122.5 -4.57 -1.1 0.96 -0.28 X 587.5 587.5 -1.59 -1.58 -1.1 -1.55 10 Y -304.72 405.28 -1.48 -2.54 2.35 -1.99 Z -122.5 -122.5 -2.97 -2.05 0.37 -1.14 X -78 -78 -0.88 -2.11 -1.29 -2.55 11 Y -304.66 -304.66 1.62 -2.94 1.44 -3.16 Z -102 -102 0.39 0.57 -1.91 -0.92 SUPER ACE FRAME CMM REPORT P1423822 (14.08.2014) P1422978 (06.08.2014) 6 8 4 1 7 2 SUB FRAME MTG 3 5 Frame CMM Report
  • 39. Q-Star Advance Project 41© Copyright, Confidential, Tata Motors Ltd Analyze & Improve
  • 40. Q-Star Advance Project 42© Copyright, Confidential, Tata Motors Ltd Why –Why 1: Sub frame hole mismatch with frame nut Why –Why 2: Position of holes in sub frame shifted Why –Why 3: Sub frame dimension not ok as per CMM Why –Why 4: Position of locating pin shifted in Sub frame welding fixture. 42 Root Cause:- Locating pin shifted in Sub frame welding fixture WHY WHY ANALYSIS - 1
  • 41. Q-Star Advance Project 43© Copyright, Confidential, Tata Motors Ltd LH side bkt position shifted in +Y dir by 2.0 mm. RH side bkt position shifted in +Y dir by 2.0 mm. Correction on Side member for Sub frame mtg at M/S Autoline IMPROVE PHASE
  • 42. Q-Star Advance Project 44© Copyright, Confidential, Tata Motors Ltd Jack Mtg. Hole position LH shifted in +Y direction by 2.0 mm Correction on Assy subframe at BIW 1C Jack Mtg. Hole position RH shifted in +Y direction by 2.0 mm IMPROVE PHASE
  • 43. Q-Star Advance Project 45© Copyright, Confidential, Tata Motors Ltd 45 CMM Report Part Level ( After ) IMPROVE PHASE
  • 44. Q-Star Advance Project 46© Copyright, Confidential, Tata Motors Ltd 46 LH side bkt position corrected in X dir by +2.0 mm. RH side bkt position corrected in X dir. By – 2.0 mm LH side bkt position corrected in X dir by -2.0 mm. RH side bkt position corrected in X dir. By + 2.0 mm LH side bkt position corrected in X dir by 2.0 mm. RH side bkt position corrected in X dir. By – 2.0 mm Correction on frame at Supplier IMPROVE PHASE
  • 45. Q-Star Advance Project 47© Copyright, Confidential, Tata Motors Ltd 47 LH side bkt position corrected in X dir by 2.0 mm. RH side bkt position corrected in X dir. By – 2.0 mm Correction on frame Jack Mtg. point at Supplier IMPROVE PHASE
  • 46. Q-Star Advance Project 48© Copyright, Confidential, Tata Motors Ltd 48 48 CMM Report Frame (After Improvement) S.NO. POINT NO. AXIS NOMINAL LH NOMINAL RH ERROR LH ERROR RH ERROR LH ERROR RH X -78 -78 -0.2 -0.66 0.49 0.17 A Y -355 355 0.84 -0.55 1.15 1.03 Z -102.5 -102.5 1.19 1.94 0.57 1.04 X 285 285 -0.08 -1.19 0.54 -0.01 B Y -355 355 -0.29 -0.35 0.13 0.81 Z -110.5 -110.5 0.04 -0.61 -1.75 -0.69 X 507.5 507.5 0.21 -1.01 0.31 -0.33 C Y -355 355 -1.28 -0.74 -1.45 0.5 Z -122.5 -122.5 -0.54 2.35 0.02 -1.32 X 587.5 587.5 0.32 -1.01 -0.01 -1.03 D Y -355 355 -0.75 0.11 -1.1 0.77 Z -122.5 -122.5 1.62 -0.94 -0.36 -1.71 X 91 91 0.2 -1.45 0.33 -1.03 8 Y -412.95 412.95 -1.89 1.1 -1.06 0.74 Z -102.5 102.5 0.51 1.47 0.35 0.47 X 507.5 507.5 0.11 0.56 0.7 -0.85 9 Y -304.72 405.28 -0.39 1.03 -0.88 0.83 Z -122.5 -122.5 1.94 1.37 1.47 -1.89 X 587.5 587.5 0.36 -1.58 0.58 -1.02 10 Y -304.72 405.28 -0.33 0.09 -1.25 1.12 Z -122.5 -122.5 0.77 0.31 -1.87 X -78 -78 -0.6 -0.73 0.51 -1.54 11 Y -304.66 -304.66 1.26 -1.06 1.27 -1.2 Z -102 -102 1.35 -0.81 2.55 1.05 6 7 8 3 4 5 P1426791 (05.09.2014) P1427105 (10.09.2014) 1 SUB FRAME MTG 2 SUPER ACE FRAME CMM REPORT P1426791 (11.8.14) P1427105(14.8.14)
  • 47. Q-Star Advance Project 49© Copyright, Confidential, Tata Motors Ltd 49 IMPROVE PHASE
  • 48. Q-Star Advance Project 50© Copyright, Confidential, Tata Motors Ltd Why –Why 1: Sub frame hole mismatch with frame nut Why –Why 2: Sub frame twisted during coil spring fitment. Why –Why 3: Gap observed B/W resting block and sub frame during coil spring fitment process. Why –Why 4: Resting block wear out. 50 Root Cause:- Sub frame twisted due to resting block wear out. WHY WHY ANALYSIS - 2 Why –Why 4: Check point not availed for resting block condition in JH sheet.
  • 49. Q-Star Advance Project 51© Copyright, Confidential, Tata Motors Ltd 51 DEVELOPMENT OF SOLUTION 710MM 705 MM Before fitment of coil spring DIM After fitment of coil spring Coil spring fitment with Sub Frame
  • 50. Q-Star Advance Project 52© Copyright, Confidential, Tata Motors Ltd SUB FRAME DIM 710mmSUB FRAME DIM 710mm MEASURE & ANALYZE PHASE ALL DIM MEASURED IN mmALL DIM MEASURED IN mm
  • 51. Q-Star Advance Project 53© Copyright, Confidential, Tata Motors Ltd 53 Resting block wear out leads to sub frame twisting New resting block installed DEVELOPMENT OF SOLUTION
  • 52. Q-Star Advance Project 54© Copyright, Confidential, Tata Motors Ltd 54 IMPROVE PHASE
  • 53. Q-Star Advance Project 55© Copyright, Confidential, Tata Motors Ltd Why –Why 1: Sub frame hole mismatch with frame nut. Why –Why 2: Sub frame long mbr twists after engine stuffing operation due to high twisting moment . Why –Why 3: Weight of Sub frame-engine assembly concentrated only on 2 studs Why –Why 4:Assembly mounted with only 2 studs before rest of the studs/bolts are mounted. 55 Root Cause:- Twisting of sub frame during engine stuffing due to the use of only 2 studs during the initial mounting process. WHY WHY ANALYSIS - 3 Why –Why 5: Insufficient gap for stud qualifying B/W Engine stuffing bed and sub frame.
  • 54. Q-Star Advance Project 56© Copyright, Confidential, Tata Motors Ltd SUB FRAME ASSY PROCESS SEQUENCE (BEFORE) Two Center Stud (LH/ RH) used to mount the engine carrying sub frame Mounting of remaining 8 studs and 6 bolts was done after the engine stuffing process.
  • 55. Q-Star Advance Project 57© Copyright, Confidential, Tata Motors Ltd SUB FRAME ASSY PROCESS SEQUENCE (AFTER) 2 Center studs+ 4 JACK Mtg studs + 4 FRONT Studs (LH/RH) are now mounted before the engine stuffing operation. Remaining 6 bolts are mounted after the engine stuffing process.
  • 56. Q-Star Advance Project 58© Copyright, Confidential, Tata Motors Ltd CURRENT STATUS (AFTER IMPLEMENTATION)
  • 57. Q-Star Advance Project 59© Copyright, Confidential, Tata Motors Ltd 59 Improvement Now stud qualifying is done before engine stuffing
  • 58. Q-Star Advance Project 60© Copyright, Confidential, Tata Motors Ltd Improvement 60 BEFORE AFTER Hole side increase 13 mm to 16mm
  • 59. Q-Star Advance Project 61© Copyright, Confidential, Tata Motors Ltd Improvement 61 BEFORE AFTER Sub frame Panel Side member LH hole size increase 11 mm to 12.5 mm
  • 60. Q-Star Advance Project 62© Copyright, Confidential, Tata Motors Ltd Improvement 62 BEFORE AFTER Sub frame Panel Side member RH hole size increase 12.5 mm to 14.0mm
  • 61. Q-Star Advance Project 63© Copyright, Confidential, Tata Motors Ltd 63 IMPROVE PHASE
  • 62. Q-Star Advance Project 64© Copyright, Confidential, Tata Motors Ltd 64 TARGET ACHIEVED Sub Frame Rework % after improvement IMPROVE PHASEReworkin%
  • 63. Q-Star Advance Project 65© Copyright, Confidential, Tata Motors Ltd Control
  • 64. Q-Star Advance Project 66© Copyright, Confidential, Tata Motors Ltd Hard Control Soft Control • Frame critical DIM. Inspection Gauge made. • Frame critical DIM. Inspection Gauge made. • Calibration of welding fixture done • Trolley modification done to avoid transit damage. • Work Instruction Updated & display in shop floor • Check point added in JH sheet for resting block condition. • Die spotting & polishing frequency revised & added in Die History card • On job training provided to operators for Proper matching sub frame with frame. Way of Control Mechanism CONTROL PHASE
  • 65. Q-Star Advance Project 67© Copyright, Confidential, Tata Motors Ltd STANDARDISATION 67 2 + Front stud 4 SMALL SIDE INTERNAL THREAD PNEUMATIC GUN LH & RH 4 JACK SMALL SIDE CONTROL PHASE
  • 66. Q-Star Advance Project 68© Copyright, Confidential, Tata Motors Ltd 68 CONTROL PHASE JH CHECK SHEET
  • 67. Q-Star Advance Project 69© Copyright, Confidential, Tata Motors Ltd BEFORE AFTER There was No gauge for checking sub frame dimension 710mm. Now we have gauge for checking sub frame dimension 710mm. BENEFITS:- Zero Rework , Quality improve , Cost & moral. 69 No Gauge for checking sub frame dimension. CONTROL PHASE
  • 68. Q-Star Advance Project 70© Copyright, Confidential, Tata Motors Ltd BEFORE AFTER There was No gauge for checking frame dimension 710mm. Now we have gauge for checking frame dimension 710mm. BENEFITS:- Zero Rework , Quality improve , Cost & moral. 70 No Gauge for checking frame dimension. CONTROL PHASE
  • 69. Q-Star Advance Project 71© Copyright, Confidential, Tata Motors Ltd 71 Frame to be check on checking fixture from supplier end. CONTROL PHASE
  • 70. Q-Star Advance Project 72© Copyright, Confidential, Tata Motors Ltd 72 4 TIMES / SEASON BENEFITS Tangible Benefits:- We save rework manpower (2 in nos.) cost of 30000Rs. per month 30000 *12 (month)= 3,60,000 Rs. p.a. 4 Taps & 1 Conical bit per day (670Rs.) = 17420Rs. per month 17420* 12 (month) = 2,09,040 Rs. p.a. 4 Drill bits Cost per day (4900Rs.) = 127400Rs. per month 127400 * 12 = 15,28,800 Rs. p.a. Total Amount = 20,97,840 Rs. Per annum Cost saving of Rs 20.97 Lacs/ annum
  • 71. Q-Star Advance Project 73© Copyright, Confidential, Tata Motors Ltd  Eliminate customer complain.  Improved presentation skill.  Improved analytical knowledge. 73 Intangible Benefits:- BENEFITS  Knowledge about 6 Sigma tools.  Improved team work & self confidence.
  • 72. Q-Star Advance Project 74© Copyright, Confidential, Tata Motors Ltd YOUR ARE 74