CONSULTING ENGINEERS LIMITED
PLANNING AND DESIGN OF SEWERS
USING ADVANCED TECHNIQUES
FOR PROPOSED SEWERAGE SYSTEM OF
DISTRICT- I FOR KANPUR CITY UNDER
NGRBA PROJECT
12 Dec. 2014
International Conference on Sustainable
Clean Ganga Mission: Opportunities &
Challenges
By
Sanjay L. Lalan, J. K. Singh, A. S. Gupte
Ministry for Water Resources, River Development and Ganga Rejuvenation
CONSULTING ENGINEERS LIMITED
INTRODUCTION
• National Ganga River Basin Authority (NGRBA) has taken up projects
for “Mission Clean Ganga” under which no untreated municipal
sewage or industrial effluent would be allowed to be discharged into
the river Ganga by the year 2020.
• NGRBA Objective - to provide integrated sewerage system for
collection of sewage and providing STP for treatment before
discharging sewage into River Ganga and preventing pollution of river
Ganges and for sustainable development of surrounding areas.
• NGRBA has taken up sewerage project initially in Allahabad & Kanpur
cities.
• Tata Consulting Engineers Ltd. was awarded Consultancy Services for
“Technical Review, Financial Analysis and Preparation of Bid
Documents of projects under NGRBA for Kanpur District- I &
Allahabad District- A and District- C sewerage system” in November
2011.
CONSULTING ENGINEERS LIMITED
PROJECT DETAILS
 Sub Project Area – (TCE prepared DPRs/Tenders)
 11 wards of District-I in Kanpur
 Sewerage District –C in Allahabad (including STP)
 TCE provided handholding services, day to day interaction and
technical support at Kanpur and Allahabad to UPJN for DPR /Tenders-
 Balance 23 wards of District-I in Kanpur
 Sewerage District -A in Allahabad
CONSULTING ENGINEERS LIMITED
PROJECT DETAILS
 Kanpur is the biggest city of the State of Uttar Pradesh and is main centre
of commercial and industrial activities.
 Kanpur city population - 29.42 lakhs (2011).
 It is administratively divided into 6 zones and 110 wards.
 As per Master Plan report, Kanpur city is divided into four sewerage
districts from I to IV.
 In District-I, about 70% area is sewered and remaining 30% is un-
sewered. Area is 33.20 km2 and has 34 wards.
 In unsewered area, local residents have own arrangement with septic
tanks and the effluent is discharged into nearby drains/nala which finally
discharged into river Ganga.
 District-I have 25 wards in old city (inner old area) and 9 wards in north-
east area and is situated on right bank of river Ganga which is mainly
residential area & famous for commercial centre and reputed institutes.
CONSULTING ENGINEERS LIMITED
KANPUR SEWERAGE MAP
KEY MAP OF SEWERAGE DISTRICTS IN KANPUR
DIST-II
DIST-I
DIST-III
DIST-IV
CONSULTING ENGINEERS LIMITED
POPULATION AND FLOWS
Description
Sewerage District – I, 11 wards
– Sub Project Area
Population
(2011)
2.36 lacs
Design population (2050) 3.06 lacs
Design Flows 40.39 MLD
Area covered 397 hectare
Sewerage
District
Census
Population
(2011)
Projected
Population
(2020)
Projected
Population
(2050)
Sewage
Flows 2020
(MLD)
Sewage
Flows 2050
(MLD)
I 9,04,280 12,11,850 21,65,601 159.96 285.86
Kanpur City:
CONSULTING ENGINEERS LIMITED
PROJECT LOCATION – SUB PROJECT AREA
SEWER NETWORK IN
PROJECT AREA,
KANPUR (DISTRICT- I)
CONSULTING ENGINEERS LIMITED
CONTOUR LEVELS OF SUB PROJECT AREA
Terrain Variation of 11
Wards in Sub Project
Area, Kanpur
CONSULTING ENGINEERS LIMITED
PROJECT DETAILS – SUB PROJECT AREA
 11 wards of District –I are having narrow streets and busy and
congested area.
 106km of existing sewers. Most of the existing sewers are RCC Pipes.
Large sized sewers are of Brick Masonry egg shaped sewer.
 Sewage from 11 wards is proposed to be connected to trunk sewers
located along the Mall Road (Parade-Bada chauraha-Phool Bagh road)
and leading to Jajmau STP.
 Old trunk sewer (1000 mm dia) and another new trunk sewer (1000mm-
1200mm-1400mm dia) along Mall Road.
 Due to already defined invert levels of existing trunk sewers, the efforts
made for connecting sewers of 11 wards by gravity to existing trunk
sewers.
 Sewer network was optimized using software with minimum pumping
station and avoiding deep excavation. Hydraulic design of sewers is
done using SewerCAD software.
CONSULTING ENGINEERS LIMITED
PROJECT DETAILS
 Sewage Pumping Station has been proposed near Chacha Nehru
Hospital to avoid the deep sewer excavations in downstream area.
 There is a local depression in Patkapur area, where ground levels
are in the range of 119.75 to 122.00m compared to surrounding
ground levels of 124.00m. Lift Station is proposed to pump sewage
to nearby outfall.
 For utilisation of existing sewers in project area, extensive survey
and data collection was carried out in the field to assess the
condition of sewers.
 Interacted with ULBs for required information such as sewer
collapse, choking, overflow, etc. and verified existing alignment at
site and its connectivity.
CONSULTING ENGINEERS LIMITED
SURVEY OF EXISTING SEWERS
Physical survey was done for obtaining details of existing sewers. The sewer
condition (including manholes) were observed physically by opening
manholes.
CONSULTING ENGINEERS LIMITED
PROJECT HIGHLIGHTS
 Existing sewers which were in good condition and laid within past
15-20 years, are utilized in overall planning and designing for next
30 years horizon.
 Silted sewers which are in good condition are proposed to be
used after desilting.
 Heavily silted sewers are being discarded.
 Sewers of 400mm dia. and above sizes are proposed for internal
lining by rehabilitation techniques.
 GRP slip lining for egg-shaped sewers
 Polyurea coating for circular sewers
 Trenchless technology for laying of new sewers in busy road
crossings and speedy execution
 At narrow streets, the use of HDPE pipes and pre-cast RCC
manholes is proposed to speed up the work.
CONSULTING ENGINEERS LIMITED
LINING OF EXISTING SEWERS AND PIPE JACKING
A – Existing sewers
after desilting
B - Installing
Liner
C - Rehabilitated
Sewer after grouting
D – Cross section of
Rehabilitated Sewer
LAYING OF PIPE USING
TRENCHLESS TECHNOLOGY
ALIGNMENT CHECKING WITH LASER
PIPE JACKING
CONSULTING ENGINEERS LIMITED
PROJECT HIGHLIGHTS
 During execution stage, Contractor shall first have to carry out
detailed condition assessment survey for sewers and obtain
concurrence regarding their utilization from the Department.
 Egg-shaped brick sewers are proposed to be rehabilitated with
GRP segment pipes. For this, the Contractor will require to carry
out CCTV survey, submit the assessment report and provide GRP
segment lining for identified stretches.
 Similarly, for circular sewers the Contractor will require to carry
out CCTV Survey, submit the assessment report and provide
polyurea coating for identified stretches.
 Wherever, existing sewers are to be replaced by new sewers, the
existing system will continue to operate by sequential construction
program and temporary pumping so as to minimize the
inconvenience to users.
CONSULTING ENGINEERS LIMITED
MULTIPLE HOUSE CONNECTIONS
WITH SINGLE ROAD-SIDE CHAMBER
DESILTING, PRECAST MANHOLES AND MULTIPLE
HOUSE CONNECTIONS
PRE CAST CONCRETE MANHOLE
METHODOLOGY FOR DESILTING
CONSULTING ENGINEERS LIMITED
PROPOSED SYSTEM
Description Kanpur City (Sewerage District – I, 11 wards)
Design Year 2050
Design population 3.06 lacs
Area covered 397 hectare
Sewer Network –
Proposed
Length - 62 km (RCC NP3 / HDPE PE-100 PN 6.0)
Sizes – 150 to 700mm dia.
Sewage Pumping
Station – Proposed
- One SPS (peak flow capacity: 9.26 MLD)
- One Lift Station (peak flow capacity: 2.14 MLD)
Rehabilitation of
existing sewers
- De-silting of existing sewers- 17 km (sizes– 150
to 200mm dia.)
- Rehabilitation of existing circular and egg
shaped sewers- 3 km
 Circular sewers sizes– 400 to 900mm dia.
 Egg shaped sewers sizes – 18’’ x 27’’ / 20’’ x 30’’
CONSULTING ENGINEERS LIMITED
PROJECT HIGHLIGHTS
 Prequalification and Tender documents are prepared as the World
Bank guidelines.
Prepared project level procurement plan and detailed capital cost
for the project.
Undertaken detailed financial viability analysis.
 Prepared financial models for service provider in Allahabad and
Kanpur for sub project area and also a Framework for Financial
Modeling which can be applied in later stages of the project.
 Project Economic analysis which included computation of
Internal Rate of Return and economic benefits by establishing
baseline terms of the amount of pollution in the river and
characteristics of the effluents.
CONSULTING ENGINEERS LIMITED
PROJECT BENEFITS
 With proposed sewerage system,
 Prevention of Pollution of River Ganga.
 Public inconvenience and traffic interruption will be minimized.
 Resource conservation by reducing the requirement for
procurement of new pipes.
 Construction time will be reduced by around 6 months by
avoiding major pipe trench excavation & laying work and
procurement of new pipes.
 Better environment and hygienic condition.
 Uplift the social standards of residents and human dignity.
 Avoiding the chances of damage to foundation of nearby
structure.
 UPJN Kanpur DPR for remaining 23 wards (of length about
400km) is prepared on similar approach.
CONSULTING ENGINEERS LIMITED
PROJECT COST
Sl.
No.
Components Project Cost
(Rs. In Crores)
1 Sewerage System in 11 wards of District-I in
Kanpur
75.01
2 Sewerage System in Balance 23 wards of
District-I in Kanpur
397.31
3 Sewerage system in District –C in Allahabad 147.67
4 Sewerage system in District –A in Allahabad 288.94
5 14 MLD STP in District –C in Allahabad 42.24
Total Project Cost 951.17
CONSULTING ENGINEERS LIMITED
CURRENT STATUS OF PROJECT
 The project has been approved by NGRBA in
Empowered Steering Committee meeting in 2014 for
implementation.
CONSULTING ENGINEERS LIMITED
THANK YOU

More Related Content

What's hot

City Development Plan Solapur 2041
City Development Plan Solapur 2041City Development Plan Solapur 2041
City Development Plan Solapur 2041AdithyaA16
 
Environment impact assessment of navi mumbai airport
Environment impact assessment of navi mumbai airportEnvironment impact assessment of navi mumbai airport
Environment impact assessment of navi mumbai airportVivekanand Prasad Moril
 
Drinking water-quality-rural-india
Drinking water-quality-rural-indiaDrinking water-quality-rural-india
Drinking water-quality-rural-indiamarkjoshef
 
local area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, Ahmedabadlocal area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, AhmedabadPratham Pincha
 
DEWATS Decentralized waste water treatment technology
DEWATS Decentralized waste water treatment  technologyDEWATS Decentralized waste water treatment  technology
DEWATS Decentralized waste water treatment technologyRajneesh Gautam
 
Town Planning Act: Mahrashtra
Town Planning Act: MahrashtraTown Planning Act: Mahrashtra
Town Planning Act: MahrashtraMalvika Jaishal
 
A study on Affordable Housing projects in India (by Manpreet Singh)
A study on Affordable Housing projects in India (by Manpreet Singh)A study on Affordable Housing projects in India (by Manpreet Singh)
A study on Affordable Housing projects in India (by Manpreet Singh)Manpreet Singh Lotey, MBA
 
What do you understand by Infrastructure Planning Explain the role of Infrast...
What do you understand by Infrastructure Planning Explain the role of Infrast...What do you understand by Infrastructure Planning Explain the role of Infrast...
What do you understand by Infrastructure Planning Explain the role of Infrast...sonalidalal4
 
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGIONREGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGIONYash Shah
 
Kathputli colony slum development
Kathputli colony slum developmentKathputli colony slum development
Kathputli colony slum developmentM.I.T.,AURANGABAD
 
River-Front Revitalisation
River-Front RevitalisationRiver-Front Revitalisation
River-Front RevitalisationVitastaRaina
 
Strategies and Guidelines for Waterfront Developments
Strategies and Guidelines for Waterfront DevelopmentsStrategies and Guidelines for Waterfront Developments
Strategies and Guidelines for Waterfront DevelopmentsHazreena Hussein
 
Draft Proposal of Town Planning Scheme
Draft Proposal of Town Planning SchemeDraft Proposal of Town Planning Scheme
Draft Proposal of Town Planning SchemeYajush Sonar
 
Presentation GIFT City.pdf
Presentation GIFT City.pdfPresentation GIFT City.pdf
Presentation GIFT City.pdfAnahatVikram3
 
Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍
Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍
Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍dreamsion
 

What's hot (20)

TDR - TRANSFER OF DEVELOPMENT RIGHTS
TDR - TRANSFER OF DEVELOPMENT RIGHTSTDR - TRANSFER OF DEVELOPMENT RIGHTS
TDR - TRANSFER OF DEVELOPMENT RIGHTS
 
City Development Plan Solapur 2041
City Development Plan Solapur 2041City Development Plan Solapur 2041
City Development Plan Solapur 2041
 
Sponge Cities related to CEWP
Sponge Cities related to CEWPSponge Cities related to CEWP
Sponge Cities related to CEWP
 
Environment impact assessment of navi mumbai airport
Environment impact assessment of navi mumbai airportEnvironment impact assessment of navi mumbai airport
Environment impact assessment of navi mumbai airport
 
Drinking water-quality-rural-india
Drinking water-quality-rural-indiaDrinking water-quality-rural-india
Drinking water-quality-rural-india
 
local area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, Ahmedabadlocal area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, Ahmedabad
 
DEWATS Decentralized waste water treatment technology
DEWATS Decentralized waste water treatment  technologyDEWATS Decentralized waste water treatment  technology
DEWATS Decentralized waste water treatment technology
 
Rayerbazer slum upgrading
 Rayerbazer slum upgrading  Rayerbazer slum upgrading
Rayerbazer slum upgrading
 
Town Planning Act: Mahrashtra
Town Planning Act: MahrashtraTown Planning Act: Mahrashtra
Town Planning Act: Mahrashtra
 
A study on Affordable Housing projects in India (by Manpreet Singh)
A study on Affordable Housing projects in India (by Manpreet Singh)A study on Affordable Housing projects in India (by Manpreet Singh)
A study on Affordable Housing projects in India (by Manpreet Singh)
 
What do you understand by Infrastructure Planning Explain the role of Infrast...
What do you understand by Infrastructure Planning Explain the role of Infrast...What do you understand by Infrastructure Planning Explain the role of Infrast...
What do you understand by Infrastructure Planning Explain the role of Infrast...
 
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGIONREGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
 
Kathputli colony slum development
Kathputli colony slum developmentKathputli colony slum development
Kathputli colony slum development
 
River-Front Revitalisation
River-Front RevitalisationRiver-Front Revitalisation
River-Front Revitalisation
 
Strategies and Guidelines for Waterfront Developments
Strategies and Guidelines for Waterfront DevelopmentsStrategies and Guidelines for Waterfront Developments
Strategies and Guidelines for Waterfront Developments
 
Draft Proposal of Town Planning Scheme
Draft Proposal of Town Planning SchemeDraft Proposal of Town Planning Scheme
Draft Proposal of Town Planning Scheme
 
GIFT City
GIFT CityGIFT City
GIFT City
 
Development Plan -Planning Interventions by School of Planning and Architectu...
Development Plan -Planning Interventions by School of Planning and Architectu...Development Plan -Planning Interventions by School of Planning and Architectu...
Development Plan -Planning Interventions by School of Planning and Architectu...
 
Presentation GIFT City.pdf
Presentation GIFT City.pdfPresentation GIFT City.pdf
Presentation GIFT City.pdf
 
Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍
Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍
Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍
 

Viewers also liked

basic Transportation information of kanpur city upto -2014
basic Transportation information of kanpur city upto -2014basic Transportation information of kanpur city upto -2014
basic Transportation information of kanpur city upto -2014Gourav Mewara
 
7 things about kanpur
7 things about kanpur7 things about kanpur
7 things about kanpurbutool abbas
 
Vertform - manhole construction
Vertform - manhole constructionVertform - manhole construction
Vertform - manhole constructionAnthire
 
Sewerage systems-overflows-paper15
Sewerage systems-overflows-paper15Sewerage systems-overflows-paper15
Sewerage systems-overflows-paper15IIT Kharagpur
 
VOLTAS- WATER MANAGEMENT BUSINESS DIVISION
VOLTAS- WATER MANAGEMENT BUSINESS DIVISIONVOLTAS- WATER MANAGEMENT BUSINESS DIVISION
VOLTAS- WATER MANAGEMENT BUSINESS DIVISIONprasannaainapure
 
Ashghal guide-qatar-sewerage-amp-drainage-design-manual
Ashghal guide-qatar-sewerage-amp-drainage-design-manualAshghal guide-qatar-sewerage-amp-drainage-design-manual
Ashghal guide-qatar-sewerage-amp-drainage-design-manualsyedfaisalali_50
 
Water Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesWater Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesVladimir Popovic
 
Api vs ansi pump
Api vs ansi pumpApi vs ansi pump
Api vs ansi pumpreedst
 
materials of sewer
materials of sewermaterials of sewer
materials of sewerManish Goyal
 
Pipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & CatchpitsPipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & Catchpitseddiebradbrook
 
sewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenancesewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenanceManish Goyal
 
Meteor MBBR - Complete treatment of wastewater with a very compact footprint
Meteor MBBR - Complete treatment of wastewater with a very compact footprintMeteor MBBR - Complete treatment of wastewater with a very compact footprint
Meteor MBBR - Complete treatment of wastewater with a very compact footprintDegrémont
 

Viewers also liked (20)

basic Transportation information of kanpur city upto -2014
basic Transportation information of kanpur city upto -2014basic Transportation information of kanpur city upto -2014
basic Transportation information of kanpur city upto -2014
 
7 things about kanpur
7 things about kanpur7 things about kanpur
7 things about kanpur
 
precast manholes
precast manholesprecast manholes
precast manholes
 
Vertform - manhole construction
Vertform - manhole constructionVertform - manhole construction
Vertform - manhole construction
 
Sewerage systems-overflows-paper15
Sewerage systems-overflows-paper15Sewerage systems-overflows-paper15
Sewerage systems-overflows-paper15
 
VOLTAS- WATER MANAGEMENT BUSINESS DIVISION
VOLTAS- WATER MANAGEMENT BUSINESS DIVISIONVOLTAS- WATER MANAGEMENT BUSINESS DIVISION
VOLTAS- WATER MANAGEMENT BUSINESS DIVISION
 
L 8 stormwater sewr design
L 8 stormwater sewr designL 8 stormwater sewr design
L 8 stormwater sewr design
 
Ashghal guide-qatar-sewerage-amp-drainage-design-manual
Ashghal guide-qatar-sewerage-amp-drainage-design-manualAshghal guide-qatar-sewerage-amp-drainage-design-manual
Ashghal guide-qatar-sewerage-amp-drainage-design-manual
 
Water Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesWater Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing Examples
 
Api vs ansi pump
Api vs ansi pumpApi vs ansi pump
Api vs ansi pump
 
materials of sewer
materials of sewermaterials of sewer
materials of sewer
 
Derventa City WW Project
Derventa City WW ProjectDerventa City WW Project
Derventa City WW Project
 
Accomplishment Report SMM&E; June-July 2016
Accomplishment Report SMM&E; June-July 2016Accomplishment Report SMM&E; June-July 2016
Accomplishment Report SMM&E; June-July 2016
 
Pipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & CatchpitsPipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & Catchpits
 
MBBR PRESENTATION
MBBR PRESENTATIONMBBR PRESENTATION
MBBR PRESENTATION
 
Moving bed bio reactor (mbbr) plants
Moving bed bio reactor (mbbr) plantsMoving bed bio reactor (mbbr) plants
Moving bed bio reactor (mbbr) plants
 
sewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenancesewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenance
 
L 9 pumping stations
L 9 pumping stationsL 9 pumping stations
L 9 pumping stations
 
Meteor MBBR - Complete treatment of wastewater with a very compact footprint
Meteor MBBR - Complete treatment of wastewater with a very compact footprintMeteor MBBR - Complete treatment of wastewater with a very compact footprint
Meteor MBBR - Complete treatment of wastewater with a very compact footprint
 
L 13 grit chamber
L 13 grit chamberL 13 grit chamber
L 13 grit chamber
 

Similar to PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERAGE SYSTEM OF DISTRICT- I FOR KANPUR CITY UNDER NGRBA PROJECT

Critical Study on Kochi Barrage
Critical Study on Kochi BarrageCritical Study on Kochi Barrage
Critical Study on Kochi BarrageIRJET Journal
 
IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...
IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...
IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...IRJET Journal
 
RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)IRJET Journal
 
water-resources-development-dam-engineering-water-resources-and-dam-engineeri...
water-resources-development-dam-engineering-water-resources-and-dam-engineeri...water-resources-development-dam-engineering-water-resources-and-dam-engineeri...
water-resources-development-dam-engineering-water-resources-and-dam-engineeri...LeenaMujahed
 
IRJET- Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
IRJET-  	  Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...IRJET-  	  Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
IRJET- Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...IRJET Journal
 
Resume_Basavarajappa. L N
Resume_Basavarajappa. L NResume_Basavarajappa. L N
Resume_Basavarajappa. L NBasavaraj L N
 
ASIT_CV-RCO_INDIA_Asit_June_2016
ASIT_CV-RCO_INDIA_Asit_June_2016ASIT_CV-RCO_INDIA_Asit_June_2016
ASIT_CV-RCO_INDIA_Asit_June_2016Asit Kumar Adhikary
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland
 
Is the PMC a seat of bad governance? The Devnadi case study
Is the PMC a seat of bad governance? The Devnadi case studyIs the PMC a seat of bad governance? The Devnadi case study
Is the PMC a seat of bad governance? The Devnadi case studyAnupam Saraph
 
The Ravi Riverfront Urban Development Project
The Ravi Riverfront Urban Development ProjectThe Ravi Riverfront Urban Development Project
The Ravi Riverfront Urban Development ProjectKKM Architects
 
Compendium of ppp_cases_mou_ds
Compendium of ppp_cases_mou_dsCompendium of ppp_cases_mou_ds
Compendium of ppp_cases_mou_dsManjunath Burli
 
Presentation 2015 EN PRK 1055
Presentation 2015 EN PRK 1055Presentation 2015 EN PRK 1055
Presentation 2015 EN PRK 1055Jose Miguel Ruiz
 
Melamchi Water Supply Project
Melamchi Water Supply ProjectMelamchi Water Supply Project
Melamchi Water Supply ProjectChandanGupta201
 
A CASE STUDY OF BANAWADI VILLAGE OPTIMUM DESIGN AND ESTIMATION OF SEWER NETWORK
A CASE STUDY OF BANAWADI VILLAGE OPTIMUM DESIGN AND ESTIMATION OF SEWER NETWORKA CASE STUDY OF BANAWADI VILLAGE OPTIMUM DESIGN AND ESTIMATION OF SEWER NETWORK
A CASE STUDY OF BANAWADI VILLAGE OPTIMUM DESIGN AND ESTIMATION OF SEWER NETWORKIRJET Journal
 

Similar to PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERAGE SYSTEM OF DISTRICT- I FOR KANPUR CITY UNDER NGRBA PROJECT (20)

Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15
 
Critical Study on Kochi Barrage
Critical Study on Kochi BarrageCritical Study on Kochi Barrage
Critical Study on Kochi Barrage
 
IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...
IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...
IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...
 
RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)
 
water-resources-development-dam-engineering-water-resources-and-dam-engineeri...
water-resources-development-dam-engineering-water-resources-and-dam-engineeri...water-resources-development-dam-engineering-water-resources-and-dam-engineeri...
water-resources-development-dam-engineering-water-resources-and-dam-engineeri...
 
IRJET- Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
IRJET-  	  Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...IRJET-  	  Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
IRJET- Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
 
Resume_Basavarajappa. L N
Resume_Basavarajappa. L NResume_Basavarajappa. L N
Resume_Basavarajappa. L N
 
ASIT_CV-RCO_INDIA_Asit_June_2016
ASIT_CV-RCO_INDIA_Asit_June_2016ASIT_CV-RCO_INDIA_Asit_June_2016
ASIT_CV-RCO_INDIA_Asit_June_2016
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Saeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer UtilitiesSaeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer Utilities
 
Is the PMC a seat of bad governance? The Devnadi case study
Is the PMC a seat of bad governance? The Devnadi case studyIs the PMC a seat of bad governance? The Devnadi case study
Is the PMC a seat of bad governance? The Devnadi case study
 
The Ravi Riverfront Urban Development Project
The Ravi Riverfront Urban Development ProjectThe Ravi Riverfront Urban Development Project
The Ravi Riverfront Urban Development Project
 
Compendium of ppp_cases_mou_ds
Compendium of ppp_cases_mou_dsCompendium of ppp_cases_mou_ds
Compendium of ppp_cases_mou_ds
 
Presentation 2015 EN PRK 1055
Presentation 2015 EN PRK 1055Presentation 2015 EN PRK 1055
Presentation 2015 EN PRK 1055
 
exp_sewage.pptx
exp_sewage.pptxexp_sewage.pptx
exp_sewage.pptx
 
Melamchi Water Supply Project
Melamchi Water Supply ProjectMelamchi Water Supply Project
Melamchi Water Supply Project
 
A CASE STUDY OF BANAWADI VILLAGE OPTIMUM DESIGN AND ESTIMATION OF SEWER NETWORK
A CASE STUDY OF BANAWADI VILLAGE OPTIMUM DESIGN AND ESTIMATION OF SEWER NETWORKA CASE STUDY OF BANAWADI VILLAGE OPTIMUM DESIGN AND ESTIMATION OF SEWER NETWORK
A CASE STUDY OF BANAWADI VILLAGE OPTIMUM DESIGN AND ESTIMATION OF SEWER NETWORK
 
CV Krishna Dhanya
CV Krishna DhanyaCV Krishna Dhanya
CV Krishna Dhanya
 

Recently uploaded

Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsDILIPKUMARMONDAL6
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 

Recently uploaded (20)

Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teams
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 

PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERAGE SYSTEM OF DISTRICT- I FOR KANPUR CITY UNDER NGRBA PROJECT

  • 1. CONSULTING ENGINEERS LIMITED PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERAGE SYSTEM OF DISTRICT- I FOR KANPUR CITY UNDER NGRBA PROJECT 12 Dec. 2014 International Conference on Sustainable Clean Ganga Mission: Opportunities & Challenges By Sanjay L. Lalan, J. K. Singh, A. S. Gupte Ministry for Water Resources, River Development and Ganga Rejuvenation
  • 2. CONSULTING ENGINEERS LIMITED INTRODUCTION • National Ganga River Basin Authority (NGRBA) has taken up projects for “Mission Clean Ganga” under which no untreated municipal sewage or industrial effluent would be allowed to be discharged into the river Ganga by the year 2020. • NGRBA Objective - to provide integrated sewerage system for collection of sewage and providing STP for treatment before discharging sewage into River Ganga and preventing pollution of river Ganges and for sustainable development of surrounding areas. • NGRBA has taken up sewerage project initially in Allahabad & Kanpur cities. • Tata Consulting Engineers Ltd. was awarded Consultancy Services for “Technical Review, Financial Analysis and Preparation of Bid Documents of projects under NGRBA for Kanpur District- I & Allahabad District- A and District- C sewerage system” in November 2011.
  • 3. CONSULTING ENGINEERS LIMITED PROJECT DETAILS  Sub Project Area – (TCE prepared DPRs/Tenders)  11 wards of District-I in Kanpur  Sewerage District –C in Allahabad (including STP)  TCE provided handholding services, day to day interaction and technical support at Kanpur and Allahabad to UPJN for DPR /Tenders-  Balance 23 wards of District-I in Kanpur  Sewerage District -A in Allahabad
  • 4. CONSULTING ENGINEERS LIMITED PROJECT DETAILS  Kanpur is the biggest city of the State of Uttar Pradesh and is main centre of commercial and industrial activities.  Kanpur city population - 29.42 lakhs (2011).  It is administratively divided into 6 zones and 110 wards.  As per Master Plan report, Kanpur city is divided into four sewerage districts from I to IV.  In District-I, about 70% area is sewered and remaining 30% is un- sewered. Area is 33.20 km2 and has 34 wards.  In unsewered area, local residents have own arrangement with septic tanks and the effluent is discharged into nearby drains/nala which finally discharged into river Ganga.  District-I have 25 wards in old city (inner old area) and 9 wards in north- east area and is situated on right bank of river Ganga which is mainly residential area & famous for commercial centre and reputed institutes.
  • 5. CONSULTING ENGINEERS LIMITED KANPUR SEWERAGE MAP KEY MAP OF SEWERAGE DISTRICTS IN KANPUR DIST-II DIST-I DIST-III DIST-IV
  • 6. CONSULTING ENGINEERS LIMITED POPULATION AND FLOWS Description Sewerage District – I, 11 wards – Sub Project Area Population (2011) 2.36 lacs Design population (2050) 3.06 lacs Design Flows 40.39 MLD Area covered 397 hectare Sewerage District Census Population (2011) Projected Population (2020) Projected Population (2050) Sewage Flows 2020 (MLD) Sewage Flows 2050 (MLD) I 9,04,280 12,11,850 21,65,601 159.96 285.86 Kanpur City:
  • 7. CONSULTING ENGINEERS LIMITED PROJECT LOCATION – SUB PROJECT AREA SEWER NETWORK IN PROJECT AREA, KANPUR (DISTRICT- I)
  • 8. CONSULTING ENGINEERS LIMITED CONTOUR LEVELS OF SUB PROJECT AREA Terrain Variation of 11 Wards in Sub Project Area, Kanpur
  • 9. CONSULTING ENGINEERS LIMITED PROJECT DETAILS – SUB PROJECT AREA  11 wards of District –I are having narrow streets and busy and congested area.  106km of existing sewers. Most of the existing sewers are RCC Pipes. Large sized sewers are of Brick Masonry egg shaped sewer.  Sewage from 11 wards is proposed to be connected to trunk sewers located along the Mall Road (Parade-Bada chauraha-Phool Bagh road) and leading to Jajmau STP.  Old trunk sewer (1000 mm dia) and another new trunk sewer (1000mm- 1200mm-1400mm dia) along Mall Road.  Due to already defined invert levels of existing trunk sewers, the efforts made for connecting sewers of 11 wards by gravity to existing trunk sewers.  Sewer network was optimized using software with minimum pumping station and avoiding deep excavation. Hydraulic design of sewers is done using SewerCAD software.
  • 10. CONSULTING ENGINEERS LIMITED PROJECT DETAILS  Sewage Pumping Station has been proposed near Chacha Nehru Hospital to avoid the deep sewer excavations in downstream area.  There is a local depression in Patkapur area, where ground levels are in the range of 119.75 to 122.00m compared to surrounding ground levels of 124.00m. Lift Station is proposed to pump sewage to nearby outfall.  For utilisation of existing sewers in project area, extensive survey and data collection was carried out in the field to assess the condition of sewers.  Interacted with ULBs for required information such as sewer collapse, choking, overflow, etc. and verified existing alignment at site and its connectivity.
  • 11. CONSULTING ENGINEERS LIMITED SURVEY OF EXISTING SEWERS Physical survey was done for obtaining details of existing sewers. The sewer condition (including manholes) were observed physically by opening manholes.
  • 12. CONSULTING ENGINEERS LIMITED PROJECT HIGHLIGHTS  Existing sewers which were in good condition and laid within past 15-20 years, are utilized in overall planning and designing for next 30 years horizon.  Silted sewers which are in good condition are proposed to be used after desilting.  Heavily silted sewers are being discarded.  Sewers of 400mm dia. and above sizes are proposed for internal lining by rehabilitation techniques.  GRP slip lining for egg-shaped sewers  Polyurea coating for circular sewers  Trenchless technology for laying of new sewers in busy road crossings and speedy execution  At narrow streets, the use of HDPE pipes and pre-cast RCC manholes is proposed to speed up the work.
  • 13. CONSULTING ENGINEERS LIMITED LINING OF EXISTING SEWERS AND PIPE JACKING A – Existing sewers after desilting B - Installing Liner C - Rehabilitated Sewer after grouting D – Cross section of Rehabilitated Sewer LAYING OF PIPE USING TRENCHLESS TECHNOLOGY ALIGNMENT CHECKING WITH LASER PIPE JACKING
  • 14. CONSULTING ENGINEERS LIMITED PROJECT HIGHLIGHTS  During execution stage, Contractor shall first have to carry out detailed condition assessment survey for sewers and obtain concurrence regarding their utilization from the Department.  Egg-shaped brick sewers are proposed to be rehabilitated with GRP segment pipes. For this, the Contractor will require to carry out CCTV survey, submit the assessment report and provide GRP segment lining for identified stretches.  Similarly, for circular sewers the Contractor will require to carry out CCTV Survey, submit the assessment report and provide polyurea coating for identified stretches.  Wherever, existing sewers are to be replaced by new sewers, the existing system will continue to operate by sequential construction program and temporary pumping so as to minimize the inconvenience to users.
  • 15. CONSULTING ENGINEERS LIMITED MULTIPLE HOUSE CONNECTIONS WITH SINGLE ROAD-SIDE CHAMBER DESILTING, PRECAST MANHOLES AND MULTIPLE HOUSE CONNECTIONS PRE CAST CONCRETE MANHOLE METHODOLOGY FOR DESILTING
  • 16. CONSULTING ENGINEERS LIMITED PROPOSED SYSTEM Description Kanpur City (Sewerage District – I, 11 wards) Design Year 2050 Design population 3.06 lacs Area covered 397 hectare Sewer Network – Proposed Length - 62 km (RCC NP3 / HDPE PE-100 PN 6.0) Sizes – 150 to 700mm dia. Sewage Pumping Station – Proposed - One SPS (peak flow capacity: 9.26 MLD) - One Lift Station (peak flow capacity: 2.14 MLD) Rehabilitation of existing sewers - De-silting of existing sewers- 17 km (sizes– 150 to 200mm dia.) - Rehabilitation of existing circular and egg shaped sewers- 3 km  Circular sewers sizes– 400 to 900mm dia.  Egg shaped sewers sizes – 18’’ x 27’’ / 20’’ x 30’’
  • 17. CONSULTING ENGINEERS LIMITED PROJECT HIGHLIGHTS  Prequalification and Tender documents are prepared as the World Bank guidelines. Prepared project level procurement plan and detailed capital cost for the project. Undertaken detailed financial viability analysis.  Prepared financial models for service provider in Allahabad and Kanpur for sub project area and also a Framework for Financial Modeling which can be applied in later stages of the project.  Project Economic analysis which included computation of Internal Rate of Return and economic benefits by establishing baseline terms of the amount of pollution in the river and characteristics of the effluents.
  • 18. CONSULTING ENGINEERS LIMITED PROJECT BENEFITS  With proposed sewerage system,  Prevention of Pollution of River Ganga.  Public inconvenience and traffic interruption will be minimized.  Resource conservation by reducing the requirement for procurement of new pipes.  Construction time will be reduced by around 6 months by avoiding major pipe trench excavation & laying work and procurement of new pipes.  Better environment and hygienic condition.  Uplift the social standards of residents and human dignity.  Avoiding the chances of damage to foundation of nearby structure.  UPJN Kanpur DPR for remaining 23 wards (of length about 400km) is prepared on similar approach.
  • 19. CONSULTING ENGINEERS LIMITED PROJECT COST Sl. No. Components Project Cost (Rs. In Crores) 1 Sewerage System in 11 wards of District-I in Kanpur 75.01 2 Sewerage System in Balance 23 wards of District-I in Kanpur 397.31 3 Sewerage system in District –C in Allahabad 147.67 4 Sewerage system in District –A in Allahabad 288.94 5 14 MLD STP in District –C in Allahabad 42.24 Total Project Cost 951.17
  • 20. CONSULTING ENGINEERS LIMITED CURRENT STATUS OF PROJECT  The project has been approved by NGRBA in Empowered Steering Committee meeting in 2014 for implementation.