SlideShare a Scribd company logo
1 of 50
BEG 116 AR
DATE:
2. Pier foundation:
•A Pier foundation consists of a cylindrical column of
large diameter to support and transfer large super-
imposed loads to the firm strata below.
•Piers are holes filled with concrete which act as leg
for foundation
•Piers are used when a heavy structure is to be built
and the firm/hard strata is at reasonable depth
•Construction process comprises sinking vertical
shafts and filling with concrete
2. Pier foundation:
Fig: Pier foundation with arch
2. Pier foundation:………………
Difference between Pile and Pier foundation:
•Difference in methods of construction
•pile foundations transfer the load through friction
and/or bearing but pier foundations transfer the load
only through bearing
•pier foundation is shallower in depth than the pile
foundation
•Pier foundation require less excavation
Types of Pier foundation:
(i) Masonry or concrete pier (ii) Drilled caissons
(i) Masonry or concrete pier :
•When a good bearing stratum exists upto 5 m below
ground level, brick, masonry or concrete foundation
piers in excavated pits may be used
• The size and spacing of the piers depends upon the
depth of hard bed, nature of overlying soil and super-
imposed loads
(i) Drilled caissons :
•The terms drilled caissons, foundation pier or sub-
pier are also termed as cylindrical foundation.
•Drilled caissons are generally drilled with the
mechanical means
Drilled caissons may be of three types :
a. concrete caisson with enlarged bottom
b. caisson of steel pipe with concrete filled in the
pipe
c. caisson with concrete and steel core in steel
pipe
Drilled caissons
3. Well foundation or caissons:
•“Caisson”- french word “caisse”- means box
•Well foundations or caissons are box like structure-
circular or rectangular-which are sunk from the
surface of either land or water to the desired depth
•Adopted for the construction of foundation of bridge ,
pier
•They are much large in diameter than the pier
foundations or drilled caissons
3. Well foundation or caissons:………..
Caisson foundations are used for following
purpose(or in following case):
•To transmit load of the structure to hard bearing
strata lying below deep waters
box
3. Well foundation or caissons:………..
•Caisson foundations are used for major foundation
works, such as for:
bridge piers and abutments in rivers, lakes etc
Wharves, quay walls, docks
Break waters and other structures for shore
protections
Large water front structures such as pump houses,
subjected to heavy vertical and horizontal loads
•Well foundations or
caissons are hollow from
inside, which may be filled
with sand and are plugged
at the bottom.
•The load is transferred
though the perimeter wall,
called steining
•Well foundations are not
used for buildings
3. Well foundation or caissons:……
3. Well foundation or caissons:………..
Types of caissons:
a. Box caissons
b. Open caissons or wells or well foundation
c. Monolithic caissons
d. Pneumatic caissons
3. Well foundation or caissons:………..
a. Box caissons:
•Box is open at top and closed at the bottom
•May be of RCC, steel or timber
•It is first built on land and then sunk in position
•The cavity is generally filled with sand
•Then the top of caisson is filled with concrete
a. Box caissons:……….
a. Box caissons:……….
•Source: Gurucharan pg 112
a. Box caissons:………………..
•Box caisson is used in following case:
When the depth of water is not more than 6 to 8m
When the bed material is soft or loose
a. Box caissons:………………..
Procedure:
•First of all the base where caisson is to rest is
leveled and consolidated
•If caisson is to rest on group of piles, the head of
piles are leveled such a way that heads of pile lie on
same plain
•The caisson is floated on site of use and slowly sunk
by filling the cavity of box caisson with sand or gravel
a. Box caissons:………………..
Procedure:…………
•Sand filling helps in uniform distribution of load on
soil
•The sand bed is sealed with concrete in order to
confine soil in its position
b. Open caissons or well or well foundation
•Unlike box caisson open caisson is open at both top
and bottom end
•Open caisson is a box of timber, metal or RCC
•Open caissons are known as well and if no. of well
is two it is known as twin well and if more wells than
these are called monolith
•Uneconomical – as heavy timbering is required
•Slow in construction- since greater earthwork
required
b. Open caissons or well or well foundation
•Types of open caisson:
i. Single well
ii. Multiple well or monoliths
iii. Cylinder
•Gurucharan pg 113 to 116
c. Pneumatic caisson
•Closed at the top and
open (during construction)
at the bottom
•The basic principle is to
isolate the working
chamber from the
surrounding atmosphere
•Working process similar to
the open caisson but in this
caisson the working
chamber is kept air tight
c. Pneumatic caisson
•The pressure of air in the shaft is kept higher than
that of the water at the working depth so that the
subsoil water may not enter the working chamber
FOUNDATION IN BLACK COTTON SOIL
What is Black cotton soil?
Having properties of shrinkage and swelling due to
moisture movement through them
Swells excessively when wet(wet during rain) and
shrinks when dry
This results cracks in wall and damage lintels,
beams
Have poor bearing capacity
Things to be considered while designing footing in
black cotton soil:
•The safe bearing capacity of soil should be properly
determined
•The foundation should be taken at least 50cm lower
than the depth of moisture movement
•If the black cotton soil layer is at the top(1 to 1.5m)
deep, the layer can be completely removed and
foundation can be laid over non-shrinkable and non-
swelling soil
Things to be considered while designing footing in
black cotton soil:…………………………
•But if the black cotton soil is at greater depth than
the foundation laid should not be allowed to be in
contact with soil
•In this case the excavation of large width and depth
is dug and insert the layer of sand around and
beneath the footing
•Deeper piles and piers are used
•In case the bearing capacity of soil is low the
foundation trench should be made hard
Things to be considered while designing footing in
black cotton soil:……………..
•Better to construct this type of foundation during dry
season
Types of foundation in black cotton soil:
1. Strip or pad foundation
2. Pier foundation
3. Under reamed pile foundation
1. Strip or pad foundation:
•Some special design features as follows are
adopted:
When soil has little swelling pressure
When soil has relatively high swelling pressure
When soil has high swelling pressure
When soil is soft and loose and bearing capacity is
low
1. Strip or pad foundation:…………..
When soil has little swelling pressure:
A layer of of 60cm thick
cohesion less sand is
filled below the
foundation bed and
compacted
Sand is also filled around
the footing
1. Strip or pad foundation:…………..
When soil has relatively high swelling pressure:
By keeping alternate
layers of sand and
ballast/mooram
1. Strip or pad foundation:…………..
When soil has high swelling pressure:
25 to 30 cm thick and wide strips of concrete is laid
over the compacted base of trench
The space or gap between the two strips of concrete
is filled with sand and is equal to the width of bottom
of masonry
Above this strip the foundation bed is laid
Side of foundation laid with sand
1. Strip or pad foundation:…………..
When soil has high swelling pressure:………..
•80mm dia pipe @ spacing
1.5m are placed through
masonry and concrete
reaching sand fill and pipe is
filled with sand
•Plug may placed at the top
of the pipe which can be
removed and placed as per
the work required
1. Strip or pad foundation:…………..
When soil is soft and loose and bearing capacity is
low:
•First of all 30 cm thick layer of
ballast is rammed
•Over it 30cm thick layer of
sand is filled
•Over it lies the concrete bed
of foundation
•Sides of foundation filled with
sand as usual
2. Pier foundation with arches:
•Piers are dug at regular interval and filled with
cement concrete
•Piers rest on hard bearing strata
•Piers at the top are connected through concrete or
masonry arch
•Above masonry arch the walls rest
•Sometimes beams are provided over the arch in
case the arch is constructed of masonry
2. Pier foundation with arches:………
•The arches are constructed high above ground level
•The gap allows the free vertical movement of soil
during swelling and shrinkage operation
3. Under-reamed pile foundation:
•Under reamed piles are bored
cast in situ concrete piles having
bulb shaped enlargement near
base
•A Pile having one bulb is called
single under reamed pile and
having two is double underreamed
pile
•The bearing capacity of the pile is
increased by increasing the
number of bulbs at the base
•The basic principle of under reamed pile is to anchor
the structure at a depth where ground movement are
negligible due to moisture variation or other reasons
•Simple tools are
required for construction
of under-reamed piles
like spiral auger, under
reaming tool, and boring
guide
•For speeding up the
construction bore and
under ream for large
diameter and deeper pile
a mechanical rig can be
used
3. Under-reamed pile foundation:…………….
•Diameter of the bulb is 2.5
times dia of piles stem or may
vary from 2.5times the dia of
piles
•The c/c distance vertical
spacing between two bulbs(in
case of multi reamed piles) vary
from 1.25 to 1 .5 times the
diameter of bulb
•Length of under reamed piles
varies from 3 to 8m
3. Under-reamed pile foundation:…………….
FOUNDATION IN SLOPING SITE
•Generally, it's most economical to place wall footings
at a constant elevation
•If the site or finished grade slopes along the length
of the wall, however, the footing may end up a
considerable distance below finished grade
•This is clearly not economical, as it requires extra
excavation and material
Slope the footing with the
site so its depth below the
finished grade is nearly
constant along its length
FOUNDATION IN SLOPING SITE
Step the footing so its
depth below finished grade
is not excessive at any
point along its length
Following options are preferred
FOUNDATION IN SLOPING SITE
Sloped Footing Issues
•simple geometry and apparent ease in formwork
construction.
•But create the following construction issues
FOUNDATION IN SLOPING SITE
Sloped Footing Issues
•Vertical wall bars above the footing will have different lengths
- increase the quantity of vertical reinforcement
•Horizontal reinforcing bars in the lower portion of the wall will
also have different lengths because they are interrupted by
the sloped footing
•will require trapezoidal formwork- so need modifications to
standard rectangular formwork
•A sloped footing could be unstable, particularly on a very
steep slope and
•Concrete placement and finishing could be difficult, and a stiff
concrete mixture might be required to prevent the concrete
from flowing downhill
FOUNDATION IN SLOPING SITE
Considerations For Stepped Footings
For a very long wall- stepped footing more
economical
FOUNDATION IN SLOPING SITE
Considerations For Stepped Footings
•It's generally more cost effective to minimize the
number of steps.
•For example, it may be more economical to design
for a 6 ft (1.8 m) change in elevation using three 2 ft
(0.6 m) steps or two 3 ft (0.9 m) steps rather than six
1 ft (0.3 m) steps- This minimizes the number of wall
sections to be detailed and formed
CAUSES OF FAILURE OF FOUNDATION AND
THEIR REMEDIAL MEASURES
………………
Bc punmia pg 63
THANK YOU

More Related Content

What's hot

Coffer Dams and Caissons
Coffer Dams and CaissonsCoffer Dams and Caissons
Coffer Dams and Caissons
Rizwan Samor
 

What's hot (20)

Retaining walls
Retaining wallsRetaining walls
Retaining walls
 
Slabs and types
Slabs and typesSlabs and types
Slabs and types
 
Mat or raft foundation
Mat or raft foundationMat or raft foundation
Mat or raft foundation
 
Foundation selection
Foundation selectionFoundation selection
Foundation selection
 
Well foundation ppt
Well foundation pptWell foundation ppt
Well foundation ppt
 
Deep excavation
Deep excavationDeep excavation
Deep excavation
 
Deep foundation
Deep foundationDeep foundation
Deep foundation
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Shallow Foundation
Shallow FoundationShallow Foundation
Shallow Foundation
 
Chapter 4.3 well foundation-final-ppt
Chapter 4.3   well foundation-final-pptChapter 4.3   well foundation-final-ppt
Chapter 4.3 well foundation-final-ppt
 
Pile Foundation - Rohan Dasgupta.pdf
Pile Foundation - Rohan Dasgupta.pdfPile Foundation - Rohan Dasgupta.pdf
Pile Foundation - Rohan Dasgupta.pdf
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Coffer Dams and Caissons
Coffer Dams and CaissonsCoffer Dams and Caissons
Coffer Dams and Caissons
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Foundations
FoundationsFoundations
Foundations
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
 
Tunnel constructions
Tunnel constructionsTunnel constructions
Tunnel constructions
 
FOOTING (STRUCTURE)
FOOTING (STRUCTURE)FOOTING (STRUCTURE)
FOOTING (STRUCTURE)
 
Pile foundation
Pile foundation Pile foundation
Pile foundation
 

Similar to BC-II lec 6 pierand deep fdn.pptx

Similar to BC-II lec 6 pierand deep fdn.pptx (20)

pire and well.pptx
pire and  well.pptxpire and  well.pptx
pire and well.pptx
 
Building foundation
Building foundationBuilding foundation
Building foundation
 
Foundation
FoundationFoundation
Foundation
 
foundationtypes-161207082056.pdf
foundationtypes-161207082056.pdffoundationtypes-161207082056.pdf
foundationtypes-161207082056.pdf
 
Foundation types
Foundation typesFoundation types
Foundation types
 
Presentation tos
Presentation tosPresentation tos
Presentation tos
 
foundation-shallow foundation.pptx
foundation-shallow foundation.pptxfoundation-shallow foundation.pptx
foundation-shallow foundation.pptx
 
Well Foundation
Well FoundationWell Foundation
Well Foundation
 
Foundation
FoundationFoundation
Foundation
 
Pile foundations_Advanced Construction Technology
Pile foundations_Advanced Construction TechnologyPile foundations_Advanced Construction Technology
Pile foundations_Advanced Construction Technology
 
Rock mechanics for engineering geology (part 2)
Rock mechanics for engineering geology (part 2)Rock mechanics for engineering geology (part 2)
Rock mechanics for engineering geology (part 2)
 
caissons and cofferdam in substructure construction
caissons and cofferdam in substructure constructioncaissons and cofferdam in substructure construction
caissons and cofferdam in substructure construction
 
Under reamed piles
Under reamed pilesUnder reamed piles
Under reamed piles
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
 
special foundation techniques
 special foundation techniques special foundation techniques
special foundation techniques
 
Pile foundations Case Study Delhi Metro Site Visit
Pile foundations Case Study  Delhi Metro Site VisitPile foundations Case Study  Delhi Metro Site Visit
Pile foundations Case Study Delhi Metro Site Visit
 
Pile Foundation for advanced construction equipments
Pile Foundation for advanced construction equipmentsPile Foundation for advanced construction equipments
Pile Foundation for advanced construction equipments
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 
Foundations grp 1
Foundations grp 1Foundations grp 1
Foundations grp 1
 
Foundation
FoundationFoundation
Foundation
 

Recently uploaded

Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
kumaririma588
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
amitlee9823
 
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
amitlee9823
 
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
nirzagarg
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
home
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
amitlee9823
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
nirzagarg
 
Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptx
TusharBahuguna2
 
infant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptxinfant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptx
suhanimunjal27
 

Recently uploaded (20)

Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
 
Case Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneCase Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, Pune
 
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
 
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptx
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentation
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
 
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
 
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
 
❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.
❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.
❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
 
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
 
Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptx
 
infant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptxinfant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptx
 

BC-II lec 6 pierand deep fdn.pptx

  • 2. 2. Pier foundation: •A Pier foundation consists of a cylindrical column of large diameter to support and transfer large super- imposed loads to the firm strata below. •Piers are holes filled with concrete which act as leg for foundation •Piers are used when a heavy structure is to be built and the firm/hard strata is at reasonable depth •Construction process comprises sinking vertical shafts and filling with concrete
  • 3. 2. Pier foundation: Fig: Pier foundation with arch
  • 4. 2. Pier foundation:……………… Difference between Pile and Pier foundation: •Difference in methods of construction •pile foundations transfer the load through friction and/or bearing but pier foundations transfer the load only through bearing •pier foundation is shallower in depth than the pile foundation •Pier foundation require less excavation
  • 5. Types of Pier foundation: (i) Masonry or concrete pier (ii) Drilled caissons
  • 6. (i) Masonry or concrete pier : •When a good bearing stratum exists upto 5 m below ground level, brick, masonry or concrete foundation piers in excavated pits may be used • The size and spacing of the piers depends upon the depth of hard bed, nature of overlying soil and super- imposed loads
  • 7. (i) Drilled caissons : •The terms drilled caissons, foundation pier or sub- pier are also termed as cylindrical foundation. •Drilled caissons are generally drilled with the mechanical means
  • 8. Drilled caissons may be of three types : a. concrete caisson with enlarged bottom b. caisson of steel pipe with concrete filled in the pipe c. caisson with concrete and steel core in steel pipe
  • 10. 3. Well foundation or caissons: •“Caisson”- french word “caisse”- means box •Well foundations or caissons are box like structure- circular or rectangular-which are sunk from the surface of either land or water to the desired depth •Adopted for the construction of foundation of bridge , pier •They are much large in diameter than the pier foundations or drilled caissons
  • 11. 3. Well foundation or caissons:……….. Caisson foundations are used for following purpose(or in following case): •To transmit load of the structure to hard bearing strata lying below deep waters box
  • 12. 3. Well foundation or caissons:……….. •Caisson foundations are used for major foundation works, such as for: bridge piers and abutments in rivers, lakes etc Wharves, quay walls, docks Break waters and other structures for shore protections Large water front structures such as pump houses, subjected to heavy vertical and horizontal loads
  • 13. •Well foundations or caissons are hollow from inside, which may be filled with sand and are plugged at the bottom. •The load is transferred though the perimeter wall, called steining •Well foundations are not used for buildings 3. Well foundation or caissons:……
  • 14. 3. Well foundation or caissons:……….. Types of caissons: a. Box caissons b. Open caissons or wells or well foundation c. Monolithic caissons d. Pneumatic caissons
  • 15. 3. Well foundation or caissons:………..
  • 16. a. Box caissons: •Box is open at top and closed at the bottom •May be of RCC, steel or timber •It is first built on land and then sunk in position •The cavity is generally filled with sand •Then the top of caisson is filled with concrete
  • 19. a. Box caissons:……………….. •Box caisson is used in following case: When the depth of water is not more than 6 to 8m When the bed material is soft or loose
  • 20. a. Box caissons:……………….. Procedure: •First of all the base where caisson is to rest is leveled and consolidated •If caisson is to rest on group of piles, the head of piles are leveled such a way that heads of pile lie on same plain •The caisson is floated on site of use and slowly sunk by filling the cavity of box caisson with sand or gravel
  • 21. a. Box caissons:……………….. Procedure:………… •Sand filling helps in uniform distribution of load on soil •The sand bed is sealed with concrete in order to confine soil in its position
  • 22. b. Open caissons or well or well foundation •Unlike box caisson open caisson is open at both top and bottom end •Open caisson is a box of timber, metal or RCC •Open caissons are known as well and if no. of well is two it is known as twin well and if more wells than these are called monolith •Uneconomical – as heavy timbering is required •Slow in construction- since greater earthwork required
  • 23. b. Open caissons or well or well foundation •Types of open caisson: i. Single well ii. Multiple well or monoliths iii. Cylinder •Gurucharan pg 113 to 116
  • 24. c. Pneumatic caisson •Closed at the top and open (during construction) at the bottom •The basic principle is to isolate the working chamber from the surrounding atmosphere •Working process similar to the open caisson but in this caisson the working chamber is kept air tight
  • 25. c. Pneumatic caisson •The pressure of air in the shaft is kept higher than that of the water at the working depth so that the subsoil water may not enter the working chamber
  • 26. FOUNDATION IN BLACK COTTON SOIL What is Black cotton soil? Having properties of shrinkage and swelling due to moisture movement through them Swells excessively when wet(wet during rain) and shrinks when dry This results cracks in wall and damage lintels, beams Have poor bearing capacity
  • 27. Things to be considered while designing footing in black cotton soil: •The safe bearing capacity of soil should be properly determined •The foundation should be taken at least 50cm lower than the depth of moisture movement •If the black cotton soil layer is at the top(1 to 1.5m) deep, the layer can be completely removed and foundation can be laid over non-shrinkable and non- swelling soil
  • 28. Things to be considered while designing footing in black cotton soil:………………………… •But if the black cotton soil is at greater depth than the foundation laid should not be allowed to be in contact with soil •In this case the excavation of large width and depth is dug and insert the layer of sand around and beneath the footing •Deeper piles and piers are used •In case the bearing capacity of soil is low the foundation trench should be made hard
  • 29. Things to be considered while designing footing in black cotton soil:…………….. •Better to construct this type of foundation during dry season Types of foundation in black cotton soil: 1. Strip or pad foundation 2. Pier foundation 3. Under reamed pile foundation
  • 30. 1. Strip or pad foundation: •Some special design features as follows are adopted: When soil has little swelling pressure When soil has relatively high swelling pressure When soil has high swelling pressure When soil is soft and loose and bearing capacity is low
  • 31. 1. Strip or pad foundation:………….. When soil has little swelling pressure: A layer of of 60cm thick cohesion less sand is filled below the foundation bed and compacted Sand is also filled around the footing
  • 32. 1. Strip or pad foundation:………….. When soil has relatively high swelling pressure: By keeping alternate layers of sand and ballast/mooram
  • 33. 1. Strip or pad foundation:………….. When soil has high swelling pressure: 25 to 30 cm thick and wide strips of concrete is laid over the compacted base of trench The space or gap between the two strips of concrete is filled with sand and is equal to the width of bottom of masonry Above this strip the foundation bed is laid Side of foundation laid with sand
  • 34. 1. Strip or pad foundation:………….. When soil has high swelling pressure:……….. •80mm dia pipe @ spacing 1.5m are placed through masonry and concrete reaching sand fill and pipe is filled with sand •Plug may placed at the top of the pipe which can be removed and placed as per the work required
  • 35. 1. Strip or pad foundation:………….. When soil is soft and loose and bearing capacity is low: •First of all 30 cm thick layer of ballast is rammed •Over it 30cm thick layer of sand is filled •Over it lies the concrete bed of foundation •Sides of foundation filled with sand as usual
  • 36. 2. Pier foundation with arches: •Piers are dug at regular interval and filled with cement concrete •Piers rest on hard bearing strata •Piers at the top are connected through concrete or masonry arch •Above masonry arch the walls rest •Sometimes beams are provided over the arch in case the arch is constructed of masonry
  • 37. 2. Pier foundation with arches:……… •The arches are constructed high above ground level •The gap allows the free vertical movement of soil during swelling and shrinkage operation
  • 38. 3. Under-reamed pile foundation: •Under reamed piles are bored cast in situ concrete piles having bulb shaped enlargement near base •A Pile having one bulb is called single under reamed pile and having two is double underreamed pile •The bearing capacity of the pile is increased by increasing the number of bulbs at the base •The basic principle of under reamed pile is to anchor the structure at a depth where ground movement are negligible due to moisture variation or other reasons
  • 39.
  • 40. •Simple tools are required for construction of under-reamed piles like spiral auger, under reaming tool, and boring guide •For speeding up the construction bore and under ream for large diameter and deeper pile a mechanical rig can be used 3. Under-reamed pile foundation:…………….
  • 41. •Diameter of the bulb is 2.5 times dia of piles stem or may vary from 2.5times the dia of piles •The c/c distance vertical spacing between two bulbs(in case of multi reamed piles) vary from 1.25 to 1 .5 times the diameter of bulb •Length of under reamed piles varies from 3 to 8m 3. Under-reamed pile foundation:…………….
  • 42. FOUNDATION IN SLOPING SITE •Generally, it's most economical to place wall footings at a constant elevation •If the site or finished grade slopes along the length of the wall, however, the footing may end up a considerable distance below finished grade •This is clearly not economical, as it requires extra excavation and material
  • 43. Slope the footing with the site so its depth below the finished grade is nearly constant along its length FOUNDATION IN SLOPING SITE Step the footing so its depth below finished grade is not excessive at any point along its length Following options are preferred
  • 44.
  • 45. FOUNDATION IN SLOPING SITE Sloped Footing Issues •simple geometry and apparent ease in formwork construction. •But create the following construction issues
  • 46. FOUNDATION IN SLOPING SITE Sloped Footing Issues •Vertical wall bars above the footing will have different lengths - increase the quantity of vertical reinforcement •Horizontal reinforcing bars in the lower portion of the wall will also have different lengths because they are interrupted by the sloped footing •will require trapezoidal formwork- so need modifications to standard rectangular formwork •A sloped footing could be unstable, particularly on a very steep slope and •Concrete placement and finishing could be difficult, and a stiff concrete mixture might be required to prevent the concrete from flowing downhill
  • 47. FOUNDATION IN SLOPING SITE Considerations For Stepped Footings For a very long wall- stepped footing more economical
  • 48. FOUNDATION IN SLOPING SITE Considerations For Stepped Footings •It's generally more cost effective to minimize the number of steps. •For example, it may be more economical to design for a 6 ft (1.8 m) change in elevation using three 2 ft (0.6 m) steps or two 3 ft (0.9 m) steps rather than six 1 ft (0.3 m) steps- This minimizes the number of wall sections to be detailed and formed
  • 49. CAUSES OF FAILURE OF FOUNDATION AND THEIR REMEDIAL MEASURES ……………… Bc punmia pg 63

Editor's Notes

  1. Breakwaters are structures constructed on coasts as part of coastal defense or to protect an anchorage from the effects of both weather and longshore drift.