A PROJECT REPORT
Submitted by
Internal Guide Develop by
•PROF. HEMAL PAREKH 1)PATEL TAPAN (130513106009)
2)PATEL NILESH (130513106006)
3)RAVAL GHANSYAM (130513106011)
In fulfillment for the award of the degree
of
BACHERAL OF ENGINEERING
In
Civil engineering
 It is indeed pleasure and a moment of satisfaction for
us to express our gratitude and sincere thanks to our
project guide HEMAL PAREKH madam of Civil
Engineering Dept. of alpha College of Engineering &
technology, BOL GRAM PANCHAYAT, MIHIR
MAHADEVIA who have been constant source of
inspiration, guidance and encouragement. And we
thank all the associates and colleagues who helped us
directly or indirectly. They have extremely co- operated
us in preparation and in motivating us
 CH:-1 INTRODUCTION
 CH:-2 LITERATURE
 CH:-3 METHODOLOGY
 CH:-4 SOIL TEST
4.1- CBR TEST
4.2- PROCTOR TEST
 CH:-5 DESIGN CRITERIA
5.1- DESIGN PROCEDURE
5.2- TRAFFICK DATA
5.3- TRAFFICK GROWTH RATE
5.4- DESIGN LIFE
5.5- VEHICLE DAMAGE FACTOR
 CH:-6 PAVEMENT COMPOTITION
6.1- GENERAL
6.2- SUB BASE
6.3- SUBBASE LAYER
6.4- BASE LAYER
6.5- CEMENTITION LAYER
6.6- BITUMINOUS SURFACING
 CH:-7 DRAINAGE PAVEMENT
 CH:-8 ESTIMATE
 CH:-9 CONCLUTION AND FUTURE SCOPE
 Village networking and road development is connecting road from
village to highways and other villages, due to no connectivity of roads
villagers face problems in getting basic amenities.
 The road network has been plan in pervious semester. The detail
design of all details construction plan which include cost of material,
labor, equipment use other cost. The details construction planning will
be carried out.
 The guidelines on design of flexible pavement were first brought out
in 1970, which were based on California Bearing Ratio (CBR) of sub
grade and traffic in terms of number of commercial vehicles.
 These guidelines were revised in 1984 in which design traffic was
considered in terms of cumulative number of equivalent standard axle
load of 80 kN in millions of standard axles (msa) and design charts
were provided for traffic up to 30 msa using an empirical approach.
 The design of flexible pavement involves the interplay of
several variables, such as, the wheel loads, traffic, climate,
terrain and sub grade conditions. With a view to have a unified
approach for working out the design of flexible payment in
the country, the IRC first brought out guideline in 1970.This
large spectrum of axle load.
 The guidelines on design of flexible pavement were first
brought out in 1970, which were based on California Bearing
Ratio (CBR) of sub grade and traffic in terms of number of
commercial vehicles.
 The revised guidelines used a semi-mechanistic approach
based on the results of the MORTH's research scheme R-56
implemented at NT Kharagpur.
 The design of flexible pavement is based on the principle that
for a load of any magnitude, the intensity of a load diminishes
as the load is transmitted downwards from the surface by virtue
of spreading over an increasingly larger area, by carrying it
deep enough into the ground through successive layers of
granular material.
 Kumar, C.Kishor, Kumar, S.N.V. Amar, Reddy, M.A., Reddy, K.
Sudhakar, "Investigation of Cold-in-place Recycling Mixes in
India", International Journal of Pavement Engineering, 1, 2007, pp
1-10.
 Asphalt Institute (2003), 'Performance Graded Asphalt Binder-
Specification and Testing, Super pave Series No.1 (SP-1).
 Amaranth Reddy, M., Sudhakar Reddy, K. and Pandey B.B(2001),
'Design CBR of Subgrade for Flexible Pavements', IRC Highway
Research Bulletin No.64, June 2001 pp. 61-69.
 IRC: SP:89-2010 Guidelines for Soil and Granular Material
Stabilization Using Cement, Lime & Fly Ash.
 Krishna, M. (2010), 'Investigations on Long Life Bituminous
Pavements' M.Tech. “IIT" Kharagpur.
 These guidelines will apply to design of flexible pavements for
expressways, national highways, state highways, major district
roads and other categories of roads predominantly carrying
motorized vehicles
 For the purpose of the guidelines, flexible pavements are consider
to include the pavements which have bituminous surfacing and
granular base and sub-base courses conforming to IRC standards
or to sections 500 & 400 specifications for road and bridge works,
ministry of road transport and highway.
 For design of strengthening measure or overlay for existing
pavement the design procedure described in IRC:81 “Tentative
guideline for strengthening of flexible road pavement.
 OBJECTIVE:
To determine the CBR value of soil
 STANDARD REFERENCE: IS: 2720 (Part XVI)
 APPARATUS:
Moulds with base plate, stay rod and wing nut, collar, spacer
disc, metal rammer, expansion measuring apparatus, weights,
loading machine, penetration plunger, dial gauges, IS sieves
Testing Procedure:-
 To prevent upheaval of the soil specimen into the hole of the
surcharge weights, place 2.5 kg annular weight on the soil
surface prior to the seating the penetration the plunger, after
which the remainder of the surcharge plate shall be placed.
 Place the plunger under a load of 4kg so that full contact is
established between the surface of the specimen and the
plunger.
 Apply the strain rate on the base plate and allow penetration
of plunger so that the penetration is approximately 1.25mm
per min.
 Note the reading proving ring at 0, 0.5, 1, 1.5, 2, 2.5, 4, 5,
7.5, 10, 12.5 mm. the maximum load of penetration is
recorded if occurs for a penetration of less than 12.5mm.
Sr. No. Penetration in mm Proving ring reading Load = P.R x
Constant(KN)
1 0.0 0 0
2 0.5 118.5 36.5
3 1.0 223.5 68.8
4 1.5 338.5 104.2
5 2 391.5 120.6
6 2.5 420 129.6
7 3 455 140.1
8 4 493.5 152
9 5 531.5 163.7
10 7.5 580 178.7
11 10 615 189.4
12 12.5 648 199.5
Sr. No., 12
Penetration in
mm, 12.5
Proving ring
reading, 648
Load = P.R x
Constant(KN)
, 199.5
0
100
200
300
400
500
600
700
1 2 3 4 5 6 7 8 9 10 11 12
Load(KN) CBR test chart
Penetration(mm)
 Design procedure
 pavement design are given for subgrade CBR value ranging
from 2% to 10%.
 Design traffic ranging from 1 msa to 150 msa for an average
annual pavement temperature of 35c.
 Design of road are depend following two value are under.
1) Design traffic in term of cumulative number of standard
axles
2) CBR value of subgrade
Following information is needed for estimating design traffic:
 Initial traffic after construction in terms of number of
Commercial Vehicles per day.
 Traffic growth rate during the design life in percentage.
 Design life in number of years.
 Spectrum of axle loads.
 Vehicle Damage Factor
 Distribution of commercial traffic over the carriageway.
 Design Life
 It is recommended that pavements for National Highways
and State Highways should be designed for a minimum life
of 15 years.
 Expressways and Urban Roads may be designed for a
longer life of 20 years or higher using innovative design
adopting high fatigue bituminous mixes.
 very high volume roads with design traffic greater than 200
msa and perpetual pavements can also be designed using
the principles stated in the guidelines. For other categories
of roads, a design life of 10 to 15 years may be adopted
 Vehicle Damage Factor
 The guidelines use Vehicle Damage Factor (VDF) in
estimation of cumulative msa for thickness design of
pavements. In case of cemented bases, cumulative damage
principle is used for determining fatigue life of cementations
bases for heavy traffic and for that spectrum of axle loads is
required.
 Single axle with single wheel on either side = (axle load in
KN/65)^4.
 Single axle with dual wheels on either side = (axle load in
KN/80)^4.
 Tandem axle with dual wheels on either side = (axle load in
KN/148)^4
 Different Layers of Bituminous Pavement
 SUBGRADE
 The sub grades is the top 500 mm of the embankment
immediately below the bottom of the Pavement, and is
made up of in-situ material, select soil, or stabilized soil
that forms the foundation of a pavement.
 Subgrade shall be compacted to a minimum of 97 per
cent of laboratory dry density achieved with heavy
compaction as per IS: 2720 for Expressways, National
Highways, State Highways, Major District Roads and
other heavily trafficked roads.
 Log10 CBR = 2.465 - 1.12 log10 N
 Sub-base materials may consist of natural sand, moorum,
gravel, laterite, kankar, brick metal, and crushed stone,
crushed slag and reclaimed crushed concrete/reclaimed
asphalt pavement or combinations thereof meeting the
prescribed grading and physical requirements.
 When the sub-base material consists of combination of
materials, mixing should be done mechanically either using a
suitable mixer or adopting mix-in-place method. The sub-
base should have sufficient strength and thickness to serve the
construction traffic.
 Specifications of granular sub-base (GSB) materials
conforming to MORTH Specifications for Road and Bridge
Works are recommended for use
 The base layer may consist of wet mix macadam, water
bound macadam, crusher run macadam, reclaimed
concrete etc. Relevant specifications of IRC/MORTH are
to be adopted for the construction
 MRgranular = 0.2*h0.45 MR subgrade
 Poisson's ratio of granular bases and sub-bases is
recommended as 0.35.
 Cementitious base:-Cemented base layers may consist of
aggregates or soils or both stabilized with chemical
stabilizers such as cement, lime, lime-flaysh or other
stabilizers which are required to give a minimum strength of
4.5 to 7 MPa in 7/28 days.
 Bituminous surfacing:-The surfacing consists of a wearing
course or a binder course plus wearing course. The most
commonly used wearing courses are surface dressing. Open
graded premix carpet, mix seal surfacing, semi-dense
bituminous concrete and bituminous concrete
 Ex:-Design the flexible pavement for construction of a new
road with the following data:
• Two lane single carriage way is to designed in plain area
• Initial traffic in the year of completion of construction = 310
CVPD (sum of both directions) as mentioned
Below:
heavy truck three axle: 30
heavy truck two axle: 70
mini truck: 120
large bus: 60
bus: 30
Traffic growth rate = 7.0 %
Design life = 15 years
Vehicle damage factor based on axle load survey.
vehicle
Design CBR of sub-grade soil = 9.5%
Solution:-
a) Lane Distribution factor = 0.75
b)Cumulative number of standard axle for
design life of 15 years
Vehicle type Number VDF Equivalent
standard axle,
per day
heavy truck three
axle
30 6.50 195
heavy truck two
axle
70 4.75 333
mini truck 120 1.0 120
large bus 60 0.50 30
Bus 30 0.35 11
Cumulative Number of standard axles for design riod:
N=4.73 MSA
c) Total thickness of the pavement with CBR9. 5% and
4.73 msa = 775 mm
d) Pavement composition:-
i. Bituminous wearing course:- Asphalt Concrete
50 mm.
ii. Bituminous Binder course: - DBM 50 mm
iii. Base course:- Water Bound
Macadam: 150 mm
iv. Sub-base:- Granular sub-base 325 mm
CBR not < 30 %
date Work carried out
1-1-16 Visit BOL village for our project purpose
5-1-16 Choose the flexible pavement in IS code(
IRC 37: 2012)
12-1-16 Download literature and research paper
20-1-16 Survey for road and measure the road
1-2-16 Calculate the thickness of road for
pavement layer
7-2-16 Carried out design of bituminous road
27-2-16 Estimation of road
 This pavement design study will help, if non conventional
pavement design is adopted in the construction of
pavement, there will be improved performance of the
pavement thus increasing the life and leading to financial
savings. The study has focused on finding the suitable
application of fly ash. Lime stone etc. in the non-
bituminous layers of the flexible pavement based on
geotechnical characteristics of mix comprising fly ash,
lime and soils. Since road pavement are important parts
of these projects, costing about 50% of the investment, a
careful evaluation of the alternative is necessary to make
the right choice on a basic.
REFERENCES
[1] IRC: 37-2001 “Guidelines for the Design of Flexible
Pavements”, New Delhi, 2001.
[2] IRC: SP: 19 - “Manual for Survey, investigation and
preparation of Road Projects”, New Delhi, 2001.
[3] IRC: 73-1980 “Geometric Design Standards for Rural
Highways”, New Delhi, 1990.
[4] IRC: SP: 84 – “Manual of Specifications & Standards for
Four Lining of Highways through Public Private
Partnership”, New Delhi, 2009.

More Related Content

What's hot

Summer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) RoadSummer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) Roadshashanksingh593
 
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementNIWASHISH VISWAS
 
Traning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavementTraning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavementNIWASHISH VISWAS
 
Road Construction
Road ConstructionRoad Construction
Road ConstructionDanish Mohd
 
Highway construction or Road work report
Highway construction or Road work reportHighway construction or Road work report
Highway construction or Road work reportAbdul rahman kureshi
 
Gangaram yadav ppt road con....
Gangaram yadav ppt road con....Gangaram yadav ppt road con....
Gangaram yadav ppt road con....RaazYadav6
 
Report on Widening and Construction of Roads
Report on Widening and Construction of RoadsReport on Widening and Construction of Roads
Report on Widening and Construction of RoadsSanjeev B
 
Construction Of Road
Construction Of RoadConstruction Of Road
Construction Of RoadShahid Raza
 
Railway Engineering: Turnouts
Railway Engineering: TurnoutsRailway Engineering: Turnouts
Railway Engineering: TurnoutsVijai Krishnan V
 
Training Report on Bridge Construction
Training Report on Bridge ConstructionTraining Report on Bridge Construction
Training Report on Bridge ConstructionMAHAVIR MEENA
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavementpjainrahul
 
Project report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash GargProject report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash Gargharshit315
 
Highway Cross-sectional Elements
Highway Cross-sectional ElementsHighway Cross-sectional Elements
Highway Cross-sectional ElementsAkshathaBhandary
 
project final year civil
project final year civilproject final year civil
project final year civilAlankar jaiswal
 
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTssuser5fea8f
 
TRAINING REPORT A PROJECT ON ROAD WIDENI...
                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...
TRAINING REPORT A PROJECT ON ROAD WIDENI...Pradeep Yadav
 
Anshul pwd training report
Anshul pwd training reportAnshul pwd training report
Anshul pwd training reportAnshul Shakya
 
Summer training report on cement Road Construction
 Summer training report on cement Road Construction Summer training report on cement Road Construction
Summer training report on cement Road ConstructionVijaypal Bagariya
 

What's hot (20)

Summer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) RoadSummer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) Road
 
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavement
 
Traning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavementTraning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavement
 
Road Construction
Road ConstructionRoad Construction
Road Construction
 
Highway construction or Road work report
Highway construction or Road work reportHighway construction or Road work report
Highway construction or Road work report
 
Gangaram yadav ppt road con....
Gangaram yadav ppt road con....Gangaram yadav ppt road con....
Gangaram yadav ppt road con....
 
Report on Widening and Construction of Roads
Report on Widening and Construction of RoadsReport on Widening and Construction of Roads
Report on Widening and Construction of Roads
 
Construction Of Road
Construction Of RoadConstruction Of Road
Construction Of Road
 
road construction
road constructionroad construction
road construction
 
Railway Engineering: Turnouts
Railway Engineering: TurnoutsRailway Engineering: Turnouts
Railway Engineering: Turnouts
 
Training Report on Bridge Construction
Training Report on Bridge ConstructionTraining Report on Bridge Construction
Training Report on Bridge Construction
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
Project report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash GargProject report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash Garg
 
Highway Cross-sectional Elements
Highway Cross-sectional ElementsHighway Cross-sectional Elements
Highway Cross-sectional Elements
 
project final year civil
project final year civilproject final year civil
project final year civil
 
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
 
SUMMER TRAINING FROM PWD
SUMMER TRAINING FROM PWDSUMMER TRAINING FROM PWD
SUMMER TRAINING FROM PWD
 
TRAINING REPORT A PROJECT ON ROAD WIDENI...
                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...
TRAINING REPORT A PROJECT ON ROAD WIDENI...
 
Anshul pwd training report
Anshul pwd training reportAnshul pwd training report
Anshul pwd training report
 
Summer training report on cement Road Construction
 Summer training report on cement Road Construction Summer training report on cement Road Construction
Summer training report on cement Road Construction
 

Similar to Village networking ppt

Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type F...
Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type F...Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type F...
Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type F...IRJET Journal
 
IRJET- A Study of Cement Treated Base and Sub Base in Flexible Pavement
IRJET-  	  A Study of Cement Treated Base and Sub Base in Flexible PavementIRJET-  	  A Study of Cement Treated Base and Sub Base in Flexible Pavement
IRJET- A Study of Cement Treated Base and Sub Base in Flexible PavementIRJET Journal
 
09_VV_Pavement Design IRC37-2018_29Jan2020 - Admin KHRI.pdf
09_VV_Pavement Design IRC37-2018_29Jan2020 - Admin KHRI.pdf09_VV_Pavement Design IRC37-2018_29Jan2020 - Admin KHRI.pdf
09_VV_Pavement Design IRC37-2018_29Jan2020 - Admin KHRI.pdfSandipPaul46
 
presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)alamrintu
 
CV530_04_Pavement-Design.pdf
CV530_04_Pavement-Design.pdfCV530_04_Pavement-Design.pdf
CV530_04_Pavement-Design.pdfssuser3f175e
 
CE3030igbyugfvtukfctrkryjcrycdftykfvtuljuvyuvu
CE3030igbyugfvtukfctrkryjcrycdftykfvtuljuvyuvuCE3030igbyugfvtukfctrkryjcrycdftykfvtuljuvyuvu
CE3030igbyugfvtukfctrkryjcrycdftykfvtuljuvyuvussuserb923e1
 
Pavement Design Report by priyanshu kumar 9608684800
Pavement Design Report by priyanshu kumar 9608684800Pavement Design Report by priyanshu kumar 9608684800
Pavement Design Report by priyanshu kumar 9608684800PRIYANSHU KUMAR
 
Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavementBhavik A Shah
 
IRJET- A Review on a Study of Cement Treated Base and Sub-Base in Flexible Pa...
IRJET- A Review on a Study of Cement Treated Base and Sub-Base in Flexible Pa...IRJET- A Review on a Study of Cement Treated Base and Sub-Base in Flexible Pa...
IRJET- A Review on a Study of Cement Treated Base and Sub-Base in Flexible Pa...IRJET Journal
 
IRJET - Design of Improved Drainage System using Pervious Concrete
IRJET  -  	  Design of Improved Drainage System using Pervious ConcreteIRJET  -  	  Design of Improved Drainage System using Pervious Concrete
IRJET - Design of Improved Drainage System using Pervious ConcreteIRJET Journal
 
Pavement Design_IRC-37-2018.pptx
Pavement Design_IRC-37-2018.pptxPavement Design_IRC-37-2018.pptx
Pavement Design_IRC-37-2018.pptxJignesh patel
 
RoadstaB : Road Stabilization
RoadstaB : Road Stabilization RoadstaB : Road Stabilization
RoadstaB : Road Stabilization Nikhil Sharma
 
IRJET- Study on Design of Polymer based Flexible Pavements for Low Volume Roads
IRJET- Study on Design of Polymer based Flexible Pavements for Low Volume RoadsIRJET- Study on Design of Polymer based Flexible Pavements for Low Volume Roads
IRJET- Study on Design of Polymer based Flexible Pavements for Low Volume RoadsIRJET Journal
 
Experimental Study on Pavement Stabilization Using Geosynthetic Solution
Experimental Study on Pavement Stabilization Using Geosynthetic SolutionExperimental Study on Pavement Stabilization Using Geosynthetic Solution
Experimental Study on Pavement Stabilization Using Geosynthetic SolutionIRJET Journal
 
Design Of Flexible Pavements
Design Of Flexible PavementsDesign Of Flexible Pavements
Design Of Flexible Pavementswhutton1
 

Similar to Village networking ppt (20)

Roads & bridges
Roads & bridgesRoads & bridges
Roads & bridges
 
Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type F...
Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type F...Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type F...
Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type F...
 
IRJET- A Study of Cement Treated Base and Sub Base in Flexible Pavement
IRJET-  	  A Study of Cement Treated Base and Sub Base in Flexible PavementIRJET-  	  A Study of Cement Treated Base and Sub Base in Flexible Pavement
IRJET- A Study of Cement Treated Base and Sub Base in Flexible Pavement
 
09_VV_Pavement Design IRC37-2018_29Jan2020 - Admin KHRI.pdf
09_VV_Pavement Design IRC37-2018_29Jan2020 - Admin KHRI.pdf09_VV_Pavement Design IRC37-2018_29Jan2020 - Admin KHRI.pdf
09_VV_Pavement Design IRC37-2018_29Jan2020 - Admin KHRI.pdf
 
Roadstab 2017
Roadstab 2017Roadstab 2017
Roadstab 2017
 
presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)
 
CV530_04_Pavement-Design.pdf
CV530_04_Pavement-Design.pdfCV530_04_Pavement-Design.pdf
CV530_04_Pavement-Design.pdf
 
CE3030igbyugfvtukfctrkryjcrycdftykfvtuljuvyuvu
CE3030igbyugfvtukfctrkryjcrycdftykfvtuljuvyuvuCE3030igbyugfvtukfctrkryjcrycdftykfvtuljuvyuvu
CE3030igbyugfvtukfctrkryjcrycdftykfvtuljuvyuvu
 
Pavement Design Report by priyanshu kumar 9608684800
Pavement Design Report by priyanshu kumar 9608684800Pavement Design Report by priyanshu kumar 9608684800
Pavement Design Report by priyanshu kumar 9608684800
 
V35119123
V35119123V35119123
V35119123
 
Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavement
 
IRJET- A Review on a Study of Cement Treated Base and Sub-Base in Flexible Pa...
IRJET- A Review on a Study of Cement Treated Base and Sub-Base in Flexible Pa...IRJET- A Review on a Study of Cement Treated Base and Sub-Base in Flexible Pa...
IRJET- A Review on a Study of Cement Treated Base and Sub-Base in Flexible Pa...
 
IRJET - Design of Improved Drainage System using Pervious Concrete
IRJET  -  	  Design of Improved Drainage System using Pervious ConcreteIRJET  -  	  Design of Improved Drainage System using Pervious Concrete
IRJET - Design of Improved Drainage System using Pervious Concrete
 
Pavement Design_IRC-37-2018.pptx
Pavement Design_IRC-37-2018.pptxPavement Design_IRC-37-2018.pptx
Pavement Design_IRC-37-2018.pptx
 
RoadstaB : Road Stabilization
RoadstaB : Road Stabilization RoadstaB : Road Stabilization
RoadstaB : Road Stabilization
 
IRJET- Study on Design of Polymer based Flexible Pavements for Low Volume Roads
IRJET- Study on Design of Polymer based Flexible Pavements for Low Volume RoadsIRJET- Study on Design of Polymer based Flexible Pavements for Low Volume Roads
IRJET- Study on Design of Polymer based Flexible Pavements for Low Volume Roads
 
Experimental Study on Pavement Stabilization Using Geosynthetic Solution
Experimental Study on Pavement Stabilization Using Geosynthetic SolutionExperimental Study on Pavement Stabilization Using Geosynthetic Solution
Experimental Study on Pavement Stabilization Using Geosynthetic Solution
 
Design Of Flexible Pavements
Design Of Flexible PavementsDesign Of Flexible Pavements
Design Of Flexible Pavements
 
paver desing roads
paver desing roadspaver desing roads
paver desing roads
 
TRANSPORTATION_ENGINEERING_M5.pdf
TRANSPORTATION_ENGINEERING_M5.pdfTRANSPORTATION_ENGINEERING_M5.pdf
TRANSPORTATION_ENGINEERING_M5.pdf
 

Recently uploaded

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 

Recently uploaded (20)

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 

Village networking ppt

  • 1. A PROJECT REPORT Submitted by Internal Guide Develop by •PROF. HEMAL PAREKH 1)PATEL TAPAN (130513106009) 2)PATEL NILESH (130513106006) 3)RAVAL GHANSYAM (130513106011) In fulfillment for the award of the degree of BACHERAL OF ENGINEERING In Civil engineering
  • 2.  It is indeed pleasure and a moment of satisfaction for us to express our gratitude and sincere thanks to our project guide HEMAL PAREKH madam of Civil Engineering Dept. of alpha College of Engineering & technology, BOL GRAM PANCHAYAT, MIHIR MAHADEVIA who have been constant source of inspiration, guidance and encouragement. And we thank all the associates and colleagues who helped us directly or indirectly. They have extremely co- operated us in preparation and in motivating us
  • 3.  CH:-1 INTRODUCTION  CH:-2 LITERATURE  CH:-3 METHODOLOGY  CH:-4 SOIL TEST 4.1- CBR TEST 4.2- PROCTOR TEST  CH:-5 DESIGN CRITERIA 5.1- DESIGN PROCEDURE 5.2- TRAFFICK DATA 5.3- TRAFFICK GROWTH RATE 5.4- DESIGN LIFE 5.5- VEHICLE DAMAGE FACTOR
  • 4.  CH:-6 PAVEMENT COMPOTITION 6.1- GENERAL 6.2- SUB BASE 6.3- SUBBASE LAYER 6.4- BASE LAYER 6.5- CEMENTITION LAYER 6.6- BITUMINOUS SURFACING  CH:-7 DRAINAGE PAVEMENT  CH:-8 ESTIMATE  CH:-9 CONCLUTION AND FUTURE SCOPE
  • 5.  Village networking and road development is connecting road from village to highways and other villages, due to no connectivity of roads villagers face problems in getting basic amenities.  The road network has been plan in pervious semester. The detail design of all details construction plan which include cost of material, labor, equipment use other cost. The details construction planning will be carried out.  The guidelines on design of flexible pavement were first brought out in 1970, which were based on California Bearing Ratio (CBR) of sub grade and traffic in terms of number of commercial vehicles.  These guidelines were revised in 1984 in which design traffic was considered in terms of cumulative number of equivalent standard axle load of 80 kN in millions of standard axles (msa) and design charts were provided for traffic up to 30 msa using an empirical approach.
  • 6.  The design of flexible pavement involves the interplay of several variables, such as, the wheel loads, traffic, climate, terrain and sub grade conditions. With a view to have a unified approach for working out the design of flexible payment in the country, the IRC first brought out guideline in 1970.This large spectrum of axle load.  The guidelines on design of flexible pavement were first brought out in 1970, which were based on California Bearing Ratio (CBR) of sub grade and traffic in terms of number of commercial vehicles.  The revised guidelines used a semi-mechanistic approach based on the results of the MORTH's research scheme R-56 implemented at NT Kharagpur.
  • 7.  The design of flexible pavement is based on the principle that for a load of any magnitude, the intensity of a load diminishes as the load is transmitted downwards from the surface by virtue of spreading over an increasingly larger area, by carrying it deep enough into the ground through successive layers of granular material.
  • 8.  Kumar, C.Kishor, Kumar, S.N.V. Amar, Reddy, M.A., Reddy, K. Sudhakar, "Investigation of Cold-in-place Recycling Mixes in India", International Journal of Pavement Engineering, 1, 2007, pp 1-10.  Asphalt Institute (2003), 'Performance Graded Asphalt Binder- Specification and Testing, Super pave Series No.1 (SP-1).  Amaranth Reddy, M., Sudhakar Reddy, K. and Pandey B.B(2001), 'Design CBR of Subgrade for Flexible Pavements', IRC Highway Research Bulletin No.64, June 2001 pp. 61-69.  IRC: SP:89-2010 Guidelines for Soil and Granular Material Stabilization Using Cement, Lime & Fly Ash.  Krishna, M. (2010), 'Investigations on Long Life Bituminous Pavements' M.Tech. “IIT" Kharagpur.
  • 9.
  • 10.  These guidelines will apply to design of flexible pavements for expressways, national highways, state highways, major district roads and other categories of roads predominantly carrying motorized vehicles  For the purpose of the guidelines, flexible pavements are consider to include the pavements which have bituminous surfacing and granular base and sub-base courses conforming to IRC standards or to sections 500 & 400 specifications for road and bridge works, ministry of road transport and highway.  For design of strengthening measure or overlay for existing pavement the design procedure described in IRC:81 “Tentative guideline for strengthening of flexible road pavement.
  • 11.  OBJECTIVE: To determine the CBR value of soil  STANDARD REFERENCE: IS: 2720 (Part XVI)  APPARATUS: Moulds with base plate, stay rod and wing nut, collar, spacer disc, metal rammer, expansion measuring apparatus, weights, loading machine, penetration plunger, dial gauges, IS sieves
  • 12. Testing Procedure:-  To prevent upheaval of the soil specimen into the hole of the surcharge weights, place 2.5 kg annular weight on the soil surface prior to the seating the penetration the plunger, after which the remainder of the surcharge plate shall be placed.  Place the plunger under a load of 4kg so that full contact is established between the surface of the specimen and the plunger.  Apply the strain rate on the base plate and allow penetration of plunger so that the penetration is approximately 1.25mm per min.  Note the reading proving ring at 0, 0.5, 1, 1.5, 2, 2.5, 4, 5, 7.5, 10, 12.5 mm. the maximum load of penetration is recorded if occurs for a penetration of less than 12.5mm.
  • 13.
  • 14. Sr. No. Penetration in mm Proving ring reading Load = P.R x Constant(KN) 1 0.0 0 0 2 0.5 118.5 36.5 3 1.0 223.5 68.8 4 1.5 338.5 104.2 5 2 391.5 120.6 6 2.5 420 129.6 7 3 455 140.1 8 4 493.5 152 9 5 531.5 163.7 10 7.5 580 178.7 11 10 615 189.4 12 12.5 648 199.5
  • 15. Sr. No., 12 Penetration in mm, 12.5 Proving ring reading, 648 Load = P.R x Constant(KN) , 199.5 0 100 200 300 400 500 600 700 1 2 3 4 5 6 7 8 9 10 11 12 Load(KN) CBR test chart Penetration(mm)
  • 16.  Design procedure  pavement design are given for subgrade CBR value ranging from 2% to 10%.  Design traffic ranging from 1 msa to 150 msa for an average annual pavement temperature of 35c.  Design of road are depend following two value are under. 1) Design traffic in term of cumulative number of standard axles 2) CBR value of subgrade
  • 17. Following information is needed for estimating design traffic:  Initial traffic after construction in terms of number of Commercial Vehicles per day.  Traffic growth rate during the design life in percentage.  Design life in number of years.  Spectrum of axle loads.  Vehicle Damage Factor  Distribution of commercial traffic over the carriageway.
  • 18.  Design Life  It is recommended that pavements for National Highways and State Highways should be designed for a minimum life of 15 years.  Expressways and Urban Roads may be designed for a longer life of 20 years or higher using innovative design adopting high fatigue bituminous mixes.  very high volume roads with design traffic greater than 200 msa and perpetual pavements can also be designed using the principles stated in the guidelines. For other categories of roads, a design life of 10 to 15 years may be adopted
  • 19.  Vehicle Damage Factor  The guidelines use Vehicle Damage Factor (VDF) in estimation of cumulative msa for thickness design of pavements. In case of cemented bases, cumulative damage principle is used for determining fatigue life of cementations bases for heavy traffic and for that spectrum of axle loads is required.  Single axle with single wheel on either side = (axle load in KN/65)^4.  Single axle with dual wheels on either side = (axle load in KN/80)^4.  Tandem axle with dual wheels on either side = (axle load in KN/148)^4
  • 20.  Different Layers of Bituminous Pavement
  • 21.  SUBGRADE  The sub grades is the top 500 mm of the embankment immediately below the bottom of the Pavement, and is made up of in-situ material, select soil, or stabilized soil that forms the foundation of a pavement.  Subgrade shall be compacted to a minimum of 97 per cent of laboratory dry density achieved with heavy compaction as per IS: 2720 for Expressways, National Highways, State Highways, Major District Roads and other heavily trafficked roads.  Log10 CBR = 2.465 - 1.12 log10 N
  • 22.
  • 23.  Sub-base materials may consist of natural sand, moorum, gravel, laterite, kankar, brick metal, and crushed stone, crushed slag and reclaimed crushed concrete/reclaimed asphalt pavement or combinations thereof meeting the prescribed grading and physical requirements.  When the sub-base material consists of combination of materials, mixing should be done mechanically either using a suitable mixer or adopting mix-in-place method. The sub- base should have sufficient strength and thickness to serve the construction traffic.  Specifications of granular sub-base (GSB) materials conforming to MORTH Specifications for Road and Bridge Works are recommended for use
  • 24.  The base layer may consist of wet mix macadam, water bound macadam, crusher run macadam, reclaimed concrete etc. Relevant specifications of IRC/MORTH are to be adopted for the construction  MRgranular = 0.2*h0.45 MR subgrade  Poisson's ratio of granular bases and sub-bases is recommended as 0.35.
  • 25.  Cementitious base:-Cemented base layers may consist of aggregates or soils or both stabilized with chemical stabilizers such as cement, lime, lime-flaysh or other stabilizers which are required to give a minimum strength of 4.5 to 7 MPa in 7/28 days.  Bituminous surfacing:-The surfacing consists of a wearing course or a binder course plus wearing course. The most commonly used wearing courses are surface dressing. Open graded premix carpet, mix seal surfacing, semi-dense bituminous concrete and bituminous concrete
  • 26.  Ex:-Design the flexible pavement for construction of a new road with the following data: • Two lane single carriage way is to designed in plain area • Initial traffic in the year of completion of construction = 310 CVPD (sum of both directions) as mentioned Below: heavy truck three axle: 30 heavy truck two axle: 70 mini truck: 120 large bus: 60 bus: 30 Traffic growth rate = 7.0 % Design life = 15 years Vehicle damage factor based on axle load survey. vehicle Design CBR of sub-grade soil = 9.5%
  • 27. Solution:- a) Lane Distribution factor = 0.75 b)Cumulative number of standard axle for design life of 15 years Vehicle type Number VDF Equivalent standard axle, per day heavy truck three axle 30 6.50 195 heavy truck two axle 70 4.75 333 mini truck 120 1.0 120 large bus 60 0.50 30 Bus 30 0.35 11
  • 28. Cumulative Number of standard axles for design riod: N=4.73 MSA c) Total thickness of the pavement with CBR9. 5% and 4.73 msa = 775 mm d) Pavement composition:- i. Bituminous wearing course:- Asphalt Concrete 50 mm. ii. Bituminous Binder course: - DBM 50 mm iii. Base course:- Water Bound Macadam: 150 mm iv. Sub-base:- Granular sub-base 325 mm CBR not < 30 %
  • 29. date Work carried out 1-1-16 Visit BOL village for our project purpose 5-1-16 Choose the flexible pavement in IS code( IRC 37: 2012) 12-1-16 Download literature and research paper 20-1-16 Survey for road and measure the road 1-2-16 Calculate the thickness of road for pavement layer 7-2-16 Carried out design of bituminous road 27-2-16 Estimation of road
  • 30.  This pavement design study will help, if non conventional pavement design is adopted in the construction of pavement, there will be improved performance of the pavement thus increasing the life and leading to financial savings. The study has focused on finding the suitable application of fly ash. Lime stone etc. in the non- bituminous layers of the flexible pavement based on geotechnical characteristics of mix comprising fly ash, lime and soils. Since road pavement are important parts of these projects, costing about 50% of the investment, a careful evaluation of the alternative is necessary to make the right choice on a basic.
  • 31. REFERENCES [1] IRC: 37-2001 “Guidelines for the Design of Flexible Pavements”, New Delhi, 2001. [2] IRC: SP: 19 - “Manual for Survey, investigation and preparation of Road Projects”, New Delhi, 2001. [3] IRC: 73-1980 “Geometric Design Standards for Rural Highways”, New Delhi, 1990. [4] IRC: SP: 84 – “Manual of Specifications & Standards for Four Lining of Highways through Public Private Partnership”, New Delhi, 2009.