Personal Information
Organización/Lugar de trabajo
Bhopal Area, India India
Ocupación
Project Engineer at AMBER ELECTROTECH LIMITED
Sector
Real Estate/ Construction / Architecture
Acerca de
I am a technically competent Project Management Professional offering success of 5 years in steering multi functional domains with reputed business establishments. Currently spearheading as Assit. Engineer (Electrical) - World largest Refinery Project J-3 of Reliance Industries Ltd with JMC Projects (India) Ltd (A kalpataru Group of Enterprise).I am involved in overall troubleshooting, servicing, operations and maintenance to ensure maximum operational availability of Electrical Equipment like Transformer, HT/LT Switch Gear,AIS/GIS Substation , Street Light , cable laying , Erection, Testing, commissioning ,EOT Crane,. With core capabilities in strategizing techniques for maximum utili...
Recomendaciones
(30)Railway signal
krishnendu17
•
Hace 7 años
Summer internship report on DMRC(Delhi Metro Rail Pvt. Ltd.)
Nalini Ranjan Panday
•
Hace 6 años
Electricity act 2003
Sanket Samantray
•
Hace 7 años
Aiims collages in india
Irfan Quraishi
•
Hace 6 años
Fast electrode profile
sachindesai055
•
Hace 10 años
Operation and maintenance of transformer
Kapil Singh
•
Hace 6 años
Safety in hospitals
aranli
•
Hace 12 años
Presentation Smart Hospital Projects and JMV LPS Ltd
Mahesh Chandra Manav
•
Hace 6 años
Speci vol1
Lalthakima Pachuau
•
Hace 9 años
VGGlobal procedure for DVAT Registration (delhi sales tax registeration)
Jatin Gupta
•
Hace 11 años
Underground cables
Anu71
•
Hace 9 años
Transformers (Especially For 12th Std)
Atit Gaonkar
•
Hace 10 años
A 220kV Substation
Ishank Ranjan
•
Hace 10 años
New Building Materials
Dr K M SONI
•
Hace 7 años
NFS2-3030
aescotom
•
Hace 13 años
Installation, Testing and Troubleshooting of Transformers
Living Online
•
Hace 9 años
Presentation of Manufacturing Of Distribution Transformer (Prodip)
Prodip Das Durjoy
•
Hace 9 años
Testing of transformer
SMRITI KESHARWANI
•
Hace 7 años
Modelling of 25 kV Electric Railway System
Bérengère VIGNAUX
•
Hace 6 años
Training report of 33/11kv substation Mohamdabad, Tundla
shashanksltor
•
Hace 12 años
Testing of transformer
vikasgupta1965
•
Hace 8 años
final report
vivek27594
•
Hace 8 años
Railway loco ppt
Anand Dwivedi
•
Hace 10 años
Traction system
atul giri
•
Hace 8 años
insulators, conductors, transformer and ac motors
Chippa Srikanth
•
Hace 9 años
New microsoft power point presentationTraing in Railway Electrification Office
Shudhanshu Singh
•
Hace 9 años
Caterpillar operation and maintenance manual 3500 b engines s
Zubes Masade
•
Hace 8 años
CODE_n14: Conference Program and Hall Map
GFT Innovation GmbH | CODE_n
•
Hace 10 años
Presentation1
Sunil Joshi
•
Hace 12 años
Substation overview
BHAGWAN PRASAD
•
Hace 10 años
Personal Information
Organización/Lugar de trabajo
Bhopal Area, India India
Ocupación
Project Engineer at AMBER ELECTROTECH LIMITED
Sector
Real Estate/ Construction / Architecture
Acerca de
I am a technically competent Project Management Professional offering success of 5 years in steering multi functional domains with reputed business establishments. Currently spearheading as Assit. Engineer (Electrical) - World largest Refinery Project J-3 of Reliance Industries Ltd with JMC Projects (India) Ltd (A kalpataru Group of Enterprise).I am involved in overall troubleshooting, servicing, operations and maintenance to ensure maximum operational availability of Electrical Equipment like Transformer, HT/LT Switch Gear,AIS/GIS Substation , Street Light , cable laying , Erection, Testing, commissioning ,EOT Crane,. With core capabilities in strategizing techniques for maximum utili...