Publicidad
CoreCV
CoreCV
CoreCV
Próximo SlideShare
Eddie Resume 2015 (1)Eddie Resume 2015 (1)
Cargando en ... 3
1 de 3
Publicidad

Más contenido relacionado

Publicidad

CoreCV

  1. Richard Essex A.I.O.C.S. Home Address. Tel: 01785 621453 (H) 124, Doxey email: Richard.essex5@ntlworld.com Stafford Mobile: 077 989 28 0 23 ST16 1EG Personal Profile. Loyal, focused and conscientious Generator Professional, with at least 20 years experience in the industry. Willing to extend the working day to ensure the job is completed. Keen to work in the office or site environment to achieve complete satisfaction for both employer and client. As well as my Staffordshire home, I also have the option of working from a West London base near Heathrow. Employment History: Project Manager. August 2013 to present. Powertecnique Ltd. Fareham, Hampshire. Working from my home office, administering the installation and commissioning of standby generator (20 to 1200KVA) and UPS systems nationwide. Liaising with and approving sub-contractor works, including fuel system installs and acoustic systems. Implementation of STOR systems to existing generator installations. Full customer facing responsibility and preparation of RAMS for works undertaken. Assisting sales engineers in the preparation of bids for generator installations. Project Engineer. January 2013 to August 2013. Turner EPS. Trentham, Staffordshire. Responsible for overseeing the design, supply and delivery of specialist generator systems to the oil and gas market. The generators are designed to operate in extreme and hazardous environments and are therefore heavily specified by the client. This includes the use of Atex certified components and the use of specialist metals and associated fittings. Equipment acoustic enclosures are manufactured from stainless steel 316l and instrumentation is Zone 1. Other aspects of the job include the fulfilment of the client’s documentation requirements (SDS), and completion of all necessary third party inspections from third party inspectors. Contracts Engineer May 2011 to December 2012. Finning UK Ltd, Power systems, Cannock. Administering modifications to standard Olympian genset units (20kva up to 750kva) in line with customer requirements. Specifying and ordering components and deciding on the correct method by which to implement these customisations. Also arranging for the delivery offload and positioning of the equipment as agreed with the customer. This also included small scale installations of the generators. Left Finning to join Turner EPS. Chief Estimator Jan to Nov 2010, then: Technical Sales Manager from 2010 to May 2011. Musgrave Generators Ltd. Whetstone, Leicester Creating and submitting tenders for the design build and supply of diesel generators. Carrying out site surveys. Closing contracts and leading installation designs for orders received. 12+ Orders won in the first year with Musgrave. Left Musgrave to join Finning.
  2. Project Manager / Senior Contracts Engineer. May 2003 to July 2009. Static Systems Group plc. Wombourne, Staffordshire. As Project Manager I oversaw the installation, commissioning and handover of various communication and alarm systems. Including Cell Call, General Alarm and Fire Alarm schemes in prisons, and Nurse Call and Fire Alarm systems in hospitals. Dealing with all levels of both client and employer companies. As the Senior Contracts Engineer, I examined proposed contractual terms and conditions. Negotiated problem issues with the ordering party to reach an acceptable position and to limit liability and financial exposure prior to contract acceptance. Site Surveyor. November 2002 to April 2003. Business Direct Ltd. Stafford.  Surveying nationwide locations.  Measuring, drawing up sites and interviewing site staff. Project Manager. March 1997 to November 2002. Broadcrown Ltd. Hixon, Stafford. Fully responsible for the fulfilment of company obligations under various contracts for the design, manufacture, installation and commissioning of autonomous power generation systems, mainly in UK (415V, 11kV), but also in France (15kV). Completed contracts included full turnkey projects, with civil works and the employment of architect, builders and other specialist sub-contractors and suppliers. Interviewing of prospective design engineers. Site Manager. December 1996 to March 1997. Under contract to Proman Ltd for Group Schneider Ltd. Site based in Stoke on Trent. Self employed position as Site Manger for the installation of an 11KV distribution system on waste to energy incineration plant. Project Engineer. March 1989 to Nov 1996. Dale Power System Ltd. Scarborough, North Yorks. Project engineering many projects both in UK and overseas for the supply of diesel and gas fuelled generation systems. Included site based period of approximately 1 year supervising the build of three multi-megawatt landfill gas fuelled generation stations for Blue Circle. Contracts Engineer. Nov 1987 to March 1989. Merlin Gerin UK Ltd. Harrow, Middlesex. Ordering, installation and commissioning of static UPS systems for banks, hospitals, blue chip Co. etc Senior Estimator. January 1987 to November 1987. Chubb Fire Security Ltd. Feltham, Middlesex. Estimating and surveying special fire detection systems. Giving commercial / technical guidance to other estimating staff. Tendering Engineer. Contracts Engineer. October 1983 to January 1987. Auto Diesels Braby Ltd. Uxbridge, Middlesex. Joined Auto Diesels as a tendering engineer. Given the position of Contracts Engineer when a vacancy occurred. Carried out administration of many installation projects for various hospital, prison and city establishments.
  3. QA Department Inspector. March 1981 to October 1983. Shackman Instruments Ltd. Chesham, Bucks. Precision optical and mechanical inspection and QA. Trainee Draughtsman. October 1977 to March 1981. T&R Generators Ltd. Guildford, Surrey. Drawing up of:  Steelwork fabrications.  Assemblies.  Control circuits.  Bills of materials Other duties:  Stock Control.  Final inspection.  Assembly.  Fork lift operations & maintenance. Education, Certification and Training.  Associate of the Institute of Construction Specialists.  Level 3 Certificate in the requirements for Electrical Installations (BS7671: June 2001). July 2005  Diploma (with distinction) in Contract Management, through the Confederation of Construction Specialists. June 2004  BS5839 Fire Detection Design course. September 2003.  CSCS Card, “Electrical Contracts Manager”..  CCNSG Safety Passport 2013.  ROSPA 5 day course, “Managing Safely”, August 2003 and December 2012.  Various day courses covering Asbestos Awareness Courses, CDM, Electricity at Work, Principles of Isolation, HASW Act etc.  Open University, completed and passed foundation level courses M102 (Mathematics) and S102 (Science) and Introduction to Astronomy.  NEBS Certificate in Supervisory Management, gained on distance learning basis from York College.  TEC Electrical Engineering, then studied to Higher Level at Watford College, (both as day release student).  15th Edition Code of Practice for Electrical Installations.  Citb Site Safety Plus. The Site Management Safety Training Scheme (SMSTS) 30th April 2014  Secondary education. GCE’s in Physics (C), Technical Drawing (C). CSE’s in English, Maths History Geography. Personal details. Hobbies include boat maintenance/improvement, cycling, reading, gym, computer work, photography, walking, cinema and d.i.y.
Publicidad