Lean Six Sigma is a hybrid methodology combining Lean and Six Sigma to enable a customer
focused and data driven approach towards process improvement by reducing waste. The improvement
methodology enables to reduce product or service failure rates to a negligible level (roughly 3.4 failures
per million opportunities). Lean Six Sigma encompasses all aspects of a business, including
management, service delivery, design, production and customer satisfaction. Lean Six Sigma companies
typically spend less than 5 percent of their revenues addressing and repairing quality problems.
The 3 commandments of this philosophy are: -
 The Customer is the King
 In God we trust, all others bring data
 Variation is the enemy of all processes
Manufacturing, automobile, aviation, medical transcription, software, ITES, banks and even other
financial institutions are following this methodology.
The question then is why not Jewellery industry?
The jewellery industry can also adopt and benefit from Lean Techniques as it aims to eliminate
waste and improve flow of work. We have to understand “waste” in the context of the jewellery
manufacturing process.
What is waste - Waste can arise at the following stages:
1. During design stage – Work that can be proactively avoided can be decided at this stage so that
wasteful practices are not built into work practices.
2. During planning stage – Planning and scheduling can be done in a manner that prevents loss of
time, less inventories and so on.
3. During operations stage – This is reactive as compared to the earlier actions and is to be addressed
after the process is in place.
1
Lean considers the following 7 types of wastes as relevant to the operational stage:
1. Transportation – Moving products that are not actually required to perform the processing
2. Inventory – All components, work in process and finished products not under process
3. Motion – People or equipment moving or walking more than is required to perform the
processing
4. Waiting – for the next production step
5. Overproduction – production ahead of demand
6. Over processing – due to poor tool or product design
7. Defects – effort involved in inspecting and fixing defects – cost of quality
Lean philosophy:
1. Design a simple manufacturing system
2. Recognise that there is always room for improvement
3. Continually improve the manufacturing system design / processes
S No Waste Description Effect of waste
1 Rework Most jewellery pieces are
subjected to rework and the
rework percentage is generally
very high depending upon the
manufacturing technique used
and the design complexity
- Limits competitiveness in
establishing selling price because
these costs are ultimately borne by
the buyer
- Prevents on-time deliveries which
cause additional costs in terms of
overtime, premium freight and other
administrative costs
- Represents quality problems whichmay
reach customers even if 100%
inspection methods are in place. It is a
statistical factthat 100% inspection is
only 85% effective.
2 Total Rejection Pieces which have become non-
conforming to customer
requirements and having to
undergo a non-value added
melting process for recovery of
precious metal is a waste.
- Costs of rejection have to be absorbed
by good pieces and in turn by the
customer
- Contributes to approximately 3% -5% of
total production waste
3 Extra Pieces Produced to compensate for
Total Rejection
These represent additional waste to
compensate original waste.
2
4 Process
Bottlenecks
Work in process builds up due
to imbalance in capacities
- Idle manpower
- Idle machinery
- High levels of work in process
5 Machine
Downtime
May happen due to inadequate
maintenance systems
- Reduces manufacturing capacity
- When critical equipment breakdown,
the consequences could be serious
6 Inventories Unnecessarily over producing
items
- Inventories held up in all stages from
gold central to finished goods
storage is considered a waste.
- Carrying costs of inventories could
add upto 25% - 30% per year
Benefits of Lean Six Sigma:
 Reduction in waste
 Improvement in productivity and quality
 Introduction of innovative practices for improving competitiveness
 Induce good management practices
 Increase in output
 Reduction in customer complaints
 Better adherence to delivery schedules
 Reduction in stage wise rejections
 Lesser inventory requirements
 Optimum utilisation of resources like space, manpower, materials, equipment, energy,
consumables etc.
 Orderly work place
 Culture of continual improvement
What’s in it for Jewellery business owner?
 Reduce cost of operations by 30% (YoY) while scaling up to be world –class
 Improve sales revenue by 25% (YoY) with less investment
 Become one of the pioneers in jewellery industry to achieve Process Excellence
3
STRETCH 30 – “Strategic Re-engineering To Reach Competitive
Horizon”
Principal Coach
A Transformational Leader with over two decades of experience in the field of Project
management and Operations Management with a specialization in Quality across Manufacturing,
Information Technology and Services. He has rich experience training & consulting various world class
companies and thousands of students, professionals and leaders through many public programs.
Minimum 30% improvement, irrespective of current level of process maturity
• Metrics driven organisation
• Roadmap assessment
• Cost of Quality modeling
• Kaizen for Quick hits and rapid
changes to standardization
• Analytics for opportunity
assessment
• Lean operations
• Six Sigma tools for enhanced
effectiveness
• BPR strategic tools / IT –
assisted re-engineering for
transformation
• Significant reduction in Cost
per FTE and Cost per
transaction
• Reduced customer complaints
and improved NPS
• Six sigma level of defects /
errors in Operations
• Improved Turn Around Times
• Enhanced productivity
• Transformational gains on all
key metrics
• World – class organisation
Name: Kalyan Krishnamoorthy
Education: BE, PGDM, CSSMBB, CQP, MCQI, FCSIA, PMP
Experience: 20 years plus
Skills: Lean, Six Sigma, TQM, JIT, Statistics, Analytics, Customer Service,
ISO and Project / Program Management
Strengths: Focus, Includer, Strategic, Learner and Analytical –Top 5
strengths from the Strengths Finder of Gallup Organization
4
Earlier, he was leading the strategic agenda of Innovation and Digitisation as Head of Business
Excellence and Group Change Delivery across fifty plus countries for Standard Chartered Scope
International. He was driving the “Leadership Series Sponsor” program for Standard Chartered group
mentoring fifty plus leaders across the globe, supporting the organisation’s strategy of “massively
multiply leadership capability”. In his earlier assignments as Quality Leader in various multi-national
corporations, he has deployed strategic change management programs such as Lean, Six Sigma and
Innovation for business transformation with a focus on analytics and customer-centricity.
He is a certified Six Sigma Master Black Belt (CSSMBB) from Indian Statistical Institute, Lean
Master / Reengineering Customer Care Engineer from Renault Institute of Quality Management and
Cegos, UK, certified Chartered Quality Professional (CQP) and a Member of the Chartered Quality
Institute (MCQI), UK. Fellow (FCSIA) Member of the Customer Service Institute of America, certified
Project Management Professional (PMP) from Project Management Institute, US and a certified
Assessor of Business Excellence from the Confederation of Indian Industry–Institute of Quality. He is an
empanelled Lean Manufacturing Consultant by the Quality Council of India – National Accreditation
Board for Education & Training. He is also an Uplifting Customer Service Champion and “Writing back”
Specialist from Up your Service! College, Singapore.
Speaker at the various international forums including the American Society for Quality, 5th
Annual Middle-east Business Excellence Summit in Dubai, 2nd Gulf Quality conference in Doha, Qatar
and the Madras Chapter of Indian Institution of Industrial Engineering. Reviewer of papers for National
Project Management Conference, India. Member of the panel judges for various conferences /
competitions such as International Quality Conference by National Institution for Quality and Reliability
and QIMPRO convention.
He is also a PhD Research scholar from Amrita School of Business with four international
publications and his research interests include Process Excellence, Service Excellence and Experimental
Psychology.
Key expertise
 Transformational Leadership
 Lean Six Sigma
 Customer Service
 Analytics & Business Intelligence
 Program & Project Management
 Cost Optimization / Productivity
Improvements
 Innovation & Digitisation
 Benchmarking
 Problem Solving EPS/ 8 D, TRIZ, TOC
 BPMS – Business Process
Management Systems
 Performance Management / Metrics
& Measurement
 Risk Management
5
Clients served
6
Major Achievements
 Mentored more than 100 hi-impact projects with over 25 million USD hard saves and significant
improvement in Total Customer Experience / Net Promoter Score across world class companies in
UK, UAE & India.
 Trained more than 1500 Professionals with over 5000 hours of training in Project management,
Lean and Six Sigma across world class companies in India, UAE and UK.
 Pioneered the implementation of Lean Management Practices (including twenty plus Best practices
from manufacturing) in the Banking and Financial services.
 First to introduce the concept of “Service Guarantee” for all key banking products across markets
with robust processes using “Lean Pods”.
 Led the strategic agenda of Innovation and Digitisation for Standard Chartered Scope International
across fifty plus countries.
 Lean six Sigma efficiency improvement projects including maximization of Straight-through
processing through Innovation & Digitisation leading to cost save of more than USD 25 million.
 Lean Six Sigma projects on customer to customer TAT reduction of more than 50% on key products
such as cards, personal loans and savings account leading to an increase in Net Promoter Score from
30 to 45.
 Seat Utilisation improvement from 110% to 150% across locations through implementation of agile
work place solutions.
 Pioneered the introduction of Work Measurement (Industrial engineering practices like MOST –
Maynard Operation Sequence Technique) and Hyper-specialisation in the IT / ITES industry for
Productivity / cost optimisation.
 Use of latest trends in technology including Artificial Intelligence (virtual assistants) to eliminate
manual intervention in operations.
 Winner of the Icons CEO award of the Global Shared Services Centre consecutively for 2 years (2012
and 2013).
 Introduction of an innovative concept of “Customer Consultant Award” for complaining customers.
 Service Excellence enabled through implementation of CRM solution across the bank.
 Six Sigma Black Belt project of TAT reduction of control panels from 8 weeks to 3 weeks.
 Successfully led “Cash for Growth” and improved the net cash flow position by more than 30%.
 Successful implementation of Quality Control Process Control (QCPC) for the manufacture of
Inverter/ Converter boxes for Delhi Metro Rail project by DMRC with technology transfer from
Mitsubishi Electric Corporation, Japan.
 Deployed “Quality Focus” program including Process Excellence, Sourcing Excellence, Design
Excellence, Project Excellence and Autonomous Teams across the units in 35 plus countries.
7

More Related Content

What's hot

Quality management review template
Quality management review templateQuality management review template
Quality management review template
selinasimpson2801
 
Quality Management System PowerPoint Presentation Slide
Quality Management System PowerPoint Presentation Slide  Quality Management System PowerPoint Presentation Slide
Quality Management System PowerPoint Presentation Slide
SlideTeam
 

What's hot (20)

Mitra matra iatf 16949 honda module 4
Mitra matra iatf 16949 honda module 4Mitra matra iatf 16949 honda module 4
Mitra matra iatf 16949 honda module 4
 
Quality Management System PowerPoint Presentation Slides
Quality Management System PowerPoint Presentation Slides Quality Management System PowerPoint Presentation Slides
Quality Management System PowerPoint Presentation Slides
 
PPT Presentation on ISO 9001 Requirements
PPT Presentation on ISO 9001 RequirementsPPT Presentation on ISO 9001 Requirements
PPT Presentation on ISO 9001 Requirements
 
Quality assurance
Quality assuranceQuality assurance
Quality assurance
 
PPt on Qualituy Control
PPt on Qualituy ControlPPt on Qualituy Control
PPt on Qualituy Control
 
Quality management review template
Quality management review templateQuality management review template
Quality management review template
 
Iso 9001
Iso 9001Iso 9001
Iso 9001
 
VDA 6.5 (REVISED VOLUME 2020) PRODUCT AUDITOR QUALIFICATION COURSE
VDA 6.5 (REVISED VOLUME 2020) PRODUCT AUDITOR QUALIFICATION COURSEVDA 6.5 (REVISED VOLUME 2020) PRODUCT AUDITOR QUALIFICATION COURSE
VDA 6.5 (REVISED VOLUME 2020) PRODUCT AUDITOR QUALIFICATION COURSE
 
Iso 9001 2015 Understanding
Iso 9001 2015 Understanding Iso 9001 2015 Understanding
Iso 9001 2015 Understanding
 
What is iso 9001 qms
What is iso 9001 qmsWhat is iso 9001 qms
What is iso 9001 qms
 
Lean Six Sigma in various Industries
Lean Six Sigma in various IndustriesLean Six Sigma in various Industries
Lean Six Sigma in various Industries
 
Quality in Manufacturing for Production & Manufacturing
Quality in Manufacturing for Production & ManufacturingQuality in Manufacturing for Production & Manufacturing
Quality in Manufacturing for Production & Manufacturing
 
ISO 9001:2015 Overview. Presentation for Training (Preview)
ISO 9001:2015 Overview. Presentation for Training (Preview) ISO 9001:2015 Overview. Presentation for Training (Preview)
ISO 9001:2015 Overview. Presentation for Training (Preview)
 
Flowchart
FlowchartFlowchart
Flowchart
 
Overview of the iso 9001:2015
Overview of the iso 9001:2015Overview of the iso 9001:2015
Overview of the iso 9001:2015
 
ISO 9001 ultimate guide to the core quality management standard.pdf
ISO 9001 ultimate guide to the core quality management standard.pdfISO 9001 ultimate guide to the core quality management standard.pdf
ISO 9001 ultimate guide to the core quality management standard.pdf
 
Lean Six Sigma White Belt Webinar
Lean Six Sigma White Belt WebinarLean Six Sigma White Belt Webinar
Lean Six Sigma White Belt Webinar
 
Quality manual
Quality manualQuality manual
Quality manual
 
Quality Management System PowerPoint Presentation Slide
Quality Management System PowerPoint Presentation Slide  Quality Management System PowerPoint Presentation Slide
Quality Management System PowerPoint Presentation Slide
 
The new ISO 9001:2015
The new ISO 9001:2015The new ISO 9001:2015
The new ISO 9001:2015
 

Viewers also liked

Digital jewellery
Digital jewelleryDigital jewellery
Digital jewellery
Manu Priya
 
Fact Sheet_PoliticalAction-Aug2016-FINAL
Fact Sheet_PoliticalAction-Aug2016-FINALFact Sheet_PoliticalAction-Aug2016-FINAL
Fact Sheet_PoliticalAction-Aug2016-FINAL
Ann Warner
 
Todo tiene su razón de ser
Todo tiene su razón de serTodo tiene su razón de ser
Todo tiene su razón de ser
mila82
 
Bia, rươu - 'hung thủ' gây ra các chứng bệnh về gan
Bia, rươu - 'hung thủ' gây ra các chứng bệnh về ganBia, rươu - 'hung thủ' gây ra các chứng bệnh về gan
Bia, rươu - 'hung thủ' gây ra các chứng bệnh về gan
neville103
 
chuyên mua đồng hồ casio giảm giá
chuyên mua đồng hồ casio giảm giáchuyên mua đồng hồ casio giảm giá
chuyên mua đồng hồ casio giảm giá
raul652
 
Hafta 1
Hafta  1Hafta  1
Hafta 1
feza0
 

Viewers also liked (16)

Digital jewellery
Digital jewelleryDigital jewellery
Digital jewellery
 
Fact Sheet_PoliticalAction-Aug2016-FINAL
Fact Sheet_PoliticalAction-Aug2016-FINALFact Sheet_PoliticalAction-Aug2016-FINAL
Fact Sheet_PoliticalAction-Aug2016-FINAL
 
LinkedIn - Social Networking Service
LinkedIn - Social Networking ServiceLinkedIn - Social Networking Service
LinkedIn - Social Networking Service
 
Project A
Project AProject A
Project A
 
Todo tiene su razón de ser
Todo tiene su razón de serTodo tiene su razón de ser
Todo tiene su razón de ser
 
Proposal
ProposalProposal
Proposal
 
Uttam Singh CV
Uttam Singh CVUttam Singh CV
Uttam Singh CV
 
Elwira Katkowska CV 2015
Elwira Katkowska CV 2015Elwira Katkowska CV 2015
Elwira Katkowska CV 2015
 
Портфоліо Рижикова
Портфоліо РижиковаПортфоліо Рижикова
Портфоліо Рижикова
 
Khodiyar ceramics (i) pvt ltd corporate presentation
Khodiyar ceramics (i) pvt ltd corporate presentationKhodiyar ceramics (i) pvt ltd corporate presentation
Khodiyar ceramics (i) pvt ltd corporate presentation
 
Bia, rươu - 'hung thủ' gây ra các chứng bệnh về gan
Bia, rươu - 'hung thủ' gây ra các chứng bệnh về ganBia, rươu - 'hung thủ' gây ra các chứng bệnh về gan
Bia, rươu - 'hung thủ' gây ra các chứng bệnh về gan
 
chuyên mua đồng hồ casio giảm giá
chuyên mua đồng hồ casio giảm giáchuyên mua đồng hồ casio giảm giá
chuyên mua đồng hồ casio giảm giá
 
Media proposal
Media proposalMedia proposal
Media proposal
 
Shawnette Whitehead resume 2015
Shawnette Whitehead resume 2015Shawnette Whitehead resume 2015
Shawnette Whitehead resume 2015
 
Hafta 1
Hafta  1Hafta  1
Hafta 1
 
Geschiedenis twitter marketing
Geschiedenis twitter marketingGeschiedenis twitter marketing
Geschiedenis twitter marketing
 

Similar to Lean Six Sigma for Jewellery

BKAM3063 OPERATION AND PROJECT MANAGEMENTSECOND SEMEST
BKAM3063 OPERATION AND PROJECT MANAGEMENTSECOND SEMESTBKAM3063 OPERATION AND PROJECT MANAGEMENTSECOND SEMEST
BKAM3063 OPERATION AND PROJECT MANAGEMENTSECOND SEMEST
ChantellPantoja184
 
Leading the way in six sigma
Leading the way in six sigmaLeading the way in six sigma
Leading the way in six sigma
Invensis Learning
 
Introductory Advantage Presentation Case Study
Introductory Advantage Presentation Case StudyIntroductory Advantage Presentation Case Study
Introductory Advantage Presentation Case Study
Earlynn373
 
Integrating lssiso9ts
Integrating lssiso9tsIntegrating lssiso9ts
Integrating lssiso9ts
Omnex Inc.
 

Similar to Lean Six Sigma for Jewellery (20)

Six sigma vs kaizen
Six sigma vs kaizenSix sigma vs kaizen
Six sigma vs kaizen
 
Six Sigma Vs Kaizen
Six Sigma Vs KaizenSix Sigma Vs Kaizen
Six Sigma Vs Kaizen
 
BKAM3063 OPERATION AND PROJECT MANAGEMENTSECOND SEMEST
BKAM3063 OPERATION AND PROJECT MANAGEMENTSECOND SEMESTBKAM3063 OPERATION AND PROJECT MANAGEMENTSECOND SEMEST
BKAM3063 OPERATION AND PROJECT MANAGEMENTSECOND SEMEST
 
Gazelles_Mfg_casestudies
Gazelles_Mfg_casestudiesGazelles_Mfg_casestudies
Gazelles_Mfg_casestudies
 
Leading the way in six sigma
Leading the way in six sigmaLeading the way in six sigma
Leading the way in six sigma
 
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhhOM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
 
6 Sigma and Kaizen.pptx
6 Sigma and Kaizen.pptx6 Sigma and Kaizen.pptx
6 Sigma and Kaizen.pptx
 
Learning Six Sigma
Learning Six SigmaLearning Six Sigma
Learning Six Sigma
 
sixsigmavskaizen-110520221636-phpapp02.pdf
sixsigmavskaizen-110520221636-phpapp02.pdfsixsigmavskaizen-110520221636-phpapp02.pdf
sixsigmavskaizen-110520221636-phpapp02.pdf
 
sixsigma-
sixsigma-sixsigma-
sixsigma-
 
Six sigma
Six sigmaSix sigma
Six sigma
 
6 sigma basic best ppt
6 sigma basic best ppt6 sigma basic best ppt
6 sigma basic best ppt
 
How to implement operational excellence in organizations
How to implement operational excellence in organizationsHow to implement operational excellence in organizations
How to implement operational excellence in organizations
 
Six sigma
Six sigma Six sigma
Six sigma
 
Lean Production
Lean ProductionLean Production
Lean Production
 
Quality management principles operation management-amit kumar singh
Quality management principles operation management-amit kumar singhQuality management principles operation management-amit kumar singh
Quality management principles operation management-amit kumar singh
 
Six sigma green belt training (autosaved)
Six sigma green belt training (autosaved)Six sigma green belt training (autosaved)
Six sigma green belt training (autosaved)
 
Chapter 11_ The role of quality in performance management.pdf
Chapter 11_ The role of quality in performance management.pdfChapter 11_ The role of quality in performance management.pdf
Chapter 11_ The role of quality in performance management.pdf
 
Introductory Advantage Presentation Case Study
Introductory Advantage Presentation Case StudyIntroductory Advantage Presentation Case Study
Introductory Advantage Presentation Case Study
 
Integrating lssiso9ts
Integrating lssiso9tsIntegrating lssiso9ts
Integrating lssiso9ts
 

Lean Six Sigma for Jewellery

  • 1. Lean Six Sigma – a breakthrough methodology for business transformation in Jewellery Industry Introduction: Lean Six Sigma is a hybrid methodology combining Lean and Six Sigma to enable a customer focused and data driven approach towards process improvement by reducing waste. The improvement methodology enables to reduce product or service failure rates to a negligible level (roughly 3.4 failures per million opportunities). Lean Six Sigma encompasses all aspects of a business, including management, service delivery, design, production and customer satisfaction. Lean Six Sigma companies typically spend less than 5 percent of their revenues addressing and repairing quality problems. The 3 commandments of this philosophy are: -  The Customer is the King  In God we trust, all others bring data  Variation is the enemy of all processes Manufacturing, automobile, aviation, medical transcription, software, ITES, banks and even other financial institutions are following this methodology. The question then is why not Jewellery industry? The jewellery industry can also adopt and benefit from Lean Techniques as it aims to eliminate waste and improve flow of work. We have to understand “waste” in the context of the jewellery manufacturing process. What is waste - Waste can arise at the following stages: 1. During design stage – Work that can be proactively avoided can be decided at this stage so that wasteful practices are not built into work practices. 2. During planning stage – Planning and scheduling can be done in a manner that prevents loss of time, less inventories and so on. 3. During operations stage – This is reactive as compared to the earlier actions and is to be addressed after the process is in place. 1
  • 2. Lean considers the following 7 types of wastes as relevant to the operational stage: 1. Transportation – Moving products that are not actually required to perform the processing 2. Inventory – All components, work in process and finished products not under process 3. Motion – People or equipment moving or walking more than is required to perform the processing 4. Waiting – for the next production step 5. Overproduction – production ahead of demand 6. Over processing – due to poor tool or product design 7. Defects – effort involved in inspecting and fixing defects – cost of quality Lean philosophy: 1. Design a simple manufacturing system 2. Recognise that there is always room for improvement 3. Continually improve the manufacturing system design / processes S No Waste Description Effect of waste 1 Rework Most jewellery pieces are subjected to rework and the rework percentage is generally very high depending upon the manufacturing technique used and the design complexity - Limits competitiveness in establishing selling price because these costs are ultimately borne by the buyer - Prevents on-time deliveries which cause additional costs in terms of overtime, premium freight and other administrative costs - Represents quality problems whichmay reach customers even if 100% inspection methods are in place. It is a statistical factthat 100% inspection is only 85% effective. 2 Total Rejection Pieces which have become non- conforming to customer requirements and having to undergo a non-value added melting process for recovery of precious metal is a waste. - Costs of rejection have to be absorbed by good pieces and in turn by the customer - Contributes to approximately 3% -5% of total production waste 3 Extra Pieces Produced to compensate for Total Rejection These represent additional waste to compensate original waste. 2
  • 3. 4 Process Bottlenecks Work in process builds up due to imbalance in capacities - Idle manpower - Idle machinery - High levels of work in process 5 Machine Downtime May happen due to inadequate maintenance systems - Reduces manufacturing capacity - When critical equipment breakdown, the consequences could be serious 6 Inventories Unnecessarily over producing items - Inventories held up in all stages from gold central to finished goods storage is considered a waste. - Carrying costs of inventories could add upto 25% - 30% per year Benefits of Lean Six Sigma:  Reduction in waste  Improvement in productivity and quality  Introduction of innovative practices for improving competitiveness  Induce good management practices  Increase in output  Reduction in customer complaints  Better adherence to delivery schedules  Reduction in stage wise rejections  Lesser inventory requirements  Optimum utilisation of resources like space, manpower, materials, equipment, energy, consumables etc.  Orderly work place  Culture of continual improvement What’s in it for Jewellery business owner?  Reduce cost of operations by 30% (YoY) while scaling up to be world –class  Improve sales revenue by 25% (YoY) with less investment  Become one of the pioneers in jewellery industry to achieve Process Excellence 3
  • 4. STRETCH 30 – “Strategic Re-engineering To Reach Competitive Horizon” Principal Coach A Transformational Leader with over two decades of experience in the field of Project management and Operations Management with a specialization in Quality across Manufacturing, Information Technology and Services. He has rich experience training & consulting various world class companies and thousands of students, professionals and leaders through many public programs. Minimum 30% improvement, irrespective of current level of process maturity • Metrics driven organisation • Roadmap assessment • Cost of Quality modeling • Kaizen for Quick hits and rapid changes to standardization • Analytics for opportunity assessment • Lean operations • Six Sigma tools for enhanced effectiveness • BPR strategic tools / IT – assisted re-engineering for transformation • Significant reduction in Cost per FTE and Cost per transaction • Reduced customer complaints and improved NPS • Six sigma level of defects / errors in Operations • Improved Turn Around Times • Enhanced productivity • Transformational gains on all key metrics • World – class organisation Name: Kalyan Krishnamoorthy Education: BE, PGDM, CSSMBB, CQP, MCQI, FCSIA, PMP Experience: 20 years plus Skills: Lean, Six Sigma, TQM, JIT, Statistics, Analytics, Customer Service, ISO and Project / Program Management Strengths: Focus, Includer, Strategic, Learner and Analytical –Top 5 strengths from the Strengths Finder of Gallup Organization 4
  • 5. Earlier, he was leading the strategic agenda of Innovation and Digitisation as Head of Business Excellence and Group Change Delivery across fifty plus countries for Standard Chartered Scope International. He was driving the “Leadership Series Sponsor” program for Standard Chartered group mentoring fifty plus leaders across the globe, supporting the organisation’s strategy of “massively multiply leadership capability”. In his earlier assignments as Quality Leader in various multi-national corporations, he has deployed strategic change management programs such as Lean, Six Sigma and Innovation for business transformation with a focus on analytics and customer-centricity. He is a certified Six Sigma Master Black Belt (CSSMBB) from Indian Statistical Institute, Lean Master / Reengineering Customer Care Engineer from Renault Institute of Quality Management and Cegos, UK, certified Chartered Quality Professional (CQP) and a Member of the Chartered Quality Institute (MCQI), UK. Fellow (FCSIA) Member of the Customer Service Institute of America, certified Project Management Professional (PMP) from Project Management Institute, US and a certified Assessor of Business Excellence from the Confederation of Indian Industry–Institute of Quality. He is an empanelled Lean Manufacturing Consultant by the Quality Council of India – National Accreditation Board for Education & Training. He is also an Uplifting Customer Service Champion and “Writing back” Specialist from Up your Service! College, Singapore. Speaker at the various international forums including the American Society for Quality, 5th Annual Middle-east Business Excellence Summit in Dubai, 2nd Gulf Quality conference in Doha, Qatar and the Madras Chapter of Indian Institution of Industrial Engineering. Reviewer of papers for National Project Management Conference, India. Member of the panel judges for various conferences / competitions such as International Quality Conference by National Institution for Quality and Reliability and QIMPRO convention. He is also a PhD Research scholar from Amrita School of Business with four international publications and his research interests include Process Excellence, Service Excellence and Experimental Psychology. Key expertise  Transformational Leadership  Lean Six Sigma  Customer Service  Analytics & Business Intelligence  Program & Project Management  Cost Optimization / Productivity Improvements  Innovation & Digitisation  Benchmarking  Problem Solving EPS/ 8 D, TRIZ, TOC  BPMS – Business Process Management Systems  Performance Management / Metrics & Measurement  Risk Management 5
  • 7. Major Achievements  Mentored more than 100 hi-impact projects with over 25 million USD hard saves and significant improvement in Total Customer Experience / Net Promoter Score across world class companies in UK, UAE & India.  Trained more than 1500 Professionals with over 5000 hours of training in Project management, Lean and Six Sigma across world class companies in India, UAE and UK.  Pioneered the implementation of Lean Management Practices (including twenty plus Best practices from manufacturing) in the Banking and Financial services.  First to introduce the concept of “Service Guarantee” for all key banking products across markets with robust processes using “Lean Pods”.  Led the strategic agenda of Innovation and Digitisation for Standard Chartered Scope International across fifty plus countries.  Lean six Sigma efficiency improvement projects including maximization of Straight-through processing through Innovation & Digitisation leading to cost save of more than USD 25 million.  Lean Six Sigma projects on customer to customer TAT reduction of more than 50% on key products such as cards, personal loans and savings account leading to an increase in Net Promoter Score from 30 to 45.  Seat Utilisation improvement from 110% to 150% across locations through implementation of agile work place solutions.  Pioneered the introduction of Work Measurement (Industrial engineering practices like MOST – Maynard Operation Sequence Technique) and Hyper-specialisation in the IT / ITES industry for Productivity / cost optimisation.  Use of latest trends in technology including Artificial Intelligence (virtual assistants) to eliminate manual intervention in operations.  Winner of the Icons CEO award of the Global Shared Services Centre consecutively for 2 years (2012 and 2013).  Introduction of an innovative concept of “Customer Consultant Award” for complaining customers.  Service Excellence enabled through implementation of CRM solution across the bank.  Six Sigma Black Belt project of TAT reduction of control panels from 8 weeks to 3 weeks.  Successfully led “Cash for Growth” and improved the net cash flow position by more than 30%.  Successful implementation of Quality Control Process Control (QCPC) for the manufacture of Inverter/ Converter boxes for Delhi Metro Rail project by DMRC with technology transfer from Mitsubishi Electric Corporation, Japan.  Deployed “Quality Focus” program including Process Excellence, Sourcing Excellence, Design Excellence, Project Excellence and Autonomous Teams across the units in 35 plus countries. 7