ILU Training Analysis A Lean Visual Management Tool
Empowering with Information One of the principals for developing the engagement of our team has been ‘empowering with information’ Visual Management boards are an attempt to provide simple feedback to the manufacturing team to measure performance Enrober Team Safety RIR –1.1 Quality 94% 75% Training Red            O              O Jack           L               U Hamish      I              O	 Demand Production    107   %
Proactive Metrics  Sales, Production kg’s and labour efficiency are simple metrics but reinforce the perceptions that ‘management is only interested in production’ Needed to develop tools to measure proactive activity that supports the ongoing success of the business such as training and safety.  ILU Codes help us deliver a proactive training measurement
ILU’s Explained ILU codes are a series of four successive and progressive strokes which represent progress developing competency in a unique skill set. These codes were overlayed on our existing competency documents. Qualifying Skills Competent Skills High Skilled Operator – Completed Range Skilled Operator
ILU’s Explained (continued)  I represents someone with core safety and hygiene skills still working under supervision of a skilled worker L a person who works independently but not yet responsible for the output of the entire line U a person who can supervise training and take responsibility for the output of the team.  The square represents for us represents an empolyee who has achieved a complete set of U level skills across a machine centre
ILU applied to a Competency In the following sequence demonstrates how through the completion of a competency an employee progresses from an I, to an L to a U.
Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Pieter           Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Pieter           Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo
Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Pieter           Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Pieter           Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo
Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Pieter           Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Pieter           Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo
Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Pieter           Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Pieter           Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo Yes             1/2/2009	Peter            Elmo
Square applied to a Machine Centre The following slides represents how you achieve a square level by completeing U levels across a machine centre group of competency.
ILU as a measuring tool At Haighs we count  I = 1 L = 2 U = 3  In this way we can calculate a number as a measure of our current skill mix. This allows the setting of a measurable goal as an objective of an investment in training An example of measuring against a target is on the next sheet
ILU Matrix 48% 13/27 4/9 6/9 3/6 28/33 84% 8/9 9/9 6/9 5/6
Furthermore this allows the demonstration of the company’s commitment to training to our employees. It is used as a visual tool for management planning in the workplace. ILU as a measuring tool
Acknowledgements Our ILU system is an adaptation of a system explained by Professor Peter Hines.  I believe he explained this was a system used by Nissan in Automotive Manufacturing.

More Related Content

What's hot

Training module 4 m change
Training module   4 m changeTraining module   4 m change
Training module 4 m changeDeepak Sharma
 
Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozenQC Labs
 
Total Productive Maintenance
Total Productive Maintenance Total Productive Maintenance
Total Productive Maintenance Ashik Takvir
 
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...ADD VALUE CONSULTING Inc
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozenavijit biswas
 
Autonomous Maintenance Presentation
Autonomous Maintenance PresentationAutonomous Maintenance Presentation
Autonomous Maintenance PresentationAbdul Rehman Ghauri
 
Error proofing IATF16949:2016
Error proofing IATF16949:2016Error proofing IATF16949:2016
Error proofing IATF16949:2016Bilal Ashar
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment EffectivenessAnand Subramaniam
 
FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)Ankit Gupta
 
Methods time measurement (mtm)
Methods time measurement (mtm)Methods time measurement (mtm)
Methods time measurement (mtm)soojal
 
TPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTimothy Wooi
 

What's hot (20)

Pfmea process fmea
Pfmea   process fmeaPfmea   process fmea
Pfmea process fmea
 
Shop Floor Planning & Control
Shop Floor Planning & ControlShop Floor Planning & Control
Shop Floor Planning & Control
 
Training module 4 m change
Training module   4 m changeTraining module   4 m change
Training module 4 m change
 
Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozen
 
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
 
Total Productive Maintenance
Total Productive Maintenance Total Productive Maintenance
Total Productive Maintenance
 
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
 
Autonomous Maintenance Presentation
Autonomous Maintenance PresentationAutonomous Maintenance Presentation
Autonomous Maintenance Presentation
 
OEE
OEEOEE
OEE
 
TPM: Planned Maintenance
TPM: Planned MaintenanceTPM: Planned Maintenance
TPM: Planned Maintenance
 
Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)
 
Error proofing IATF16949:2016
Error proofing IATF16949:2016Error proofing IATF16949:2016
Error proofing IATF16949:2016
 
Tpm
TpmTpm
Tpm
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Process F.M.E.A
Process F.M.E.AProcess F.M.E.A
Process F.M.E.A
 
FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)
 
Methods time measurement (mtm)
Methods time measurement (mtm)Methods time measurement (mtm)
Methods time measurement (mtm)
 
TPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous Maintenance
 
Tpm preview
Tpm previewTpm preview
Tpm preview
 

Viewers also liked

Morrisons 3
Morrisons 3Morrisons 3
Morrisons 3philg2
 
Wali's Will-Skill Matrix
Wali's Will-Skill MatrixWali's Will-Skill Matrix
Wali's Will-Skill MatrixWali Zahid
 
Multi –skilled workforce slide (2)
Multi –skilled workforce slide (2)Multi –skilled workforce slide (2)
Multi –skilled workforce slide (2)Anil Kumar
 
Factory management-1 The Corporate Constitution and Management Framework
Factory management-1 The Corporate Constitution and Management FrameworkFactory management-1 The Corporate Constitution and Management Framework
Factory management-1 The Corporate Constitution and Management FrameworkEduardo L. Garcia
 
ISO 9001:2015 Objectives Requirements | A Practical Approach That You Can Use...
ISO 9001:2015 Objectives Requirements | A Practical Approach That You Can Use...ISO 9001:2015 Objectives Requirements | A Practical Approach That You Can Use...
ISO 9001:2015 Objectives Requirements | A Practical Approach That You Can Use...Andre Barnarde
 
Tutorial 3: Skills Matrix Presentations (T27 & T34)
Tutorial 3: Skills Matrix Presentations (T27 & T34)Tutorial 3: Skills Matrix Presentations (T27 & T34)
Tutorial 3: Skills Matrix Presentations (T27 & T34)Comm202
 
Multi skilling ppt-1
Multi skilling ppt-1Multi skilling ppt-1
Multi skilling ppt-1Prithvi Ghag
 
10 Lessons for New Managers
10 Lessons for New Managers10 Lessons for New Managers
10 Lessons for New ManagersMRH Team
 
26 Soft Skills Training For Job Readiness
26   Soft Skills Training For Job Readiness26   Soft Skills Training For Job Readiness
26 Soft Skills Training For Job ReadinessKATHLEEN S GAY
 

Viewers also liked (18)

Skill matrix
Skill matrixSkill matrix
Skill matrix
 
skills matrix
skills matrixskills matrix
skills matrix
 
Skill matrix for Garments Industry
Skill matrix for Garments IndustrySkill matrix for Garments Industry
Skill matrix for Garments Industry
 
Skill will matrix
Skill will matrixSkill will matrix
Skill will matrix
 
Skill matrix by Md. Mazharul Islam
Skill matrix by Md. Mazharul IslamSkill matrix by Md. Mazharul Islam
Skill matrix by Md. Mazharul Islam
 
Morrisons 3
Morrisons 3Morrisons 3
Morrisons 3
 
Wali's Will-Skill Matrix
Wali's Will-Skill MatrixWali's Will-Skill Matrix
Wali's Will-Skill Matrix
 
Technical Skills Matrix
Technical Skills MatrixTechnical Skills Matrix
Technical Skills Matrix
 
Multi –skilled workforce slide (2)
Multi –skilled workforce slide (2)Multi –skilled workforce slide (2)
Multi –skilled workforce slide (2)
 
Factory management-1 The Corporate Constitution and Management Framework
Factory management-1 The Corporate Constitution and Management FrameworkFactory management-1 The Corporate Constitution and Management Framework
Factory management-1 The Corporate Constitution and Management Framework
 
The house of lean v3.6 ELG
The house of lean v3.6 ELGThe house of lean v3.6 ELG
The house of lean v3.6 ELG
 
ISO 9001:2015 Objectives Requirements | A Practical Approach That You Can Use...
ISO 9001:2015 Objectives Requirements | A Practical Approach That You Can Use...ISO 9001:2015 Objectives Requirements | A Practical Approach That You Can Use...
ISO 9001:2015 Objectives Requirements | A Practical Approach That You Can Use...
 
Tutorial 3: Skills Matrix Presentations (T27 & T34)
Tutorial 3: Skills Matrix Presentations (T27 & T34)Tutorial 3: Skills Matrix Presentations (T27 & T34)
Tutorial 3: Skills Matrix Presentations (T27 & T34)
 
Matrix management
Matrix managementMatrix management
Matrix management
 
Multi skilling ppt-1
Multi skilling ppt-1Multi skilling ppt-1
Multi skilling ppt-1
 
10 Lessons for New Managers
10 Lessons for New Managers10 Lessons for New Managers
10 Lessons for New Managers
 
26 Soft Skills Training For Job Readiness
26   Soft Skills Training For Job Readiness26   Soft Skills Training For Job Readiness
26 Soft Skills Training For Job Readiness
 
Gestión de la Calidad y Excelencia
Gestión de la Calidad y ExcelenciaGestión de la Calidad y Excelencia
Gestión de la Calidad y Excelencia
 

ILU Training Analysis Tool

  • 1. ILU Training Analysis A Lean Visual Management Tool
  • 2. Empowering with Information One of the principals for developing the engagement of our team has been ‘empowering with information’ Visual Management boards are an attempt to provide simple feedback to the manufacturing team to measure performance Enrober Team Safety RIR –1.1 Quality 94% 75% Training Red O O Jack L U Hamish I O Demand Production 107 %
  • 3. Proactive Metrics Sales, Production kg’s and labour efficiency are simple metrics but reinforce the perceptions that ‘management is only interested in production’ Needed to develop tools to measure proactive activity that supports the ongoing success of the business such as training and safety. ILU Codes help us deliver a proactive training measurement
  • 4. ILU’s Explained ILU codes are a series of four successive and progressive strokes which represent progress developing competency in a unique skill set. These codes were overlayed on our existing competency documents. Qualifying Skills Competent Skills High Skilled Operator – Completed Range Skilled Operator
  • 5. ILU’s Explained (continued) I represents someone with core safety and hygiene skills still working under supervision of a skilled worker L a person who works independently but not yet responsible for the output of the entire line U a person who can supervise training and take responsibility for the output of the team. The square represents for us represents an empolyee who has achieved a complete set of U level skills across a machine centre
  • 6. ILU applied to a Competency In the following sequence demonstrates how through the completion of a competency an employee progresses from an I, to an L to a U.
  • 7.
  • 8. Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Pieter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Pieter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo
  • 9. Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Pieter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Pieter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo
  • 10. Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Pieter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Pieter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo
  • 11. Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Pieter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Pieter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo Yes 1/2/2009 Peter Elmo
  • 12. Square applied to a Machine Centre The following slides represents how you achieve a square level by completeing U levels across a machine centre group of competency.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17. ILU as a measuring tool At Haighs we count I = 1 L = 2 U = 3 In this way we can calculate a number as a measure of our current skill mix. This allows the setting of a measurable goal as an objective of an investment in training An example of measuring against a target is on the next sheet
  • 18. ILU Matrix 48% 13/27 4/9 6/9 3/6 28/33 84% 8/9 9/9 6/9 5/6
  • 19. Furthermore this allows the demonstration of the company’s commitment to training to our employees. It is used as a visual tool for management planning in the workplace. ILU as a measuring tool