Time dependant differential consolidation of slurry wall backfill
Rahul V. Mukherjee
University of Saskatchewan, Saskatoon, Canada (rahul.mukherjee@usask.ca)
Moir D.Haug
University of Saskatchewan, Saskatoon, Canada (mhaug@mdhsolutions.com)
ABSTRACT: This paper presents the preliminary results of a laboratory testing program to investigate time-dependant
differential consolidation of slurry wall backfill material. The program was conducted to supplement the design and
installation of an 11,000 m long slurry wall. This slurry wall is installed through intermediate aquifers within low permeable
glacial till to a final depth of nearly 50 m. The testing program involves large diameter large strain consolidation testing of
selected field backfill samples. The apparatus was also modified to measure lateral pressure during loading. The heads
across the large strain consolidation apparatus were measured continuously. These results were supplemented by direct
shear tests performed on the different backfill materials. The results of this program show that there is significant retardation
in vertical stress in the backfill caused by arching. It also shows that the narrower the trench the greater the loss of vertical
effective stress. Future testing and analysis may show that the loss of this stress increases the potential for differential
consolidation around intermediate aquifers.
INTRODUCTION
The potential for slurry wall backfill arching and hang-up
was examined in a laboratory testing program. The
permeability of clay till slurry backfill is highly dependent
on the load placed on the backfill. As a result permeability
usually decreases with depth as the backfill consolidates
slowly under increasingly high loads. If the width of the
backfill trench is narrow and the depth great, there is a
potential for arching and backfill hang-up. In addition, if
the slurry wall crosses multiple aquifers it is possible that
differential consolidation around these aquifers could
result in the creation of more permeable zones with depth.
In order to examine this potential a laboratory program
was conducted to examine large-strain consolidation of
clay-till slurry backfill.
BACKGROUND
Soil bentonite (SB) slurry walls vertical barriers
constructed by excavating a narrow trench through
permeable material or zones and backfilling with a
mixture of soil, bentonite and water to achieve a low
permeability barrier (Xanthakos 1979, Haug 1983, Evans
1995). The soil either comes from the excavated trench or
from a source nearby, if the soil is deemed to be
unsuitable for use. The slurry in the SB wall is a mixture
of water and dry bentonite (4% - 7%) by weight (Evans
1994). Before placement in the trench the backfill is
mixed with desired amount of slurry from the trench to
provide a desired consistency. Since SB walls are mainly
used as low permeability barriers and constructed as a part
of polluted site remediation process, hydraulic
conductivity value plays a very important role. In general,
they range from 10-7
m/s to 10-11
m/s (D’Appolonia 1981,
Haug 1987, Evans 1995, Yeo et al 2005).
The value of permeability for the backfill mixture depends
upon many factors such as (i) the amount of dry bentonite
added to the mix (Ryan 1987, Evan 1994, Yeo et al 2005),
(ii) the amount of fines in the mixture (Xanthakos 1979,
D’Appolonia 1981, Yeo et al 2005), (iii) resistance of the
mix against the contaminant being contained and (iv) the
state of stress in the slurry wall (Evans 1995, Filz
1999).The performance assessment of these walls in terms
of hydraulic behaviour is generally done through
laboratory testing of the backfill mixture.
Laboratory model and field study on the slurry walls have
shown that the stress in the wall does not increase linearly
with depth as assumed earlier (McCandless and Bodocsi
1987, Evans 1995).The friction at the trench/backfill
interface governs the consolidation behaviour of the
backfill-slurry mix, which is fairly compressible. This
phenomenon can be explained by arching mechanism.
THEORY
Arching (Terzaghi 1943) can be described as “transfer of
stress from a yielding mass of a soil onto adjoining
stationary parts”. This theory was first described by
Marston and Anderson in 1913 to show the state of stress
on pipes in ditches, which was further described by
Terzaghi in his paper in 1945. Figure 1 shows the force
mobilization around a small element of backfill dh in
thickness in a trench of width B due to arching. According
to this theory, the trench walls are considered as rigid and
the backfill material is considered as compressible.
Consolidation and settlement of backfill with time cause
shear stresses to be mobilized along the trench walls (Fig
1), which act as a partial support for the backfill and hence
reduces the effective vertical stress in the trench below the
overburden pressure.
According to static equilibrium conditions, considering
the vertical force equilibrium (∑ FY=0) of the horizontal
slice in Fig1.
(a)
Where,
µ = co-efficient of friction between the trench wall and
backfill
K = co- efficient of earth pressure (ratio of horizontal
stress to vertical stress)
Solving the partial differential equation in (a), we get
V = ) (b)
Computing the average vertical stress from equation b,
σav = = ) (c)
Fig 1: Arching mechanism after (Marston and Anderson, 1913)
FOCUS OF THE STUDY
Backfill hang-up and arching is of particular concern for
deep slurry walls. This potential is a function of the width
of the trench, the depth of the trench, shear strength of the
backfill and potentially the sequence and spacing of
permeable zones cut-off by the slurry wall.
In 2009, construction was started on an 11,000 m long,
over 45 m deep slurry wall through glacial till at a
Saskatchewan potash mine. This slurry wall is intended to
control the migration of chloride impacted water. The
permeability and the potential for osmotic consolidation is
a function of the stress environment of the trench backfill.
As a result, the potential for arching or wall hang-up is a
concern. Further complicating the situation is the presence
of stacked aquifer which will result in more rapid backfill
consolidation at various depths in the trench. Figure 2
shows the site geology.
Fig 2: Schematic diagram of site geology
EXPERIMENTAL PROGRAM
The experimental program involves large strain
consolidation testing of the backfill mixes. A 150 mm
diameter consolidation cell was modified to increase its
depth and fitted with ports (A to E) to enable pore
pressures to be measured. Marriott bottle system was also
used to enable continuous monitoring of permeability
during loading. Miniature load cells were installed on the
walls of the mold at different depth to measure the stress
profile. Figure 3 shows a sketch of the mold.
Direct shear tests were also conducted on the different
backfill mixes to measure their frictional characteristics.
TEST MATERIALS
Till that was used in the experimental study was collected
from the site. Table 1 shows the index properties of the till
and the backfill. Additional backfill mixes were prepared
for this study by adjusting the fine content to 10%, 25%
and 50%.
Fig 3: Modified mould
TABLE1. Index properties of Till and clay-till backfill
Property Till Backfill
Specific Gravity 2.72 2.68
Liquid Limit (%) 42.5 37.5
Plastic Limit (%) 24 20
Plasticity Index (%) 18.5 17.5
Gravel (%) 30 20
Sand (%) 40 52
Silt (%) 14.5 19
Clay (%) (<0.002 mm) 15.5 9
TESTS PERFORMED AND TEST PROCEDURE
Direct shear test
Samples from different mix were allowed to consolidate
in large consolidation molds at different specified normal
loads. After, consolidation was complete; the samples
were extruded and trimmed to fit into 150 mm x 150 mm
diameter direct shear box. The samples were left for 1 -3
days depending upon the normal load. The shear box test
was then carried out according to ASTM D-3080-04.
Large strain consolidation and hydraulic conductivity
testing
All the saturated samples in the molds were compacted at
a water content corresponding to a slump of 12 cm and at
a constant dry density. The depths in the field were
simulated corresponding to the load applied onto the
sample. The samples once compacted were left to
consolidate under the weight of the loading plate, till the
load cell and potentiometer reading stabilized. The whole
setup was then loaded using Karol-Warner Conbel. Load
cell and deflection readings were recorded and monitored
continuously. A constant head hydraulic conductivity test
was run simultaneously, with a use of a Marriott bottle
arrangement (Fig 3). Once the equilibrium was attained,
next incremental load was applied to the sample.
DISCUSSION OF TEST RESULTS
Impact of fine content on shear strength
Figure 4 shows the variation of shear strength with
percent of fine in the backfill mix. The bold line
represents the 50% fine content mix and the dotted line
represents the 25% fine mix. The angle of internal friction
was not highly dependent on the % of fine. The friction
angle for these clay-till mixes ranged from 23 to 26
degrees. These values are considerably lower than the 30
to 35 degrees previously reported in the literature.
Fig 4: Shear strength of clay-till backfill
Fig 5: Variation in vertical hydraulic conductivity and
coefficient of lateral earth pressure with calculated depth
Figure 5 shows the variation of coefficient of lateral earth
pressure (k) and hydraulic conductivity measured during
one of the large strain consolidation tests. The hydraulic
conductivity decreases. This is because, as the load is
increased the void ratio decreased, gradually with depth,
however the rate of decrease slowed under increased
loads. A sharper decrease was measured for the
coefficient of lateral earth pressure.
Stress distribution in slurry wall
Figure 6 shows the stress distribution profile in deep clay-
till backfilled deep slurry trench with width of 0.6 to 2.1
m using the results of the test program according to
equation (c). The unit weight, coefficient of lateral earth
pressure and shear strength of the backfill are: γ = 17.8
kNm3
, k=0.10 and ϕ = 23.The stress in the backfill is
always less than the geostatic stress (γ`h) and becomes
constant with depth. This is because at large depths, the
shear stresses at the sides of the trench are then large
enough to balance the extra weight of each additional
layer of backfill. However, for any given depth, it is
evident from the figure that with the increase in the width
of the wall, the stress increases.
Fig 6: Stress profile in SB walls
CONCLUSION
The results of this study show that there is a significant
loss of effective vertical stress in the backfill with depth,
and that this loss increases for narrower trench. Future
testing will be required to show if such loss in stress
increases differential consolidation across aquifers. The
hydraulic conductivity of the clay-till backfill was found
to range from 10-5
m/s at a depth of 0.5 m to 10-8
m/s at a
depth of 2m. The hydraulic conductivity was still
decreasing with load. The coefficient of lateral earth
pressure was also found to decrease ranging from near 0.3
near ground surface to 0.1 approaching 2.5 m depth. In the
case of a 1m wide trench only a small proportion of the
backfill weight acts to consolidate backfill at depth.
REFERENCES
ASTM D 3080 – 04. Standard test method for direct shear test of
soils under consolidated drained conditions
D’Appolonia, D. (1980) Soil-bentonite slurry trench cut-offs.
Journal of Geotechnical Engineering Division, 106(4), 399-417.
Evans, J.C., Costa, M.J. and Cooley, B. (1995) The state-of-
stress in soil-bentonite slurry trench cut-off walls, Proc.,
Geoenvironment 2000, ASCE Geotechnical Special Publication
No.46, Y.B. Acar and D.E. Daniel, eds., New Orleans,
Louisiana,1173-1191
Filz, G.M. (1996) Consolidation stresses in soil-bentonite
backfilled trenches, Proc.,Environmental Geotechnics,
Kamon(ed), Balkema,Rotterdam,497-502.
Haug, M.D. (1983) Selection criteria for slurry trench cut-offs.
Canadian Journal of Civil Engg, 10(3),527-537.
Marston, A. and Anderson, A.O. (1913) The theory of loads on
pipes in ditches and tests of cement and clay drain tie and sewer
pipe. Iowa Engineering Experimental station Bulletin (31),
Ames, Iowa.
McCandless, R.M. and Bodocsi, A. (1988) Hydraulic
characteristics of model soil-bentonite slurry cut-off walls. In
Proceedings of the 5th
National Conference on Hazardous
Wastes and Hazardous Materials.
Evans, J.C. 1994. Hydraulic conductivity of vertical cut-off
walls. Hydraulic conductivity and waster contaminant transport
in soil, ASTM STP 1142, D.E. Daniel and S.J Trautwein, eds.,
Chapman and Hall, London,430-454.
Ryan, C.R. 1987. Soil bentonite cut-off walls, Geotechnical
practice for waste disposal’87, R.D Woods, ed., ASCE, New
York, 182-204.
Terzaghi, K. (1945) Stability and stiffness of cellular
cofferdams. Transactions, ASCE, 110(2253), 1083-1119.
Xanthakos, P.P. (1979) Slurry walls, McGraw Hill, New York,
NY.
Yeo, S.S., Shackelford, C.D. and Evans, J.C (2005)
Consolidation and hydraulic conductivity of nine model soil-
bentonite backfills. Journal of Geotechnical and
Geoenvironmental Engineering, 131(10), 1189-1198.

Más contenido relacionado

La actualidad más candente

Presentation on Laboratory Tests-Road Construction
Presentation on Laboratory Tests-Road ConstructionPresentation on Laboratory Tests-Road Construction
Presentation on Laboratory Tests-Road ConstructionTEJASWI SHARMA
 
Theoretical Behaviourof Soil Stability Using Geo Grids.
Theoretical Behaviourof Soil Stability Using Geo Grids.Theoretical Behaviourof Soil Stability Using Geo Grids.
Theoretical Behaviourof Soil Stability Using Geo Grids.ijceronline
 
Understanding Permeability of Hydraulic Fracture Networks A Sandbox Analog Mo...
Understanding Permeability of Hydraulic Fracture Networks A Sandbox Analog Mo...Understanding Permeability of Hydraulic Fracture Networks A Sandbox Analog Mo...
Understanding Permeability of Hydraulic Fracture Networks A Sandbox Analog Mo...Renee Heldman
 
Engineering properties of soil
Engineering properties of soilEngineering properties of soil
Engineering properties of soilRakesh Reddy
 
03 pavement materials - soil
03   pavement materials - soil03   pavement materials - soil
03 pavement materials - soilMuhammad Awais
 
Consolidation of Soil
Consolidation of SoilConsolidation of Soil
Consolidation of SoilArbaz Kazi
 
shear strenth of soil tests
shear strenth of soil testsshear strenth of soil tests
shear strenth of soil teststirath prajapati
 
Soil Bearing Capacity and Case study of Black Cotton Soil
Soil Bearing Capacity and Case study of Black Cotton SoilSoil Bearing Capacity and Case study of Black Cotton Soil
Soil Bearing Capacity and Case study of Black Cotton SoilPraveen S.K
 
New-Fangled Approach to Predict the Behaviour of Composite Sandwich Pavements
New-Fangled Approach to Predict the Behaviour of Composite Sandwich PavementsNew-Fangled Approach to Predict the Behaviour of Composite Sandwich Pavements
New-Fangled Approach to Predict the Behaviour of Composite Sandwich PavementsIDES Editor
 
shear strength of soil
shear strength of soilshear strength of soil
shear strength of soilAamir Ali
 
Shear Strength of Soil
Shear Strength of SoilShear Strength of Soil
Shear Strength of SoilUmang Parmar
 
Weathering of Rocks: Laboratory Test
Weathering of Rocks: Laboratory TestWeathering of Rocks: Laboratory Test
Weathering of Rocks: Laboratory TestVijai Krishnan V
 
Shear strength of soil
Shear strength of soilShear strength of soil
Shear strength of soilrajini24
 

La actualidad más candente (20)

Design flexible and rigid pavements
Design flexible and rigid pavementsDesign flexible and rigid pavements
Design flexible and rigid pavements
 
GeoManitobaPaper373
GeoManitobaPaper373GeoManitobaPaper373
GeoManitobaPaper373
 
Presentation on Laboratory Tests-Road Construction
Presentation on Laboratory Tests-Road ConstructionPresentation on Laboratory Tests-Road Construction
Presentation on Laboratory Tests-Road Construction
 
Theoretical Behaviourof Soil Stability Using Geo Grids.
Theoretical Behaviourof Soil Stability Using Geo Grids.Theoretical Behaviourof Soil Stability Using Geo Grids.
Theoretical Behaviourof Soil Stability Using Geo Grids.
 
Understanding Permeability of Hydraulic Fracture Networks A Sandbox Analog Mo...
Understanding Permeability of Hydraulic Fracture Networks A Sandbox Analog Mo...Understanding Permeability of Hydraulic Fracture Networks A Sandbox Analog Mo...
Understanding Permeability of Hydraulic Fracture Networks A Sandbox Analog Mo...
 
Engineering properties of soil
Engineering properties of soilEngineering properties of soil
Engineering properties of soil
 
Ijet v5 i6p18
Ijet v5 i6p18Ijet v5 i6p18
Ijet v5 i6p18
 
03 pavement materials - soil
03   pavement materials - soil03   pavement materials - soil
03 pavement materials - soil
 
F04653441
F04653441F04653441
F04653441
 
Chapter 12
Chapter 12Chapter 12
Chapter 12
 
Consolidation of Soil
Consolidation of SoilConsolidation of Soil
Consolidation of Soil
 
shear strenth of soil tests
shear strenth of soil testsshear strenth of soil tests
shear strenth of soil tests
 
Soil Bearing Capacity and Case study of Black Cotton Soil
Soil Bearing Capacity and Case study of Black Cotton SoilSoil Bearing Capacity and Case study of Black Cotton Soil
Soil Bearing Capacity and Case study of Black Cotton Soil
 
Direct Shear Final Pape
Direct Shear Final PapeDirect Shear Final Pape
Direct Shear Final Pape
 
New-Fangled Approach to Predict the Behaviour of Composite Sandwich Pavements
New-Fangled Approach to Predict the Behaviour of Composite Sandwich PavementsNew-Fangled Approach to Predict the Behaviour of Composite Sandwich Pavements
New-Fangled Approach to Predict the Behaviour of Composite Sandwich Pavements
 
shear strength of soil
shear strength of soilshear strength of soil
shear strength of soil
 
Chapter 13
Chapter 13Chapter 13
Chapter 13
 
Shear Strength of Soil
Shear Strength of SoilShear Strength of Soil
Shear Strength of Soil
 
Weathering of Rocks: Laboratory Test
Weathering of Rocks: Laboratory TestWeathering of Rocks: Laboratory Test
Weathering of Rocks: Laboratory Test
 
Shear strength of soil
Shear strength of soilShear strength of soil
Shear strength of soil
 

Similar a Time dependant differential consolidation of slurry wall backfill

case study on terzaghi’s theory
case study on terzaghi’s theorycase study on terzaghi’s theory
case study on terzaghi’s theoryAbhishek Mangukiya
 
"Observed Installation Effects of Vibro Replacement Stone Columns in Soft Clay"
"Observed Installation Effects of Vibro Replacement Stone Columns in Soft Clay""Observed Installation Effects of Vibro Replacement Stone Columns in Soft Clay"
"Observed Installation Effects of Vibro Replacement Stone Columns in Soft Clay"Remedy Geotechnics Ltd
 
IRJET - Critical Appraisal on Footing Subjected to Moment
IRJET - Critical Appraisal on Footing Subjected to MomentIRJET - Critical Appraisal on Footing Subjected to Moment
IRJET - Critical Appraisal on Footing Subjected to MomentIRJET Journal
 
Field and Theoretical Analysis of Accelerated Consolidation Using Vertical Dr...
Field and Theoretical Analysis of Accelerated Consolidation Using Vertical Dr...Field and Theoretical Analysis of Accelerated Consolidation Using Vertical Dr...
Field and Theoretical Analysis of Accelerated Consolidation Using Vertical Dr...inventionjournals
 
11.[49 58]an experimental investigation on interference of piled rafts in sof...
11.[49 58]an experimental investigation on interference of piled rafts in sof...11.[49 58]an experimental investigation on interference of piled rafts in sof...
11.[49 58]an experimental investigation on interference of piled rafts in sof...Alexander Decker
 
Laboratory experimental study and elastic wave velocity on physical propertie...
Laboratory experimental study and elastic wave velocity on physical propertie...Laboratory experimental study and elastic wave velocity on physical propertie...
Laboratory experimental study and elastic wave velocity on physical propertie...HoangTienTrung1
 
Behaviour of Single Pile in Reinforced Slope Subjected to Inclined Load
Behaviour of Single Pile in Reinforced Slope Subjected to Inclined LoadBehaviour of Single Pile in Reinforced Slope Subjected to Inclined Load
Behaviour of Single Pile in Reinforced Slope Subjected to Inclined LoadIJERA Editor
 
Behaviour of Single Pile in Reinforced Slope Subjected to Inclined Load
Behaviour of Single Pile in Reinforced Slope Subjected to Inclined Load Behaviour of Single Pile in Reinforced Slope Subjected to Inclined Load
Behaviour of Single Pile in Reinforced Slope Subjected to Inclined Load IJERA Editor
 
Experimental and Analytical Study on Uplift Capacity -Formatted Paper.pdf
Experimental and Analytical Study on Uplift Capacity -Formatted Paper.pdfExperimental and Analytical Study on Uplift Capacity -Formatted Paper.pdf
Experimental and Analytical Study on Uplift Capacity -Formatted Paper.pdfSamirsinh Parmar
 
Performance of square footing resting on laterally confined sand
Performance of square footing resting on laterally confined sandPerformance of square footing resting on laterally confined sand
Performance of square footing resting on laterally confined sandeSAT Publishing House
 
HORIZONTAL ANCHOR IN REINFORCED EARTH.pptx
HORIZONTAL ANCHOR IN REINFORCED EARTH.pptxHORIZONTAL ANCHOR IN REINFORCED EARTH.pptx
HORIZONTAL ANCHOR IN REINFORCED EARTH.pptxSamirsinh Parmar
 
Prefabricated vertical drains
Prefabricated vertical drainsPrefabricated vertical drains
Prefabricated vertical drainsMadhuReddy163523
 
THE EFFECT OF IMPROVEMENT SURROUNDING SOIL ON BORED PILE FRICTION CAPACITY
THE EFFECT OF IMPROVEMENT SURROUNDING SOIL ON BORED PILE FRICTION CAPACITY THE EFFECT OF IMPROVEMENT SURROUNDING SOIL ON BORED PILE FRICTION CAPACITY
THE EFFECT OF IMPROVEMENT SURROUNDING SOIL ON BORED PILE FRICTION CAPACITY IAEME Publication
 
Conference paper subgrade reaction
Conference paper subgrade reactionConference paper subgrade reaction
Conference paper subgrade reactionabdulhakim mawas
 
Flow over an Erodible Broad Crested Weir
Flow over an Erodible Broad Crested WeirFlow over an Erodible Broad Crested Weir
Flow over an Erodible Broad Crested WeirIJERA Editor
 
UNIT-III Consolidation.ppt
UNIT-III Consolidation.pptUNIT-III Consolidation.ppt
UNIT-III Consolidation.pptmythili spd
 
A Review Paper on Concrete Cast In-Situ Bored Piles Cushioned with Mixture of...
A Review Paper on Concrete Cast In-Situ Bored Piles Cushioned with Mixture of...A Review Paper on Concrete Cast In-Situ Bored Piles Cushioned with Mixture of...
A Review Paper on Concrete Cast In-Situ Bored Piles Cushioned with Mixture of...IRJET Journal
 

Similar a Time dependant differential consolidation of slurry wall backfill (20)

case study on terzaghi’s theory
case study on terzaghi’s theorycase study on terzaghi’s theory
case study on terzaghi’s theory
 
"Observed Installation Effects of Vibro Replacement Stone Columns in Soft Clay"
"Observed Installation Effects of Vibro Replacement Stone Columns in Soft Clay""Observed Installation Effects of Vibro Replacement Stone Columns in Soft Clay"
"Observed Installation Effects of Vibro Replacement Stone Columns in Soft Clay"
 
IRJET - Critical Appraisal on Footing Subjected to Moment
IRJET - Critical Appraisal on Footing Subjected to MomentIRJET - Critical Appraisal on Footing Subjected to Moment
IRJET - Critical Appraisal on Footing Subjected to Moment
 
Field and Theoretical Analysis of Accelerated Consolidation Using Vertical Dr...
Field and Theoretical Analysis of Accelerated Consolidation Using Vertical Dr...Field and Theoretical Analysis of Accelerated Consolidation Using Vertical Dr...
Field and Theoretical Analysis of Accelerated Consolidation Using Vertical Dr...
 
11.[49 58]an experimental investigation on interference of piled rafts in sof...
11.[49 58]an experimental investigation on interference of piled rafts in sof...11.[49 58]an experimental investigation on interference of piled rafts in sof...
11.[49 58]an experimental investigation on interference of piled rafts in sof...
 
Laboratory experimental study and elastic wave velocity on physical propertie...
Laboratory experimental study and elastic wave velocity on physical propertie...Laboratory experimental study and elastic wave velocity on physical propertie...
Laboratory experimental study and elastic wave velocity on physical propertie...
 
Behaviour of Single Pile in Reinforced Slope Subjected to Inclined Load
Behaviour of Single Pile in Reinforced Slope Subjected to Inclined LoadBehaviour of Single Pile in Reinforced Slope Subjected to Inclined Load
Behaviour of Single Pile in Reinforced Slope Subjected to Inclined Load
 
Behaviour of Single Pile in Reinforced Slope Subjected to Inclined Load
Behaviour of Single Pile in Reinforced Slope Subjected to Inclined Load Behaviour of Single Pile in Reinforced Slope Subjected to Inclined Load
Behaviour of Single Pile in Reinforced Slope Subjected to Inclined Load
 
Experimental and Analytical Study on Uplift Capacity -Formatted Paper.pdf
Experimental and Analytical Study on Uplift Capacity -Formatted Paper.pdfExperimental and Analytical Study on Uplift Capacity -Formatted Paper.pdf
Experimental and Analytical Study on Uplift Capacity -Formatted Paper.pdf
 
Performance of square footing resting on laterally confined sand
Performance of square footing resting on laterally confined sandPerformance of square footing resting on laterally confined sand
Performance of square footing resting on laterally confined sand
 
D0363015021
D0363015021D0363015021
D0363015021
 
HORIZONTAL ANCHOR IN REINFORCED EARTH.pptx
HORIZONTAL ANCHOR IN REINFORCED EARTH.pptxHORIZONTAL ANCHOR IN REINFORCED EARTH.pptx
HORIZONTAL ANCHOR IN REINFORCED EARTH.pptx
 
Prefabricated vertical drains
Prefabricated vertical drainsPrefabricated vertical drains
Prefabricated vertical drains
 
THE EFFECT OF IMPROVEMENT SURROUNDING SOIL ON BORED PILE FRICTION CAPACITY
THE EFFECT OF IMPROVEMENT SURROUNDING SOIL ON BORED PILE FRICTION CAPACITY THE EFFECT OF IMPROVEMENT SURROUNDING SOIL ON BORED PILE FRICTION CAPACITY
THE EFFECT OF IMPROVEMENT SURROUNDING SOIL ON BORED PILE FRICTION CAPACITY
 
Conference paper subgrade reaction
Conference paper subgrade reactionConference paper subgrade reaction
Conference paper subgrade reaction
 
Flow over an Erodible Broad Crested Weir
Flow over an Erodible Broad Crested WeirFlow over an Erodible Broad Crested Weir
Flow over an Erodible Broad Crested Weir
 
I0362057063
I0362057063I0362057063
I0362057063
 
UNIT-III Consolidation.ppt
UNIT-III Consolidation.pptUNIT-III Consolidation.ppt
UNIT-III Consolidation.ppt
 
UNIT-III.ppt
UNIT-III.pptUNIT-III.ppt
UNIT-III.ppt
 
A Review Paper on Concrete Cast In-Situ Bored Piles Cushioned with Mixture of...
A Review Paper on Concrete Cast In-Situ Bored Piles Cushioned with Mixture of...A Review Paper on Concrete Cast In-Situ Bored Piles Cushioned with Mixture of...
A Review Paper on Concrete Cast In-Situ Bored Piles Cushioned with Mixture of...
 

Time dependant differential consolidation of slurry wall backfill

  • 1. Time dependant differential consolidation of slurry wall backfill Rahul V. Mukherjee University of Saskatchewan, Saskatoon, Canada (rahul.mukherjee@usask.ca) Moir D.Haug University of Saskatchewan, Saskatoon, Canada (mhaug@mdhsolutions.com) ABSTRACT: This paper presents the preliminary results of a laboratory testing program to investigate time-dependant differential consolidation of slurry wall backfill material. The program was conducted to supplement the design and installation of an 11,000 m long slurry wall. This slurry wall is installed through intermediate aquifers within low permeable glacial till to a final depth of nearly 50 m. The testing program involves large diameter large strain consolidation testing of selected field backfill samples. The apparatus was also modified to measure lateral pressure during loading. The heads across the large strain consolidation apparatus were measured continuously. These results were supplemented by direct shear tests performed on the different backfill materials. The results of this program show that there is significant retardation in vertical stress in the backfill caused by arching. It also shows that the narrower the trench the greater the loss of vertical effective stress. Future testing and analysis may show that the loss of this stress increases the potential for differential consolidation around intermediate aquifers. INTRODUCTION The potential for slurry wall backfill arching and hang-up was examined in a laboratory testing program. The permeability of clay till slurry backfill is highly dependent on the load placed on the backfill. As a result permeability usually decreases with depth as the backfill consolidates slowly under increasingly high loads. If the width of the backfill trench is narrow and the depth great, there is a potential for arching and backfill hang-up. In addition, if the slurry wall crosses multiple aquifers it is possible that differential consolidation around these aquifers could result in the creation of more permeable zones with depth. In order to examine this potential a laboratory program was conducted to examine large-strain consolidation of clay-till slurry backfill. BACKGROUND Soil bentonite (SB) slurry walls vertical barriers constructed by excavating a narrow trench through permeable material or zones and backfilling with a mixture of soil, bentonite and water to achieve a low permeability barrier (Xanthakos 1979, Haug 1983, Evans 1995). The soil either comes from the excavated trench or from a source nearby, if the soil is deemed to be unsuitable for use. The slurry in the SB wall is a mixture of water and dry bentonite (4% - 7%) by weight (Evans 1994). Before placement in the trench the backfill is mixed with desired amount of slurry from the trench to provide a desired consistency. Since SB walls are mainly used as low permeability barriers and constructed as a part of polluted site remediation process, hydraulic conductivity value plays a very important role. In general, they range from 10-7 m/s to 10-11 m/s (D’Appolonia 1981, Haug 1987, Evans 1995, Yeo et al 2005). The value of permeability for the backfill mixture depends upon many factors such as (i) the amount of dry bentonite added to the mix (Ryan 1987, Evan 1994, Yeo et al 2005), (ii) the amount of fines in the mixture (Xanthakos 1979, D’Appolonia 1981, Yeo et al 2005), (iii) resistance of the mix against the contaminant being contained and (iv) the state of stress in the slurry wall (Evans 1995, Filz 1999).The performance assessment of these walls in terms of hydraulic behaviour is generally done through laboratory testing of the backfill mixture. Laboratory model and field study on the slurry walls have shown that the stress in the wall does not increase linearly with depth as assumed earlier (McCandless and Bodocsi 1987, Evans 1995).The friction at the trench/backfill interface governs the consolidation behaviour of the backfill-slurry mix, which is fairly compressible. This phenomenon can be explained by arching mechanism. THEORY Arching (Terzaghi 1943) can be described as “transfer of stress from a yielding mass of a soil onto adjoining stationary parts”. This theory was first described by Marston and Anderson in 1913 to show the state of stress on pipes in ditches, which was further described by Terzaghi in his paper in 1945. Figure 1 shows the force mobilization around a small element of backfill dh in thickness in a trench of width B due to arching. According to this theory, the trench walls are considered as rigid and
  • 2. the backfill material is considered as compressible. Consolidation and settlement of backfill with time cause shear stresses to be mobilized along the trench walls (Fig 1), which act as a partial support for the backfill and hence reduces the effective vertical stress in the trench below the overburden pressure. According to static equilibrium conditions, considering the vertical force equilibrium (∑ FY=0) of the horizontal slice in Fig1. (a) Where, µ = co-efficient of friction between the trench wall and backfill K = co- efficient of earth pressure (ratio of horizontal stress to vertical stress) Solving the partial differential equation in (a), we get V = ) (b) Computing the average vertical stress from equation b, σav = = ) (c) Fig 1: Arching mechanism after (Marston and Anderson, 1913) FOCUS OF THE STUDY Backfill hang-up and arching is of particular concern for deep slurry walls. This potential is a function of the width of the trench, the depth of the trench, shear strength of the backfill and potentially the sequence and spacing of permeable zones cut-off by the slurry wall. In 2009, construction was started on an 11,000 m long, over 45 m deep slurry wall through glacial till at a Saskatchewan potash mine. This slurry wall is intended to control the migration of chloride impacted water. The permeability and the potential for osmotic consolidation is a function of the stress environment of the trench backfill. As a result, the potential for arching or wall hang-up is a concern. Further complicating the situation is the presence of stacked aquifer which will result in more rapid backfill consolidation at various depths in the trench. Figure 2 shows the site geology. Fig 2: Schematic diagram of site geology EXPERIMENTAL PROGRAM The experimental program involves large strain consolidation testing of the backfill mixes. A 150 mm diameter consolidation cell was modified to increase its depth and fitted with ports (A to E) to enable pore pressures to be measured. Marriott bottle system was also used to enable continuous monitoring of permeability during loading. Miniature load cells were installed on the walls of the mold at different depth to measure the stress profile. Figure 3 shows a sketch of the mold. Direct shear tests were also conducted on the different backfill mixes to measure their frictional characteristics. TEST MATERIALS Till that was used in the experimental study was collected from the site. Table 1 shows the index properties of the till and the backfill. Additional backfill mixes were prepared
  • 3. for this study by adjusting the fine content to 10%, 25% and 50%. Fig 3: Modified mould TABLE1. Index properties of Till and clay-till backfill Property Till Backfill Specific Gravity 2.72 2.68 Liquid Limit (%) 42.5 37.5 Plastic Limit (%) 24 20 Plasticity Index (%) 18.5 17.5 Gravel (%) 30 20 Sand (%) 40 52 Silt (%) 14.5 19 Clay (%) (<0.002 mm) 15.5 9 TESTS PERFORMED AND TEST PROCEDURE Direct shear test Samples from different mix were allowed to consolidate in large consolidation molds at different specified normal loads. After, consolidation was complete; the samples were extruded and trimmed to fit into 150 mm x 150 mm diameter direct shear box. The samples were left for 1 -3 days depending upon the normal load. The shear box test was then carried out according to ASTM D-3080-04. Large strain consolidation and hydraulic conductivity testing All the saturated samples in the molds were compacted at a water content corresponding to a slump of 12 cm and at a constant dry density. The depths in the field were simulated corresponding to the load applied onto the sample. The samples once compacted were left to consolidate under the weight of the loading plate, till the load cell and potentiometer reading stabilized. The whole setup was then loaded using Karol-Warner Conbel. Load cell and deflection readings were recorded and monitored continuously. A constant head hydraulic conductivity test was run simultaneously, with a use of a Marriott bottle arrangement (Fig 3). Once the equilibrium was attained, next incremental load was applied to the sample. DISCUSSION OF TEST RESULTS Impact of fine content on shear strength Figure 4 shows the variation of shear strength with percent of fine in the backfill mix. The bold line represents the 50% fine content mix and the dotted line represents the 25% fine mix. The angle of internal friction was not highly dependent on the % of fine. The friction angle for these clay-till mixes ranged from 23 to 26 degrees. These values are considerably lower than the 30 to 35 degrees previously reported in the literature. Fig 4: Shear strength of clay-till backfill Fig 5: Variation in vertical hydraulic conductivity and coefficient of lateral earth pressure with calculated depth
  • 4. Figure 5 shows the variation of coefficient of lateral earth pressure (k) and hydraulic conductivity measured during one of the large strain consolidation tests. The hydraulic conductivity decreases. This is because, as the load is increased the void ratio decreased, gradually with depth, however the rate of decrease slowed under increased loads. A sharper decrease was measured for the coefficient of lateral earth pressure. Stress distribution in slurry wall Figure 6 shows the stress distribution profile in deep clay- till backfilled deep slurry trench with width of 0.6 to 2.1 m using the results of the test program according to equation (c). The unit weight, coefficient of lateral earth pressure and shear strength of the backfill are: γ = 17.8 kNm3 , k=0.10 and ϕ = 23.The stress in the backfill is always less than the geostatic stress (γ`h) and becomes constant with depth. This is because at large depths, the shear stresses at the sides of the trench are then large enough to balance the extra weight of each additional layer of backfill. However, for any given depth, it is evident from the figure that with the increase in the width of the wall, the stress increases. Fig 6: Stress profile in SB walls CONCLUSION The results of this study show that there is a significant loss of effective vertical stress in the backfill with depth, and that this loss increases for narrower trench. Future testing will be required to show if such loss in stress increases differential consolidation across aquifers. The hydraulic conductivity of the clay-till backfill was found to range from 10-5 m/s at a depth of 0.5 m to 10-8 m/s at a depth of 2m. The hydraulic conductivity was still decreasing with load. The coefficient of lateral earth pressure was also found to decrease ranging from near 0.3 near ground surface to 0.1 approaching 2.5 m depth. In the case of a 1m wide trench only a small proportion of the backfill weight acts to consolidate backfill at depth. REFERENCES ASTM D 3080 – 04. Standard test method for direct shear test of soils under consolidated drained conditions D’Appolonia, D. (1980) Soil-bentonite slurry trench cut-offs. Journal of Geotechnical Engineering Division, 106(4), 399-417. Evans, J.C., Costa, M.J. and Cooley, B. (1995) The state-of- stress in soil-bentonite slurry trench cut-off walls, Proc., Geoenvironment 2000, ASCE Geotechnical Special Publication No.46, Y.B. Acar and D.E. Daniel, eds., New Orleans, Louisiana,1173-1191 Filz, G.M. (1996) Consolidation stresses in soil-bentonite backfilled trenches, Proc.,Environmental Geotechnics, Kamon(ed), Balkema,Rotterdam,497-502. Haug, M.D. (1983) Selection criteria for slurry trench cut-offs. Canadian Journal of Civil Engg, 10(3),527-537. Marston, A. and Anderson, A.O. (1913) The theory of loads on pipes in ditches and tests of cement and clay drain tie and sewer pipe. Iowa Engineering Experimental station Bulletin (31), Ames, Iowa. McCandless, R.M. and Bodocsi, A. (1988) Hydraulic characteristics of model soil-bentonite slurry cut-off walls. In Proceedings of the 5th National Conference on Hazardous Wastes and Hazardous Materials. Evans, J.C. 1994. Hydraulic conductivity of vertical cut-off walls. Hydraulic conductivity and waster contaminant transport in soil, ASTM STP 1142, D.E. Daniel and S.J Trautwein, eds., Chapman and Hall, London,430-454. Ryan, C.R. 1987. Soil bentonite cut-off walls, Geotechnical practice for waste disposal’87, R.D Woods, ed., ASCE, New York, 182-204. Terzaghi, K. (1945) Stability and stiffness of cellular cofferdams. Transactions, ASCE, 110(2253), 1083-1119. Xanthakos, P.P. (1979) Slurry walls, McGraw Hill, New York, NY. Yeo, S.S., Shackelford, C.D. and Evans, J.C (2005) Consolidation and hydraulic conductivity of nine model soil- bentonite backfills. Journal of Geotechnical and Geoenvironmental Engineering, 131(10), 1189-1198.