SlideShare a Scribd company logo
1 of 2
PATTI SCHELINE HANLEY
713-851-1043 |Txtish23@Yahoo.Com
576 Lakeshore Drive, Victoria, TX 77905
Project ControlsManager
 Implementing and managing robust project controls meeting strictclienttimelines/requirements. Adept in developing and
managing work breakdown structures, technical requirements, quality control measures, projectexecution plans (PEP),work
planningsessions,and process standardization.
 Recruiting, directing, and training top-level project teams includingschedulers,cost control analysts,document controllers,
and project administrators.
 First-rate financial manager developing sound financial controls, costestimates,and multimillion-dollar projectbudgets.
Expert in developing and presenting reports on contract commitments, cash flow, expenditures, forecasting,earned value
measurements, and costtrends and deviations.
 Building strong working relationships with third-party engineering firms,integrated project management teams, and
executive management teams. Highly capablein empowering others and expanding team skill sets through training. Adept in
gathering, analyzing,and verifyingprojectdata on-site and from projectoffice.
Professional History
Locations in Houston, TX unless noted otherwise
Emerson Process Systems & Solutions — 2014 to Present
Project Controls Lead | Scope: Firm’s largestmulti-unitmain automation contractor (MAC)
contractfor greenfield and brownfield refinery expansion project. Focus: Promoted to
leadership roledelivering training to project administratorsin projectcostcontrols.
 Results: Upgraded level of expertise of project administrators.Earned “Spot On”
performance award within fivemonths of starting.
Wood Group Mustang — 2005 to 2014
Project Controls Manager | Scope: Multipleglobal engineering,procurement, and
construction management (EPCM) projects involving refiningand chemical process plant
design upgrades. Focus: Developing new dashboard executive review process,providing
project oversighton technical design areas for earned valuereporting.
 Results: Significantly reduced costs and improved effectiveness by streamlining executive
reviews to 30 minutes.
The OB/GYN Centre,P.A. — 1994 to 2005
Business Manager | Scope: Managing all contracts for insurancecompanies,hospitals,
laboratories and facilities.Focus:Reporting needs, business processes, financial management,
and office management.
 Results: Successfully guided and managed steady expansion of this office from solo practice
to three physicians with assistingteam of 16. Developed processes to supportthis growth.
LITWIN Engineers and Constructors, Inc. — 1990 to 1994
Senior Cost Analyst | Scope: Multi-unitEPC refinery expansion project involvingupgrades and
construction of fluid catalytic cracker unit.Focus: Developing estimate from front end
engineering design (FEED) to execution of engineering, procurement and construction.
Reporting on all trends/deviations in cost,quantities and projectprogress.
 Results: Developed effective project strategies that significantly reduced projectcosts.
– Wide Industry/Project Experience –
EPCM | Domestic/Global Engineering | Department of
Defense | Oil & Gas | Chemical Refineries | Water Treatment
| Greenfield & Brownfield Projects | Environmental
Remediation | EPA/Superfund Projects | Nuclear Waste
— Projects’ Technical
Scope: Specific Units,
Processes, & Systems —
sulfur recovery
wastewater & purge
treatment
full burn optimization
sour water stripper
amine regeneration
coker
gas concentration
ultralow sulfur diesel
fluid catalytic cracker
wet gas scrubber
training simulator
acid plant
power generation
gas turbine
visbreaker
LPG/LCN/HCN/C5 Merox
alkaline | dimersol
MTBE | TAME | MSAT
PATTI SCHELINE HANLEY 713-851-1043 |Txtish23@Yahoo.Com | Page 2
NUS, Inc. — 1988 to 1990
Project Controls Analyst & Quality Assurance (QA) Manager | Scope: Numerous environmental remediation and EPA Superfund
projects.Focus: Project management plans, costand labor plans,QA,status and change management reports, contract
management reports, milestone schedules,and subcontractor/consultantagreements.
 Results: Increased clientsatisfaction through developing and implementing complete QA plans and procedures.
Parsons, Brinckerhoff, Quade & Douglas, Inc. — 1981 to 1988
Project Management System Controller | Document Control Manager. | Scope: Design of exploratory shaftfacilities for
preliminary testingfor repository for storageof high-level nuclear waste. Focus: Complying with Nuclear Quality Assurance
Standards (ANSI/ASME NQA-1). Reporting all projectstages and progress to clientand Department of Energy.
 Results: Launched from ground up and maintained first-class projectofficeand document and information center.
Previous Experience
Served as Budget Specialist for Department of Defense (Portsmouth, NH and Charleston,SC). Developed and tracked $6 million
dollar receivables budget for services provided to vessels and units at two Naval Stations. Awarded commendation by Naval
Station Commanding Officer for outstandingservice.
Education & Training
Forecasting Functionality, Houston Area Engineering Association.
Total Cost Management for the 90's, American Association of Cost Engineers.
Federal Government Contracting, Cost/Schedule Control Systems,
& Performance Analysis & Forecasting, Decision Planning Corp.
General Studies at Houston Community College and New Hampshire College
Memberships & Involvement
VP of Education, Toastmasters International; certified Competent Communicator and Competent Leader
Chair Woman, Mustang Teams for Relay for Life for American Cancer Society (three years)
Planning Team Member, Memorial Drive United Methodist Church Annual Women’s Dinner (two years)
President, Women of Mustang Engineering Network (W.O.M.E.N.) (two years)
Co-Chair, million dollar combined federal campaign to raise money for United Way
Board & Architectural Review Committee Member, MGPO Neighborhood Homeowners Association
Disciple Group Youth Leader, Memorial Drive United Methodist Church
Leader for Cookie Sales, First Air and Camping Volunteer, San Jacinto Girl Scout Council
Testimonials
“... dependable and always met or beat deadlines. Her assignments were performed with reliability.
Her ever present cheerful nature enhanced the morale of the project team.“
— Manager of Cost Control, Litwin Engineers and Constructors, Inc.
“... always demonstrated knowledge, diligence, energy, capability, and good nature contributed substantially to the success of
our fast moving and high visibility project. I highly recommend her and would be most happy to work with her again.”
— VP at Parsons Brinckerhoff
“... We would not have been able to achieve our desired results without your efforts.”
— President of Industrial Business Unit, Wood Group Mustang

More Related Content

Similar to Hanley Patti - FINAL Resume - 2 18 15

Lynne Krogsrud 09022016
Lynne Krogsrud 09022016Lynne Krogsrud 09022016
Lynne Krogsrud 09022016Lynne Krogsrud
 
Paul Campbell Resume 02SEP2015
Paul Campbell Resume 02SEP2015Paul Campbell Resume 02SEP2015
Paul Campbell Resume 02SEP2015Paul Campbell
 
Program Manager Resume 4
Program Manager Resume 4Program Manager Resume 4
Program Manager Resume 4Joe Ungvarsky
 
Austin_C _Mattson_II_resume_Sep_2015
Austin_C _Mattson_II_resume_Sep_2015Austin_C _Mattson_II_resume_Sep_2015
Austin_C _Mattson_II_resume_Sep_2015Austin C. Mattson II
 
Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015wendell spencer
 
Ronald J Kunz Resume C
Ronald J Kunz Resume CRonald J Kunz Resume C
Ronald J Kunz Resume CRon Kunz
 
Doug Mader Us Eng Overview Public
Doug Mader Us Eng Overview  PublicDoug Mader Us Eng Overview  Public
Doug Mader Us Eng Overview Publicdmader
 
Randel j. croteau resume - ats
Randel j. croteau   resume - atsRandel j. croteau   resume - ats
Randel j. croteau resume - atsRandy Croteau
 
Wood Joe Resume_14Jul16
Wood Joe Resume_14Jul16Wood Joe Resume_14Jul16
Wood Joe Resume_14Jul16Joe Wood
 
UpdatedResumeasof10-17-16
UpdatedResumeasof10-17-16UpdatedResumeasof10-17-16
UpdatedResumeasof10-17-16Ken Simmons
 
Executive Resume Matt Jensen 17-02
Executive Resume Matt Jensen 17-02Executive Resume Matt Jensen 17-02
Executive Resume Matt Jensen 17-02Matt Jensen
 
Resume Paul Ferrata 2018
Resume Paul Ferrata 2018Resume Paul Ferrata 2018
Resume Paul Ferrata 2018Paul D. Ferrata
 
J Ewing Project Manager III Resume
J Ewing Project Manager III ResumeJ Ewing Project Manager III Resume
J Ewing Project Manager III ResumeJovaughn Ewing
 
Shults, Richard Jr. Rail Mbb
Shults, Richard Jr. Rail MbbShults, Richard Jr. Rail Mbb
Shults, Richard Jr. Rail MbbRichard_Shults
 

Similar to Hanley Patti - FINAL Resume - 2 18 15 (20)

Lynne Krogsrud 09022016
Lynne Krogsrud 09022016Lynne Krogsrud 09022016
Lynne Krogsrud 09022016
 
Paul Campbell Resume 02SEP2015
Paul Campbell Resume 02SEP2015Paul Campbell Resume 02SEP2015
Paul Campbell Resume 02SEP2015
 
David Fitzsimmons Resume
David Fitzsimmons ResumeDavid Fitzsimmons Resume
David Fitzsimmons Resume
 
Program Manager Resume 4
Program Manager Resume 4Program Manager Resume 4
Program Manager Resume 4
 
Austin_C _Mattson_II_resume_Sep_2015
Austin_C _Mattson_II_resume_Sep_2015Austin_C _Mattson_II_resume_Sep_2015
Austin_C _Mattson_II_resume_Sep_2015
 
Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015
 
Ronald J Kunz Resume C
Ronald J Kunz Resume CRonald J Kunz Resume C
Ronald J Kunz Resume C
 
Doug Mader Us Eng Overview Public
Doug Mader Us Eng Overview  PublicDoug Mader Us Eng Overview  Public
Doug Mader Us Eng Overview Public
 
Montey ThamesMil
Montey ThamesMilMontey ThamesMil
Montey ThamesMil
 
Randel j. croteau resume - ats
Randel j. croteau   resume - atsRandel j. croteau   resume - ats
Randel j. croteau resume - ats
 
Wood Joe Resume_14Jul16
Wood Joe Resume_14Jul16Wood Joe Resume_14Jul16
Wood Joe Resume_14Jul16
 
UpdatedResumeasof10-17-16
UpdatedResumeasof10-17-16UpdatedResumeasof10-17-16
UpdatedResumeasof10-17-16
 
CV
CVCV
CV
 
Job resume
Job resumeJob resume
Job resume
 
Executive Resume Matt Jensen 17-02
Executive Resume Matt Jensen 17-02Executive Resume Matt Jensen 17-02
Executive Resume Matt Jensen 17-02
 
Cartwright Gary - Resume FINAL
Cartwright Gary - Resume FINALCartwright Gary - Resume FINAL
Cartwright Gary - Resume FINAL
 
Resume Paul Ferrata 2018
Resume Paul Ferrata 2018Resume Paul Ferrata 2018
Resume Paul Ferrata 2018
 
J Ewing Project Manager III Resume
J Ewing Project Manager III ResumeJ Ewing Project Manager III Resume
J Ewing Project Manager III Resume
 
Daniel Carpenter Resume
Daniel Carpenter ResumeDaniel Carpenter Resume
Daniel Carpenter Resume
 
Shults, Richard Jr. Rail Mbb
Shults, Richard Jr. Rail MbbShults, Richard Jr. Rail Mbb
Shults, Richard Jr. Rail Mbb
 

Hanley Patti - FINAL Resume - 2 18 15

  • 1. PATTI SCHELINE HANLEY 713-851-1043 |Txtish23@Yahoo.Com 576 Lakeshore Drive, Victoria, TX 77905 Project ControlsManager  Implementing and managing robust project controls meeting strictclienttimelines/requirements. Adept in developing and managing work breakdown structures, technical requirements, quality control measures, projectexecution plans (PEP),work planningsessions,and process standardization.  Recruiting, directing, and training top-level project teams includingschedulers,cost control analysts,document controllers, and project administrators.  First-rate financial manager developing sound financial controls, costestimates,and multimillion-dollar projectbudgets. Expert in developing and presenting reports on contract commitments, cash flow, expenditures, forecasting,earned value measurements, and costtrends and deviations.  Building strong working relationships with third-party engineering firms,integrated project management teams, and executive management teams. Highly capablein empowering others and expanding team skill sets through training. Adept in gathering, analyzing,and verifyingprojectdata on-site and from projectoffice. Professional History Locations in Houston, TX unless noted otherwise Emerson Process Systems & Solutions — 2014 to Present Project Controls Lead | Scope: Firm’s largestmulti-unitmain automation contractor (MAC) contractfor greenfield and brownfield refinery expansion project. Focus: Promoted to leadership roledelivering training to project administratorsin projectcostcontrols.  Results: Upgraded level of expertise of project administrators.Earned “Spot On” performance award within fivemonths of starting. Wood Group Mustang — 2005 to 2014 Project Controls Manager | Scope: Multipleglobal engineering,procurement, and construction management (EPCM) projects involving refiningand chemical process plant design upgrades. Focus: Developing new dashboard executive review process,providing project oversighton technical design areas for earned valuereporting.  Results: Significantly reduced costs and improved effectiveness by streamlining executive reviews to 30 minutes. The OB/GYN Centre,P.A. — 1994 to 2005 Business Manager | Scope: Managing all contracts for insurancecompanies,hospitals, laboratories and facilities.Focus:Reporting needs, business processes, financial management, and office management.  Results: Successfully guided and managed steady expansion of this office from solo practice to three physicians with assistingteam of 16. Developed processes to supportthis growth. LITWIN Engineers and Constructors, Inc. — 1990 to 1994 Senior Cost Analyst | Scope: Multi-unitEPC refinery expansion project involvingupgrades and construction of fluid catalytic cracker unit.Focus: Developing estimate from front end engineering design (FEED) to execution of engineering, procurement and construction. Reporting on all trends/deviations in cost,quantities and projectprogress.  Results: Developed effective project strategies that significantly reduced projectcosts. – Wide Industry/Project Experience – EPCM | Domestic/Global Engineering | Department of Defense | Oil & Gas | Chemical Refineries | Water Treatment | Greenfield & Brownfield Projects | Environmental Remediation | EPA/Superfund Projects | Nuclear Waste — Projects’ Technical Scope: Specific Units, Processes, & Systems — sulfur recovery wastewater & purge treatment full burn optimization sour water stripper amine regeneration coker gas concentration ultralow sulfur diesel fluid catalytic cracker wet gas scrubber training simulator acid plant power generation gas turbine visbreaker LPG/LCN/HCN/C5 Merox alkaline | dimersol MTBE | TAME | MSAT
  • 2. PATTI SCHELINE HANLEY 713-851-1043 |Txtish23@Yahoo.Com | Page 2 NUS, Inc. — 1988 to 1990 Project Controls Analyst & Quality Assurance (QA) Manager | Scope: Numerous environmental remediation and EPA Superfund projects.Focus: Project management plans, costand labor plans,QA,status and change management reports, contract management reports, milestone schedules,and subcontractor/consultantagreements.  Results: Increased clientsatisfaction through developing and implementing complete QA plans and procedures. Parsons, Brinckerhoff, Quade & Douglas, Inc. — 1981 to 1988 Project Management System Controller | Document Control Manager. | Scope: Design of exploratory shaftfacilities for preliminary testingfor repository for storageof high-level nuclear waste. Focus: Complying with Nuclear Quality Assurance Standards (ANSI/ASME NQA-1). Reporting all projectstages and progress to clientand Department of Energy.  Results: Launched from ground up and maintained first-class projectofficeand document and information center. Previous Experience Served as Budget Specialist for Department of Defense (Portsmouth, NH and Charleston,SC). Developed and tracked $6 million dollar receivables budget for services provided to vessels and units at two Naval Stations. Awarded commendation by Naval Station Commanding Officer for outstandingservice. Education & Training Forecasting Functionality, Houston Area Engineering Association. Total Cost Management for the 90's, American Association of Cost Engineers. Federal Government Contracting, Cost/Schedule Control Systems, & Performance Analysis & Forecasting, Decision Planning Corp. General Studies at Houston Community College and New Hampshire College Memberships & Involvement VP of Education, Toastmasters International; certified Competent Communicator and Competent Leader Chair Woman, Mustang Teams for Relay for Life for American Cancer Society (three years) Planning Team Member, Memorial Drive United Methodist Church Annual Women’s Dinner (two years) President, Women of Mustang Engineering Network (W.O.M.E.N.) (two years) Co-Chair, million dollar combined federal campaign to raise money for United Way Board & Architectural Review Committee Member, MGPO Neighborhood Homeowners Association Disciple Group Youth Leader, Memorial Drive United Methodist Church Leader for Cookie Sales, First Air and Camping Volunteer, San Jacinto Girl Scout Council Testimonials “... dependable and always met or beat deadlines. Her assignments were performed with reliability. Her ever present cheerful nature enhanced the morale of the project team.“ — Manager of Cost Control, Litwin Engineers and Constructors, Inc. “... always demonstrated knowledge, diligence, energy, capability, and good nature contributed substantially to the success of our fast moving and high visibility project. I highly recommend her and would be most happy to work with her again.” — VP at Parsons Brinckerhoff “... We would not have been able to achieve our desired results without your efforts.” — President of Industrial Business Unit, Wood Group Mustang