12. ARMMIC System (prototype I) GUI data display Motor controller (reuse of 2005 MLR IRaD) Motor arrangement w/laser scanner ARMMIC INITIAL Test System
13. ARMMIC Initial Capabilities Demonstration Note penetration of baffles, vents, fixtures indicate drop ceiling & “real” (concrete) ceiling Scans of small conference room showing operator (baseball capped), and associated “shadow”. Scanner origin
14. ARMMIC Initial Capabilities Demonstration IIz Scanner origin Note subtle structures as tile rails, baffled lighting, and dropped projector Total time duration for scan was 65-70 seconds at resolution (1-degree). A reduced data set option exists; allows for estimated volume (3D box) drawing ; a flattened, 2D output is optional).