1. RIAZ HUSSAIN
Site Engineer
Oil & Gas/ Petrochemical/Fertilizer/Plant Maintenance
+966597055621, riazhussainj@gmail.com
Objective
To be a part of a prestigious organization where I could polish my technical and interpersonal
skills in order to enhance my professional competence and ability to maneuver, as to not only
benefit the organization working with, but also to reach the pinnacle of my career.
Summary
A highly talented PIPELINE, PIPING and STRUCTURAL FABRICATION Professional with
almost 7 years of extensive experience in Fabrication of Oil & Gas Cross country Pipelines,
Offshore Concrete coated Pipeline, Oil and Water wellhead critical Piping, Strong organizational
experience in Planning, monitoring and multidimensional execution of projects for multiple
clients; Monitor progress of the project at all stages; Profound experience to maintain high
quality standards to meet challenges of this fast paced, high turn-over industry; Tendency to
thrive in dynamic and fluid environments while remaining pragmatic and focused; Highly
ethical, trustworthy and discreet
Work Experience
Total Professional Experience : 7 Years
Oversea Experience (Shutdown and Projects) : 3 Years
Mechanical Engineer
Responsibilities:
⦁ Projects Planning, Monitoring and Execution, Construction, Erection and commissioning in line.
⦁ Expediting & Material control teams to identify & allocate.
⦁ Planning of manpower & equipment’s requirement at the site by reviewing the piping isometrics.
⦁ Review piping & equipment general specification.
⦁ Preparation of piping specifications as per process data.
⦁ Raising all technical queries/field action report related to design as per construction code requirement
with client engineers.
⦁ Handling assigned area Pipeline, piping erection/installation.
⦁ Reviewing the test packages for different Pipeline, piping package.
⦁ Preparing the As-Built drawings as per actual condition.
⦁ Solve the engineering related problems arising during construction & erection.
⦁ Preparation of all pre-commissioning method statement of pipe cleaning (Air blowing, Hydro
2. testing Air pigging, Water flushing, Steam blowing), system tightness test, drying and air freeing.
⦁ Preparation of checklists, reports and records for pre-commissioning activities.
⦁ Field Joint fit-up by clamp and welding in cross country Pipeline & piping.
⦁ Pipe lowering in Trench & Tie-in joints (Road crossing).
⦁ Modification of Compressor Internal Piping.
⦁ Handling the job of verification of test pack, loop verification; punch list assurance of test pack.
⦁ To execute the work according to drawing & P&ID.
CURRENT PROFESSIONAL EXPERIENCE
Company : SENDAN INTERNATIONAL LTD SAUDIA ARABIA
Position : Site Engineer
Duration : Nov-2014 - Present
Projects
- Fabrication and installation of Piping
- Conduct fit-up and welding inspections of pipe spools and field installed piping
- Conduct inspections with owner for (Lien tracking/Line Check) as per P&ID,coordinate with
Isometric/support drawings with related pipe design tables for different services i.e. Fuel Gas,
Steam, Lubrications oil, Demine Water,Service.
- Leak Test and Hydro Testing inspection of Piping systems
- Installation of Cooling Tower,Heat Exchangers and structure with ladders and gratings
Shutdown
- Supervision, monitoring and coordinating of all shutdown activities which include removal of old
system and installation of new system
- Coordination and liaising with owner /client for shutdown preparation and activities
- Close supervision of site activities and control different teams of workers
- Old Pumps removal and installation of new pumps
- Modification of Piping and Hydro Test
- Flare Stack modification works
- Final handover of shutdown activities and documents
Company : HYUNDAI ENGINEERING PAKISTAN
Position : Piping Engineer
Duration : June-2014 to Nov-2014
Project : ARL Up-gradation (Oil Refinery)
- Piping construction activities of Attock Refinery Limited up gradation project, including Amine
system, Isomerization, Diesel Hydro Desulphurization, Hydroteater, Howe Braker, Sulfur
Recovery, Steam Generation System, Power Plant , Sour Water, Compressed air system, Cooling
water system,Interconnecting rack, Flare System, Utility and Off set,Catalytic reformer
- Fabrication of Stainless Steel, Alloy Steel, Mild Steel & Carbon Steel process pipe lines of
various diameters & their related pipe supports.
- Preparation of spools according to marked spools Isometric drawings.
- Inspection of Fabricated spools with client representatives.
- Welding of inspected spools according to approved WPS applicable codes & standards.
- Erection of process Stainless Steel, Alloy Steel & Carbon Steel Pipe Lines of various diameter
and schedules of different systems.
- Comply with all QA/QC standards as applicable to the company systems, policies, procedures,
and documents in order to deliver the expected quality of work.
3. - Controlling the welding of joints according to Isometric Drawings and checking Diameter,
Thickness, Drawing Number & Class in Welding Progress Report.
- Conduct line checking using isometric drawing and piping and instrument diagram to verify all
the fittings and spool are in their proper orientations, and also prior for pipe testing for
commissioning process such as,hydro testing and pressure leak testing.
Company : DESCON ENGINEERING QATAR LLC
Position : Area Engineer
Duration : January-2014 to May-2014
Shutdown – Dolphin energy Qatar Gas Qatar Petroleum .
- Extraction of U Tube and straight tube bundles of exchangers, using Bundle puller.
- Inspection of U tube bundles for corrosion and witness NDE examination where required.
- Overhaul, servicing and inspection of Static Equipment.
- Servicing of various types of rotating equipment such as valves, pumps and compressors
- Maintenance of all major static equipments like heat exchangers, fin fan coolers, columns, and
pressure vessels.
- Maintenance of high pressure shell and tube heat exchanger involving cleaning of fouled tubes
with the help of high pressure pumps/ water jetting up to 20,000 PSI pressure with the help of
power lance and with the help of hydrokinetic method.
- Hydro testing for high pressure vessels and shell and tube heat Exchangers.
- Supervision of scaffolding erection safe for use.
Company : PAK ARAB ENGINEERING (PVT) LTD
Position : Site Engineer (Piping)
Duration : April-2013 to Dec-2013
Project OGDCL Qadirpur Compression Project
- Piping prefabrication including pipe supports, piping erections including pipe supports, spool
pieces control, check and monitor tools, equipment and welding consumables, check and monitor
preservation, pipe internal cleaning for small bore and large bore, including jacket pipes.
- Piping Erection, Welding, Complete assembly of all the lines, Release for RMC, Performing
hydro test, Reinstalment of lines, Approval by QC and Client’s Piping Inspector and Releasing
for Precommissioning.
- Schedule monitoring for manpower mobilization welding Dia-inch, No. of spools and Pipe
Supports.
- Providing all work points with scaffolds, riggers and adequate cranes used for the lifting-up of all
spool-pipes or big valves at the desired location.
- Piping internal inspection witness for large bore piping.
- Ensure work permits (confined space welding, grinding, erection, work for high level, etc).
Shutdown.OMVQadinwari oil and gas processing plant
- Maintenance executionof all staticEquipment’s - HeatExchangers,Columns,Pressure Vessels,
Heaters,Boilers,Tanks,pipingetc.andfabricationof pipelines.
- Work pack preparationforshutdownjobsasperthe job list
- Prepare maintenance programs,includingshutdowncampaignstoensure technical integrity,
safe/reliable operationand maximumavailability.
4. - Executionof ShutdownandTurnaroundactivities,monitoringandcontrol withinplanning
schedule.
- Witnessandsupervise all pre-jobinspectionactivitiesrelatetoservice contractorsequipment
Company : DESCON ENGINEERING UAE
Position : Site Engineer
Duration : January-2013 to March-2013
Shutdown ASAB Gas co Plant 1,2
- Extraction of U Tube and straight tube bundles of exchangers, using Bundle puller.
- Inspection of U tube bundles for corrosion and witness NDE examination where required.
- Overhaul, servicing and inspection of Static Equipment.
- Servicing of various types of rotating equipment such as valves, pumps and compressors
- Maintenance of all major static equipments like heat exchangers, fin fan coolers, columns, and
pressure vessels.
- Maintenance of high pressure shell and tube heat exchanger involving cleaning of fouled tubes
with the help of high pressure pumps/ water jetting up to 20,000 PSI pressure with the help of
power lance and with the help of hydrokinetic method.
- Hydro testing for high pressure vessels and shell and tube heat Exchangers.
- Supervision of scaffolding erection safe for use.
Company : PAK ARAB ENGINEERING (PVT) LTD
Position : Site Engineer
Duration : Feb-2010 to Dec-2012
OMVQadin wari oil and gas processing plant
- Maintenance executionof all staticEquipment’s - HeatExchangers,Columns,Pressure Vessels,
Heaters,Boilers,Tanks,pipingetc.andfabricationof pipelines.
- Work pack preparationforshutdownjobsasperthe job list
Company : ENGRO ENERGY
Position : QA/QC Engineer
Duration : Jan-2009 to Jan-2010
Project : Engro Energy CCPP
- Monitoringandinspectingthe workperformedatPipe FabricationShopof makingPipe Spools
for above groundandundergroundpipingbychecking fit-up,dimensional check,rootgape,high
low,bevel angle before weldingasperdrawingandas perapplicable WPSof differentmaterials
like CarbonSteel,StainlessSteel,AlloySteel andAluminum
- FamiliartowitnessHydrostaticorpneumaticteststoensure thatthe installedpipeline isfree
fromleakage andalsopropermaterial isused
- Commandto witnessWQT(WeldersQualificationTest)of Pipe,PlateandTackingWeldersof
AlloySteel,StainlessSteel,Aluminum, andCarbonSteel asperASME SectionIX
- Monitorwelderperformance andweldingactivitiestoensure workisbeingcarriedoutin
accordance withthe approvedweldingprocedureduringfabricationandinstallation
- Good commandregardingProcessesinvolveduringfabrication.(GTAW,SMAW,MIG)
- Carryoutsurveillance andwitnessinspectionof installationof all the Pipingworks
5. - Ensuringthat all measuringandtestequipmentatsite are calibrated,ingoodworkingcondition
and calibrationcertificatesare maintained
- Monitoringandinspectingthe workperformedof makingSteel Structure Supports,Steel Plates,
angles,beamsbyapplyingcutting,grinding,drilling,weldingandusingnuts/boltsoperationsto
maintainbetterqualityof SteelStructure Workshop
- Commandto inspectSurface preparationandfinal paintinspectionof Pipes,fittingsand
structures
- Verificationof material identificationbyMTC’sand as per drawings
ACADMIC QUALIFICATION
B.E Metallurgical & Material Engineering fromMehran Universityof Engineering
TechnologyJamshoro Sindh Pakistan Year 2008
TRAININGS
- PTW (Permittowork) at SAUDI KAYAN,IBNEZAHAR,YANPET,GAS(YANBU).
- PTW (Permittowork) at Gasco PlantAsabAbu Dhabi/QatarGas & H2S /BA Training.
- Trainingof PlantPipingInspectionasperAPI750.
- Training of ISO 9001 QMS, ISO 14001EMS, ISO 18001OHSAS by Gem System Design Trainers &
ManagementsConsultants.
- Through HSE Training I can reduce the chances of any accident/ incidents at workplace and can
improve workplace environmentaswell aslossesatworkplaces.
- The Managerial Competencies is tailor-made training course specially designed to increase the
competence andcommitmentlevel of middlemanagersandprojectengineers.
- The Management by System is absolutely a unique training course designed to focus on the
SYSTEMS approach to the organization. It covers the ISO standards / system certification aspect
as well.
Accreditations
Accreditedwith PakistanEngineeringCouncil.
Accreditedwith Saudi EngineeringCouncil.
PERSONAL DETAILS
Name: Riaz Hussain
Date of Birth: 28-10-1986
Nationality: Pakistani
Profile : Male
Current Location: Jubail – Saudi Arabia
Passport: AF 8737421 (30 Oct 2017)
Religion: Islam
Reference
References available upon request.