(AIET/DOEE/2017-18/SP/I)
CERTIFICATE
This is to certify that the Mr. RANJAN KUMAR of 3rdyear, ARYA
INSTITUTE OF ENGINEERING AND TECHNOLOGY,
JAIPUR (Electrical engineering) has undergone Practical Training
from 1/06/2017 to 30/06/2017 in this organization. During this
period he has undergone training for the general operations of
various equipment’s installed in Coal Handling System , Boiler
System , Turbine System , Cooling Tower System , Generator system
, Transformer System , Switchyard , Control room, at , Super
Thermal Power Station (NTPC) Kahalgaon (Bihar).
Mr. Vibhu Tyagi Mr. Vibhu Tyagi
(PTS GUIDE) (PTS INCHARGE)
Assistant Professor Assistant Professor
Dept. of Electrical Engineering Dept. Of Electrical Engineering
Mr. Deepak Sharma
(H.O.D)
Associate Professor
Dept. Of Electrical Engineering
DEPARTMENT OF ELECTRICAL ENGINEERING
ARYA INSTITUTE OF ENGINEERING & TECHNOLOGY
SP-40, RIICO INDUSTRIAL AREA, JAIPUR (RAJASTHAN)-302028
(AIET/DOEE/2017-18/SP/II)
(AIET/DOEE/2017-18/SP/III)
ACKNOWLEDGEMENT
With profound respect and gratitude, I take the opportunity to convey my
thanks to complete the training here. I do extend my heartfelt thanks to Prof.
R.P Yadav (TBMD, Head), Mr. Abhay Kr. (Sr. Manager, BMD), Mr. Shazad
Alam (Sr. Engineer Switch yard dept.) & Mr. S.P Dubey (DM Plant Head) for
providing me this opportunity to be a part of this esteemed organization. I am
extremely grateful to all the technical staff of NTPC Kahalgaon for their co-
operation and guidance that helped me a lot during the course of training. I
have learnt a lot working under them and I will always be indebted ofthem for
this value addition in me. We are thanks to other staff member which are
guided me. Finally I would like to saythis summer training has been a valuable
part in my life. At last but not least I am thankful to the all the staff member of
“ARYA INSTITUTE OF ENGINEERING AND TECHNOLOGY”
KUKAS, JAIPUR, department of Electrical Engineering.
RANJAN KUMAR
Electrical Engineering
14EAIEE079
B.Tech 4th
Yr. VII SEM
(AIET/DOEE/2017-18/SP/IV)
ABSTRACT
To fulfil the power demands ofthe country, it is required to set up new project,
time to time so that demand and generation gap may be narrowed but most
important is to full utilization of existing capacity .This may be possible only
by increasing the reliability, availability, maintainability of power generation
units and by operating the units at its full capacity.
In Kahalgaon Super Thermal Power Plant varios equipment are installed like
three type of turbine (HPT, IPT, LPT), Turbogenerator, Main Exciter,Various
type of transformer and installed switchyard etc. to meet the power demands
of the country, it is required to set up new project, time to time so that demand
and generation gap may be narrowed but most important is to full utilization
of existing capacity .this may be possible only by increasing the reliability,
availability, maintainability of power generation units and by operating the
units at its full capacity.
This vocational training report is concerned with the overall operation of the
plant, water treatment in the plant and thermodynamic cycles used in NTPC,
Kahalgaon, Bihar power station.
This summer training report is concerned with the overall operation of the
plant, water treatment in the plant, Coal handling in the plant, thermodynamic
cycles and Power generation and distribution system in the plant used in Super
Thermal Power Station (NTPC) Kahalgaon (Bihar).
(AIET/DOEE/2017-18/SP/V)
List of Figure
Figure No. Figure Description Page No.
1.1 NTPC IN INDIAN POWER SECTOR 03
1.2 Graphical Representation of sources of electricity in India 04
1.3 Graphical Representation of total capacity and generation
of NTPC
04
1.4 Overview of NTPC Kahalgaon (Bihar) 08
1.5 Process of generating coal to electricity 10
1.6 Typical diagram of a coal-fired thermal power station 11
1.7 Flow diagram of bottom ash handling system 14
1.8 Parts of Boiler Auxiliaries 17
1.9 FD Fan and ID Fan 19
2.0 Typical arrangement of ESP 21
2.1 Cooling Tower 21
2.2 High Pressure Turbine 23
2.3 Intermediate Pressure Turbine 23
2.4 Low Pressure Turbine 24
2.6 Overview about all turbine 25
2.7 Stator Frame 26
2.8 Stator Core 27
2.9 Turbogenerator Hydrogen Cooling Circuit 28
3.0 Turbogenerator 32
3.1 Generator Transformer 37
3.2 Station Transformer 38
3.3 Unit Auxiliary Transformer 39
3.4 Switchyard 41
3.5 Bus-Bar 42
3.6 Lightning Arrester 42
3.7 Wave Trap 43
3.8 Capacitive Voltage Transformer 44
(AIET/DOEE/2017-18/SP/VI)
3.9 Current Transformer 44
4.0 Potential Transformer 45
4.3 Relay 46
4.4 Air Blast Circuit Breaker 48
4.5 SF6Circuit Breaker 49
4.6 Isolator 50
4.7 Circuit Isolator 51
4.8
4.9
5.0
C&I department
Charging of battery
Discharging of battery
53
58
58
(AIET/DOEE/2017-18/SP/VII)
List of Table
Table No. Table Description Page No.
1.1 Classification of plant and its capacity 5
1.2 Regional Spread of Generating Facilities 5
1.3
1.4
Project profile of different state
Element of a coal fired thermal power plant
7
11
1.5
1.6
1.7
1.8
Rating of Motor used in NTPC Kahalgaon
Specification of ID fan
Specification of FD fan
Specification of primary air fan
12
19
20
20
1.9
2.0
2.1
Turbogenerator Rating for stage-1
Turbogenerator Rating for stage-2
Specification excitation system of stage-1
30
31
33
(AIET/DOEE/2017-18/SP/VIII)
List of Symbols
SerialNo. Symbols Name Symbols
1. Transformer
2. Step-Up transformer
3. Step-Down transformer
4. Generator
5. Motor
6. Voltmeter
7. Ammeter
8. Battery
9. DC Supply Source
10. AC Supply Source
(AIET/DOEE/2017-18/SP/IX)
LIST OF ABBREVIATION
Units Abbreviation
A Ampere
V Voltage
AC Alternating Current
CB Circuit Breaker
CT Current Transformer
PT Potential Transformer
CVT Capacitive Voltage Transformer
LPT Low Pressure Turbine
IPT Intermediate Pressure Turbine
HPT High Pressure Turbine
CT Cooling Tower
GT Generating Transformer
ST Station Transformer
UAT Unit Auxiliaries Transformer
CHP Coal Handling Plant
AHP Ash Handling Plant
ESP Electrostatic Precipitators
MVA Mega Volt Ampere
P.F. Power Factor
PLCC Power Line Carrier Communication
SF6 Sulphur Hexafluoride Circuit Breaker
(AIET/DOEE/2017-18/SP/X)
CONTENTS
S. No. Title Page No.
CERTIFICATE
ACKNOWLEDGEMENT
ABSTRACT
LIST OF FIGURE
LIST OF TABLE
LIST OF SYMBOL
LIST OF ABBREVIATION
CONTENTS
(I-II)
(III)
(IV)
(V-VI)
(VII)
(VIII)
(IX)
(X-XI)
1.
CHAPTER-1
About the company (NTPC) 1-7
2.
CHAPTER-2
About the NTPC Kahalgaon 8-9
3.
CHAPTER-3
CoalBasedPlant
3.1Type of coal
3.2 Process of generating coal to electricity
3.3 Basics of Thermal Power Plant
10
10
10
11
4.
CHAPTER-4
Majorarea in NTPC
4.0 Coal Handling Plant
4.1 Coal Handling Plant layout & Locations of mine
12
12
12
5. Ash Handling Plant
5.1 What is Ash?
5.3 Type of Ash
13
13
13
(AIET/DOEE/2017-18/SP/XI)
6.
CHAPTER-5
Boilerand its Auxiliaries
6.1 Boiler
6.2 Types of boilers
6.4 Boiler Auxiliaries (Stage-I & II)
6.5 Arrangement of main part of boiler
15
15
15
17
17
7. Turbine and its Auxiliaries
7.1 Turbine
7.2 Turbine Layout in NTPC
24
24
24
8.
CHAPTER-6
Electric Generator and its auxiliaries
8.1 Stator frame
8.2 Rotor
8.3 Generator Parameters
8.4 Cooling of generator
8.5 Seal Oil Operation
8.6 Main Exciter
8.7 Electric Transformer
8.71 Working Principle
8.72 Main Part
8.73 Classification
8.74 Type of cooling
8.75 Main Part of transformer
28
28
29
30
31
31
34
36
36
37
38
38
9. Electric Switchyard
9.1 Outdoor Equipment
9.2 Indoor Equipment
43
43
44
CONCLUSION 60
REFERENCE 61

More Related Content

What's hot

Thesis- Cont sys for wind turbines (Sept 2015 revision)
Thesis- Cont sys for wind turbines (Sept 2015 revision)Thesis- Cont sys for wind turbines (Sept 2015 revision)
Thesis- Cont sys for wind turbines (Sept 2015 revision)
Larry Branscomb
 
DADRI GAS POWER PLANT report
DADRI GAS POWER PLANT reportDADRI GAS POWER PLANT report
DADRI GAS POWER PLANT report
94600banti
 
GEA32208 GEs 3MW Platform_Brochure_R6
GEA32208 GEs 3MW Platform_Brochure_R6GEA32208 GEs 3MW Platform_Brochure_R6
GEA32208 GEs 3MW Platform_Brochure_R6
Harold Schnetzka
 
Micro turbine iii_pdr
Micro turbine iii_pdrMicro turbine iii_pdr
Micro turbine iii_pdr
Nitin Kharche
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANT
Subarna Poddar
 

What's hot (20)

Thesis- Cont sys for wind turbines (Sept 2015 revision)
Thesis- Cont sys for wind turbines (Sept 2015 revision)Thesis- Cont sys for wind turbines (Sept 2015 revision)
Thesis- Cont sys for wind turbines (Sept 2015 revision)
 
DADRI GAS POWER PLANT report
DADRI GAS POWER PLANT reportDADRI GAS POWER PLANT report
DADRI GAS POWER PLANT report
 
GEA32208 GEs 3MW Platform_Brochure_R6
GEA32208 GEs 3MW Platform_Brochure_R6GEA32208 GEs 3MW Platform_Brochure_R6
GEA32208 GEs 3MW Platform_Brochure_R6
 
Gas turbine Power Station Internship Report
Gas turbine Power Station Internship ReportGas turbine Power Station Internship Report
Gas turbine Power Station Internship Report
 
Ntpc badarpur summer training
Ntpc badarpur summer trainingNtpc badarpur summer training
Ntpc badarpur summer training
 
Micro turbine iii_pdr
Micro turbine iii_pdrMicro turbine iii_pdr
Micro turbine iii_pdr
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
Presentation on Power Saving from Two – Wheeler Bike Silencer
Presentation on Power Saving from Two – Wheeler Bike SilencerPresentation on Power Saving from Two – Wheeler Bike Silencer
Presentation on Power Saving from Two – Wheeler Bike Silencer
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANT
 
IRJET- Power Generation at Speed Bumper by Pneumatic Mechanism
IRJET- Power Generation at Speed Bumper by Pneumatic MechanismIRJET- Power Generation at Speed Bumper by Pneumatic Mechanism
IRJET- Power Generation at Speed Bumper by Pneumatic Mechanism
 
Shivesh ntpc ppt
Shivesh ntpc pptShivesh ntpc ppt
Shivesh ntpc ppt
 
My gtc presentation
My gtc presentationMy gtc presentation
My gtc presentation
 
NTPC Seminar
NTPC SeminarNTPC Seminar
NTPC Seminar
 
IRJET- To Utilize Vehicle Heat and Exhaust Energy
IRJET-  	  To Utilize Vehicle Heat and Exhaust EnergyIRJET-  	  To Utilize Vehicle Heat and Exhaust Energy
IRJET- To Utilize Vehicle Heat and Exhaust Energy
 
Analytics Project - Combined Cycle Power Plant
Analytics Project  - Combined Cycle Power PlantAnalytics Project  - Combined Cycle Power Plant
Analytics Project - Combined Cycle Power Plant
 
DEWI Magazin49_Ingeteam_INGECON WIND FIX2VAR SPEED
DEWI Magazin49_Ingeteam_INGECON WIND FIX2VAR SPEEDDEWI Magazin49_Ingeteam_INGECON WIND FIX2VAR SPEED
DEWI Magazin49_Ingeteam_INGECON WIND FIX2VAR SPEED
 
Aero Dynamic Power Control of Permanent Magnet Synchronous Generator using Fu...
Aero Dynamic Power Control of Permanent Magnet Synchronous Generator using Fu...Aero Dynamic Power Control of Permanent Magnet Synchronous Generator using Fu...
Aero Dynamic Power Control of Permanent Magnet Synchronous Generator using Fu...
 
Udbhav's presentation on ntpc
Udbhav's presentation on ntpcUdbhav's presentation on ntpc
Udbhav's presentation on ntpc
 
Seminar report format (1)
Seminar report format (1)Seminar report format (1)
Seminar report format (1)
 

Similar to NTPC KAHALGAON Main page

Srijantripathireport 150324060509-conversion-gate01
Srijantripathireport 150324060509-conversion-gate01Srijantripathireport 150324060509-conversion-gate01
Srijantripathireport 150324060509-conversion-gate01
Mohit Kothari
 

Similar to NTPC KAHALGAON Main page (20)

Practical Training Report on RGTPP Ramgarh Jaisalmer
Practical Training Report on RGTPP Ramgarh JaisalmerPractical Training Report on RGTPP Ramgarh Jaisalmer
Practical Training Report on RGTPP Ramgarh Jaisalmer
 
ramgarh gas thermal plant front page by bhagu bhatia
ramgarh gas thermal plant front page by bhagu bhatiaramgarh gas thermal plant front page by bhagu bhatia
ramgarh gas thermal plant front page by bhagu bhatia
 
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
 
IRJET- Energy and Exergy Analysis of Multiple Extraction Cum Condensing Stea...
IRJET-	 Energy and Exergy Analysis of Multiple Extraction Cum Condensing Stea...IRJET-	 Energy and Exergy Analysis of Multiple Extraction Cum Condensing Stea...
IRJET- Energy and Exergy Analysis of Multiple Extraction Cum Condensing Stea...
 
Training reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishorTraining reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishor
 
Performance Evaluation of Low Pressure Energy Recovery Tesla Turbine
Performance Evaluation of Low Pressure Energy Recovery Tesla TurbinePerformance Evaluation of Low Pressure Energy Recovery Tesla Turbine
Performance Evaluation of Low Pressure Energy Recovery Tesla Turbine
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
 
IRJET- Construction of Fuel Oil Pump House at 1x800mw North Chennai Therm...
IRJET-  	  Construction of Fuel Oil Pump House at 1x800mw North Chennai Therm...IRJET-  	  Construction of Fuel Oil Pump House at 1x800mw North Chennai Therm...
IRJET- Construction of Fuel Oil Pump House at 1x800mw North Chennai Therm...
 
IRJET- Fatigue Life Estimation of Turbine Bypass Valve
IRJET- Fatigue Life Estimation of Turbine Bypass ValveIRJET- Fatigue Life Estimation of Turbine Bypass Valve
IRJET- Fatigue Life Estimation of Turbine Bypass Valve
 
plc scada and networking
plc scada and networkingplc scada and networking
plc scada and networking
 
TBEA ENERGY (INDIA) PVT LTD
TBEA ENERGY (INDIA) PVT LTDTBEA ENERGY (INDIA) PVT LTD
TBEA ENERGY (INDIA) PVT LTD
 
IRJET-Detailed Energy Audit in a Captive Cogeneration Plant
IRJET-Detailed Energy Audit in a Captive Cogeneration PlantIRJET-Detailed Energy Audit in a Captive Cogeneration Plant
IRJET-Detailed Energy Audit in a Captive Cogeneration Plant
 
Srijantripathireport 150324060509-conversion-gate01
Srijantripathireport 150324060509-conversion-gate01Srijantripathireport 150324060509-conversion-gate01
Srijantripathireport 150324060509-conversion-gate01
 
220 kv G.G.S (report)
220 kv G.G.S (report)220 kv G.G.S (report)
220 kv G.G.S (report)
 
220 kv G.S.S (report)
220 kv G.S.S (report)220 kv G.S.S (report)
220 kv G.S.S (report)
 
Lovely Amit
Lovely AmitLovely Amit
Lovely Amit
 
BPSCL Vocational Training report
BPSCL Vocational Training report BPSCL Vocational Training report
BPSCL Vocational Training report
 
PTPS
PTPSPTPS
PTPS
 
Sagar mehta summer training thermal power station full report
Sagar mehta summer training thermal power station full reportSagar mehta summer training thermal power station full report
Sagar mehta summer training thermal power station full report
 
Nikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTINikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTI
 

More from Ranjan kumar

More from Ranjan kumar (19)

Seminar report theory
Seminar report theorySeminar report theory
Seminar report theory
 
Seminar report main page 2
Seminar report main page 2Seminar report main page 2
Seminar report main page 2
 
Seminar report main page 1
Seminar report main page 1Seminar report main page 1
Seminar report main page 1
 
Seminar report cover page
Seminar report cover pageSeminar report cover page
Seminar report cover page
 
Seminar presentation
Seminar presentationSeminar presentation
Seminar presentation
 
Project report
Project reportProject report
Project report
 
Project report
Project reportProject report
Project report
 
Project main page 2
Project main page 2Project main page 2
Project main page 2
 
Project main page 2
Project main page 2Project main page 2
Project main page 2
 
Project main page 1
Project main page 1Project main page 1
Project main page 1
 
Project main page 1
Project main page 1Project main page 1
Project main page 1
 
Project cover page
Project cover pageProject cover page
Project cover page
 
Project cover page
Project cover pageProject cover page
Project cover page
 
Ranjan NTPC KAHALGAON ppt
Ranjan  NTPC KAHALGAON pptRanjan  NTPC KAHALGAON ppt
Ranjan NTPC KAHALGAON ppt
 
NTPC KAHALGAON Cover page
NTPC KAHALGAON Cover pageNTPC KAHALGAON Cover page
NTPC KAHALGAON Cover page
 
Ntpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILENtpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILE
 
Ranjan resume
Ranjan  resumeRanjan  resume
Ranjan resume
 
SMART GRID TECHNOLOGY
SMART GRID TECHNOLOGYSMART GRID TECHNOLOGY
SMART GRID TECHNOLOGY
 
RANJAN RESUME 1
RANJAN RESUME 1RANJAN RESUME 1
RANJAN RESUME 1
 

Recently uploaded

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Recently uploaded (20)

General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 

NTPC KAHALGAON Main page

  • 1. (AIET/DOEE/2017-18/SP/I) CERTIFICATE This is to certify that the Mr. RANJAN KUMAR of 3rdyear, ARYA INSTITUTE OF ENGINEERING AND TECHNOLOGY, JAIPUR (Electrical engineering) has undergone Practical Training from 1/06/2017 to 30/06/2017 in this organization. During this period he has undergone training for the general operations of various equipment’s installed in Coal Handling System , Boiler System , Turbine System , Cooling Tower System , Generator system , Transformer System , Switchyard , Control room, at , Super Thermal Power Station (NTPC) Kahalgaon (Bihar). Mr. Vibhu Tyagi Mr. Vibhu Tyagi (PTS GUIDE) (PTS INCHARGE) Assistant Professor Assistant Professor Dept. of Electrical Engineering Dept. Of Electrical Engineering Mr. Deepak Sharma (H.O.D) Associate Professor Dept. Of Electrical Engineering DEPARTMENT OF ELECTRICAL ENGINEERING ARYA INSTITUTE OF ENGINEERING & TECHNOLOGY SP-40, RIICO INDUSTRIAL AREA, JAIPUR (RAJASTHAN)-302028
  • 3. (AIET/DOEE/2017-18/SP/III) ACKNOWLEDGEMENT With profound respect and gratitude, I take the opportunity to convey my thanks to complete the training here. I do extend my heartfelt thanks to Prof. R.P Yadav (TBMD, Head), Mr. Abhay Kr. (Sr. Manager, BMD), Mr. Shazad Alam (Sr. Engineer Switch yard dept.) & Mr. S.P Dubey (DM Plant Head) for providing me this opportunity to be a part of this esteemed organization. I am extremely grateful to all the technical staff of NTPC Kahalgaon for their co- operation and guidance that helped me a lot during the course of training. I have learnt a lot working under them and I will always be indebted ofthem for this value addition in me. We are thanks to other staff member which are guided me. Finally I would like to saythis summer training has been a valuable part in my life. At last but not least I am thankful to the all the staff member of “ARYA INSTITUTE OF ENGINEERING AND TECHNOLOGY” KUKAS, JAIPUR, department of Electrical Engineering. RANJAN KUMAR Electrical Engineering 14EAIEE079 B.Tech 4th Yr. VII SEM
  • 4. (AIET/DOEE/2017-18/SP/IV) ABSTRACT To fulfil the power demands ofthe country, it is required to set up new project, time to time so that demand and generation gap may be narrowed but most important is to full utilization of existing capacity .This may be possible only by increasing the reliability, availability, maintainability of power generation units and by operating the units at its full capacity. In Kahalgaon Super Thermal Power Plant varios equipment are installed like three type of turbine (HPT, IPT, LPT), Turbogenerator, Main Exciter,Various type of transformer and installed switchyard etc. to meet the power demands of the country, it is required to set up new project, time to time so that demand and generation gap may be narrowed but most important is to full utilization of existing capacity .this may be possible only by increasing the reliability, availability, maintainability of power generation units and by operating the units at its full capacity. This vocational training report is concerned with the overall operation of the plant, water treatment in the plant and thermodynamic cycles used in NTPC, Kahalgaon, Bihar power station. This summer training report is concerned with the overall operation of the plant, water treatment in the plant, Coal handling in the plant, thermodynamic cycles and Power generation and distribution system in the plant used in Super Thermal Power Station (NTPC) Kahalgaon (Bihar).
  • 5. (AIET/DOEE/2017-18/SP/V) List of Figure Figure No. Figure Description Page No. 1.1 NTPC IN INDIAN POWER SECTOR 03 1.2 Graphical Representation of sources of electricity in India 04 1.3 Graphical Representation of total capacity and generation of NTPC 04 1.4 Overview of NTPC Kahalgaon (Bihar) 08 1.5 Process of generating coal to electricity 10 1.6 Typical diagram of a coal-fired thermal power station 11 1.7 Flow diagram of bottom ash handling system 14 1.8 Parts of Boiler Auxiliaries 17 1.9 FD Fan and ID Fan 19 2.0 Typical arrangement of ESP 21 2.1 Cooling Tower 21 2.2 High Pressure Turbine 23 2.3 Intermediate Pressure Turbine 23 2.4 Low Pressure Turbine 24 2.6 Overview about all turbine 25 2.7 Stator Frame 26 2.8 Stator Core 27 2.9 Turbogenerator Hydrogen Cooling Circuit 28 3.0 Turbogenerator 32 3.1 Generator Transformer 37 3.2 Station Transformer 38 3.3 Unit Auxiliary Transformer 39 3.4 Switchyard 41 3.5 Bus-Bar 42 3.6 Lightning Arrester 42 3.7 Wave Trap 43 3.8 Capacitive Voltage Transformer 44
  • 6. (AIET/DOEE/2017-18/SP/VI) 3.9 Current Transformer 44 4.0 Potential Transformer 45 4.3 Relay 46 4.4 Air Blast Circuit Breaker 48 4.5 SF6Circuit Breaker 49 4.6 Isolator 50 4.7 Circuit Isolator 51 4.8 4.9 5.0 C&I department Charging of battery Discharging of battery 53 58 58
  • 7. (AIET/DOEE/2017-18/SP/VII) List of Table Table No. Table Description Page No. 1.1 Classification of plant and its capacity 5 1.2 Regional Spread of Generating Facilities 5 1.3 1.4 Project profile of different state Element of a coal fired thermal power plant 7 11 1.5 1.6 1.7 1.8 Rating of Motor used in NTPC Kahalgaon Specification of ID fan Specification of FD fan Specification of primary air fan 12 19 20 20 1.9 2.0 2.1 Turbogenerator Rating for stage-1 Turbogenerator Rating for stage-2 Specification excitation system of stage-1 30 31 33
  • 8. (AIET/DOEE/2017-18/SP/VIII) List of Symbols SerialNo. Symbols Name Symbols 1. Transformer 2. Step-Up transformer 3. Step-Down transformer 4. Generator 5. Motor 6. Voltmeter 7. Ammeter 8. Battery 9. DC Supply Source 10. AC Supply Source
  • 9. (AIET/DOEE/2017-18/SP/IX) LIST OF ABBREVIATION Units Abbreviation A Ampere V Voltage AC Alternating Current CB Circuit Breaker CT Current Transformer PT Potential Transformer CVT Capacitive Voltage Transformer LPT Low Pressure Turbine IPT Intermediate Pressure Turbine HPT High Pressure Turbine CT Cooling Tower GT Generating Transformer ST Station Transformer UAT Unit Auxiliaries Transformer CHP Coal Handling Plant AHP Ash Handling Plant ESP Electrostatic Precipitators MVA Mega Volt Ampere P.F. Power Factor PLCC Power Line Carrier Communication SF6 Sulphur Hexafluoride Circuit Breaker
  • 10. (AIET/DOEE/2017-18/SP/X) CONTENTS S. No. Title Page No. CERTIFICATE ACKNOWLEDGEMENT ABSTRACT LIST OF FIGURE LIST OF TABLE LIST OF SYMBOL LIST OF ABBREVIATION CONTENTS (I-II) (III) (IV) (V-VI) (VII) (VIII) (IX) (X-XI) 1. CHAPTER-1 About the company (NTPC) 1-7 2. CHAPTER-2 About the NTPC Kahalgaon 8-9 3. CHAPTER-3 CoalBasedPlant 3.1Type of coal 3.2 Process of generating coal to electricity 3.3 Basics of Thermal Power Plant 10 10 10 11 4. CHAPTER-4 Majorarea in NTPC 4.0 Coal Handling Plant 4.1 Coal Handling Plant layout & Locations of mine 12 12 12 5. Ash Handling Plant 5.1 What is Ash? 5.3 Type of Ash 13 13 13
  • 11. (AIET/DOEE/2017-18/SP/XI) 6. CHAPTER-5 Boilerand its Auxiliaries 6.1 Boiler 6.2 Types of boilers 6.4 Boiler Auxiliaries (Stage-I & II) 6.5 Arrangement of main part of boiler 15 15 15 17 17 7. Turbine and its Auxiliaries 7.1 Turbine 7.2 Turbine Layout in NTPC 24 24 24 8. CHAPTER-6 Electric Generator and its auxiliaries 8.1 Stator frame 8.2 Rotor 8.3 Generator Parameters 8.4 Cooling of generator 8.5 Seal Oil Operation 8.6 Main Exciter 8.7 Electric Transformer 8.71 Working Principle 8.72 Main Part 8.73 Classification 8.74 Type of cooling 8.75 Main Part of transformer 28 28 29 30 31 31 34 36 36 37 38 38 9. Electric Switchyard 9.1 Outdoor Equipment 9.2 Indoor Equipment 43 43 44 CONCLUSION 60 REFERENCE 61