SlideShare a Scribd company logo
1 of 21
SUMMER PRACTICAL TRAINING REPORT
AT
400kV GRID SUB-STATION
(HEERAPURA, JAIPUR)
SUBMITTED TO:-
DEPARTMENT OF
ELECTRICAL ENGINEERING
JECRC, JAIPUR
SUBMITTED BY:-
PUNEET MANGHANI
13EJCEE080
BATCH: B-1
400kV GRID SUB-STATION
SESSION 2016
ABOUT 400kV GSS
 EASTABLISHED:
19 July 2000 by Govt. of Raj.
 CAPACITY:
250 MVA
INTRODUCTION
Electric power is generated, transmitted and distributed in
the form of AC. The electric power produced at the power
station is delivered to the consumers through a large
network of transmission and distribution.
SUBSTATION
Main tasks of sub-station
 Fault analysis
 Voltage control
 Controlling the exchange of energy
 Protection of transmission system
 Reliable supply
ABSTRACT
 400 kV INCOMING FEEDERS
BASSI- 1
BASSI- 2
MERTA
HINDOUN CITY
 200 kV OUTGOING FEEDERS
SANGANER
SEZ
PHULERA
KTPS
CONTENTS
 Bus bars
 Isolators
 Insulators
 Circuit breakers
 Power transformers
 Control room
 Potential and current transformers
 Relays
 Lightning arrestors
 Battery room
BUS BARS
• An electrical conductor
that makes a common
connection between
several circuits
 Single main transfer
scheme
 Single bus bar scheme
 Double main bus bar
scheme
ISOLATORS
• Isolators is a mechanical switch
which isolates a part of circuit
from system when required.
• Types:
i)Double break isolators
ii)Single break isolators
iii)Pantograph type isolators
INSULATORS
• It provides insulation between the conductors and
support and thus prevent any leakage current from
conductor to earth.
• Purpose:
i)Support
ii)Break the current
• Types:
i)Pin type insulators
ii)Suspension type insulators
iii)Strain type insulators
CIRCUIT BREAKER
The main function of circuit breaker:
i) It carries current continuously
without heating
ii) Opens or close the circuit when
required.
iii)It protects the circuit in case of
any fault.
Types of circuit breaker:
 Vacuum circuit breaker
 SF6 circuit breaker
 Oil circuit breaker
 Air circuit breaker
Difference between Isolator and Circuit
Breaker
 Isolator is an off-load device while circuit breaker is
an on- load device.
 Isolator is a switch which is operated manually,
separates the circuit from the power main and
discharges the trapped charges in the circuit.
 Circuit breaker operates automatically, triggered by
electromechanical mechanism inside and are a safety
feature for abnormal and voltage in the circuit
POWER TRANSFORMER
 Transformers are used to transform voltage from one circuit to another
without changing the frequency.
Types of power transformer:
 Step up transformer and step down transformer
 Single phase transformer and three phase
transformer
 Electrical power transformer, distribution transformer
an instrument transformer
 Two winding transformer and auto transformer
 Outdoor transformer and indoor transformer
LIGHTNING ARRESTER
 A lightning arrester is a device used on electrical
power systems and telecommunications systems to
protect the insulation and conductors of the system
from the damaging effects of lightning. The
typical lightning arrester has a high-voltage
terminal and a ground terminal.
RELAYS
 A relay is an electrically operated switch
which senses abnormal conditions of
electrical circuit and closes its contacts.
Many relays use an electromagnet to
mechanically operate a switch
CONTROL ROOM
BATTERY ROOM
A battery room is a room in
a facility used to
house batteries for backup
or uninterruptible power
systems.
CONCLUSION
 During my two months summer training I got the
knowledge about transmission and distribution of the
electrical power, about the equipment used, their
arrangement and their working.
THANK YOU


More Related Content

What's hot

Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentationKanahiya Lal
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substationIshank Ranjan
 
PPT ON 400KV GSS HEERAPURA JAIPUR
PPT ON 400KV GSS HEERAPURA JAIPUR PPT ON 400KV GSS HEERAPURA JAIPUR
PPT ON 400KV GSS HEERAPURA JAIPUR Amit kumar
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCLAman Rajput
 
industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLsurendra rawat
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training pptShubham Patel
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptAshutosh Srivastava
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV Girish Gupta
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppclSunny Daksh
 
A training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopurA training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopurdilkhush009
 
substation 220 kv
substation 220 kv substation 220 kv
substation 220 kv student
 
Substations
SubstationsSubstations
Substationsitfakash
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
 
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54Subhash Mahla
 
PPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppclPPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppclVISHAL VERMA
 

What's hot (20)

Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentation
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
PPT ON 400KV GSS HEERAPURA JAIPUR
PPT ON 400KV GSS HEERAPURA JAIPUR PPT ON 400KV GSS HEERAPURA JAIPUR
PPT ON 400KV GSS HEERAPURA JAIPUR
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL
 
industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCL
 
33/11 KV SUBSTATION
33/11 KV SUBSTATION33/11 KV SUBSTATION
33/11 KV SUBSTATION
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
 
132 kv
132 kv132 kv
132 kv
 
220 kv gss
220 kv gss220 kv gss
220 kv gss
 
A training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopurA training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopur
 
substation 220 kv
substation 220 kv substation 220 kv
substation 220 kv
 
220 kv gss dausa
220 kv gss dausa220 kv gss dausa
220 kv gss dausa
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
 
Substations
SubstationsSubstations
Substations
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
 
PPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppclPPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppcl
 

Viewers also liked

Powergrid ppt campus_v1.33 engr
Powergrid ppt campus_v1.33 engrPowergrid ppt campus_v1.33 engr
Powergrid ppt campus_v1.33 engrAbhijit Sahare
 
T&D India (February 2017) – Transition in Transmission
T&D India (February 2017) – Transition in TransmissionT&D India (February 2017) – Transition in Transmission
T&D India (February 2017) – Transition in TransmissionT&D India
 
Power grid corporation of india ltd
Power grid corporation of india ltdPower grid corporation of india ltd
Power grid corporation of india ltdTanay Roy, CFA
 
switching substation, plcc and scada
switching substation, plcc and scadaswitching substation, plcc and scada
switching substation, plcc and scadaHemendra Kumar Rajput
 
PPT POWER GRID CORPORATION OF INDIA LIMITED
PPT POWER GRID CORPORATION OF INDIA LIMITED PPT POWER GRID CORPORATION OF INDIA LIMITED
PPT POWER GRID CORPORATION OF INDIA LIMITED Aditya Shankar
 
Power grid operation in India
Power grid operation in IndiaPower grid operation in India
Power grid operation in IndiaMahim Srivastava
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohitMohit Awasthi
 
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSPartha Parida
 

Viewers also liked (10)

Powergrid ppt campus_v1.33 engr
Powergrid ppt campus_v1.33 engrPowergrid ppt campus_v1.33 engr
Powergrid ppt campus_v1.33 engr
 
T&D India (February 2017) – Transition in Transmission
T&D India (February 2017) – Transition in TransmissionT&D India (February 2017) – Transition in Transmission
T&D India (February 2017) – Transition in Transmission
 
Powergridppt
PowergridpptPowergridppt
Powergridppt
 
Power grid corporation of india ltd
Power grid corporation of india ltdPower grid corporation of india ltd
Power grid corporation of india ltd
 
switching substation, plcc and scada
switching substation, plcc and scadaswitching substation, plcc and scada
switching substation, plcc and scada
 
PPT POWER GRID CORPORATION OF INDIA LIMITED
PPT POWER GRID CORPORATION OF INDIA LIMITED PPT POWER GRID CORPORATION OF INDIA LIMITED
PPT POWER GRID CORPORATION OF INDIA LIMITED
 
Power grid operation in India
Power grid operation in IndiaPower grid operation in India
Power grid operation in India
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
 
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
 
Substation overview
Substation overviewSubstation overview
Substation overview
 

Similar to Training report on 400 kV GSS

220 kv gss sitapua ppt sk95
220 kv gss sitapua ppt sk95220 kv gss sitapua ppt sk95
220 kv gss sitapua ppt sk95Sumit Kumar
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxfallinhay
 
Substation equipment and its function 2
Substation equipment and its function 2Substation equipment and its function 2
Substation equipment and its function 2Zulfiqar Mangrio
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviyaAnuj Bansal
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFjang041
 
substation internship report
substation internship report substation internship report
substation internship report Arun Thapa
 
Indusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptxIndusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptxSNEHAKANWAR1
 
220kv GSS, VKIA, jaipur
220kv GSS, VKIA, jaipur 220kv GSS, VKIA, jaipur
220kv GSS, VKIA, jaipur Renuka Verma
 
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI  NAGAR, LUCKNOW33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI  NAGAR, LUCKNOW
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOWSatya Prakash Chaurasia
 
PPT ON 220KV GSS
PPT ON 220KV GSSPPT ON 220KV GSS
PPT ON 220KV GSSMohitkalal4
 
New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660bhagat ram meena
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxShubhoDas5
 
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish BairwaPPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish BairwaAshish Bairwa
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxsohaib268827
 

Similar to Training report on 400 kV GSS (20)

220 kv gss sitapua ppt sk95
220 kv gss sitapua ppt sk95220 kv gss sitapua ppt sk95
220 kv gss sitapua ppt sk95
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptx
 
Substation equipment and its function 2
Substation equipment and its function 2Substation equipment and its function 2
Substation equipment and its function 2
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviya
 
UPPTCL CHAKIA 132KV
UPPTCL CHAKIA 132KVUPPTCL CHAKIA 132KV
UPPTCL CHAKIA 132KV
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEF
 
substation internship report
substation internship report substation internship report
substation internship report
 
Bharat singh 1
Bharat singh 1Bharat singh 1
Bharat singh 1
 
Indusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptxIndusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptx
 
220kv GSS, VKIA, jaipur
220kv GSS, VKIA, jaipur 220kv GSS, VKIA, jaipur
220kv GSS, VKIA, jaipur
 
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI  NAGAR, LUCKNOW33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI  NAGAR, LUCKNOW
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW
 
PPT ON 220KV GSS
PPT ON 220KV GSSPPT ON 220KV GSS
PPT ON 220KV GSS
 
New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptx
 
33kv substation
33kv substation33kv substation
33kv substation
 
Industrail training
Industrail trainingIndustrail training
Industrail training
 
Omprakash mahawar ppt
Omprakash mahawar pptOmprakash mahawar ppt
Omprakash mahawar ppt
 
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish BairwaPPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
 

Recently uploaded

The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsDILIPKUMARMONDAL6
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 

Recently uploaded (20)

The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teams
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 

Training report on 400 kV GSS

  • 1. SUMMER PRACTICAL TRAINING REPORT AT 400kV GRID SUB-STATION (HEERAPURA, JAIPUR) SUBMITTED TO:- DEPARTMENT OF ELECTRICAL ENGINEERING JECRC, JAIPUR SUBMITTED BY:- PUNEET MANGHANI 13EJCEE080 BATCH: B-1
  • 3. ABOUT 400kV GSS  EASTABLISHED: 19 July 2000 by Govt. of Raj.  CAPACITY: 250 MVA
  • 4. INTRODUCTION Electric power is generated, transmitted and distributed in the form of AC. The electric power produced at the power station is delivered to the consumers through a large network of transmission and distribution.
  • 5. SUBSTATION Main tasks of sub-station  Fault analysis  Voltage control  Controlling the exchange of energy  Protection of transmission system  Reliable supply
  • 6. ABSTRACT  400 kV INCOMING FEEDERS BASSI- 1 BASSI- 2 MERTA HINDOUN CITY  200 kV OUTGOING FEEDERS SANGANER SEZ PHULERA KTPS
  • 7. CONTENTS  Bus bars  Isolators  Insulators  Circuit breakers  Power transformers  Control room  Potential and current transformers  Relays  Lightning arrestors  Battery room
  • 8. BUS BARS • An electrical conductor that makes a common connection between several circuits  Single main transfer scheme  Single bus bar scheme  Double main bus bar scheme
  • 9. ISOLATORS • Isolators is a mechanical switch which isolates a part of circuit from system when required. • Types: i)Double break isolators ii)Single break isolators iii)Pantograph type isolators
  • 10. INSULATORS • It provides insulation between the conductors and support and thus prevent any leakage current from conductor to earth. • Purpose: i)Support ii)Break the current • Types: i)Pin type insulators ii)Suspension type insulators iii)Strain type insulators
  • 11. CIRCUIT BREAKER The main function of circuit breaker: i) It carries current continuously without heating ii) Opens or close the circuit when required. iii)It protects the circuit in case of any fault.
  • 12. Types of circuit breaker:  Vacuum circuit breaker  SF6 circuit breaker  Oil circuit breaker  Air circuit breaker
  • 13. Difference between Isolator and Circuit Breaker  Isolator is an off-load device while circuit breaker is an on- load device.  Isolator is a switch which is operated manually, separates the circuit from the power main and discharges the trapped charges in the circuit.  Circuit breaker operates automatically, triggered by electromechanical mechanism inside and are a safety feature for abnormal and voltage in the circuit
  • 14. POWER TRANSFORMER  Transformers are used to transform voltage from one circuit to another without changing the frequency.
  • 15. Types of power transformer:  Step up transformer and step down transformer  Single phase transformer and three phase transformer  Electrical power transformer, distribution transformer an instrument transformer  Two winding transformer and auto transformer  Outdoor transformer and indoor transformer
  • 16. LIGHTNING ARRESTER  A lightning arrester is a device used on electrical power systems and telecommunications systems to protect the insulation and conductors of the system from the damaging effects of lightning. The typical lightning arrester has a high-voltage terminal and a ground terminal.
  • 17. RELAYS  A relay is an electrically operated switch which senses abnormal conditions of electrical circuit and closes its contacts. Many relays use an electromagnet to mechanically operate a switch
  • 19. BATTERY ROOM A battery room is a room in a facility used to house batteries for backup or uninterruptible power systems.
  • 20. CONCLUSION  During my two months summer training I got the knowledge about transmission and distribution of the electrical power, about the equipment used, their arrangement and their working.