West Podium Entry Rumble Strips
Good morning Rick,
Remove them, thanks for contacting me.
Chuck Cummings |Senior Engineering Technician City of Hillsboro, Oregon | Public Works - Engineering
phone 503-681-6255|cell 503-260-4834 email Chuck.Cummings@hillsboro-oregon.gov.
web www.ci.hillsboro.or.us
-----Original Message-----
From: Rick Sommerfeld [mailto:rsommerfeld@hollandpartnergroup.com]
Sent: Tuesday, November 11, 2014 1:08 PM
To: Chuck Cummings
Subject: FW: Rumble strips
Chuck, I would like to remove the rumble strips from the job site. We have not had to use them yet. Leahy has
been managing the course rock entries well to maintain excellent jobsite containment of sediment and tracking
has been almost nonexistent. It is a tight jobsite and getting more restricted all of the time. The rumble strips
are large cumbersome and the potential of slicing a tire if not hit straight on is quite high. I will continue to keep
a close leash on traffic activity. Are you ok with this plan?
Rick Sommerfeld
Project Superintendent
WestPodiumTrafficBarricade Alternative
WhenI assignedtothe WestPodiumthe planat AlmaGardenswas to use plasticbarricades aroundthe
buildingon3 sidesaspart of the trafficcontrol measuresatconsiderable expensetoHCIin the
neighborhoodof $30k. I reviewedthe existingplananddevisedanalternate planandproposeditto
Tony Piscitellowhowasveryreceptive tothe change. Please readthe copiedemail below tosee howI
managedthissituation.
Todd,
Let’sstart with: 130LF of concrete barriersfor4-months(Oct.2014 to Feb.2015) @
$20.65/LF x 4-mos/18-mos= $597 (rented,placed&removedbyLeahy)
160 LF of concrete barriersfor18-months(Oct.2014 to April 2016) @
$20.65/LF = $3,304 (rented,placed&removedbyLeahy)
276LF of plasticbarriersfor18-months (Oct.2014 to April
2016) @$57.50/LF = $15,870 (purchasedandownedbyHCI)
Total Initial Barrier Order $19,771
If necessary,we will finetune the final quantitiesinthe field.
Thanks,
Tony
From: Rick Sommerfeld
Sent: Thursday,October2, 2014 5:15 PM
To: TonyPiscitello
Cc: Tom Twells;MelissaMcFeron;ToddPeters
Subject:RE: JerseyBarriers
Tony,by limitingthe plasticsectionstoonlythe parkingsectionatthe AlmaGardens(plus18’ westand
18’ East for turnradius) the numberof LF plasticbarricade purchasedisreducedto276’ total. That is
46 plasticbarricades 6’ long$350 each whichwill cost$16,100. That leaves320 LF of concrete barriers
for the remainderwhichwillbe 10’sections$206.50 each for18 monthsfora total of $6,608. The
combinedtotal is$22,708 whichwill save close to$10,000. In additionitispossible thatmore costcan
be reducedbyreturningsome of the barricadesearly. Once the curbs are placedonthe looproad about
15 concrete barrierswill nolongerbe needed. The plasticbarricades willarrive justintime if ordered
now,I recommendthatLeahybe directedtoproceedwiththe revisedquantities.
Rick Sommerfeld
ProjectSuperintendent
HCI has receivedthe plasticbarricades (theyare currentlynotarentable item) purchasedthroughKen
LeahyConstructionInc.and theyare in use at thistime. The concrete barrierportionof cost proposal
has beensetupand isreadyto be usedbuthas not beenstartedyetbecause Iam managing
the plasticbarricades insuch a waythat the needforthe concrete barricadeshasnot beenneeded. We
are currentlywell underhalf the original estimatedcostsfor barricades andI furtherintendtolimitthe
use of the rentable barricades tothe bare minimumtoeliminate evenmore costs.
WestPodiumWestEntry Plan
WhenI was assignedtoWestPodiumthere wasdirectiontoremove about120LF of existing9’sidewalk
(inlike newcondition) tothe northof the projectby the swale androck it to create a construction
entrance. Thissectionof sidewalkwouldhave beenanextracostnot includedinthe contract. This
removal wouldhave broughtconstructionactivitiesclosertoNECherryDrive therebyincreasingthe risk
of contaminantexposure atthe Citystreet.(AlmaGardenLoopisa private road anyminoramountof
sand andgrit not bumpedoff atthe rock entrance usuallytracksoff before CherryDrive.) Todate the
sidewalkhasnotbeenremoved,the constructionentrance wasbuiltatthe endof the fire access
road. It ismy intenttosave the demo,rocking,removal andsidewalkreplacementcostsandreplace
only2 panelsthathadlightpostsinthem. This ispotentiallya$10-15k costsavingsto the projectas
well asa savingtime onthe schedule.
These are some of the examplesof howIhave beenstrivingtomake thisasuccessful project,Ihave
workedhardat it, and will continuetobe a diligenttothatend.
Bestregards,
Rick Sommerfeld
ProjectSuperintendent
Holland Construction, Inc.
Orenco StationOffice
6297 NE CampusCourt
Hillsboro,Oregon 97124
C: 503-939-5483
rsommerfeld@hollandpartnergroup.com

More Related Content

More from Rick Sommerfeld

West Podium EORM Safety Inspection 4-14-15
West Podium EORM Safety Inspection 4-14-15West Podium EORM Safety Inspection 4-14-15
West Podium EORM Safety Inspection 4-14-15Rick Sommerfeld
 
VECTOR APARTMENTS WOOD FRAMING
VECTOR APARTMENTS WOOD FRAMINGVECTOR APARTMENTS WOOD FRAMING
VECTOR APARTMENTS WOOD FRAMINGRick Sommerfeld
 
Orenco Podium Loop Road Safety Analysis
Orenco Podium Loop Road Safety AnalysisOrenco Podium Loop Road Safety Analysis
Orenco Podium Loop Road Safety AnalysisRick Sommerfeld
 
RWS Qualification Certificate General Carpenter
RWS Qualification Certificate General CarpenterRWS Qualification Certificate General Carpenter
RWS Qualification Certificate General CarpenterRick Sommerfeld
 
RWS Apprenticeship Completion Certification
RWS Apprenticeship Completion CertificationRWS Apprenticeship Completion Certification
RWS Apprenticeship Completion CertificationRick Sommerfeld
 
George Brown College Transit Level Laser Certificate
George Brown College Transit Level Laser CertificateGeorge Brown College Transit Level Laser Certificate
George Brown College Transit Level Laser CertificateRick Sommerfeld
 
OSHA 500 CERTIFICATE RWS
OSHA 500 CERTIFICATE RWSOSHA 500 CERTIFICATE RWS
OSHA 500 CERTIFICATE RWSRick Sommerfeld
 
AGC SUPERVISORY TRAINING CERTIFICATED RWS
AGC SUPERVISORY TRAINING CERTIFICATED RWSAGC SUPERVISORY TRAINING CERTIFICATED RWS
AGC SUPERVISORY TRAINING CERTIFICATED RWSRick Sommerfeld
 
ITT Tech Deans List Sept 2015 RWS
ITT Tech Deans List Sept 2015 RWSITT Tech Deans List Sept 2015 RWS
ITT Tech Deans List Sept 2015 RWSRick Sommerfeld
 
RWS Qualification Certificate General Carpenter
RWS Qualification Certificate General CarpenterRWS Qualification Certificate General Carpenter
RWS Qualification Certificate General CarpenterRick Sommerfeld
 
RWS Apprenticeship Completion Certification
RWS Apprenticeship Completion CertificationRWS Apprenticeship Completion Certification
RWS Apprenticeship Completion CertificationRick Sommerfeld
 
West Podium Staging Plan 09.25.14
West Podium Staging Plan 09.25.14West Podium Staging Plan 09.25.14
West Podium Staging Plan 09.25.14Rick Sommerfeld
 
West Podium .2015.05.18 schedule
West Podium .2015.05.18 scheduleWest Podium .2015.05.18 schedule
West Podium .2015.05.18 scheduleRick Sommerfeld
 
West Look Ahead Schedule 03.31.15
West Look Ahead Schedule 03.31.15West Look Ahead Schedule 03.31.15
West Look Ahead Schedule 03.31.15Rick Sommerfeld
 

More from Rick Sommerfeld (20)

SCOTIA BANK PLAZA
SCOTIA BANK PLAZASCOTIA BANK PLAZA
SCOTIA BANK PLAZA
 
West Podium EORM Safety Inspection 4-14-15
West Podium EORM Safety Inspection 4-14-15West Podium EORM Safety Inspection 4-14-15
West Podium EORM Safety Inspection 4-14-15
 
VECTOR APARTMENTS WOOD FRAMING
VECTOR APARTMENTS WOOD FRAMINGVECTOR APARTMENTS WOOD FRAMING
VECTOR APARTMENTS WOOD FRAMING
 
SW CENTER
SW CENTERSW CENTER
SW CENTER
 
VECTOR APARTMENTS
VECTOR APARTMENTSVECTOR APARTMENTS
VECTOR APARTMENTS
 
Orenco Podium Loop Road Safety Analysis
Orenco Podium Loop Road Safety AnalysisOrenco Podium Loop Road Safety Analysis
Orenco Podium Loop Road Safety Analysis
 
RWS Qualification Certificate General Carpenter
RWS Qualification Certificate General CarpenterRWS Qualification Certificate General Carpenter
RWS Qualification Certificate General Carpenter
 
RWS Apprenticeship Completion Certification
RWS Apprenticeship Completion CertificationRWS Apprenticeship Completion Certification
RWS Apprenticeship Completion Certification
 
UBC JOURNEYMAN CERT
UBC JOURNEYMAN CERTUBC JOURNEYMAN CERT
UBC JOURNEYMAN CERT
 
George Brown College Transit Level Laser Certificate
George Brown College Transit Level Laser CertificateGeorge Brown College Transit Level Laser Certificate
George Brown College Transit Level Laser Certificate
 
OSHA 500 CERTIFICATE RWS
OSHA 500 CERTIFICATE RWSOSHA 500 CERTIFICATE RWS
OSHA 500 CERTIFICATE RWS
 
AGC SUPERVISORY TRAINING CERTIFICATED RWS
AGC SUPERVISORY TRAINING CERTIFICATED RWSAGC SUPERVISORY TRAINING CERTIFICATED RWS
AGC SUPERVISORY TRAINING CERTIFICATED RWS
 
ITT Tech Deans List Sept 2015 RWS
ITT Tech Deans List Sept 2015 RWSITT Tech Deans List Sept 2015 RWS
ITT Tech Deans List Sept 2015 RWS
 
ASSOCIATES DEGREE ITT
ASSOCIATES DEGREE ITTASSOCIATES DEGREE ITT
ASSOCIATES DEGREE ITT
 
RWS High School DIPLOMA
RWS High School DIPLOMARWS High School DIPLOMA
RWS High School DIPLOMA
 
RWS Qualification Certificate General Carpenter
RWS Qualification Certificate General CarpenterRWS Qualification Certificate General Carpenter
RWS Qualification Certificate General Carpenter
 
RWS Apprenticeship Completion Certification
RWS Apprenticeship Completion CertificationRWS Apprenticeship Completion Certification
RWS Apprenticeship Completion Certification
 
West Podium Staging Plan 09.25.14
West Podium Staging Plan 09.25.14West Podium Staging Plan 09.25.14
West Podium Staging Plan 09.25.14
 
West Podium .2015.05.18 schedule
West Podium .2015.05.18 scheduleWest Podium .2015.05.18 schedule
West Podium .2015.05.18 schedule
 
West Look Ahead Schedule 03.31.15
West Look Ahead Schedule 03.31.15West Look Ahead Schedule 03.31.15
West Look Ahead Schedule 03.31.15
 

West Podium Traffic Barrier and Entry Alternate Recommendation - 30k savings

  • 1. West Podium Entry Rumble Strips Good morning Rick, Remove them, thanks for contacting me. Chuck Cummings |Senior Engineering Technician City of Hillsboro, Oregon | Public Works - Engineering phone 503-681-6255|cell 503-260-4834 email Chuck.Cummings@hillsboro-oregon.gov. web www.ci.hillsboro.or.us -----Original Message----- From: Rick Sommerfeld [mailto:rsommerfeld@hollandpartnergroup.com] Sent: Tuesday, November 11, 2014 1:08 PM To: Chuck Cummings Subject: FW: Rumble strips Chuck, I would like to remove the rumble strips from the job site. We have not had to use them yet. Leahy has been managing the course rock entries well to maintain excellent jobsite containment of sediment and tracking has been almost nonexistent. It is a tight jobsite and getting more restricted all of the time. The rumble strips are large cumbersome and the potential of slicing a tire if not hit straight on is quite high. I will continue to keep a close leash on traffic activity. Are you ok with this plan? Rick Sommerfeld Project Superintendent
  • 2. WestPodiumTrafficBarricade Alternative WhenI assignedtothe WestPodiumthe planat AlmaGardenswas to use plasticbarricades aroundthe buildingon3 sidesaspart of the trafficcontrol measuresatconsiderable expensetoHCIin the neighborhoodof $30k. I reviewedthe existingplananddevisedanalternate planandproposeditto Tony Piscitellowhowasveryreceptive tothe change. Please readthe copiedemail below tosee howI managedthissituation. Todd, Let’sstart with: 130LF of concrete barriersfor4-months(Oct.2014 to Feb.2015) @ $20.65/LF x 4-mos/18-mos= $597 (rented,placed&removedbyLeahy) 160 LF of concrete barriersfor18-months(Oct.2014 to April 2016) @ $20.65/LF = $3,304 (rented,placed&removedbyLeahy) 276LF of plasticbarriersfor18-months (Oct.2014 to April 2016) @$57.50/LF = $15,870 (purchasedandownedbyHCI) Total Initial Barrier Order $19,771 If necessary,we will finetune the final quantitiesinthe field. Thanks, Tony From: Rick Sommerfeld Sent: Thursday,October2, 2014 5:15 PM To: TonyPiscitello Cc: Tom Twells;MelissaMcFeron;ToddPeters Subject:RE: JerseyBarriers Tony,by limitingthe plasticsectionstoonlythe parkingsectionatthe AlmaGardens(plus18’ westand 18’ East for turnradius) the numberof LF plasticbarricade purchasedisreducedto276’ total. That is 46 plasticbarricades 6’ long$350 each whichwill cost$16,100. That leaves320 LF of concrete barriers for the remainderwhichwillbe 10’sections$206.50 each for18 monthsfora total of $6,608. The combinedtotal is$22,708 whichwill save close to$10,000. In additionitispossible thatmore costcan be reducedbyreturningsome of the barricadesearly. Once the curbs are placedonthe looproad about 15 concrete barrierswill nolongerbe needed. The plasticbarricades willarrive justintime if ordered now,I recommendthatLeahybe directedtoproceedwiththe revisedquantities. Rick Sommerfeld ProjectSuperintendent HCI has receivedthe plasticbarricades (theyare currentlynotarentable item) purchasedthroughKen LeahyConstructionInc.and theyare in use at thistime. The concrete barrierportionof cost proposal has beensetupand isreadyto be usedbuthas not beenstartedyetbecause Iam managing the plasticbarricades insuch a waythat the needforthe concrete barricadeshasnot beenneeded. We are currentlywell underhalf the original estimatedcostsfor barricades andI furtherintendtolimitthe use of the rentable barricades tothe bare minimumtoeliminate evenmore costs.
  • 3. WestPodiumWestEntry Plan WhenI was assignedtoWestPodiumthere wasdirectiontoremove about120LF of existing9’sidewalk (inlike newcondition) tothe northof the projectby the swale androck it to create a construction entrance. Thissectionof sidewalkwouldhave beenanextracostnot includedinthe contract. This removal wouldhave broughtconstructionactivitiesclosertoNECherryDrive therebyincreasingthe risk of contaminantexposure atthe Citystreet.(AlmaGardenLoopisa private road anyminoramountof sand andgrit not bumpedoff atthe rock entrance usuallytracksoff before CherryDrive.) Todate the sidewalkhasnotbeenremoved,the constructionentrance wasbuiltatthe endof the fire access road. It ismy intenttosave the demo,rocking,removal andsidewalkreplacementcostsandreplace only2 panelsthathadlightpostsinthem. This ispotentiallya$10-15k costsavingsto the projectas well asa savingtime onthe schedule. These are some of the examplesof howIhave beenstrivingtomake thisasuccessful project,Ihave workedhardat it, and will continuetobe a diligenttothatend. Bestregards, Rick Sommerfeld ProjectSuperintendent Holland Construction, Inc. Orenco StationOffice 6297 NE CampusCourt Hillsboro,Oregon 97124 C: 503-939-5483 rsommerfeld@hollandpartnergroup.com