Nebraska Public Power District
with SEAL Systems:

Plant Maintenance Orders delivered with
Document Attachments in SAP R/3



                                            On January 1, 1970, three
                                            separate utility companies in
                                            Nebraska (the Platte Valley
                                            Public Power and Irrigation
                                            District, the Consumers Public
                                            Power District, and the
                                            Nebraska Public Power System)
                                            merged to become Nebraska
                                            Public Power District. Since
                                            then, people have depended on
                                            the Nebraska Public Power
                                            District (NPPD) to keep
                                            electricity flowing to their
                                            homes. Today, NPPD serves
                                            approximately 1 million
                                            customers throughout 91
                                            counties, utilizing a variety of
                                            generation sources, including
                                            hydro-electric, coal-fire, and
                                            nuclear plants.
This public utilities               Unfortunately, the                  In an average month,
company lives by the slogan:         massive attachments                 550 work packages were
“Always There When You               accompanying the work               produced. A normal package
Need Us.” This means not only        packages proved extremely           would take 9 minutes to
keeping the plants and               difficult to compile. Different     assemble, or 82 hours a month.
distribution networks at high        attachments were stored in          While that figure sounds
levels of output, but also           different servers, rather than      substantial on its own, it pales
practicing strict safety standards   linked to Document Information      in comparison to the workload
at all times. A major part of        records in the Document             during outages, when the
maintaining this strict safety       Management System. This             numbers triple: an average 1600
regimen includes scheduled           being the case, the cumbersome      work packages were produced,
outages every 18 months;             printing process required an        some with literally thousands of
during these outages, extensive      employee to draw up each            pages of attachments. This
maintenance is performed,            attachment in it’s native           translates into 240 hours per
covering all aspects of the          application, print it separately,   outage!
plants, within a matter of           and then compile the entire
weeks.                               work package by hand. There                 Though it was common
                                     was no simple way to print the      knowledge within the plant that
         Of course, when dealing     attachments out of SAP. Even        the method for printing work
with something as complex and        after the attachments were          orders was less than ideal, few
powerful as a nuclear power          printed, they bore no               people knew just how
plant, there is no margin for        identification to indicate which    overwhelming a challenge it
error. Maintenance or repairs        work package they belonged to.      could be. That would soon
require extensive, highly-           Each Plant Maintenance order        change. During a particular
detailed work packages to            could have anywhere from 1 to       scheduled outage, when the
ensure proper safety protocols       15 attachments, and each            demand for work packages
are followed at all times. At        individual attachment could         intensifies greatly, Kyle Pavel, a
NPPD’s Cooper Nuclear Plant          range anywhere from 40 to 200       business analyst for the nuclear
alone, approximately 100             pages long (one even tipped the     plant, assisted the employees in
people rely directly on these        scales at 1100 pages!). It took     assembling the work packages.
work packages for                                                                      “It was very
maintaining the                                                                        frustrating, tedious
facility (although,                                                                    and time-
clearly, the                                                                           consuming,” she
importance of                                                                          recalls, “It was just
these documents                                                                        a mess.”
extends far beyond
those working                                                                                  Clearly,
directly with them,                                                                    something had to
impacting the                                                                          be done to improve
safety and quality                                                                     this process.
of life of the entire
community).                                                                                  An in-
                                                                                     house solution was
       These work                                                                    sought, but proved
order packages are                                                                   impossible. The
maintained inside                                                                    massive coding job
SAP’s PM module,                                                                     would have proved
and each package                                                                     far too costly to
requires additional document         seven employees, and a lot of       have been feasible
attachments in order to be           grief, to assemble these
complete.                            packages.
Finding no resolution
within the company itself, Kyle
looked for outside assistance.
“At the time, SAP had come out
to conduct an engineering
assessment for [the nuclear
plant],” Kyle notes. Kyle met
with SAP and explained the
“painful, time-consuming”
printing process currently being
used at the plant. The SAP
representative directed Kyle to
look at SEAL Systems as a
potential solution, with whom
SAP already had a respectful,
productive business                         In addition, every          SEAL printing process, the time
relationship.                       attachment in the package now       was slashed to 1.5 minutes.
                                    received a watermark stamp,         This means a savings of 69
        As mentioned                identifying the work order it       hours during an average month,
previously, one of the greatest     belonged to and its sequence in     but a huge savings of 200 hours
flaws in NPPD’s original            the package. This assures that,     during an outage. In addition,
printing process was the tedious    not only will the correct, most     the number of people required
process of retrieving each          recently updated documents be       to produce the packages was
attachment, printing it, and then   included in the work order, but     reduced to one individual, as
compiling it which took             they will appear in the right       opposed to the 5 or 7 people
substantial operator                succession. Not only that, but it   needed prior to the SEAL
intervention. SEAL Systems          guarantees that the attachments     solution.
worked with Kyle and her            can be restored to their correct
Cooper Nuclear Plant                order, once they return to the              With the help of SEAL
colleagues to address this          plant. Often the attachments        Systems, Nebraska Public
problem, and several other          become split in the field, where    Power District was able to
issues as well. The new SEAL        a worker can make notations on      increase the efficiency of their
Systems process distilled the       the document. This information      operations. “We’re very
printing of work packages down      has to be returned, in its          happy,” Kyle reports, “We’ve
to a single step. The entire        entirety, to the Work Package       gone from a time intensive
work order could now be             Center to ensure complete           process to a very streamlined
printed as a single unit.           documentation of the Work           process, where one individual
                                    being done. By utilizing SEAL       can handle the entire
        The fact that the           Systems’ identification             workload.” Quite a change
attachments include many types      methods, this task has become a     from the “painful” experience
of documents was also taken         much easier process.                during previous outages! By
into account by SEAL Systems.                                           utilizing the benefits of the
Specialized attachments, such              The benefits of the          SEAL Systems solution,
as graphics or drawings, are        SEAL solution are easy to see,      Nebraska Public Power District
sent directly to a plotter during   and not just from the smile on      can spend less time and
the course of the print job,        the employee responsible for        resources worrying about their
rather than requiring an            assembling all those work           printing, and more time
employee to print and then          packages. Prior to                  focusing on serving their
retrieve the attachments            implementation, an average          customers.
separately.                         work package took 9 minutes to
                                    assemble. After adopting the

More Related Content

Similar to Maintenance Orders N[1]

Rob Nelson - Challenge 2 - Virtual Design Master
Rob Nelson - Challenge 2 - Virtual Design MasterRob Nelson - Challenge 2 - Virtual Design Master
Rob Nelson - Challenge 2 - Virtual Design Mastervdmchallenge
 
Cloud Economics in Training and Simulation
Cloud Economics in Training and SimulationCloud Economics in Training and Simulation
Cloud Economics in Training and SimulationNane Kratzke
 
Cloud Economics in Training and Simulation
Cloud Economics in Training and SimulationCloud Economics in Training and Simulation
Cloud Economics in Training and SimulationNane Kratzke
 
NICS Puppet Case Study
NICS Puppet Case StudyNICS Puppet Case Study
NICS Puppet Case StudyPuppet
 
2011 Johnson City Flood Recovery Story
2011 Johnson City Flood Recovery Story2011 Johnson City Flood Recovery Story
2011 Johnson City Flood Recovery StoryPatrick Shannon, PMP
 
Disk Failures
Disk FailuresDisk Failures
Disk Failuresmvde3000
 
Emergency Communication of Southern Oregon
Emergency Communication of Southern OregonEmergency Communication of Southern Oregon
Emergency Communication of Southern OregonDataCore Software
 
Century yuasa case study
Century yuasa case studyCentury yuasa case study
Century yuasa case studyJoeyDorrington
 
Supporting Cloud Article
Supporting Cloud ArticleSupporting Cloud Article
Supporting Cloud Articleeuroamerican
 
Hoyt diana
Hoyt dianaHoyt diana
Hoyt dianaNASAPMC
 
Firstcomm construction of a DR plan
Firstcomm construction of a DR planFirstcomm construction of a DR plan
Firstcomm construction of a DR planFirstComm
 
HPC Cluster Computing from 64 to 156,000 Cores 
HPC Cluster Computing from 64 to 156,000 Cores HPC Cluster Computing from 64 to 156,000 Cores 
HPC Cluster Computing from 64 to 156,000 Cores inside-BigData.com
 
Healthcare intel it 443833 443833
Healthcare intel it 443833 443833Healthcare intel it 443833 443833
Healthcare intel it 443833 443833Liberteks
 

Similar to Maintenance Orders N[1] (20)

Rob Nelson - Challenge 2 - Virtual Design Master
Rob Nelson - Challenge 2 - Virtual Design MasterRob Nelson - Challenge 2 - Virtual Design Master
Rob Nelson - Challenge 2 - Virtual Design Master
 
Cloud Economics in Training and Simulation
Cloud Economics in Training and SimulationCloud Economics in Training and Simulation
Cloud Economics in Training and Simulation
 
Cloud Economics in Training and Simulation
Cloud Economics in Training and SimulationCloud Economics in Training and Simulation
Cloud Economics in Training and Simulation
 
Construction of a Disaster Recovery Plan with Business Only Broadband
Construction of a Disaster Recovery Plan with Business Only BroadbandConstruction of a Disaster Recovery Plan with Business Only Broadband
Construction of a Disaster Recovery Plan with Business Only Broadband
 
variable data publishing
variable data publishingvariable data publishing
variable data publishing
 
NICS Puppet Case Study
NICS Puppet Case StudyNICS Puppet Case Study
NICS Puppet Case Study
 
2011 Johnson City Flood Recovery Story
2011 Johnson City Flood Recovery Story2011 Johnson City Flood Recovery Story
2011 Johnson City Flood Recovery Story
 
Disk Failures
Disk FailuresDisk Failures
Disk Failures
 
Emergency Communication of Southern Oregon
Emergency Communication of Southern OregonEmergency Communication of Southern Oregon
Emergency Communication of Southern Oregon
 
First Things First
First Things FirstFirst Things First
First Things First
 
First Things First
First Things FirstFirst Things First
First Things First
 
Century yuasa case study
Century yuasa case studyCentury yuasa case study
Century yuasa case study
 
Supporting Cloud Article
Supporting Cloud ArticleSupporting Cloud Article
Supporting Cloud Article
 
Hoyt diana
Hoyt dianaHoyt diana
Hoyt diana
 
Dcb 336
Dcb 336Dcb 336
Dcb 336
 
Firstcomm construction of a DR plan
Firstcomm construction of a DR planFirstcomm construction of a DR plan
Firstcomm construction of a DR plan
 
Firstcomm construction of a DR plan
Firstcomm construction of a DR planFirstcomm construction of a DR plan
Firstcomm construction of a DR plan
 
HPC Cluster Computing from 64 to 156,000 Cores 
HPC Cluster Computing from 64 to 156,000 Cores HPC Cluster Computing from 64 to 156,000 Cores 
HPC Cluster Computing from 64 to 156,000 Cores 
 
Weekly report
Weekly reportWeekly report
Weekly report
 
Healthcare intel it 443833 443833
Healthcare intel it 443833 443833Healthcare intel it 443833 443833
Healthcare intel it 443833 443833
 

Maintenance Orders N[1]

  • 1. www.sealsystems.com 865-380-0005 Nebraska Public Power District with SEAL Systems: Plant Maintenance Orders delivered with Document Attachments in SAP R/3 On January 1, 1970, three separate utility companies in Nebraska (the Platte Valley Public Power and Irrigation District, the Consumers Public Power District, and the Nebraska Public Power System) merged to become Nebraska Public Power District. Since then, people have depended on the Nebraska Public Power District (NPPD) to keep electricity flowing to their homes. Today, NPPD serves approximately 1 million customers throughout 91 counties, utilizing a variety of generation sources, including hydro-electric, coal-fire, and nuclear plants.
  • 2. This public utilities Unfortunately, the In an average month, company lives by the slogan: massive attachments 550 work packages were “Always There When You accompanying the work produced. A normal package Need Us.” This means not only packages proved extremely would take 9 minutes to keeping the plants and difficult to compile. Different assemble, or 82 hours a month. distribution networks at high attachments were stored in While that figure sounds levels of output, but also different servers, rather than substantial on its own, it pales practicing strict safety standards linked to Document Information in comparison to the workload at all times. A major part of records in the Document during outages, when the maintaining this strict safety Management System. This numbers triple: an average 1600 regimen includes scheduled being the case, the cumbersome work packages were produced, outages every 18 months; printing process required an some with literally thousands of during these outages, extensive employee to draw up each pages of attachments. This maintenance is performed, attachment in it’s native translates into 240 hours per covering all aspects of the application, print it separately, outage! plants, within a matter of and then compile the entire weeks. work package by hand. There Though it was common was no simple way to print the knowledge within the plant that Of course, when dealing attachments out of SAP. Even the method for printing work with something as complex and after the attachments were orders was less than ideal, few powerful as a nuclear power printed, they bore no people knew just how plant, there is no margin for identification to indicate which overwhelming a challenge it error. Maintenance or repairs work package they belonged to. could be. That would soon require extensive, highly- Each Plant Maintenance order change. During a particular detailed work packages to could have anywhere from 1 to scheduled outage, when the ensure proper safety protocols 15 attachments, and each demand for work packages are followed at all times. At individual attachment could intensifies greatly, Kyle Pavel, a NPPD’s Cooper Nuclear Plant range anywhere from 40 to 200 business analyst for the nuclear alone, approximately 100 pages long (one even tipped the plant, assisted the employees in people rely directly on these scales at 1100 pages!). It took assembling the work packages. work packages for “It was very maintaining the frustrating, tedious facility (although, and time- clearly, the consuming,” she importance of recalls, “It was just these documents a mess.” extends far beyond those working Clearly, directly with them, something had to impacting the be done to improve safety and quality this process. of life of the entire community). An in- house solution was These work sought, but proved order packages are impossible. The maintained inside massive coding job SAP’s PM module, would have proved and each package far too costly to requires additional document seven employees, and a lot of have been feasible attachments in order to be grief, to assemble these complete. packages.
  • 3. Finding no resolution within the company itself, Kyle looked for outside assistance. “At the time, SAP had come out to conduct an engineering assessment for [the nuclear plant],” Kyle notes. Kyle met with SAP and explained the “painful, time-consuming” printing process currently being used at the plant. The SAP representative directed Kyle to look at SEAL Systems as a potential solution, with whom SAP already had a respectful, productive business In addition, every SEAL printing process, the time relationship. attachment in the package now was slashed to 1.5 minutes. received a watermark stamp, This means a savings of 69 As mentioned identifying the work order it hours during an average month, previously, one of the greatest belonged to and its sequence in but a huge savings of 200 hours flaws in NPPD’s original the package. This assures that, during an outage. In addition, printing process was the tedious not only will the correct, most the number of people required process of retrieving each recently updated documents be to produce the packages was attachment, printing it, and then included in the work order, but reduced to one individual, as compiling it which took they will appear in the right opposed to the 5 or 7 people substantial operator succession. Not only that, but it needed prior to the SEAL intervention. SEAL Systems guarantees that the attachments solution. worked with Kyle and her can be restored to their correct Cooper Nuclear Plant order, once they return to the With the help of SEAL colleagues to address this plant. Often the attachments Systems, Nebraska Public problem, and several other become split in the field, where Power District was able to issues as well. The new SEAL a worker can make notations on increase the efficiency of their Systems process distilled the the document. This information operations. “We’re very printing of work packages down has to be returned, in its happy,” Kyle reports, “We’ve to a single step. The entire entirety, to the Work Package gone from a time intensive work order could now be Center to ensure complete process to a very streamlined printed as a single unit. documentation of the Work process, where one individual being done. By utilizing SEAL can handle the entire The fact that the Systems’ identification workload.” Quite a change attachments include many types methods, this task has become a from the “painful” experience of documents was also taken much easier process. during previous outages! By into account by SEAL Systems. utilizing the benefits of the Specialized attachments, such The benefits of the SEAL Systems solution, as graphics or drawings, are SEAL solution are easy to see, Nebraska Public Power District sent directly to a plotter during and not just from the smile on can spend less time and the course of the print job, the employee responsible for resources worrying about their rather than requiring an assembling all those work printing, and more time employee to print and then packages. Prior to focusing on serving their retrieve the attachments implementation, an average customers. separately. work package took 9 minutes to assemble. After adopting the