SlideShare a Scribd company logo
1 of 26
YOUR JOURNEY MATTERS
Smoother, safer train rides on the North-South and East-West Lines with SMRT
Updated as at: 15 February 2017
Introduction
To provide the best service to commuters, SMRT has embarked on a multi-year, multi-project effort
of upgrading Singapore’s oldest, longest and most heavily utilised MRT lines – the North-South and
East-West Lines (NSEWL).
	
	
	
	
	
	
	
	
	
	
	
	
	
	
	
	
	
	
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
This multi-year, multi-project effort consists of various programmes:
●  Sleeper replacement,
●  Re-signalling works,
●  Third Rail replacement.
Besides these rail renewal projects, there are other works in progress to bring commuters better
journeys:
●  Upgrading of older trains,
●  Increasing passenger capacity,
●  Maintenance of escalators,
●  Maintenance of Platform Screen Doors,
●  Maintenance of air conditioning,
●  Escalator Refurbishment Programme.
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
	
	
Keen to learn more about how these projects will benefit you?
Join us, as we explain the work being done through this presentation.
	
Introduction
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
The key engineering projects are:
	
Improving the North-South and East-West Lines
Result: A better railway system that will
allow SMRT to serve you better.
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
Improving the North-South and East-West Lines
A timeline of the work in progress:
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
Improving the North-South and East-West Lines
SMRT is also working to address the rail network’s future power needs and minimise the
inconvenience resulting from power-related faults by:
●  Renewing power components nearing the end-of-life stage,
●  Increasing the power capacity of the network,
●  Improving the design of the power network.
Sleeper Replacement
SMRT has worked closely with LTA and rail contractors
for the replacement of wooden sleepers on the NSL
and the EWL with concrete sleepers. The concrete
sleepers are more durable and have a lifespan double
that of wooden sleepers.
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
The Impact:
Journey times on
the NSL have been
reduced by 10%.
	
The Aim: Ensuring reliability and
better availability of train services for
our commuters.
Resleepering has been
completed for NSL in
April 2015 and EWL in
December 2016.
Improving the North-South and East-West Lines
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
Improving the North-South and East-West Lines
Sleeper Replacement
Here are some fun facts!
Re-Signalling
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
Improving the North-South and East-West Lines
The new signalling system uses advanced communications technology on trains. This will update the
traffic management system on the identity, location and speed of every train.
Progress of re-signalling efforts:
●  85% re-signalling completed on the EWL
●  Re-signalling is expected to be completed on the NSL in 2017 and on the EWL in 2018.
	
	
The Impact: This will
improve the capacity of
the NSEWL to run trains
at shorter intervals.
Third Rail Replacement
The Third Rail passes along the rails, and supplies
power to the train. The Third Rail Replacement
project marks the first network-wide replacement
for NSEWL.
This project involves:
•  Turning off the power,
•  Unbolting the old Third Rails,
•  Replacing them with new ones,
•  Re-connecting the rails to the electricity
network.
Improving the North-South and East-West Lines
.	
The Impact: This will increase the reliability of the electrical system.
	
	
The	Third	Rail	
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
Upgrading Older Trains
The C651 Siemens was introduced in 1994. SMRT is
upgrading the 19 C651 trains as they have logged more
train faults than other models.
When completed in 2018, the upgraded C651 Siemens
trains will have:
●  New air conditioning,
●  New electric doors, brakes and propulsion systems,
●  Sensors that furnish the train’s state of health,
●  A makeover for the cabins.
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
Improving the North-South and East-West Lines
Increasing Passenger Capacity
30 new C151B trains for the NSEWL have been delivered to Bishan and Tuas Depots where they are
being fitted out and tested extensively and are designed to operate with the new signalling system.
More new trains are on their way to Singapore.
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
Improving the North-South and East-West Lines
The Impact:
There will be a
total of 57 new
trains,
allowing more
trains to be
run on the
NSEWL.
Maintaining Our Escalators
In January 2016, SMRT awarded OTIS
Elevator Co. (S) Pte. Ltd the contract to
refurbish 233 escalators from August 2016
to August 2021.
The main objectives are:
●  To replace worn-out parts – traction
machines, handrail drive, lubrication
system and safety switches,
●  To add new safety features – Dual
Speed Controller, Variable Speed
Device and Balustrade Panels
Securing Mechanism.
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
SMRT and OTIS jointly commenced the ‘Pre-Start Escalator and Site Survey’ exercise in February
2016, with the objective of assessing and reporting the pre-existing conditions of each escalator.
The challenge:
This is the first escalator upgrading project to be carried out during service hours. It is being prioritised
to speed up work and minimise the impact to commuters.
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
Maintaining Our Escalators
The Impact: More
reliable and safer
escalator rides as part of
commuters’ daily
journeys once all 233
escalators are fully
refurbished.
Your safety is important! When using escalators, remember:
Staying Safe on Escalators
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
Keeping Screen Doors Functioning Smoothly
As a safety feature, a train cannot depart the station if
any of the 24 screen doors in a platform are detected as
open.
Preventive maintenance of PSDs is done from the
platform. It involves:
●  Checking all 24 screen doors,
●  Replacing worn-out parts such as the rubber nose
or guard,
●  Cleaning and removing debris,
●  Testing the emergency release lever,
●  Testing the opening and shutting of doors,
●  Observing how the doors interact with incoming
trains.
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
Did you know that there are 2,880 platform screen doors (PSDs) across the NSEWL?
Corrective maintenance
on faulty doors requires
the team to access the
track as the work has to
be done on the train-
facing side of the doors.
A project to replace
ageing parts in the doors
started in 2015 and is
scheduled to complete in
early 2017.
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
Keeping Screen Doors Functioning Smoothly
Improving Our Air Conditioning
Air conditioning is crucial in keeping trains cool and comfortable.
Here are some facts about the air conditioning in NSEWL Trains:
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
Why do aircon faults happen?
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
Improving Our Air Conditioning
What happens when an aircon fault is detected?
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
Improving Our Air Conditioning
We are working towards a better air conditioning system for you!
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
Improving Our Air Conditioning
Coordinating Our Maintenance Efforts
To help serve our commuters better, SMRT has set up a Maintenance Operations Centre (MOC).
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
Strengthening Our Workforce
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
Alongside upgrading of our trains and rail
lines, we are working towards strengthening
our workforce.
•  Reinforcing Our Engineering
Workforce – Increasing the number of
staff for good working order.
•  Engineering Maintenance Manager
Role – Upgrading skills of middle
management to lead effectively.
•  Professional Education – Introducing
initiatives to nurture current and future
rail professionals.
Caring For Our Commuters
In the quest to improve and provide outstanding customer service to our passengers, SMRT has
launched several programmes since 2014:
●  Care Stickers: To identify passengers who would appreciate a seat
●  Priority Queues: At elevators, for passengers with needs
●  Charging Points: For quick charge of mobile devices
●  Escalator Safety announcements: For the safety of passengers
●  Care Zones: To allow quick responses to passengers who need help
	
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
The transformation of
NSEWL is making steady
progress. Passengers will
be able to enjoy
smoother, safer and
faster journeys on a
modernised rail network
with higher levels of
reliability and increased
capacity.
	
Your Journey Matters to Us...
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
And each journey is important to us.
Did you know that
over 2 million
passenger trips are
made on the SMRT
rail network every
day?
We seek the continued support of our commuters, as our team works
diligently and carefully to deliver a rejuvenated NSEWL that
Singaporeans will be proud of.
© Copyright SMRT Corporation Ltd. 2017. All rights reserved.
Your Journey Matters to Us...
Check out this cool ‘doodle video’ on the SMRT rail renewal programme!

More Related Content

What's hot

Report on rsa for rural road
Report on rsa for rural roadReport on rsa for rural road
Report on rsa for rural roadPawan Kumar
 
Transportation planning
Transportation planningTransportation planning
Transportation planningTousif Jaman
 
Case study of feasibility study of mrts
Case study of feasibility study of mrtsCase study of feasibility study of mrts
Case study of feasibility study of mrtsDivyarajsinh Chudasama
 
Taxiway design perfect ppt
Taxiway design perfect pptTaxiway design perfect ppt
Taxiway design perfect pptVijay Reddy
 
Mass transit railway (mtr) hongkong
Mass transit railway (mtr) hongkongMass transit railway (mtr) hongkong
Mass transit railway (mtr) hongkongShahrukh Niaz
 
Metro Rail Policy, 2017
Metro Rail Policy, 2017Metro Rail Policy, 2017
Metro Rail Policy, 2017Aman Kudesia
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMChandanPadhi3
 
1.3_Road Signs & Markings.pdf
1.3_Road Signs & Markings.pdf1.3_Road Signs & Markings.pdf
1.3_Road Signs & Markings.pdfManiNarendraVerma
 
Railway Engineering: Turnouts
Railway Engineering: TurnoutsRailway Engineering: Turnouts
Railway Engineering: TurnoutsVijai Krishnan V
 
Metro islamabad rawalpindi
Metro islamabad rawalpindiMetro islamabad rawalpindi
Metro islamabad rawalpindiMahmood Ahmed
 
Ahmedabad bus rapid transit system
Ahmedabad bus rapid transit systemAhmedabad bus rapid transit system
Ahmedabad bus rapid transit systemFagner Glinski
 
Internship Report on metro project
Internship Report on metro projectInternship Report on metro project
Internship Report on metro projectAkshathaBhandary
 
BRT System in Delhi
BRT System in DelhiBRT System in Delhi
BRT System in DelhiJaspal Singh
 
Transportation Engineering I
Transportation Engineering ITransportation Engineering I
Transportation Engineering IShradhesh Marve
 
Depots presentation
Depots presentationDepots presentation
Depots presentationKumar M.
 
Traffic aids street furniture
Traffic aids street furnitureTraffic aids street furniture
Traffic aids street furnitureChockalingam T
 
Traffic Queueing analysis using VISSIM Software by RK
Traffic Queueing analysis using VISSIM Software by RKTraffic Queueing analysis using VISSIM Software by RK
Traffic Queueing analysis using VISSIM Software by RKRaam Krishna Prakash Jagali
 

What's hot (20)

Report on rsa for rural road
Report on rsa for rural roadReport on rsa for rural road
Report on rsa for rural road
 
Transportation planning
Transportation planningTransportation planning
Transportation planning
 
Case study of feasibility study of mrts
Case study of feasibility study of mrtsCase study of feasibility study of mrts
Case study of feasibility study of mrts
 
Taxiway design perfect ppt
Taxiway design perfect pptTaxiway design perfect ppt
Taxiway design perfect ppt
 
Mass transit railway (mtr) hongkong
Mass transit railway (mtr) hongkongMass transit railway (mtr) hongkong
Mass transit railway (mtr) hongkong
 
Metro Rail Policy, 2017
Metro Rail Policy, 2017Metro Rail Policy, 2017
Metro Rail Policy, 2017
 
Metro project
Metro project Metro project
Metro project
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEM
 
1.3_Road Signs & Markings.pdf
1.3_Road Signs & Markings.pdf1.3_Road Signs & Markings.pdf
1.3_Road Signs & Markings.pdf
 
Railway Engineering: Turnouts
Railway Engineering: TurnoutsRailway Engineering: Turnouts
Railway Engineering: Turnouts
 
Metro islamabad rawalpindi
Metro islamabad rawalpindiMetro islamabad rawalpindi
Metro islamabad rawalpindi
 
Ahmedabad bus rapid transit system
Ahmedabad bus rapid transit systemAhmedabad bus rapid transit system
Ahmedabad bus rapid transit system
 
Internship Report on metro project
Internship Report on metro projectInternship Report on metro project
Internship Report on metro project
 
BRT System in Delhi
BRT System in DelhiBRT System in Delhi
BRT System in Delhi
 
Dr. amjad bangash bechtel
Dr. amjad bangash   bechtelDr. amjad bangash   bechtel
Dr. amjad bangash bechtel
 
Transportation Engineering I
Transportation Engineering ITransportation Engineering I
Transportation Engineering I
 
Brts
BrtsBrts
Brts
 
Depots presentation
Depots presentationDepots presentation
Depots presentation
 
Traffic aids street furniture
Traffic aids street furnitureTraffic aids street furniture
Traffic aids street furniture
 
Traffic Queueing analysis using VISSIM Software by RK
Traffic Queueing analysis using VISSIM Software by RKTraffic Queueing analysis using VISSIM Software by RK
Traffic Queueing analysis using VISSIM Software by RK
 

Viewers also liked

Smrt ticketing machine
Smrt ticketing machineSmrt ticketing machine
Smrt ticketing machineRp102460
 
Organizational Productivity - Presentation
Organizational Productivity - PresentationOrganizational Productivity - Presentation
Organizational Productivity - PresentationMohammed Arshath
 
FIIM - Assignment 2 Final (SMRT)
FIIM - Assignment 2 Final (SMRT)FIIM - Assignment 2 Final (SMRT)
FIIM - Assignment 2 Final (SMRT)kaiskchan
 
Best Practices for Publishing Posts on LinkedIn
Best Practices for Publishing Posts on LinkedInBest Practices for Publishing Posts on LinkedIn
Best Practices for Publishing Posts on LinkedInLinkedIn
 
The Quick And Dirty Guide To Creating Blog Posts That Your Audience Craves
The Quick And Dirty Guide To Creating Blog Posts That Your Audience CravesThe Quick And Dirty Guide To Creating Blog Posts That Your Audience Craves
The Quick And Dirty Guide To Creating Blog Posts That Your Audience CravesDominique Jackson
 
15 Tips for Compelling Company Updates on LinkedIn
15 Tips for Compelling Company Updates on LinkedIn15 Tips for Compelling Company Updates on LinkedIn
15 Tips for Compelling Company Updates on LinkedInLinkedIn
 

Viewers also liked (8)

Batu batureef
Batu batureefBatu batureef
Batu batureef
 
Smrt ticketing machine
Smrt ticketing machineSmrt ticketing machine
Smrt ticketing machine
 
Organizational Productivity - Presentation
Organizational Productivity - PresentationOrganizational Productivity - Presentation
Organizational Productivity - Presentation
 
FIIM - Assignment 2 Final (SMRT)
FIIM - Assignment 2 Final (SMRT)FIIM - Assignment 2 Final (SMRT)
FIIM - Assignment 2 Final (SMRT)
 
Best Practices for Publishing Posts on LinkedIn
Best Practices for Publishing Posts on LinkedInBest Practices for Publishing Posts on LinkedIn
Best Practices for Publishing Posts on LinkedIn
 
The Quick And Dirty Guide To Creating Blog Posts That Your Audience Craves
The Quick And Dirty Guide To Creating Blog Posts That Your Audience CravesThe Quick And Dirty Guide To Creating Blog Posts That Your Audience Craves
The Quick And Dirty Guide To Creating Blog Posts That Your Audience Craves
 
15 Tips for Compelling Company Updates on LinkedIn
15 Tips for Compelling Company Updates on LinkedIn15 Tips for Compelling Company Updates on LinkedIn
15 Tips for Compelling Company Updates on LinkedIn
 
SlideShare 101
SlideShare 101SlideShare 101
SlideShare 101
 

Similar to SMRT - Your Journey Matters

NGRprojectfactsheetJan2014
NGRprojectfactsheetJan2014NGRprojectfactsheetJan2014
NGRprojectfactsheetJan2014Glenn Post
 
IRJET- Redesign of Existing Private Bus Terminal at Kothamangalam
IRJET- Redesign of Existing Private Bus Terminal at KothamangalamIRJET- Redesign of Existing Private Bus Terminal at Kothamangalam
IRJET- Redesign of Existing Private Bus Terminal at KothamangalamIRJET Journal
 
TMF_Brochure-11083-SYS-11-2012-en_low_rez (spreads)
TMF_Brochure-11083-SYS-11-2012-en_low_rez (spreads)TMF_Brochure-11083-SYS-11-2012-en_low_rez (spreads)
TMF_Brochure-11083-SYS-11-2012-en_low_rez (spreads)Dan Hope
 
Rail Budget 2016-17
Rail Budget 2016-17 Rail Budget 2016-17
Rail Budget 2016-17 VIJAY KAMBOJ
 
Managing Operations And Service Quality-SMRT trains case study
Managing Operations And Service Quality-SMRT trains case study Managing Operations And Service Quality-SMRT trains case study
Managing Operations And Service Quality-SMRT trains case study Md.Masudur Rahaman
 
VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21SCVTA
 
Brochure of Seoul Metro 9
Brochure of Seoul Metro 9Brochure of Seoul Metro 9
Brochure of Seoul Metro 9simrc
 
Indian railway and tourism.
Indian railway and tourism.Indian railway and tourism.
Indian railway and tourism.Urvashi Baghel
 
Spring 2017-service-change-external-memo -final-feb-27-en
Spring 2017-service-change-external-memo -final-feb-27-enSpring 2017-service-change-external-memo -final-feb-27-en
Spring 2017-service-change-external-memo -final-feb-27-enDevyn Barrie
 
Avenue station open house
Avenue station open house Avenue station open house
Avenue station open house Crosstown TO
 
Avenue station open house presentation
Avenue station open house presentation Avenue station open house presentation
Avenue station open house presentation Crosstown TO
 
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptx
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptxRE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptx
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptxSHUBHAMSINGH673765
 
Keolis tramway expertise: Making cities more attractive places to live and work
Keolis tramway expertise: Making cities more attractive places to live and workKeolis tramway expertise: Making cities more attractive places to live and work
Keolis tramway expertise: Making cities more attractive places to live and workKeolis
 
Summer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) StudentsSummer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) StudentsKashifRaza113
 
Railway carriage workshop Ajmer
Railway carriage workshop AjmerRailway carriage workshop Ajmer
Railway carriage workshop AjmerBhupesh Jangid
 

Similar to SMRT - Your Journey Matters (20)

Rail Report 2017
Rail Report 2017Rail Report 2017
Rail Report 2017
 
NGRprojectfactsheetJan2014
NGRprojectfactsheetJan2014NGRprojectfactsheetJan2014
NGRprojectfactsheetJan2014
 
IRJET- Redesign of Existing Private Bus Terminal at Kothamangalam
IRJET- Redesign of Existing Private Bus Terminal at KothamangalamIRJET- Redesign of Existing Private Bus Terminal at Kothamangalam
IRJET- Redesign of Existing Private Bus Terminal at Kothamangalam
 
Rail revival presentation
Rail revival presentationRail revival presentation
Rail revival presentation
 
SMRT Trains Case Study
SMRT Trains Case StudySMRT Trains Case Study
SMRT Trains Case Study
 
TMF_Brochure-11083-SYS-11-2012-en_low_rez (spreads)
TMF_Brochure-11083-SYS-11-2012-en_low_rez (spreads)TMF_Brochure-11083-SYS-11-2012-en_low_rez (spreads)
TMF_Brochure-11083-SYS-11-2012-en_low_rez (spreads)
 
Rail Budget 2016-17
Rail Budget 2016-17 Rail Budget 2016-17
Rail Budget 2016-17
 
Managing Operations And Service Quality-SMRT trains case study
Managing Operations And Service Quality-SMRT trains case study Managing Operations And Service Quality-SMRT trains case study
Managing Operations And Service Quality-SMRT trains case study
 
ULTIMO-overviewV2.2.pptx
ULTIMO-overviewV2.2.pptxULTIMO-overviewV2.2.pptx
ULTIMO-overviewV2.2.pptx
 
VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21
 
Brochure of Seoul Metro 9
Brochure of Seoul Metro 9Brochure of Seoul Metro 9
Brochure of Seoul Metro 9
 
Metro project
Metro projectMetro project
Metro project
 
Indian railway and tourism.
Indian railway and tourism.Indian railway and tourism.
Indian railway and tourism.
 
Spring 2017-service-change-external-memo -final-feb-27-en
Spring 2017-service-change-external-memo -final-feb-27-enSpring 2017-service-change-external-memo -final-feb-27-en
Spring 2017-service-change-external-memo -final-feb-27-en
 
Avenue station open house
Avenue station open house Avenue station open house
Avenue station open house
 
Avenue station open house presentation
Avenue station open house presentation Avenue station open house presentation
Avenue station open house presentation
 
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptx
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptxRE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptx
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptx
 
Keolis tramway expertise: Making cities more attractive places to live and work
Keolis tramway expertise: Making cities more attractive places to live and workKeolis tramway expertise: Making cities more attractive places to live and work
Keolis tramway expertise: Making cities more attractive places to live and work
 
Summer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) StudentsSummer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) Students
 
Railway carriage workshop Ajmer
Railway carriage workshop AjmerRailway carriage workshop Ajmer
Railway carriage workshop Ajmer
 

Recently uploaded

Vidisha ❤CALL GIRL 84099*07087 ❤CALL GIRLS IN Vidisha ESCORT SERVICE❤CALL GIRL
Vidisha ❤CALL GIRL 84099*07087 ❤CALL GIRLS IN Vidisha ESCORT SERVICE❤CALL GIRLVidisha ❤CALL GIRL 84099*07087 ❤CALL GIRLS IN Vidisha ESCORT SERVICE❤CALL GIRL
Vidisha ❤CALL GIRL 84099*07087 ❤CALL GIRLS IN Vidisha ESCORT SERVICE❤CALL GIRLkantirani197
 
AMBALA CALL GIRL 9661985112 LOW PRICE ESCORT SERVICE AMBALA
AMBALA CALL GIRL 9661985112 LOW PRICE ESCORT SERVICE AMBALAAMBALA CALL GIRL 9661985112 LOW PRICE ESCORT SERVICE AMBALA
AMBALA CALL GIRL 9661985112 LOW PRICE ESCORT SERVICE AMBALASapna Call girl
 
💚Amritsar Call Girls Service 💯Jiya 📲🔝8725944379🔝Call Girls In Amritsar No💰Adv...
💚Amritsar Call Girls Service 💯Jiya 📲🔝8725944379🔝Call Girls In Amritsar No💰Adv...💚Amritsar Call Girls Service 💯Jiya 📲🔝8725944379🔝Call Girls In Amritsar No💰Adv...
💚Amritsar Call Girls Service 💯Jiya 📲🔝8725944379🔝Call Girls In Amritsar No💰Adv...Sheetaleventcompany
 
Udaipur Call Girls ☎ 9602870969✅ Just Genuine Call Girl in Udaipur Escort Ser...
Udaipur Call Girls ☎ 9602870969✅ Just Genuine Call Girl in Udaipur Escort Ser...Udaipur Call Girls ☎ 9602870969✅ Just Genuine Call Girl in Udaipur Escort Ser...
Udaipur Call Girls ☎ 9602870969✅ Just Genuine Call Girl in Udaipur Escort Ser...Apsara Of India
 
NAGPUR ESCORT SERVICE 9262871154 LOW PRICE NAGPUR ESCORT SERVICE
NAGPUR ESCORT SERVICE 9262871154 LOW PRICE NAGPUR ESCORT SERVICENAGPUR ESCORT SERVICE 9262871154 LOW PRICE NAGPUR ESCORT SERVICE
NAGPUR ESCORT SERVICE 9262871154 LOW PRICE NAGPUR ESCORT SERVICENiteshKumar82226
 
Chandigarh Call Girls ☎ 9878799926✅ Just Genuine Call Call Girls Mohali 🧿Elit...
Chandigarh Call Girls ☎ 9878799926✅ Just Genuine Call Call Girls Mohali 🧿Elit...Chandigarh Call Girls ☎ 9878799926✅ Just Genuine Call Call Girls Mohali 🧿Elit...
Chandigarh Call Girls ☎ 9878799926✅ Just Genuine Call Call Girls Mohali 🧿Elit...rajveerescorts2022
 
Chandigarh Call Girls ☎ 08868886958✅ Just Genuine Call Call Girls Chandigarh ...
Chandigarh Call Girls ☎ 08868886958✅ Just Genuine Call Call Girls Chandigarh ...Chandigarh Call Girls ☎ 08868886958✅ Just Genuine Call Call Girls Chandigarh ...
Chandigarh Call Girls ☎ 08868886958✅ Just Genuine Call Call Girls Chandigarh ...Sheetaleventcompany
 
darjiling ❤CALL GIRL 7870993772 ❤CALL GIRLS ESCORT SERVICE in darjiling Book...
darjiling ❤CALL GIRL 7870993772 ❤CALL GIRLS  ESCORT SERVICE in darjiling Book...darjiling ❤CALL GIRL 7870993772 ❤CALL GIRLS  ESCORT SERVICE in darjiling Book...
darjiling ❤CALL GIRL 7870993772 ❤CALL GIRLS ESCORT SERVICE in darjiling Book...Monika Rani
 
❤️Zirakpur Escort Service☎️7837612180☎️ Call Girl service in Zirakpur☎️ Zirak...
❤️Zirakpur Escort Service☎️7837612180☎️ Call Girl service in Zirakpur☎️ Zirak...❤️Zirakpur Escort Service☎️7837612180☎️ Call Girl service in Zirakpur☎️ Zirak...
❤️Zirakpur Escort Service☎️7837612180☎️ Call Girl service in Zirakpur☎️ Zirak...Sheetaleventcompany
 
VIDEO CALL SERVICE CALL GIRL LIVE SERVICE REAL GIRL LIVE VIDEO CALL SERVICE C...
VIDEO CALL SERVICE CALL GIRL LIVE SERVICE REAL GIRL LIVE VIDEO CALL SERVICE C...VIDEO CALL SERVICE CALL GIRL LIVE SERVICE REAL GIRL LIVE VIDEO CALL SERVICE C...
VIDEO CALL SERVICE CALL GIRL LIVE SERVICE REAL GIRL LIVE VIDEO CALL SERVICE C...rajbaburaj201
 
Call Girls In {The Suryaa New Delhi} Call Us !! [ 9667938988 ] Escort Sevice ...
Call Girls In {The Suryaa New Delhi} Call Us !! [ 9667938988 ] Escort Sevice ...Call Girls In {The Suryaa New Delhi} Call Us !! [ 9667938988 ] Escort Sevice ...
Call Girls In {The Suryaa New Delhi} Call Us !! [ 9667938988 ] Escort Sevice ...aakahthapa70
 
chittorgarh 💋 Call Girl 9748763073 Call Girls in Chittorgarh Escort service ...
chittorgarh 💋  Call Girl 9748763073 Call Girls in Chittorgarh Escort service ...chittorgarh 💋  Call Girl 9748763073 Call Girls in Chittorgarh Escort service ...
chittorgarh 💋 Call Girl 9748763073 Call Girls in Chittorgarh Escort service ...apshanarani255
 
Call Now ☎8264348440|| Call Girls in Mehrauli Escort Service Delhi N.C.R..pdf
Call Now ☎8264348440|| Call Girls in Mehrauli Escort Service Delhi N.C.R..pdfCall Now ☎8264348440|| Call Girls in Mehrauli Escort Service Delhi N.C.R..pdf
Call Now ☎8264348440|| Call Girls in Mehrauli Escort Service Delhi N.C.R..pdfsoniya singh
 
Call Girls In {The Leela Ambience Hotel, Delhi} Call Us !! [ 9667938988 ] Esc...
Call Girls In {The Leela Ambience Hotel, Delhi} Call Us !! [ 9667938988 ] Esc...Call Girls In {The Leela Ambience Hotel, Delhi} Call Us !! [ 9667938988 ] Esc...
Call Girls In {The Leela Ambience Hotel, Delhi} Call Us !! [ 9667938988 ] Esc...aakahthapa70
 
9999266834 Call Girls In Noida Sector 51 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 51 (Delhi) Call Girl Service9999266834 Call Girls In Noida Sector 51 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 51 (Delhi) Call Girl Servicenishacall1
 
💊💊 OBAT PENGGUGUR KANDUNGAN JAMBI 08776558899 ATAU CARA GUGURKAN JANIN KLINIK...
💊💊 OBAT PENGGUGUR KANDUNGAN JAMBI 08776558899 ATAU CARA GUGURKAN JANIN KLINIK...💊💊 OBAT PENGGUGUR KANDUNGAN JAMBI 08776558899 ATAU CARA GUGURKAN JANIN KLINIK...
💊💊 OBAT PENGGUGUR KANDUNGAN JAMBI 08776558899 ATAU CARA GUGURKAN JANIN KLINIK...Cara Menggugurkan Kandungan 087776558899
 
Call Girls Siliguri Just Call 7870993772 Top Class Call Girl Service Availabl...
Call Girls Siliguri Just Call 7870993772 Top Class Call Girl Service Availabl...Call Girls Siliguri Just Call 7870993772 Top Class Call Girl Service Availabl...
Call Girls Siliguri Just Call 7870993772 Top Class Call Girl Service Availabl...Monika Rani
 
MORADABAD CALL GIRL 9661985112 IN CALL GIRLS ESCORT SERVICE
MORADABAD CALL GIRL 9661985112 IN CALL GIRLS ESCORT SERVICEMORADABAD CALL GIRL 9661985112 IN CALL GIRLS ESCORT SERVICE
MORADABAD CALL GIRL 9661985112 IN CALL GIRLS ESCORT SERVICESapna Call girl
 
Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...
Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...
Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...Ifra Zohaib
 
Budaun Call Girl WhatsApp Chat: 📞 8617370543 | Girls Number for Friendship
Budaun Call Girl WhatsApp Chat: 📞 8617370543 | Girls Number for FriendshipBudaun Call Girl WhatsApp Chat: 📞 8617370543 | Girls Number for Friendship
Budaun Call Girl WhatsApp Chat: 📞 8617370543 | Girls Number for FriendshipNitya salvi
 

Recently uploaded (20)

Vidisha ❤CALL GIRL 84099*07087 ❤CALL GIRLS IN Vidisha ESCORT SERVICE❤CALL GIRL
Vidisha ❤CALL GIRL 84099*07087 ❤CALL GIRLS IN Vidisha ESCORT SERVICE❤CALL GIRLVidisha ❤CALL GIRL 84099*07087 ❤CALL GIRLS IN Vidisha ESCORT SERVICE❤CALL GIRL
Vidisha ❤CALL GIRL 84099*07087 ❤CALL GIRLS IN Vidisha ESCORT SERVICE❤CALL GIRL
 
AMBALA CALL GIRL 9661985112 LOW PRICE ESCORT SERVICE AMBALA
AMBALA CALL GIRL 9661985112 LOW PRICE ESCORT SERVICE AMBALAAMBALA CALL GIRL 9661985112 LOW PRICE ESCORT SERVICE AMBALA
AMBALA CALL GIRL 9661985112 LOW PRICE ESCORT SERVICE AMBALA
 
💚Amritsar Call Girls Service 💯Jiya 📲🔝8725944379🔝Call Girls In Amritsar No💰Adv...
💚Amritsar Call Girls Service 💯Jiya 📲🔝8725944379🔝Call Girls In Amritsar No💰Adv...💚Amritsar Call Girls Service 💯Jiya 📲🔝8725944379🔝Call Girls In Amritsar No💰Adv...
💚Amritsar Call Girls Service 💯Jiya 📲🔝8725944379🔝Call Girls In Amritsar No💰Adv...
 
Udaipur Call Girls ☎ 9602870969✅ Just Genuine Call Girl in Udaipur Escort Ser...
Udaipur Call Girls ☎ 9602870969✅ Just Genuine Call Girl in Udaipur Escort Ser...Udaipur Call Girls ☎ 9602870969✅ Just Genuine Call Girl in Udaipur Escort Ser...
Udaipur Call Girls ☎ 9602870969✅ Just Genuine Call Girl in Udaipur Escort Ser...
 
NAGPUR ESCORT SERVICE 9262871154 LOW PRICE NAGPUR ESCORT SERVICE
NAGPUR ESCORT SERVICE 9262871154 LOW PRICE NAGPUR ESCORT SERVICENAGPUR ESCORT SERVICE 9262871154 LOW PRICE NAGPUR ESCORT SERVICE
NAGPUR ESCORT SERVICE 9262871154 LOW PRICE NAGPUR ESCORT SERVICE
 
Chandigarh Call Girls ☎ 9878799926✅ Just Genuine Call Call Girls Mohali 🧿Elit...
Chandigarh Call Girls ☎ 9878799926✅ Just Genuine Call Call Girls Mohali 🧿Elit...Chandigarh Call Girls ☎ 9878799926✅ Just Genuine Call Call Girls Mohali 🧿Elit...
Chandigarh Call Girls ☎ 9878799926✅ Just Genuine Call Call Girls Mohali 🧿Elit...
 
Chandigarh Call Girls ☎ 08868886958✅ Just Genuine Call Call Girls Chandigarh ...
Chandigarh Call Girls ☎ 08868886958✅ Just Genuine Call Call Girls Chandigarh ...Chandigarh Call Girls ☎ 08868886958✅ Just Genuine Call Call Girls Chandigarh ...
Chandigarh Call Girls ☎ 08868886958✅ Just Genuine Call Call Girls Chandigarh ...
 
darjiling ❤CALL GIRL 7870993772 ❤CALL GIRLS ESCORT SERVICE in darjiling Book...
darjiling ❤CALL GIRL 7870993772 ❤CALL GIRLS  ESCORT SERVICE in darjiling Book...darjiling ❤CALL GIRL 7870993772 ❤CALL GIRLS  ESCORT SERVICE in darjiling Book...
darjiling ❤CALL GIRL 7870993772 ❤CALL GIRLS ESCORT SERVICE in darjiling Book...
 
❤️Zirakpur Escort Service☎️7837612180☎️ Call Girl service in Zirakpur☎️ Zirak...
❤️Zirakpur Escort Service☎️7837612180☎️ Call Girl service in Zirakpur☎️ Zirak...❤️Zirakpur Escort Service☎️7837612180☎️ Call Girl service in Zirakpur☎️ Zirak...
❤️Zirakpur Escort Service☎️7837612180☎️ Call Girl service in Zirakpur☎️ Zirak...
 
VIDEO CALL SERVICE CALL GIRL LIVE SERVICE REAL GIRL LIVE VIDEO CALL SERVICE C...
VIDEO CALL SERVICE CALL GIRL LIVE SERVICE REAL GIRL LIVE VIDEO CALL SERVICE C...VIDEO CALL SERVICE CALL GIRL LIVE SERVICE REAL GIRL LIVE VIDEO CALL SERVICE C...
VIDEO CALL SERVICE CALL GIRL LIVE SERVICE REAL GIRL LIVE VIDEO CALL SERVICE C...
 
Call Girls In {The Suryaa New Delhi} Call Us !! [ 9667938988 ] Escort Sevice ...
Call Girls In {The Suryaa New Delhi} Call Us !! [ 9667938988 ] Escort Sevice ...Call Girls In {The Suryaa New Delhi} Call Us !! [ 9667938988 ] Escort Sevice ...
Call Girls In {The Suryaa New Delhi} Call Us !! [ 9667938988 ] Escort Sevice ...
 
chittorgarh 💋 Call Girl 9748763073 Call Girls in Chittorgarh Escort service ...
chittorgarh 💋  Call Girl 9748763073 Call Girls in Chittorgarh Escort service ...chittorgarh 💋  Call Girl 9748763073 Call Girls in Chittorgarh Escort service ...
chittorgarh 💋 Call Girl 9748763073 Call Girls in Chittorgarh Escort service ...
 
Call Now ☎8264348440|| Call Girls in Mehrauli Escort Service Delhi N.C.R..pdf
Call Now ☎8264348440|| Call Girls in Mehrauli Escort Service Delhi N.C.R..pdfCall Now ☎8264348440|| Call Girls in Mehrauli Escort Service Delhi N.C.R..pdf
Call Now ☎8264348440|| Call Girls in Mehrauli Escort Service Delhi N.C.R..pdf
 
Call Girls In {The Leela Ambience Hotel, Delhi} Call Us !! [ 9667938988 ] Esc...
Call Girls In {The Leela Ambience Hotel, Delhi} Call Us !! [ 9667938988 ] Esc...Call Girls In {The Leela Ambience Hotel, Delhi} Call Us !! [ 9667938988 ] Esc...
Call Girls In {The Leela Ambience Hotel, Delhi} Call Us !! [ 9667938988 ] Esc...
 
9999266834 Call Girls In Noida Sector 51 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 51 (Delhi) Call Girl Service9999266834 Call Girls In Noida Sector 51 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 51 (Delhi) Call Girl Service
 
💊💊 OBAT PENGGUGUR KANDUNGAN JAMBI 08776558899 ATAU CARA GUGURKAN JANIN KLINIK...
💊💊 OBAT PENGGUGUR KANDUNGAN JAMBI 08776558899 ATAU CARA GUGURKAN JANIN KLINIK...💊💊 OBAT PENGGUGUR KANDUNGAN JAMBI 08776558899 ATAU CARA GUGURKAN JANIN KLINIK...
💊💊 OBAT PENGGUGUR KANDUNGAN JAMBI 08776558899 ATAU CARA GUGURKAN JANIN KLINIK...
 
Call Girls Siliguri Just Call 7870993772 Top Class Call Girl Service Availabl...
Call Girls Siliguri Just Call 7870993772 Top Class Call Girl Service Availabl...Call Girls Siliguri Just Call 7870993772 Top Class Call Girl Service Availabl...
Call Girls Siliguri Just Call 7870993772 Top Class Call Girl Service Availabl...
 
MORADABAD CALL GIRL 9661985112 IN CALL GIRLS ESCORT SERVICE
MORADABAD CALL GIRL 9661985112 IN CALL GIRLS ESCORT SERVICEMORADABAD CALL GIRL 9661985112 IN CALL GIRLS ESCORT SERVICE
MORADABAD CALL GIRL 9661985112 IN CALL GIRLS ESCORT SERVICE
 
Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...
Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...
Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...
 
Budaun Call Girl WhatsApp Chat: 📞 8617370543 | Girls Number for Friendship
Budaun Call Girl WhatsApp Chat: 📞 8617370543 | Girls Number for FriendshipBudaun Call Girl WhatsApp Chat: 📞 8617370543 | Girls Number for Friendship
Budaun Call Girl WhatsApp Chat: 📞 8617370543 | Girls Number for Friendship
 

SMRT - Your Journey Matters

  • 1. YOUR JOURNEY MATTERS Smoother, safer train rides on the North-South and East-West Lines with SMRT Updated as at: 15 February 2017
  • 2. Introduction To provide the best service to commuters, SMRT has embarked on a multi-year, multi-project effort of upgrading Singapore’s oldest, longest and most heavily utilised MRT lines – the North-South and East-West Lines (NSEWL). © Copyright SMRT Corporation Ltd. 2017. All rights reserved.
  • 3. This multi-year, multi-project effort consists of various programmes: ●  Sleeper replacement, ●  Re-signalling works, ●  Third Rail replacement. Besides these rail renewal projects, there are other works in progress to bring commuters better journeys: ●  Upgrading of older trains, ●  Increasing passenger capacity, ●  Maintenance of escalators, ●  Maintenance of Platform Screen Doors, ●  Maintenance of air conditioning, ●  Escalator Refurbishment Programme. © Copyright SMRT Corporation Ltd. 2017. All rights reserved. Keen to learn more about how these projects will benefit you? Join us, as we explain the work being done through this presentation. Introduction
  • 4. © Copyright SMRT Corporation Ltd. 2017. All rights reserved. The key engineering projects are: Improving the North-South and East-West Lines Result: A better railway system that will allow SMRT to serve you better.
  • 5. © Copyright SMRT Corporation Ltd. 2017. All rights reserved. Improving the North-South and East-West Lines A timeline of the work in progress:
  • 6. © Copyright SMRT Corporation Ltd. 2017. All rights reserved. Improving the North-South and East-West Lines SMRT is also working to address the rail network’s future power needs and minimise the inconvenience resulting from power-related faults by: ●  Renewing power components nearing the end-of-life stage, ●  Increasing the power capacity of the network, ●  Improving the design of the power network.
  • 7. Sleeper Replacement SMRT has worked closely with LTA and rail contractors for the replacement of wooden sleepers on the NSL and the EWL with concrete sleepers. The concrete sleepers are more durable and have a lifespan double that of wooden sleepers. © Copyright SMRT Corporation Ltd. 2017. All rights reserved. The Impact: Journey times on the NSL have been reduced by 10%. The Aim: Ensuring reliability and better availability of train services for our commuters. Resleepering has been completed for NSL in April 2015 and EWL in December 2016. Improving the North-South and East-West Lines
  • 8. © Copyright SMRT Corporation Ltd. 2017. All rights reserved. Improving the North-South and East-West Lines Sleeper Replacement Here are some fun facts!
  • 9. Re-Signalling © Copyright SMRT Corporation Ltd. 2017. All rights reserved. Improving the North-South and East-West Lines The new signalling system uses advanced communications technology on trains. This will update the traffic management system on the identity, location and speed of every train. Progress of re-signalling efforts: ●  85% re-signalling completed on the EWL ●  Re-signalling is expected to be completed on the NSL in 2017 and on the EWL in 2018. The Impact: This will improve the capacity of the NSEWL to run trains at shorter intervals.
  • 10. Third Rail Replacement The Third Rail passes along the rails, and supplies power to the train. The Third Rail Replacement project marks the first network-wide replacement for NSEWL. This project involves: •  Turning off the power, •  Unbolting the old Third Rails, •  Replacing them with new ones, •  Re-connecting the rails to the electricity network. Improving the North-South and East-West Lines . The Impact: This will increase the reliability of the electrical system. The Third Rail © Copyright SMRT Corporation Ltd. 2017. All rights reserved.
  • 11. Upgrading Older Trains The C651 Siemens was introduced in 1994. SMRT is upgrading the 19 C651 trains as they have logged more train faults than other models. When completed in 2018, the upgraded C651 Siemens trains will have: ●  New air conditioning, ●  New electric doors, brakes and propulsion systems, ●  Sensors that furnish the train’s state of health, ●  A makeover for the cabins. © Copyright SMRT Corporation Ltd. 2017. All rights reserved. Improving the North-South and East-West Lines
  • 12. Increasing Passenger Capacity 30 new C151B trains for the NSEWL have been delivered to Bishan and Tuas Depots where they are being fitted out and tested extensively and are designed to operate with the new signalling system. More new trains are on their way to Singapore. © Copyright SMRT Corporation Ltd. 2017. All rights reserved. Improving the North-South and East-West Lines The Impact: There will be a total of 57 new trains, allowing more trains to be run on the NSEWL.
  • 13. Maintaining Our Escalators In January 2016, SMRT awarded OTIS Elevator Co. (S) Pte. Ltd the contract to refurbish 233 escalators from August 2016 to August 2021. The main objectives are: ●  To replace worn-out parts – traction machines, handrail drive, lubrication system and safety switches, ●  To add new safety features – Dual Speed Controller, Variable Speed Device and Balustrade Panels Securing Mechanism. © Copyright SMRT Corporation Ltd. 2017. All rights reserved.
  • 14. SMRT and OTIS jointly commenced the ‘Pre-Start Escalator and Site Survey’ exercise in February 2016, with the objective of assessing and reporting the pre-existing conditions of each escalator. The challenge: This is the first escalator upgrading project to be carried out during service hours. It is being prioritised to speed up work and minimise the impact to commuters. © Copyright SMRT Corporation Ltd. 2017. All rights reserved. Maintaining Our Escalators The Impact: More reliable and safer escalator rides as part of commuters’ daily journeys once all 233 escalators are fully refurbished.
  • 15. Your safety is important! When using escalators, remember: Staying Safe on Escalators © Copyright SMRT Corporation Ltd. 2017. All rights reserved.
  • 16. Keeping Screen Doors Functioning Smoothly As a safety feature, a train cannot depart the station if any of the 24 screen doors in a platform are detected as open. Preventive maintenance of PSDs is done from the platform. It involves: ●  Checking all 24 screen doors, ●  Replacing worn-out parts such as the rubber nose or guard, ●  Cleaning and removing debris, ●  Testing the emergency release lever, ●  Testing the opening and shutting of doors, ●  Observing how the doors interact with incoming trains. © Copyright SMRT Corporation Ltd. 2017. All rights reserved. Did you know that there are 2,880 platform screen doors (PSDs) across the NSEWL?
  • 17. Corrective maintenance on faulty doors requires the team to access the track as the work has to be done on the train- facing side of the doors. A project to replace ageing parts in the doors started in 2015 and is scheduled to complete in early 2017. © Copyright SMRT Corporation Ltd. 2017. All rights reserved. Keeping Screen Doors Functioning Smoothly
  • 18. Improving Our Air Conditioning Air conditioning is crucial in keeping trains cool and comfortable. Here are some facts about the air conditioning in NSEWL Trains: © Copyright SMRT Corporation Ltd. 2017. All rights reserved.
  • 19. Why do aircon faults happen? © Copyright SMRT Corporation Ltd. 2017. All rights reserved. Improving Our Air Conditioning
  • 20. What happens when an aircon fault is detected? © Copyright SMRT Corporation Ltd. 2017. All rights reserved. Improving Our Air Conditioning
  • 21. We are working towards a better air conditioning system for you! © Copyright SMRT Corporation Ltd. 2017. All rights reserved. Improving Our Air Conditioning
  • 22. Coordinating Our Maintenance Efforts To help serve our commuters better, SMRT has set up a Maintenance Operations Centre (MOC). © Copyright SMRT Corporation Ltd. 2017. All rights reserved.
  • 23. Strengthening Our Workforce © Copyright SMRT Corporation Ltd. 2017. All rights reserved. Alongside upgrading of our trains and rail lines, we are working towards strengthening our workforce. •  Reinforcing Our Engineering Workforce – Increasing the number of staff for good working order. •  Engineering Maintenance Manager Role – Upgrading skills of middle management to lead effectively. •  Professional Education – Introducing initiatives to nurture current and future rail professionals.
  • 24. Caring For Our Commuters In the quest to improve and provide outstanding customer service to our passengers, SMRT has launched several programmes since 2014: ●  Care Stickers: To identify passengers who would appreciate a seat ●  Priority Queues: At elevators, for passengers with needs ●  Charging Points: For quick charge of mobile devices ●  Escalator Safety announcements: For the safety of passengers ●  Care Zones: To allow quick responses to passengers who need help © Copyright SMRT Corporation Ltd. 2017. All rights reserved.
  • 25. The transformation of NSEWL is making steady progress. Passengers will be able to enjoy smoother, safer and faster journeys on a modernised rail network with higher levels of reliability and increased capacity. Your Journey Matters to Us... © Copyright SMRT Corporation Ltd. 2017. All rights reserved. And each journey is important to us. Did you know that over 2 million passenger trips are made on the SMRT rail network every day?
  • 26. We seek the continued support of our commuters, as our team works diligently and carefully to deliver a rejuvenated NSEWL that Singaporeans will be proud of. © Copyright SMRT Corporation Ltd. 2017. All rights reserved. Your Journey Matters to Us... Check out this cool ‘doodle video’ on the SMRT rail renewal programme!