SlideShare a Scribd company logo
1 of 57
Pictorial presentation of some
projects
Ebonyi State
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS 1
Construction of blocks of 5 classrooms
blocks in Owutu Central School
(EB/AS/02)
2
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
Construction of one motorized borehole in
Egbebu Central School(EB/AS/03)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
3
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
4
Construction of compartmented VIP
toilets in Amangwu Community Primary
School I(EB/AS/10)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
5
Construction of compartmented VIP toilets in okporojo
Primary School(EB/AS/13)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
6
Renovation of classroom block in Ezechi
Primary School(EB/AS/23)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
7
Renovation of classroom block in Ebiri Primary
School(EB/AS/24)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
8
Renovation of classroom block in Ekula
Primary School(EB/AS/26)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
9
Renovation of classroom block in Edda
Central School(EB/AS/27)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
10
Renovation of classroom block in Amosonta Primary
School(EB/AS/29)
Renovation of classroom block in Umunnabuike
Primary School(EB/AS/30)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
11
Renovation of classroom block in
Ejikewu Primary school(EB/AS/31)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
12
Renovation of classroom block in Oso Central
School(EB/AS/34)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
13
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
14
Renovation of classroom block in Amaigbo Primary
School(EB/AS/32)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
15
Renovation of classroom block in Amangwu
Community Primary School(EB/AS/33)
Reconstruct 3 Health Posts that share residences in town halls
into a BH Clinic at Akpughuru HP(EB/AS/37)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
16
Renovation of 3 dilapidated health facilities at Umunna, Model
Health(EB/AS/40)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
17
Renovation of 3 dilapidated health facilities at Model HC
EziEdda(EB/AS/41)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
18
Construction of one (1) number hand pump Borehole at
Nguzu(EB/AS/43)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
19
Construction of 1 motorized borehole in a EKoli
health facility at (EB/AS/52)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
20
Procure and diatribute drugs for ANC, PNC, Immunization, Deworming, Malaria, Diarrhoea and other
diseases to Umunna HC(EB/AS/55), Igbara Health Clinic(EB/AS/56), Akpughuru health clinic (EB/AS/57), to
Model HC (EB/AS/58), to Asaga health post (EB/AS/59), Ogiri health post (EB/AS/60), Amoso BHC
(EB/AS/61), Nguzu Health Center (EB/AS/62), Ekoli Health Center (EB/AS/63), Amosonta health post
(EB/AS/64
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
21
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
22
Construction of handpump boreholes at Central School,
Onuafiukwa(EB/IW/83)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
23
Construction of handpump boreholes at Community Primary
School, Igbudu Agbenyim; (EB/IW/85)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
24
Construction of handpump boreholes at Community
Primary School, Ndiagu Echara (EB/IW/86)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
25
Construction of handpump boreholes at Community
Primary School, Obegu Enyibichiri (EB/IW/87)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
26
Construction of handpump boreholes at
Community Primary School, odeligbo
(EB/IW/88)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
27
Construction of handpump boreholes at Community Primary
School, Nsuba Okpuitumo. (EB/IW/89)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
28
Construction of 5 compartment gender separated VIP
toilets in Community Primary School, Igbudu Agbenyim
(EB/IW/92)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
29
Construction of 5 compartment gender separated VIP toilets in Onu Nwode
Primary School, Ndufu Echara (EB/IW/95)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
30
Construction of 5 compartment gender separated
VIP toilets Community Primary School, Enyibichiri
Amagu; (EB/IW/96)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
31
Construction of 5 compartment gender separated VIP toilets in Community
Primary School, Odeligbo (EB/IW/98)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
32
Renovation of classrooms within Community Central
School, Igbudu(EB/IW/100)
Renovation of classrooms within Central
School, Onuafiukwa (EB/IW/101)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
33
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
34
Renovation of classrooms within Community Primary
School, Igbudu Agbenyim; (EB/IW/102)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
35
Renovation of classrooms within Community Primary
School, Ndiagu Echara (EB/IW/103)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
36
Renovation of classrooms within Umunnator Central School, Onu
Nwakpu (EB/IW/104)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
37
Renovation of classrooms within Community Primary
School, Enyibichiri Amagu (EB/IW/105)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
38
Renovation of classrooms within Community Primary
School, Odeligbo (EB/IW/106)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
39
Reconstruction of classroom blocks in Community Primary
School Nsuba Opuitumo(EB/IW/107)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
40
Reconstruction of classroom blocks in Community Primary School,
Obegu Enyibichiri (EB/IW/108)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
41
Reconstruction of classroom blocks in Community Primary School,
Ndiogbu Noyo (EB/IW/110)
Reconstruction of classroom blocks in New haven Primary
school, Nzashi Echara. (EB/IW/111)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
42
Construction of desks (2 seater) for the
abovementioned 12 primary
schools(EB/IW/112)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
43
Construction of one (1) number hand pump borehole at
Oronga Amagu Health Center(EB/IW/113)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
44
Construction of one (1) number hand pump
borehole at Ekpa Omaka clinic (EB/IW/115)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
45
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
46
Renovation/Expansion of PHC at Oronga
Amagu(EB/IW/116)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
47
Construction of one (1) number hand pump Borehole each
in Osebi community primary school (EB/IZ/131)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
48
Construction of five (5) compartment Ventilated Improved Pit
(VIP) in Amachara community primary school(EB/IZ/132)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
49
Construction of five (5) compartment Ventilated Improved Pit (VIP) in
Oyege central school, (EB/IZ/134)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
50
Construction of five (5) compartment Ventilated
Improved Pit (VIP) in Mgbabeluzor primary school
(EB/IZ/136)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
51
Construction of five (5) compartment Ventilated
Improved Pit (VIP) in Osebi community primary school
(EB/IZ/137)
Renovation of Classrooms within five (5)
Public primary schools in the L.G.A. Ndidoko
community primary school(EB/IZ/138)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
52
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
53
Renovation of Classrooms within five (5) Public
primary schools in the L.G.A. Amachara community
primary school (EB/IZ/139)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
54
Renovation of Classrooms within five (5) Public primary schools in
the L.G.A. Osebi community primary school (EB/IZ/142)
Reconstruction of Classroom blocks, which were originally built
with mud blocks, within three (3) Public primary schools in the
L.G.A Oyege central school (EB/IZ/144)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
55
Reconstruction of Classroom blocks, which were originally built with
mud blocks, within three (3) Public primary schools in the L.G.A.
Mgbabeluzor (EB/IZ/145)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
56
Rehabilitation and expansion of some health centres within the LGA
which were originally built with mud blocks and have just one or two
rooms apartments inside Ndingele(EB/IZ/153)
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS
57

More Related Content

Viewers also liked

Adamawa sample pictorial presentation of some projects (adamawa)
Adamawa sample pictorial presentation of some projects (adamawa)Adamawa sample pictorial presentation of some projects (adamawa)
Adamawa sample pictorial presentation of some projects (adamawa)
OSSAP-MDGS
 
Cross river 2 sample pictorial presentation of some projects
Cross river 2 sample pictorial presentation of some projectsCross river 2 sample pictorial presentation of some projects
Cross river 2 sample pictorial presentation of some projects
OSSAP-MDGS
 
Kebbi sample pictorial presentation of some projects 2
Kebbi sample pictorial presentation of some projects 2Kebbi sample pictorial presentation of some projects 2
Kebbi sample pictorial presentation of some projects 2
OSSAP-MDGS
 
Kano sample pictorial presentation of some projects (kano)
Kano  sample pictorial presentation of some projects (kano)Kano  sample pictorial presentation of some projects (kano)
Kano sample pictorial presentation of some projects (kano)
OSSAP-MDGS
 
Borno 2 pictorial presentation of some projects
Borno 2 pictorial presentation of some projectsBorno 2 pictorial presentation of some projects
Borno 2 pictorial presentation of some projects
OSSAP-MDGS
 
Ebonyi sample pictorial presentation of some projects
Ebonyi sample pictorial presentation of some projectsEbonyi sample pictorial presentation of some projects
Ebonyi sample pictorial presentation of some projects
OSSAP-MDGS
 
Visit picture for taraba state
Visit picture for taraba stateVisit picture for taraba state
Visit picture for taraba state
OSSAP-MDGS
 
Plateau pictures
Plateau picturesPlateau pictures
Plateau pictures
OSSAP-MDGS
 
Appendix 4 sparc maf final draft report april 2003
Appendix 4 sparc  maf  final  draft report april 2003 Appendix 4 sparc  maf  final  draft report april 2003
Appendix 4 sparc maf final draft report april 2003
OSSAP-MDGS
 
Katsina 2 ppt mdg kt pictures
Katsina 2 ppt mdg kt picturesKatsina 2 ppt mdg kt pictures
Katsina 2 ppt mdg kt pictures
OSSAP-MDGS
 
Plateau stage 2 visit md gs- cgs - plateau state
Plateau stage 2 visit md gs- cgs - plateau statePlateau stage 2 visit md gs- cgs - plateau state
Plateau stage 2 visit md gs- cgs - plateau state
OSSAP-MDGS
 
Crear un cuenta de google
Crear un cuenta de googleCrear un cuenta de google
Crear un cuenta de google
Alexandra Ló
 
experience-infographic
experience-infographicexperience-infographic
experience-infographic
Tim Fields
 
пасха близко
пасха близкопасха близко
пасха близко
sanatore
 

Viewers also liked (15)

Adamawa sample pictorial presentation of some projects (adamawa)
Adamawa sample pictorial presentation of some projects (adamawa)Adamawa sample pictorial presentation of some projects (adamawa)
Adamawa sample pictorial presentation of some projects (adamawa)
 
Cross river 2 sample pictorial presentation of some projects
Cross river 2 sample pictorial presentation of some projectsCross river 2 sample pictorial presentation of some projects
Cross river 2 sample pictorial presentation of some projects
 
Kebbi sample pictorial presentation of some projects 2
Kebbi sample pictorial presentation of some projects 2Kebbi sample pictorial presentation of some projects 2
Kebbi sample pictorial presentation of some projects 2
 
Kano sample pictorial presentation of some projects (kano)
Kano  sample pictorial presentation of some projects (kano)Kano  sample pictorial presentation of some projects (kano)
Kano sample pictorial presentation of some projects (kano)
 
Borno 2 pictorial presentation of some projects
Borno 2 pictorial presentation of some projectsBorno 2 pictorial presentation of some projects
Borno 2 pictorial presentation of some projects
 
Ebonyi sample pictorial presentation of some projects
Ebonyi sample pictorial presentation of some projectsEbonyi sample pictorial presentation of some projects
Ebonyi sample pictorial presentation of some projects
 
Visit picture for taraba state
Visit picture for taraba stateVisit picture for taraba state
Visit picture for taraba state
 
Plateau pictures
Plateau picturesPlateau pictures
Plateau pictures
 
Appendix 4 sparc maf final draft report april 2003
Appendix 4 sparc  maf  final  draft report april 2003 Appendix 4 sparc  maf  final  draft report april 2003
Appendix 4 sparc maf final draft report april 2003
 
Katsina 2 ppt mdg kt pictures
Katsina 2 ppt mdg kt picturesKatsina 2 ppt mdg kt pictures
Katsina 2 ppt mdg kt pictures
 
Plateau stage 2 visit md gs- cgs - plateau state
Plateau stage 2 visit md gs- cgs - plateau statePlateau stage 2 visit md gs- cgs - plateau state
Plateau stage 2 visit md gs- cgs - plateau state
 
\\Ace\Students\10\Alexander Poynter\My Documents\Media Studies\Evaluation\Bre...
\\Ace\Students\10\Alexander Poynter\My Documents\Media Studies\Evaluation\Bre...\\Ace\Students\10\Alexander Poynter\My Documents\Media Studies\Evaluation\Bre...
\\Ace\Students\10\Alexander Poynter\My Documents\Media Studies\Evaluation\Bre...
 
Crear un cuenta de google
Crear un cuenta de googleCrear un cuenta de google
Crear un cuenta de google
 
experience-infographic
experience-infographicexperience-infographic
experience-infographic
 
пасха близко
пасха близкопасха близко
пасха близко
 

Recently uploaded

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 

Recently uploaded (20)

Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 

Ebonyi 02 sample pictorial presentation second round

  • 1. Pictorial presentation of some projects Ebonyi State INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 1
  • 2. Construction of blocks of 5 classrooms blocks in Owutu Central School (EB/AS/02) 2 INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS
  • 3. Construction of one motorized borehole in Egbebu Central School(EB/AS/03) INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 3
  • 4. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 4 Construction of compartmented VIP toilets in Amangwu Community Primary School I(EB/AS/10)
  • 5. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 5 Construction of compartmented VIP toilets in okporojo Primary School(EB/AS/13)
  • 6. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 6 Renovation of classroom block in Ezechi Primary School(EB/AS/23)
  • 7. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 7 Renovation of classroom block in Ebiri Primary School(EB/AS/24)
  • 8. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 8 Renovation of classroom block in Ekula Primary School(EB/AS/26)
  • 9. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 9 Renovation of classroom block in Edda Central School(EB/AS/27)
  • 10. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 10 Renovation of classroom block in Amosonta Primary School(EB/AS/29)
  • 11. Renovation of classroom block in Umunnabuike Primary School(EB/AS/30) INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 11
  • 12. Renovation of classroom block in Ejikewu Primary school(EB/AS/31) INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 12
  • 13. Renovation of classroom block in Oso Central School(EB/AS/34) INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 13
  • 14. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 14 Renovation of classroom block in Amaigbo Primary School(EB/AS/32)
  • 15. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 15 Renovation of classroom block in Amangwu Community Primary School(EB/AS/33)
  • 16. Reconstruct 3 Health Posts that share residences in town halls into a BH Clinic at Akpughuru HP(EB/AS/37) INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 16
  • 17. Renovation of 3 dilapidated health facilities at Umunna, Model Health(EB/AS/40) INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 17
  • 18. Renovation of 3 dilapidated health facilities at Model HC EziEdda(EB/AS/41) INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 18
  • 19. Construction of one (1) number hand pump Borehole at Nguzu(EB/AS/43) INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 19
  • 20. Construction of 1 motorized borehole in a EKoli health facility at (EB/AS/52) INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 20
  • 21. Procure and diatribute drugs for ANC, PNC, Immunization, Deworming, Malaria, Diarrhoea and other diseases to Umunna HC(EB/AS/55), Igbara Health Clinic(EB/AS/56), Akpughuru health clinic (EB/AS/57), to Model HC (EB/AS/58), to Asaga health post (EB/AS/59), Ogiri health post (EB/AS/60), Amoso BHC (EB/AS/61), Nguzu Health Center (EB/AS/62), Ekoli Health Center (EB/AS/63), Amosonta health post (EB/AS/64 INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 21
  • 22. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 22 Construction of handpump boreholes at Central School, Onuafiukwa(EB/IW/83)
  • 23. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 23 Construction of handpump boreholes at Community Primary School, Igbudu Agbenyim; (EB/IW/85)
  • 24. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 24 Construction of handpump boreholes at Community Primary School, Ndiagu Echara (EB/IW/86)
  • 25. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 25 Construction of handpump boreholes at Community Primary School, Obegu Enyibichiri (EB/IW/87)
  • 26. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 26 Construction of handpump boreholes at Community Primary School, odeligbo (EB/IW/88)
  • 27. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 27 Construction of handpump boreholes at Community Primary School, Nsuba Okpuitumo. (EB/IW/89)
  • 28. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 28 Construction of 5 compartment gender separated VIP toilets in Community Primary School, Igbudu Agbenyim (EB/IW/92)
  • 29. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 29 Construction of 5 compartment gender separated VIP toilets in Onu Nwode Primary School, Ndufu Echara (EB/IW/95)
  • 30. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 30 Construction of 5 compartment gender separated VIP toilets Community Primary School, Enyibichiri Amagu; (EB/IW/96)
  • 31. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 31 Construction of 5 compartment gender separated VIP toilets in Community Primary School, Odeligbo (EB/IW/98)
  • 32. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 32 Renovation of classrooms within Community Central School, Igbudu(EB/IW/100)
  • 33. Renovation of classrooms within Central School, Onuafiukwa (EB/IW/101) INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 33
  • 34. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 34 Renovation of classrooms within Community Primary School, Igbudu Agbenyim; (EB/IW/102)
  • 35. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 35 Renovation of classrooms within Community Primary School, Ndiagu Echara (EB/IW/103)
  • 36. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 36 Renovation of classrooms within Umunnator Central School, Onu Nwakpu (EB/IW/104)
  • 37. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 37 Renovation of classrooms within Community Primary School, Enyibichiri Amagu (EB/IW/105)
  • 38. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 38 Renovation of classrooms within Community Primary School, Odeligbo (EB/IW/106)
  • 39. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 39 Reconstruction of classroom blocks in Community Primary School Nsuba Opuitumo(EB/IW/107)
  • 40. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 40 Reconstruction of classroom blocks in Community Primary School, Obegu Enyibichiri (EB/IW/108)
  • 41. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 41 Reconstruction of classroom blocks in Community Primary School, Ndiogbu Noyo (EB/IW/110)
  • 42. Reconstruction of classroom blocks in New haven Primary school, Nzashi Echara. (EB/IW/111) INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 42
  • 43. Construction of desks (2 seater) for the abovementioned 12 primary schools(EB/IW/112) INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 43
  • 44. Construction of one (1) number hand pump borehole at Oronga Amagu Health Center(EB/IW/113) INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 44
  • 45. Construction of one (1) number hand pump borehole at Ekpa Omaka clinic (EB/IW/115) INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 45
  • 46. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 46 Renovation/Expansion of PHC at Oronga Amagu(EB/IW/116)
  • 47. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 47 Construction of one (1) number hand pump Borehole each in Osebi community primary school (EB/IZ/131)
  • 48. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 48 Construction of five (5) compartment Ventilated Improved Pit (VIP) in Amachara community primary school(EB/IZ/132)
  • 49. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 49 Construction of five (5) compartment Ventilated Improved Pit (VIP) in Oyege central school, (EB/IZ/134)
  • 50. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 50 Construction of five (5) compartment Ventilated Improved Pit (VIP) in Mgbabeluzor primary school (EB/IZ/136)
  • 51. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 51 Construction of five (5) compartment Ventilated Improved Pit (VIP) in Osebi community primary school (EB/IZ/137)
  • 52. Renovation of Classrooms within five (5) Public primary schools in the L.G.A. Ndidoko community primary school(EB/IZ/138) INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 52
  • 53. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 53 Renovation of Classrooms within five (5) Public primary schools in the L.G.A. Amachara community primary school (EB/IZ/139)
  • 54. INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 54 Renovation of Classrooms within five (5) Public primary schools in the L.G.A. Osebi community primary school (EB/IZ/142)
  • 55. Reconstruction of Classroom blocks, which were originally built with mud blocks, within three (3) Public primary schools in the L.G.A Oyege central school (EB/IZ/144) INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 55
  • 56. Reconstruction of Classroom blocks, which were originally built with mud blocks, within three (3) Public primary schools in the L.G.A. Mgbabeluzor (EB/IZ/145) INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 56
  • 57. Rehabilitation and expansion of some health centres within the LGA which were originally built with mud blocks and have just one or two rooms apartments inside Ndingele(EB/IZ/153) INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 57