Site Instruction ProvisionsSite Instruction Provisions
1. Procedure Details :1. Procedure Details :
AbstractAbstract
This document provides information on procedure for measuring and quantifying of materials based on plan andThis document provides information on procedure for measuring and quantifying of materials based on plan and
actual site changes constructed or implemented on all outside plant facilities, completed civil and cable works.actual site changes constructed or implemented on all outside plant facilities, completed civil and cable works.
PurposePurpose
Site changes documentation is very essential for verification of revised actual measurement and quantity of allSite changes documentation is very essential for verification of revised actual measurement and quantity of all
materials installed. Result of all the changes on plan, specification, activity, site condition and measurement willmaterials installed. Result of all the changes on plan, specification, activity, site condition and measurement will
be the basis for the checking of quantity survey plan or as-built plan and bill of quantity.be the basis for the checking of quantity survey plan or as-built plan and bill of quantity.
Scope of workScope of work
Ensure correct Quantity Survey measurement of all completed civil, cable installation and aerial permanent works.Ensure correct Quantity Survey measurement of all completed civil, cable installation and aerial permanent works.
Manpower requirementManpower requirement
For the purpose of pre-project acceptance requiring for additional manpower. This is to recommend theFor the purpose of pre-project acceptance requiring for additional manpower. This is to recommend the
immediate manpower requirement in order to facilitate the need for Northeast and portion of FOBN2. This willimmediate manpower requirement in order to facilitate the need for Northeast and portion of FOBN2. This will
provide advance project cost probability emanating from the actual completed works recorded as to date.provide advance project cost probability emanating from the actual completed works recorded as to date.
 1 Clerical Assistance1 Clerical Assistance
ContentsContents
1. Procedure Details1. Procedure Details
2. Integrated Flow Chart for SI Documentation2. Integrated Flow Chart for SI Documentation
3. Process Flow3. Process Flow
4. SI Documentation4. SI Documentation
Site Instruction DocumentationSite Instruction Documentation
EnclosuresEnclosures
Site Instruction form towards Client/CustomerSite Instruction form towards Client/Customer
Site Instruction form towards Sub-contractorSite Instruction form towards Sub-contractor
AbstractAbstract
This description gives guidelines how to prepare and get an approval of a Site Instruction.This description gives guidelines how to prepare and get an approval of a Site Instruction.
ApplicationApplication
This document is applicable for Globe NLTN Projects for Northwest, Northeast and FOBN2 areas.This document is applicable for Globe NLTN Projects for Northwest, Northeast and FOBN2 areas.
This description is also to be used by any sub-contractors engaged for cable network installation work.This description is also to be used by any sub-contractors engaged for cable network installation work.
ContentsContents
11 ResponsibilitiesResponsibilities 33
1.11.1 Installation ManagerInstallation Manager 33
1.21.2 Project Control functionProject Control function 44
1.31.3 Installation SupervisorInstallation Supervisor 44
1.41.4 Site SupervisorSite Supervisor 44
1.51.5 Site Engineer from OSP Engineering 5Site Engineer from OSP Engineering 5
22 DescriptionDescription 55
33 Site Instruction Form 7Site Instruction Form 7
ResponsibilitiesResponsibilities
1.1 Installation Manager1.1 Installation Manager
Installation Manager is responsible to:Installation Manager is responsible to:
 Establish the Site Instruction procedure together with the customer and Project Control functionEstablish the Site Instruction procedure together with the customer and Project Control function
 Inform and make sure that concerned installation staff understand the Site Instruction procedureInform and make sure that concerned installation staff understand the Site Instruction procedure
 Receive information from Installation Supervisor that a Site Instruction involving cost and/or time extensionReceive information from Installation Supervisor that a Site Instruction involving cost and/or time extension
has been sent to Project Control function for action.has been sent to Project Control function for action.
ResponsibilitiesResponsibilities
1.1 Installation Manager1.1 Installation Manager
Installation Manager is responsible to:Installation Manager is responsible to:
 Receiving information from Project Control function that Client/ Customer has approved offered price and/orReceiving information from Project Control function that Client/ Customer has approved offered price and/or
time extensions.time extensions.
1.2 Project Control function1.2 Project Control function
The Project Control function is responsible to:The Project Control function is responsible to:
 When a Site Instruction is received, from Installation Supervisor, involving cost and/or time extension an offerWhen a Site Instruction is received, from Installation Supervisor, involving cost and/or time extension an offer
shall be prepared and formally submitted for approvalshall be prepared and formally submitted for approval
 After written approval from Client/Customer instruct Installation Supervisor when the Site Instruction involvingAfter written approval from Client/Customer instruct Installation Supervisor when the Site Instruction involving
cost and/or time extension can re-start.cost and/or time extension can re-start.
1.3 Installation Supervisor1.3 Installation Supervisor
The Installation Supervisor is responsible to:The Installation Supervisor is responsible to:
 When receiving the Site Instruction decide if there is cost and/or time extension involvedWhen receiving the Site Instruction decide if there is cost and/or time extension involved
 Instruct Site Supervisor to start the suggested Site Instruction work if cost and/or time extension are notInstruct Site Supervisor to start the suggested Site Instruction work if cost and/or time extension are not
involvedinvolved
 Make sure that a cost estimate is prepared as soon as possible by him/herself or other appointed functionMake sure that a cost estimate is prepared as soon as possible by him/herself or other appointed function
within the Project if cost and/or time extension are involvedwithin the Project if cost and/or time extension are involved
 Send the cost and time extension estimate to Project Administration function for action and InstallationSend the cost and time extension estimate to Project Administration function for action and Installation
Manager for informationManager for information..
Site Instruction DocumentationSite Instruction Documentation
Site Instruction DocumentationSite Instruction Documentation
ResponsibilitiesResponsibilities
1.4 Site Supervisor1.4 Site Supervisor
Site Supervisor is responsible to:Site Supervisor is responsible to:
 Discuss and agree with Customer Site Representative including client and Sun-contractor with technicalDiscuss and agree with Customer Site Representative including client and Sun-contractor with technical
solution suggested and prepare a Site Instruction in accordance to the agreed solution.solution suggested and prepare a Site Instruction in accordance to the agreed solution.
 Make proper recommendation to the solution and ensure that Client/Customer, Ericsson Site Supervisor andMake proper recommendation to the solution and ensure that Client/Customer, Ericsson Site Supervisor and
Site Representatives are always affix signature to the Site Instruction as well as the Sub-contractorSite Representatives are always affix signature to the Site Instruction as well as the Sub-contractor
Representative, if applicableRepresentative, if applicable
 Send the Site Instruction to Installation Supervisor for the immediate revision and implementation of approvedSend the Site Instruction to Installation Supervisor for the immediate revision and implementation of approved
construction works. Site Supervisor must check the recommended solution and revision prior start of theconstruction works. Site Supervisor must check the recommended solution and revision prior start of the
required workrequired work
 Make sure that no work starts before such instruction is received.Make sure that no work starts before such instruction is received.
1.5 Site Engineer from OSP Engineering1.5 Site Engineer from OSP Engineering
Site Engineer is responsible to:Site Engineer is responsible to:
 Suggest to Site Supervisor a new plan when approved drawing(s) require a change.Suggest to Site Supervisor a new plan when approved drawing(s) require a change.
 Site Engineer can only agree on the approved plan based from revision but will not authorize to sign in theSite Engineer can only agree on the approved plan based from revision but will not authorize to sign in the
Site Instruction Form.Site Instruction Form.
 He/she may conduct random inspection, if applicable.He/she may conduct random inspection, if applicable.
 He/ She can suggest a suitable solution.He/ She can suggest a suitable solution.
Site Instruction DocumentationSite Instruction Documentation
2. Description :2. Description :
The Site Instruction procedure is required in all cases when an approved design is changed, see Attachment 1.The Site Instruction procedure is required in all cases when an approved design is changed, see Attachment 1.
 There will be no work included in the Site Instruction unless all signature are affixed.There will be no work included in the Site Instruction unless all signature are affixed.
 Preparation of new Site Instruction is recommended for the additional work order from the previous SitePreparation of new Site Instruction is recommended for the additional work order from the previous Site
Instruction.Instruction.
 The work shall be started upon clearing all Site Instruction and approved by Client/Customer, Ericsson SiteThe work shall be started upon clearing all Site Instruction and approved by Client/Customer, Ericsson Site
Supervisor, Sub-contractor.Supervisor, Sub-contractor.
 In some cases, when cost and/or time extension affect the start of the construction, another clearance isIn some cases, when cost and/or time extension affect the start of the construction, another clearance is
required from Client/Customer, Ericsson Site Supervisor, Sub-contractor prior the start of the suggested work.required from Client/Customer, Ericsson Site Supervisor, Sub-contractor prior the start of the suggested work.
3. Site Instruction Form :3. Site Instruction Form :
See Attachment 3See Attachment 3
GLOBE Representative
Approved as corrected
Disapproved
Approved for Implementation
DeleteDirectional Boring
Extend
PROPOSAL:
Handhole
S. I. No. Date:
Relocate
RerouteCulvert Attachment Pulling
BlowingBridge Attachment
Description
Modify / Demolish
Change Type / Size /
Height
Remark:
contract price only no change in contract time and price
The instructions appearing above shall have effect on:
contract time only both contract price and time
GLOBE COMMENTS
ERICSSON Representative
As-built
Prepared by:Remark:
Non-Chargeable Chargeable to GLOBE
ERICSSON COMMENTS
REASON:
Original route:
REMARKS PROPOSAL
Others (specify): Ploughing
Change Material Use
Additional
Client's request Trenching
Revision Trial Pit
JointingDesign Excavation
R. O. W.
Obstruction
OF CHANGE CIVIL CABLE of works
REASON TYPE OF INSTALLATION
Scheme No.
Scheme CWS
GLOBE OSP NW_NLTN PROJECT
SITE INSTRUCTION FORM
Segment No. :
Cable

More Related Content

What's hot

LABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docx
LABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docxLABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docx
LABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docx
Dwarika Bhushan Sharma
 
Crane Safety & Rigging
Crane Safety & RiggingCrane Safety & Rigging
Crane Safety & Rigging
fcarlson
 
Safety Moment-Unsafe Act and Unsafe Condition.pptx
Safety Moment-Unsafe Act and Unsafe Condition.pptxSafety Moment-Unsafe Act and Unsafe Condition.pptx
Safety Moment-Unsafe Act and Unsafe Condition.pptx
Innocent Bhaikwa
 
62809773 h-s-checklist
62809773 h-s-checklist62809773 h-s-checklist
62809773 h-s-checklist
imaduddin91
 

What's hot (20)

Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdf
 
Fire Risk Assessment.doc
Fire Risk Assessment.docFire Risk Assessment.doc
Fire Risk Assessment.doc
 
LABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docx
LABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docxLABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docx
LABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docx
 
16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates
 
Hira
HiraHira
Hira
 
SAFE USE OF LIFTING EQUIPMENT LEEA
SAFE USE OF LIFTING EQUIPMENT LEEASAFE USE OF LIFTING EQUIPMENT LEEA
SAFE USE OF LIFTING EQUIPMENT LEEA
 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templates
 
HSE REPORT 2013-2014.ppt
HSE REPORT 2013-2014.pptHSE REPORT 2013-2014.ppt
HSE REPORT 2013-2014.ppt
 
Hse principles and practises [compatibility mode]
Hse principles and practises [compatibility mode]Hse principles and practises [compatibility mode]
Hse principles and practises [compatibility mode]
 
Basic Scaffolding Awareness
Basic Scaffolding AwarenessBasic Scaffolding Awareness
Basic Scaffolding Awareness
 
Night work safety
Night work safetyNight work safety
Night work safety
 
PPE Awareness training
PPE Awareness trainingPPE Awareness training
PPE Awareness training
 
Health And Safety Induction
Health And Safety InductionHealth And Safety Induction
Health And Safety Induction
 
Crane Safety & Rigging
Crane Safety & RiggingCrane Safety & Rigging
Crane Safety & Rigging
 
Safety Moment-Unsafe Act and Unsafe Condition.pptx
Safety Moment-Unsafe Act and Unsafe Condition.pptxSafety Moment-Unsafe Act and Unsafe Condition.pptx
Safety Moment-Unsafe Act and Unsafe Condition.pptx
 
(Fencing of Machinery and Safety) Regulations 1970 Part 1
(Fencing of Machinery and Safety) Regulations 1970 Part 1(Fencing of Machinery and Safety) Regulations 1970 Part 1
(Fencing of Machinery and Safety) Regulations 1970 Part 1
 
Legal register
Legal registerLegal register
Legal register
 
Elements of a Safe Scaffold
Elements of a Safe ScaffoldElements of a Safe Scaffold
Elements of a Safe Scaffold
 
ASP exam essential practice questions
ASP exam essential practice questionsASP exam essential practice questions
ASP exam essential practice questions
 
62809773 h-s-checklist
62809773 h-s-checklist62809773 h-s-checklist
62809773 h-s-checklist
 

Similar to Site Instruction Provision

Table of ContentsProject ObjectiveRationale for Projec.docx
Table of ContentsProject ObjectiveRationale for Projec.docxTable of ContentsProject ObjectiveRationale for Projec.docx
Table of ContentsProject ObjectiveRationale for Projec.docx
ssuserf9c51d
 
Leadership TheoriesWrite a 700- to 1,050-word paper that addre.docx
Leadership TheoriesWrite a 700- to 1,050-word paper that addre.docxLeadership TheoriesWrite a 700- to 1,050-word paper that addre.docx
Leadership TheoriesWrite a 700- to 1,050-word paper that addre.docx
smile790243
 
VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2
Jerry Bauers
 
Single Proprietorship JD
Single Proprietorship JDSingle Proprietorship JD
Single Proprietorship JD
Dean Apao
 
1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf
EmmanuelMatutu
 
Implementation-Plan_X_Corp
Implementation-Plan_X_CorpImplementation-Plan_X_Corp
Implementation-Plan_X_Corp
Jared Bourne
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C
 
ERECTION METHOD STATEMENT
ERECTION METHOD STATEMENTERECTION METHOD STATEMENT
ERECTION METHOD STATEMENT
mustafa hussain
 
Utility Coordination 2015 - for show
Utility Coordination 2015 - for showUtility Coordination 2015 - for show
Utility Coordination 2015 - for show
Lynee Russell
 

Similar to Site Instruction Provision (20)

Table of ContentsProject ObjectiveRationale for Projec.docx
Table of ContentsProject ObjectiveRationale for Projec.docxTable of ContentsProject ObjectiveRationale for Projec.docx
Table of ContentsProject ObjectiveRationale for Projec.docx
 
Leadership TheoriesWrite a 700- to 1,050-word paper that addre.docx
Leadership TheoriesWrite a 700- to 1,050-word paper that addre.docxLeadership TheoriesWrite a 700- to 1,050-word paper that addre.docx
Leadership TheoriesWrite a 700- to 1,050-word paper that addre.docx
 
PROJECT_STEPS
PROJECT_STEPSPROJECT_STEPS
PROJECT_STEPS
 
ptsresume[1]
ptsresume[1]ptsresume[1]
ptsresume[1]
 
VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2
 
CV
CVCV
CV
 
Single Proprietorship JD
Single Proprietorship JDSingle Proprietorship JD
Single Proprietorship JD
 
CV.C
CV.CCV.C
CV.C
 
1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf
 
Implementation-Plan_X_Corp
Implementation-Plan_X_CorpImplementation-Plan_X_Corp
Implementation-Plan_X_Corp
 
RAVI CV (1)
RAVI CV (1)RAVI CV (1)
RAVI CV (1)
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
 
UPDATED RESUME 2016
UPDATED RESUME 2016UPDATED RESUME 2016
UPDATED RESUME 2016
 
Erection method statement
Erection method statementErection method statement
Erection method statement
 
ERECTION METHOD STATEMENT
ERECTION METHOD STATEMENTERECTION METHOD STATEMENT
ERECTION METHOD STATEMENT
 
PradeepKombilath
PradeepKombilathPradeepKombilath
PradeepKombilath
 
Commissioning-Team-Role-Responsibilities-1.pdf
Commissioning-Team-Role-Responsibilities-1.pdfCommissioning-Team-Role-Responsibilities-1.pdf
Commissioning-Team-Role-Responsibilities-1.pdf
 
Utility Coordination 2015 - for show
Utility Coordination 2015 - for showUtility Coordination 2015 - for show
Utility Coordination 2015 - for show
 
Tpqma r5 to upload in slide share
Tpqma r5 to upload in slide shareTpqma r5 to upload in slide share
Tpqma r5 to upload in slide share
 
Quality application
Quality applicationQuality application
Quality application
 

Site Instruction Provision

  • 1. Site Instruction ProvisionSite Instruction Provision WCR / CO / CCNWCR / CO / CCN Prepared by:Prepared by: R.A. RetitaR.A. Retita
  • 2. Site Instruction ProvisionsSite Instruction Provisions 1. Procedure Details :1. Procedure Details : AbstractAbstract This document provides information on procedure for measuring and quantifying of materials based on plan andThis document provides information on procedure for measuring and quantifying of materials based on plan and actual site changes constructed or implemented on all outside plant facilities, completed civil and cable works.actual site changes constructed or implemented on all outside plant facilities, completed civil and cable works. PurposePurpose Site changes documentation is very essential for verification of revised actual measurement and quantity of allSite changes documentation is very essential for verification of revised actual measurement and quantity of all materials installed. Result of all the changes on plan, specification, activity, site condition and measurement willmaterials installed. Result of all the changes on plan, specification, activity, site condition and measurement will be the basis for the checking of quantity survey plan or as-built plan and bill of quantity.be the basis for the checking of quantity survey plan or as-built plan and bill of quantity. Scope of workScope of work Ensure correct Quantity Survey measurement of all completed civil, cable installation and aerial permanent works.Ensure correct Quantity Survey measurement of all completed civil, cable installation and aerial permanent works. Manpower requirementManpower requirement For the purpose of pre-project acceptance requiring for additional manpower. This is to recommend theFor the purpose of pre-project acceptance requiring for additional manpower. This is to recommend the immediate manpower requirement in order to facilitate the need for Northeast and portion of FOBN2. This willimmediate manpower requirement in order to facilitate the need for Northeast and portion of FOBN2. This will provide advance project cost probability emanating from the actual completed works recorded as to date.provide advance project cost probability emanating from the actual completed works recorded as to date.  1 Clerical Assistance1 Clerical Assistance ContentsContents 1. Procedure Details1. Procedure Details 2. Integrated Flow Chart for SI Documentation2. Integrated Flow Chart for SI Documentation 3. Process Flow3. Process Flow 4. SI Documentation4. SI Documentation
  • 3.
  • 4. Site Instruction DocumentationSite Instruction Documentation EnclosuresEnclosures Site Instruction form towards Client/CustomerSite Instruction form towards Client/Customer Site Instruction form towards Sub-contractorSite Instruction form towards Sub-contractor AbstractAbstract This description gives guidelines how to prepare and get an approval of a Site Instruction.This description gives guidelines how to prepare and get an approval of a Site Instruction. ApplicationApplication This document is applicable for Globe NLTN Projects for Northwest, Northeast and FOBN2 areas.This document is applicable for Globe NLTN Projects for Northwest, Northeast and FOBN2 areas. This description is also to be used by any sub-contractors engaged for cable network installation work.This description is also to be used by any sub-contractors engaged for cable network installation work. ContentsContents 11 ResponsibilitiesResponsibilities 33 1.11.1 Installation ManagerInstallation Manager 33 1.21.2 Project Control functionProject Control function 44 1.31.3 Installation SupervisorInstallation Supervisor 44 1.41.4 Site SupervisorSite Supervisor 44 1.51.5 Site Engineer from OSP Engineering 5Site Engineer from OSP Engineering 5 22 DescriptionDescription 55 33 Site Instruction Form 7Site Instruction Form 7 ResponsibilitiesResponsibilities 1.1 Installation Manager1.1 Installation Manager Installation Manager is responsible to:Installation Manager is responsible to:  Establish the Site Instruction procedure together with the customer and Project Control functionEstablish the Site Instruction procedure together with the customer and Project Control function  Inform and make sure that concerned installation staff understand the Site Instruction procedureInform and make sure that concerned installation staff understand the Site Instruction procedure  Receive information from Installation Supervisor that a Site Instruction involving cost and/or time extensionReceive information from Installation Supervisor that a Site Instruction involving cost and/or time extension has been sent to Project Control function for action.has been sent to Project Control function for action.
  • 5. ResponsibilitiesResponsibilities 1.1 Installation Manager1.1 Installation Manager Installation Manager is responsible to:Installation Manager is responsible to:  Receiving information from Project Control function that Client/ Customer has approved offered price and/orReceiving information from Project Control function that Client/ Customer has approved offered price and/or time extensions.time extensions. 1.2 Project Control function1.2 Project Control function The Project Control function is responsible to:The Project Control function is responsible to:  When a Site Instruction is received, from Installation Supervisor, involving cost and/or time extension an offerWhen a Site Instruction is received, from Installation Supervisor, involving cost and/or time extension an offer shall be prepared and formally submitted for approvalshall be prepared and formally submitted for approval  After written approval from Client/Customer instruct Installation Supervisor when the Site Instruction involvingAfter written approval from Client/Customer instruct Installation Supervisor when the Site Instruction involving cost and/or time extension can re-start.cost and/or time extension can re-start. 1.3 Installation Supervisor1.3 Installation Supervisor The Installation Supervisor is responsible to:The Installation Supervisor is responsible to:  When receiving the Site Instruction decide if there is cost and/or time extension involvedWhen receiving the Site Instruction decide if there is cost and/or time extension involved  Instruct Site Supervisor to start the suggested Site Instruction work if cost and/or time extension are notInstruct Site Supervisor to start the suggested Site Instruction work if cost and/or time extension are not involvedinvolved  Make sure that a cost estimate is prepared as soon as possible by him/herself or other appointed functionMake sure that a cost estimate is prepared as soon as possible by him/herself or other appointed function within the Project if cost and/or time extension are involvedwithin the Project if cost and/or time extension are involved  Send the cost and time extension estimate to Project Administration function for action and InstallationSend the cost and time extension estimate to Project Administration function for action and Installation Manager for informationManager for information.. Site Instruction DocumentationSite Instruction Documentation
  • 6. Site Instruction DocumentationSite Instruction Documentation ResponsibilitiesResponsibilities 1.4 Site Supervisor1.4 Site Supervisor Site Supervisor is responsible to:Site Supervisor is responsible to:  Discuss and agree with Customer Site Representative including client and Sun-contractor with technicalDiscuss and agree with Customer Site Representative including client and Sun-contractor with technical solution suggested and prepare a Site Instruction in accordance to the agreed solution.solution suggested and prepare a Site Instruction in accordance to the agreed solution.  Make proper recommendation to the solution and ensure that Client/Customer, Ericsson Site Supervisor andMake proper recommendation to the solution and ensure that Client/Customer, Ericsson Site Supervisor and Site Representatives are always affix signature to the Site Instruction as well as the Sub-contractorSite Representatives are always affix signature to the Site Instruction as well as the Sub-contractor Representative, if applicableRepresentative, if applicable  Send the Site Instruction to Installation Supervisor for the immediate revision and implementation of approvedSend the Site Instruction to Installation Supervisor for the immediate revision and implementation of approved construction works. Site Supervisor must check the recommended solution and revision prior start of theconstruction works. Site Supervisor must check the recommended solution and revision prior start of the required workrequired work  Make sure that no work starts before such instruction is received.Make sure that no work starts before such instruction is received. 1.5 Site Engineer from OSP Engineering1.5 Site Engineer from OSP Engineering Site Engineer is responsible to:Site Engineer is responsible to:  Suggest to Site Supervisor a new plan when approved drawing(s) require a change.Suggest to Site Supervisor a new plan when approved drawing(s) require a change.  Site Engineer can only agree on the approved plan based from revision but will not authorize to sign in theSite Engineer can only agree on the approved plan based from revision but will not authorize to sign in the Site Instruction Form.Site Instruction Form.  He/she may conduct random inspection, if applicable.He/she may conduct random inspection, if applicable.  He/ She can suggest a suitable solution.He/ She can suggest a suitable solution.
  • 7. Site Instruction DocumentationSite Instruction Documentation 2. Description :2. Description : The Site Instruction procedure is required in all cases when an approved design is changed, see Attachment 1.The Site Instruction procedure is required in all cases when an approved design is changed, see Attachment 1.  There will be no work included in the Site Instruction unless all signature are affixed.There will be no work included in the Site Instruction unless all signature are affixed.  Preparation of new Site Instruction is recommended for the additional work order from the previous SitePreparation of new Site Instruction is recommended for the additional work order from the previous Site Instruction.Instruction.  The work shall be started upon clearing all Site Instruction and approved by Client/Customer, Ericsson SiteThe work shall be started upon clearing all Site Instruction and approved by Client/Customer, Ericsson Site Supervisor, Sub-contractor.Supervisor, Sub-contractor.  In some cases, when cost and/or time extension affect the start of the construction, another clearance isIn some cases, when cost and/or time extension affect the start of the construction, another clearance is required from Client/Customer, Ericsson Site Supervisor, Sub-contractor prior the start of the suggested work.required from Client/Customer, Ericsson Site Supervisor, Sub-contractor prior the start of the suggested work. 3. Site Instruction Form :3. Site Instruction Form : See Attachment 3See Attachment 3
  • 8. GLOBE Representative Approved as corrected Disapproved Approved for Implementation DeleteDirectional Boring Extend PROPOSAL: Handhole S. I. No. Date: Relocate RerouteCulvert Attachment Pulling BlowingBridge Attachment Description Modify / Demolish Change Type / Size / Height Remark: contract price only no change in contract time and price The instructions appearing above shall have effect on: contract time only both contract price and time GLOBE COMMENTS ERICSSON Representative As-built Prepared by:Remark: Non-Chargeable Chargeable to GLOBE ERICSSON COMMENTS REASON: Original route: REMARKS PROPOSAL Others (specify): Ploughing Change Material Use Additional Client's request Trenching Revision Trial Pit JointingDesign Excavation R. O. W. Obstruction OF CHANGE CIVIL CABLE of works REASON TYPE OF INSTALLATION Scheme No. Scheme CWS GLOBE OSP NW_NLTN PROJECT SITE INSTRUCTION FORM Segment No. : Cable